Office of Learning Oregon Department of Education Carl D. Perkins Career & Technical Education Act of 2006 2014-2015 Update to the Perkins IV Local 5-Year Plan Local Improvement Plan Basic Annual Application And Annual Report It is the policy of the State Board of Education and a priority of the Oregon Department of Education that there will be no discrimination or harassment on the grounds of race, color, religion, sex, sexual orientation, national origin, age or disability in any educational programs, activities or employment. Persons having questions about equal opportunity and nondiscrimination should contact the Deputy Superintendent of Public Instruction with the Oregon Department of Education, 255 Capitol Street NE, Salem, Oregon 97310; Phone: 503-947-5740; or Fax: 503-378-4772. The CTE brand logo, brand-positioning, theme, and brand extensions are the property of NASDCTEc This document includes the following sections: Introduction o Submission Instructions Cover Page Local or Consortium Basic Grant Plan and Annual Report o Program Design Performance Overview to the Local Plan Update Summary Report of 2014-2015 CTE Strategies and Accomplishments 1. Standards and Content (SC) 2. Alignment and Articulation (AA) 3. Accountability and Evaluation (AE) Perkins Performance Measures 4. Student Support Services (SS) (for designated CTE Programs of Study) 5. Professional Development (PD) o Local Improvement Planning Process o Consortium Regional Investment Planning 2014-2015 Perkins IV Basic Grant Budget Spending Report 2014-2015 Perkins IV Basic Grant Equipment & Non-Consumable Supply Inventory Introduction This Introduction is a general overview of the 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application and Annual Report. For the purposes of this document, the 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application and Annual Report will be referred to by the short title of the Local Plan Update. For complete instructions on filling out this document, see the Guide to the 2014-2015 Perkins IV Basic Grant Application and Annual Report, available on the Oregon Department of Education (ODE) website at http://www.ode.state.or.us/search/page/?id=1625. For the purposes of this document, the Guide to the 2014-2015 Perkins IV Basic Grant Application and Annual Report will be referred to by the short title of the Guide. The focus of the Local Plan Update is on activities related to local secondary and postsecondary component designs for CTE Program of Study (POS) implementation. A minimum of 10% of the funds are required to be designated to professional development. (Reminder: This is 10% of the grant amount, but funding may be leveraged from other sources). Each year of the Perkins IV authorization a detailed local plan updating the initial 5-year plan and previous updates has been submitted. The intent has been to reflect a single, 5-year plan that is updated annually, not a collection of five 1-year plans. Local Plan Updates will continue to update the 5-year plan annually, until the reauthorization of the Carl D. Perkins Act. The Annual Report has been integrated into the Local Plan Update. The report sections may be completed throughout the program year as activities are completed. The Annual Report is due Monday, November 16, 2015. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 i Program Design Performance: The Overview to the Local Plan Update is an opportunity to provide readers with the background and context to better understand the status of your plan. Each Core Element must address at least one Indicator through at least one Planned Activity; welldesigned SMART Goals will help you evaluate how successful your planning strategies were. (For more information about SMART Goals refer to the Guide.) If you are repeating an activity, please explain why you are repeating it. Include a discussion of the clearly measurable effectiveness that influenced your decision to repeat it, as well as an explanation of any enhancements to the activity. Planned Activities are required for Perkins Performance Measures that do not meet the 90% threshold rule. It is highly recommended that a detailed activity be included for any Perkins Performance Measure that has not been met by a comfortable margin. Local Improvement Planning Process: This section will inform readers of the planning process used to create the plan and who was involved. Please note that Trend Data Worksheets are required for any Perkins Performance Measure that did not meet the 90% threshold. Consortium Regional Investment Planning (Required for Consortium Basic Grant Plans ONLY): The Consortium Member Roster provides a quick look at who is involved in consortium planning and their role. When submitting the application, please attach a signed copy of the complete consortium operational agreement and copies of job descriptions of staff funded by the consortium (for more information refer to the Guide). Annual Report: The Annual Report is integrated into the Local Plan Update. A section labeled “Summary Report” is provided for the Overview