Internal Audit Follow-Up Report Facilities Management TxDOT Audit Office Facilities Management TxDOT Internal Audit – MAP Follow-Up Objective Assess the status of corrective actions for high risk Management Action Plans (MAPs) previously communicated in Facilities Management Audit Report issued November 16, 2012. Summary Results Testing included an evaluation of 3 MAPs to determine if corrective actions were implemented as agreed. MAP Status 3 Closed 0 Open 0 New Comments Corrective actions have been completed. Corrective actions that require completion to address identified risks from the original audit report. Corrective actions that were newly identified and further actions are necessary to properly address the remaining risks. Scope The audit was performed by Anuradha Masand and Vivian Cohn (Engagement Lead). The audit was conducted during the period from July 9, 2013 to July 31, 2013. Methodology The audit work included: Reviewing Routine Facility Contract (RFC) Handbook and supplement, RFC Financial Management & Monitoring Standard Operating Procedures (SOP), Facilities Management Equipment Warranty Management SOP, Facilities Management Preventive Maintenance Manual, and Contract Specialist Training Agenda Reviewing RFC SharePoint site Testing sample routine facility contracts for adequate oversight, compliance with applicable Historically Underutilized Business (HUB) requirements, and proper approval on change order Interviewing process owners and key personnel Background This report was prepared for the Transportation Commission, TxDOT Administration and Management. The report presents the results of the Facilities Management Follow-Up Audit Report which was conducted as part of the Fiscal Year 2013 Audit Plan. The Facilities Management (FM) section was responsible for centralized strategic planning, policy making, design & construction, program implementation, and facility asset management of all TxDOT facilities statewide. The FM section was transferred from Maintenance Division (MNT) to Real Estate Management & Development Division (RMD) in August 22, 2013 2 Facilities Management TxDOT Internal Audit – MAP Follow-Up 2013. There are two types of Routine Facility Contract (RFC). RMD manages capital construction RFCs while Support Services Division (SSD) manages capital operation RFCs. Both Divisions were newly established this year. Effectiveness of statewide Preventive Maintenance (PM) program and sustainability of centralized routine facility contract program were not tested due to recent structural changes. We conducted this follow-up engagement in accordance with Generally Accepted Government Auditing Standards and in conformance with the International Standards for the Professional Practice of Internal Auditing. Those standards require that we plan and perform the engagement to obtain sufficient, appropriate evidence to provide a reasonable basis for our conclusions based on our engagement objectives. We believe that the evidence obtained provides a reasonable basis for our conclusions based on our engagement objectives. Closing Comments The results of this MAP Follow-Up engagement were discussed with/provided to Real Estate Management and Development Division and Support Services Division on August 6, 2013. The audit team appreciates the cooperation and assistance received during this engagement. August 22, 2013 3