College of Engineering Department: Mechanical Engineering Course : Computer aided Manufacturing (ME 415) Duration: 45 Minutes. Attempt all the questions: Quiz: Date: March 4, 2014 Marks : 10 QN1. For the three types of production systems, Job shop, Batch and Mass production, mark the level of requirement as ‘H’ for high, ‘M’ for Medium and ‘L’ for Low against the criterion given below. [1] Criterion Production Quantity (H, M, and L) Job variety Labor Skill Equipment Job Shop o o o o o o o o o o o o Batch Production H M L H M L H M L General Special purpose o o o o o o o o o o o o Mass production H M L H M L H M L General Special purpose o o o o o o o o o o o o H M L H M L H M L General Special purpose b. Define the followings terms: Processing function, material handling, inspection and test [2] QN2. Write brief about the followings: Fixed automation, Flexible automation, and Programmable automation [2] QN3. There are 4 jobs to be processed on 4 machines in a flow shop. The process times for all jobs at each machine are given in the accompanying table. [1+2] Find out the lower bounds on each machines. And find out the sequence of jobs for optimal make span time. Job1 J2 J3 J4 Machine M1 2 hrs 1 6 4 M2 3 4 3 2 M3 1 8 5 3 M4 5 5 2 7 QN4. There are 3 jobs arrived in the system. The sequencing of jobs on machine ‘B’ has to be done based on rules. The current time is 10hr. [2] Job Arrival to system Arrival at B Due Date Operations and timings 1 5 Hrs 10 Hrs 30 hrs B-5hrs A 2 hrs D 5 hrs 2 4 5 25 D-3 hrsB-3 hrsC-2 hrsA-1 hr 3 0 5 20 E-4 hrsB-4 hrs Based on slack per remaining operations, least work remaining find the sequence at machine B.