to the Local Plan Update; sections labeled “Report” are provided for each Smart Goal, Indicator, Performance Measure, and Planned Activity; the 2014-2015 Perkins IV Basic Grant Budget Spending Report and the 2014-2015 Perkins IV Basic Grant Equipment & Non-Consumable Supply Inventory are at the end of the document. These sections may be completed throughout the program year as activities are completed. The Annual Report is due Monday, November 16, 2015. Statement of Assurances: All eligible recipient fiscal agents must submit a Perkins Statement of Assurances signed by the eligible recipient’s highest level administrator. The Statement of Assurances submitted during the CIP Budget Narrative process will also apply to the Local Plan Update and Annual Report. Statement of Assurances can be found here: http://www.ode.state.or.us/teachlearn/pte/perkins-annual-assurance-5-2113-rev.doc. Special Notes Purchasing equipment is not an activity, but may support an activity. Please limit the Local Plan Update to activities; list all planned equipment purchases in the Budget Narrative and Spending Workbook. Any budget changes of 10% or more must be approved in advance by ODE staff. Since the Local Plan Update is intended to be a planning document for all activities that will address CTE priorities, activities that will not use Perkins funding may be included. Any changes to the Local Plan Update must be approved in advance by ODE staff. (For more information, contact Donna Brant, 503-947-5622, donna.brant@state.or.us) FAILURE TO RECEIVE ADVANCE APPROVAL FOR CHANGES MAY RESULT IN LOSS OF FUNDS Publication Information The Oregon Department of Education (ODE) may publish your Local Plan Update, in complete or in part, on ODE’s Web site or through other means available to us. We look forward to reviewing your local plan and initiatives to implement the Act in the coming years. ODE CTE Program Staff are available to answer questions that arise as you update and revise your plan. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 ii Back to Introduction SUBMISSION INSTRUCTIONS Completed Local Plan Updates shall be submitted no later than close of business (5:00 pm PST) on Monday, June 30, 2014. The Local Plan Update, including cover page, is to be submitted electronically as an attachment to an e‐mail. Hard copy original of cover page and signed assurance should be mailed to the submission address below. Electronic Submission Address: Hard Copy Submission Address: Perkins.Submit@state.or.us Barbara O’Neill Office of Learning Instruction, Standards, Assessment & Accountability Unit Oregon Department of Education 255 Capitol Street NE Salem, OR 97310-0203 503-947-5787 Questions? Local Plan Update: Michael Fridley , Education Specialist michael.fridley@state.or.us 503-947-5660 Budget Narrative & Spending Workbook: Reynold Gardner, Education Specialist reynold.gardner@state.or.us 503-947-5615 State CTE Staff List 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 iii Cover Page Carl D. Perkins Career and Technical Education Act of 2006 2014-2015 Update to Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Back to Introduction Agency Name, Address and Authorizing Signature of Eligible Recipient: PACTEC, Portland Community College Eligible Recipient Agency Name P.O. Box 19000 Mailing Address, City & ZIP Portland, OR 97280 Authorizing Signature (Chief Administrator) June, 27, 2014 Date Fiscal Agent Person at, or representing, the eligible agency responsible for answering questions about this plan: AUTHORIZED REPRESENTATIVE Name: Position: Telephone: Email: FISCAL AGENT Kendra Cawley Dean of Academic Affairs 971-722-4481 kcawley@pcc.edu Name: Position: Telephone: Email: Jim Langstraat Associate VP of Finance 971-722-2913 Jim.langstraat@pcc.edu Type of 2014-2015 Perkins IV Local Plan Update/Application: Direct Secondary School District Basic Plan Consortium Basic Plan Direct Community College Basic Plan Complete the following: Local Plan Update Budget Narrative & Spending Workbook (Submitted Online) Complete the following: Local Plan Update Budget Narrative & Spending Workbook (Submitted Online) Consortium Operations Agreement Job Description(s) for consortium funded staff Complete the following: Local Plan Update Budget Narrative & Spending Workbook (Submitted Online) 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 1 Local or Consortium Basic Grant Plan and Annual Report Back to Introduction PROGRAM DESIGN PERFORMANCE (For guidance in completing this section refer to the Guide.) Overview to the Local Plan Update Identify major opportunities and challenges that are addressed in this plan Opportunities that will be leveraged/connections that will be made/collaborations that will be pursued: PACTEC has dynamic programs experiencing a great deal of success in their work. We will continue to support teachers in their efforts to continue and improve their work and to keep their programs up-to-date, and with strong industry connections. We have some very strong regional advisory committees that work in conjunction with the