Unit 16 - Unit recording sheet - Principles of project management (DOC, 137KB)

advertisement
OCR Level 3 Cambridge Technical in Business
Unit 16 Principles of project management
Unit Recording Sheet
This form should be completed by the centre assessor. Please enter specific page numbers where evidence can be found in the portfolio, or where electronic evidence is being submitted, the location of this.
One of these sheets should be attached to the assessed work of each candidate.
Unit Title Principles of project management
Unit Code
M/507/8163
Year
Centre Name
Centre Number
Candidate Name
Candidate Number
2
0
1
Grading Criteria - The Learner can:
Pass
The grading criteria are the pass requirements for this unit. In order to achieve a pass
grade, all pass criteria must be achieved.
Grading
Criteria
achieved ()
Teacher comment
Page
No./Evidence
location
Learning Outcome 1: Understand the stages of project management
P1:
Explain the stages of project management used in a specific business project
Learning Outcome 2: Understand the skills project managers need to have
P2:
Explain the skillset a project manager needs to have and why
Learning Outcome 3: Understand how and why projects are monitored and
factors that influence a project
P3:
Explain how the factors that influence or present a risk to a specific project are
monitored
Learning Outcome 4: Be able to prepare project plans
P4:
Prepare a project plan for a specific project
P5:
Justify the choice of the project plan tool(s) used
Version 01
Oxford Cambridge and RSA Examinations
M/507/8163/URS
Grading Criteria - The Learner can:
Merit Criteria
The grading criteria are the merit requirements for this unit. In order to achieve a merit
grade, all merit criteria must be achieved and all pass criteria must also have been
achieved.
Grading
Criteria
achieved ()
Page
Teacher comment
No./Evidence
location
Learning Outcome 3: Understand how and why projects are monitored
and factors that influence a project
M1:
Analyse the factors that influence, and the factors that present a risk to, a
specific project and explain the potential impact(s) on the project
Learning Outcome 4: Be able to prepare project plans
M2:
Explain how the risks to a specific project could be mitigated
Version 01
Oxford Cambridge and RSA Examinations
M/507/8163/URS
Grading Criteria - The Learner can:
Distinction Criteria
Grading
The grading criteria are the distinction requirements for this unit. In order to achieve a
distinction grade, all distinction criteria must be achieved and all merit and pass criteria
must also have been achieved.
Page
Criteria
achieved ()
Teacher comment
No./Evidence
location
Learning Outcome 3: Understand how and why projects are monitored
and factors that influence a project
D1:
Evaluate the effectiveness of the methods used for monitoring a specific project
Learning Outcome 4: Be able to prepare project plans
D2:
Evaluate the impact on a specific project if contingencies have to be
implemented
OVERALL GRADE (P,M or D)
I confirm that:

the candidate’s work is solely that of the candidate concerned and was conducted under the required conditions as laid down in the qualification
handbook;

internal standardisation has been carried out and that all grades have been correctly recorded and accurately transcribed to the claim being
submitted to OCR.
Completed by:
Please note:
Date :
This form may be updated on an annual basis. The current version of this form will be available on the OCR website (www.ocr.org.uk).
Version 01
Oxford Cambridge and RSA Examinations
M/507/8163/URS
Download