OCR Level 3 Cambridge Technical in Business Unit 16 Principles of project management Unit Recording Sheet This form should be completed by the centre assessor. Please enter specific page numbers where evidence can be found in the portfolio, or where electronic evidence is being submitted, the location of this. One of these sheets should be attached to the assessed work of each candidate. Unit Title Principles of project management Unit Code M/507/8163 Year Centre Name Centre Number Candidate Name Candidate Number 2 0 1 Grading Criteria - The Learner can: Pass The grading criteria are the pass requirements for this unit. In order to achieve a pass grade, all pass criteria must be achieved. Grading Criteria achieved () Teacher comment Page No./Evidence location Learning Outcome 1: Understand the stages of project management P1: Explain the stages of project management used in a specific business project Learning Outcome 2: Understand the skills project managers need to have P2: Explain the skillset a project manager needs to have and why Learning Outcome 3: Understand how and why projects are monitored and factors that influence a project P3: Explain how the factors that influence or present a risk to a specific project are monitored Learning Outcome 4: Be able to prepare project plans P4: Prepare a project plan for a specific project P5: Justify the choice of the project plan tool(s) used Version 01 Oxford Cambridge and RSA Examinations M/507/8163/URS Grading Criteria - The Learner can: Merit Criteria The grading criteria are the merit requirements for this unit. In order to achieve a merit grade, all merit criteria must be achieved and all pass criteria must also have been achieved. Grading Criteria achieved () Page Teacher comment No./Evidence location Learning Outcome 3: Understand how and why projects are monitored and factors that influence a project M1: Analyse the factors that influence, and the factors that present a risk to, a specific project and explain the potential impact(s) on the project Learning Outcome 4: Be able to prepare project plans M2: Explain how the risks to a specific project could be mitigated Version 01 Oxford Cambridge and RSA Examinations M/507/8163/URS Grading Criteria - The Learner can: Distinction Criteria Grading The grading criteria are the distinction requirements for this unit. In order to achieve a distinction grade, all distinction criteria must be achieved and all merit and pass criteria must also have been achieved. Page Criteria achieved () Teacher comment No./Evidence location Learning Outcome 3: Understand how and why projects are monitored and factors that influence a project D1: Evaluate the effectiveness of the methods used for monitoring a specific project Learning Outcome 4: Be able to prepare project plans D2: Evaluate the impact on a specific project if contingencies have to be implemented OVERALL GRADE (P,M or D) I confirm that: the candidate’s work is solely that of the candidate concerned and was conducted under the required conditions as laid down in the qualification handbook; internal standardisation has been carried out and that all grades have been correctly recorded and accurately transcribed to the claim being submitted to OCR. Completed by: Please note: Date : This form may be updated on an annual basis. The current version of this form will be available on the OCR website (www.ocr.org.uk). Version 01 Oxford Cambridge and RSA Examinations M/507/8163/URS