community college’s advisory committee. The strongest would be our Machine Manufacturing and Early Childhood Education programs. We look toward making similar connections in other CTE subject areas. We have interest in developing some new programs of study and have submitted paperwork for some of those this year. Additionally, PCC will now be articulating Math 95. Students who take and complete that course will graduate from high school having completed the math required for nearly all CTE Associates degrees at PCC. Nearly all of our programs have articulations with PCC. We added Multimedia to our list of articulations this year and had productive work sessions between the college and high school faculty of this subject area. The worked together to identify courses that are a logical part of the program at the college and give students a strong foundation in the subject. This collaborative model helped all involved to feel confident about the partnership being developed and the quality of work that was being done. The only other program not currently articulated with PCC is our Culinary/Hospitality program. Since MHCC is discontinuing their culinary program we will be looking elsewhere for alignment and articulation. One of our teachers is attending professional development at both of the potential colleges that offer the program so that our culinary teachers can make that decision when they return to school next fall. Challenges that will be addressed: The fact that the regional coordinator for PACTEC is new to the position, accompanied with new people in the Hillsboro and Forest Grove School Districts is a challenge. Navigating some of the technological issues that have arisen this year will hopefully be easier. A mentorship model for regional coordinators would be a good idea! The change in staff in the PACTEC program was a challenge as well. We hope that we have found stability for next year. Our Non-trad coordinator will transition next year to providing career pathways services to more than just non-trad students. Next year we have several new teachers replacing those who have retired. Many of them are currently hired, however several are still undecided for next year. Providing support and opportunities for networking and professional development will be addressed. Briefly describe the work of your school, district, or consortium in developing, implementing, and maintaining CTE Programs of Study PACTEC has been working with districts to increase or strengthen their CTE programs this year. Three schools received CTE Revitalization grants and we have supported them in this process and continue to support their efforts at implementation. The regional coordinator visited all of the programs this year, talked with teachers and students and checked in with the administration to build solid connections. Participating in the regional Manufacturing Advisory Board helps to create support for area manufacturing programs. Industry members have been extremely helpful in guiding 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 2 programs to align with current trends in industry. We plan a CTE/Dual Credit Symposium in August to kick-off the year. The power of seeing the vast number of participants together is much stronger than smaller meetings. Administrators and counselors are also invited to attend and this helps to start the process of reframing the importance of CTE in schools. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 3 Summary Report of 2014-2015 CTE Strategies and Accomplishments – DUE MONDAY, NOVEMBER 16, 2015 Back to Introduction (For guidance in completing this section refer to the Guide.) Exemplary activity/highlight of the year: Opportunities leveraged/connections made/collaborations that were useful: Major challenges, both met and unmet: OTHER SUPPORTED ACTIVITIES Number Joint high school and community college advisory committees established during the 2014-2015 program year. [HB 2912] Indicate any of these activities that you have supported during the 2014-2015 program year by marking “X” in the Supported column. Activity Supported Efforts to improve the recruitment and retention of CTE teachers, faculty, administrators, and counselors, including individuals in groups underrepresented in the teaching profession. [Section 134(b)(12)] Efforts to improve the transition to teaching from business and industry. [Section 134(b)(12)(B)] Efforts to develop, improve, or expand the use of technology in CTE. [Section 135(b)(4)] Efforts to initiate, improve, expand, and modernize quality CTE programs (including relevant technology). [Section 135(b)(7)] 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 4 1. Standards and Content Back to Introduction (For guidance in completing this section refer to the Guide.) Indicators for quality local plans and local use of Perkins funds. Choose at least one that you will address through the activities below. Indicator SC1 SC2 SC3 SC4 SC5 CTE Programs of Study align with Oregon Skill Sets or other industry-based standards. Coherent and rigorous content aligned with challenging academic standards is integrated with relevant CTE programs. CTE students are taught to the same coherent and rigorous content aligned with challenging academic standards as are taught to all students. CTE students are provided with the academic and career and technical skills (including the mathematics and science knowledge that provides a strong basis for such skills) that lead to entry into the technology fields. CTE Programs of Study use relevant technology that directly supports increasing student academic knowledge and technical skill attainment. Source Goal 1a Sections 34(b)(3)(B), 135(b)(1) Section 134(b)(3)(D) Section 135(b)(4)(B) Goal 1b Discuss your status on the Indicator(s) you have chosen as your focus. Include the reasons you chose each Indicator. SC5 - CTE Programs of Study use relevant technology that directly supports increasing student academic knowledge and technical skill attainment. Programs of study in PACTEC’s region currently strive to implement and utilize relevant technology to teach students using industry standards. All CTE teachers meet with their Regional Advisory Committees to maintain Current Status of Indicator links with their industry partners to assure that items that they plan on including in their programs meet industry standards. Indicator Perkins IV Basic Grant Plan for Indicator 18 PACTEC area CTE Programs will integrate new technology based on industry partner recommendations in SMART Goal for Indicator order to adequately teach industry standards and prepare students for related careers as demonstrated through increased Technical Skills Attainment Performance from 78.2% to 83% by June, 2015. Evidence That Will Show Increase Technical Skills Attainment Performance from 78.2% to 83% Achievement of Goal Report on SMART Goal and Status of Indicator – Due Monday, November 16, 2015 Planned Activity #1 CTE teachers will meet with industry partners at least once, by advisory committee areas, to establish a plan for Description of Planned Activity to implementing new technology in the classroom. In addition the plan will determine future needs for professional Achieve SMART Goal development, and identify additional technology needs. Evidence That Will Show “Using New Technology Plan” is drafted and implemented. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 5 Success of Activity Increase Technical Skills Attainment Performance from 78.2% to 83%. The “Using New Technology Plan” includes: i) how to implement technology, ii) determine future needs for professional development, and iii) identify additional technology needs. Briefly describe how you will ensure maintenance or continuous improvement on the Indicators on which you have chosen to focus. Indicator SC5- CTE Programs of Study use relevant technology that directly supports increasing student academic knowledge and technical skill attainment. Plan for Maintenance or Continuous Improvement in 2015-2016 PACTEC instructors consistently evaluate the content of their programs based on input from the advisory committee, participation in professional development events, and sharing between teachers. The result is continuous improvement that requires ongoing funding to maintain alignment with industry standards. Each year we provide teachers with an opportunity to access funding to purchase equipment, curriculum development and other needs to improve Programs of Study and maintain alignment with industry needs. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 6 Back to Introduction 2. Alignment and Articulation (For guidance in completing this section refer to the Guide.) Indicators for quality local plans and local use of Perkins funds. Choose at least one that you will address through the activities below. Indicator Source AA1 CTE is linked at the secondary and postsecondary levels. Section 135(b)(2) AA2 CTE Programs of Study operate with signed alignment agreements. Goal 2a AA3 CTE Programs of Study operate with signed articulation agreements. CTE Programs of Study lead to an industry-recognized, postsecondary certificate or degree in a high wage, high demand occupation based on regional or state labor market information. Goal 2b AA4 Goal 2c Discuss your status on the Indicator(s) you have chosen as your focus. Include the reasons you chose each Indicator. Indicator AA2 CTE Programs of Study operate with signed alignment agreements. CTE Programs in the PACTEC region are aligned with post secondary programs at cooperating colleges. 70% of PACTEC CTE programs of study have dual credit status. Tigard Automotive, and St. Helens and Tualatin Current Status of Indicator Hospitality and Tourism will need to establish new articulations due to changes in staffing or college offerings. St. Helens Office Systems and Scappoose Manufacturing are also poised to begin developing articulations. Perkins IV Basic Grant Plan for Indicator CTE classes in Automotive, Office Systems, Manufacturing, and Culinary will be approved for dual credit status SMART Goal for Indicator at PCC or a cooperating college by the end of the 2014-15 school year to help prepare students for a smooth transition to post secondary education as measured by signed articulation agreements. Completion of articulation agreements for those subject areas Evidence That Will Show Syllabi for course articulation available to students Achievement of Goal Credits will be awarded to students completing CTE coursework eligible for dual credit Description of Planned Activity to Achieve SMART Goal Evidence That Will Show Success of Activity Planned Activity #1 The PCC dual credit manager and PCC Dual Credit Coordinator will meet with the high school CTE departments that are not currently articulated to develop a strategic plan to work toward approval. The strategic plan will be developed A timeline for submitting materials will be drafted and shared with participants Planned Activity #2 Description of Planned Activity to PACTEC will host a meeting for teachers, and fund their attendance to said meeting, to help them get the Achieve SMART Goal documentation in order to prepare them for approval to offer dual credit for their classes. The strategic plan and 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 7 timeline for approval will be shared. Those agreements will then be submitted for approval. Evidence That Will Show Success of Activity Teachers will commit to completing and submitting the required materials for articulation Additional articulation agreements in place. Students will be eligible to earn college credit for their articulated courses. Briefly describe how you will ensure maintenance or continuous improvement on the Indicators on which you have chosen to focus. Indicator Plan for Maintenance or Continuous Improvement in 2015-2016 AA2 CTE Programs of Study operate with signed alignment agreements. As teachers retire or change course alignment, the articulation process needs to be revisited. We have a coordinator now that focuses on CTE and will be able to do more outreach to provide support to teachers. This will be an important part of our continued improvement. We will continue to build industry partnerships, provide ongoing professional development to provide the skills necessary so that teachers are prepared to teach with the appropriate level of rigor for an articulated course. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 8 Back to Introduction 3. Accountability and Evaluation (For guidance in completing this section refer to the Guide.) Indicators for quality local plans and local use of Perkins funds. Choose at least one that you will address through the activities below. Indicator AE1 AE2 AE3 AE4 AE5 Source Evaluations of the CTE programs carried out with funds under Perkins IV are developed and implemented, including an assessment of how the needs of special populations are being met. Stakeholders are involved in the development, implementation, and evaluation of CTE programs. Section 135(b)(6) Stakeholders are informed about, and assisted in understanding, the Perkins law and CTE Programs of Study. CTE concentrators who complete the secondary or postsecondary component of their Program of Study demonstrate performance on valid and reliable technical skill assessments that align to industry-based standards. Secondary CTE concentrators who complete the secondary component of their Program of Study do not require remediation at postsecondary entry. Section 134(b)(5) Section 134(b)(5) Goal 3a Goal 3b Discuss your status on the Indicator(s) you have chosen as your focus. Include the reasons you chose each Indicator. AE4 CTE concentrators who complete the secondary or postsecondary component of their Program of Study Indicator demonstrate performance on valid and reliable technical skill assessments that align to industry-based standards. Currently all CTE programs in Region 2A have an ODE approved TSA or use an approved third party test such as NOCTI. Some schools are small and do not have completers every year. The assessments require ongoing Current Status of Indicator maintenance to remain current with industry standards and to evaluate the results of the assessments and make adjustments to program content based on the results. Perkins IV Basic Grant Plan for Indicator PACTEC CTE students will demonstrate acquisition of technical skill content on a valid and reliable assessment SMART Goal for Indicator as evidenced by meeting the Performance Target for 2S1 measure by increasing from 78.2% to 82% during the 2014-15 school year. Evidence That Will Show Performance on 2S1 performance measures upon completion of the TSA’s will increase by 3.8%. Achievement of Goal Description of Planned Activity to Achieve SMART Goal Evidence That Will Show Success of Activity Planned Activity #1 Review data with consortium members and direct resources or develop strategies to enhance areas identified as needing improvement. Analysis and discussion conducted by teachers and advisory groups of the TSAs will be used to determine the effectiveness of the current tools. Modifications, if needed, will be made. Report on Planned Activity – Due Monday, November 16, 2015 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 9 Description of Planned Activity to Achieve SMART Goal Evidence That Will Show Success of Activity Planned Activity #2 CTE programs will evaluate the current TSAs being utilized in their POSs update, revise or adopt new testing tools. Better alignment with industry standards will help teachers focus their teaching on relevant information and skills. TSA’s will be closely aligned with industry standards Improved performance by students on 2S1 as reported by the state. Report on Planned Activity – Due Monday, November 16, 2015 Briefly describe how you will ensure maintenance or continuous improvement on the Indicators on which you have chosen to focus. Indicator AE4 CTE concentrators who complete the secondary or postsecondary component of their Program of Study demonstrate performance on valid and reliable technical skill assessments that align to industry-based standards. Plan for Maintenance or Continuous Improvement in 2015-2016 As industry standards change, so should the tests that measure proficiency of those skills. Ongoing work with our regional advisory committees, college faculty, and high school teachers will improve the assessment process for students. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 10 Perkins Performance Measures Back to Introduction (For guidance in completing this section refer to the Guide.) Indicator AE6 CTE Programs of Study meet state-approved levels of performance on Perkins IV core indicators of performance. Source Goal 3c Include at least one Planned Activity for each Performance Measure that did not meet the 90% threshold. Performance Measure 6S1 Secondary Non-Traditional Participation Region 2A – 32.1% Target – 37.5% Statewide – 39.9% Current Performance Banks SD 13 Gaston SD 511J Scappoose SD 1J Sherwood SD 88J St Helens SD 502 Tigard-Tualatin SD 23J Vernonia SD 47J 29.41% 14.29% 16.67% 22.06% 28.45% 38.77% 40.00% Perkins IV Basic Grant Plan for Performance Measure SMART Goal for Performance Non-Trad student participation will increase from 32.1% to 37.5% during the 2014-15 School year. Measure Evidence That Will Show Data reported during spring reporting from the 90% reports from ODE will provide evidence. Achievement of Goal Planned Activity #1 Description of Planned Activity to Achieve SMART Goal Evidence That Will Show Success of Activity PACTEC will host professional development for CTE teachers and counselors to develop strategies to increase non-trad participation in CTE classes. Each POS will develop one goal to address non-trad participation during the year. Pre and Post surveys related to non trad participation completed by participants will help to identify the change in understanding related to supporting non-trad students The development of a relevant goal to increase non-trad participation Planned Activity #2 Description of Planned Activity to PACTEC will sponsor non-trad visits to PCC and/or non-trad community events. Counselors and CTE teachers 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 11 Achieve SMART Goal from the targeted high schools will be encouraged to attend as well. Evidence That Will Show Success of Activity Participation by students at the events. Increased participation in CTE courses Briefly describe how you will ensure maintenance or continuous improvement on each Performance Measure addressed above. Performance Measure 6S1 Secondary Non-Traditional Participation Plan for Maintenance or Continuous Improvement in 2015-2016 We have a well-developed model and staffing to make this successful. By enlisting the counselors to participate in this program we hope we’ll have lasting effect to increase participation. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 12 4. Student Support Services (for designated CTE Programs of Study) Back to Introduction (For guidance in completing this section refer to the Guide.) Indicators for quality local plans and local use of Perkins funds. Choose at least one that you will address through the activities below. Indicator SS1 SS2 SS3 SS4 CTE programs are reviewed and strategies are identified and adopted to overcome barriers that result in lowering rates of access to, or lowering success in, the programs for special populations. CTE Programs of Study provide each student with appropriate accommodations and barrier-free access to CTE learning environments for high wage, high demand careers that lead to self-sufficiency. Individuals who are members of special populations are not discriminated against on the basis of their status as members of the special populations. Special populations, including single parents and displaced homemakers, are prepared for high skill, high wage, or high demand occupations that will lead to self-sufficiency. SS5 Programs are designed to enable the special populations to meet the local adjusted levels of performance. SS6 CTE Programs of Study provide students with access to educational opportunities for careers that are nontraditional for a student’s gender. Preparation for non-traditional fields is promoted. SS7 SS8 Source Section 134(b)(8)(A) Goal 4b Section 134(b)(9) Sections 134(b)(8)(C), 135(b)(9) Section 134(b)(8)(B) Goal 4a Section 134(b)(10) SS9 Career guidance and academic counseling are provided to CTE students, including linkages to future education and training opportunities. Secondary CTE students are encouraged to enroll in rigorous and challenging courses in core academic subjects. SS10 CTE Programs of Study provide students with relevant career-related learning experiences. Section 134(b)(3)(E) Goal 4a SS11 CTE Programs of Study provide postsecondary students with cooperative work experience. Goal 4a SS12 Section 135(b)(4)(C) SS13 The use of technology in CTE – which may include encouraging schools to collaborate with technology industries to offer voluntary internships and mentoring programs, including programs that improve the mathematics and science knowledge of students – is being developed, improved, or expanded. Students are provided with strong experience in, and understanding of, all aspects of an industry. SS14 CTE Programs of Study provide secondary students with student leadership opportunities. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Section 134(b)(11) Sections 134(b)(3)(C), 135(b)(3) Goal 4a Page 13 Discuss your status on the Indicator(s) you have chosen as your focus. Include the reasons you chose each Indicator. Indicator SS14 CTE Programs of Study provide secondary students with student leadership opportunities. Several programs participate in student leadership organizations. However, there is room for increase and to Current Status of Indicator share the accomplishments of students in those organizations. Collecting accurate information about the organizations currently in existence is an important first step. Perkins IV Basic Grant Plan for Indicator Participation of students in CTE student leadership organizations will increase by 10% during the 2014-15 SMART Goal for Indicator school year. An increase in the number of teachers identified as advisors. Evidence That Will Show Increase in participation by students in student leadership organizations Achievement of Goal Planned Activity #1 Professional development opportunities directly related to establishing a CTSO and how to increase student Description of Planned Activity to involvement in CTSO’s will be presented at least once during the school year. CTSO state representatives, Achieve SMART Goal other CTSO sponsoring advisors will share their experiences and tips for using CTSOs to strengthen programs. CTE teachers will develop a strategic plan to begin a student leadership organization in their POS. Evidence That Will Show A timeline and “Steps to Success” in establishing a CTSO will be developed by region POS for this year. Success of Activity Description of Planned Activity to Achieve SMART Goal Evidence That Will Show Success of Activity Planned Activity #2 Student accomplishments related to CTSO’s will be shared during the annual awards ceremony to highlight the achievements of students during the 2014-15 school year. Student recognition and sharing of accomplishments with students, teachers and family members will celebrate achievements. Briefly describe how you will ensure maintenance or continuous improvement on the Indicators on which you have chosen to focus. Indicator Plan for Maintenance or Continuous Improvement in 2015-2016 SS14 CTE Programs of Study provide secondary students with student leadership opportunities. Ongoing support and encouragement in participation of students in CTSO’s will need to be fostered. Professional Development, opportunities for funding through grants or school support is important. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 14 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 15 Back to Introduction 5. Professional Development (For guidance in completing this section refer to the Guide.) Indicators for quality local plans and local use of Perkins funds. Choose at least one that you will address through the activities below. Indicator PD1 PD2 PD3 PD4 PD5 PD6 PD7 PD8 PD9 PD10 PD11 Comprehensive professional development (including initial teacher preparation) for career and technical education, academic, guidance, and administrative personnel is provided that promotes the integration of coherent and rigorous content aligned with challenging academic standards and relevant career and technical education (including curriculum development). Professional development programs that are consistent with section 122 are provided to secondary and postsecondary teachers, faculty, administrators, and career guidance and academic counselors who are involved in integrated career and technical education programs, including in-service and pre-service training on effective integration and use of challenging academic and career and technical education provided jointly with academic teachers to the extent practicable. In-service and pre-service training is provided on effective teaching skills, based on research that includes promising practices. In-service and pre-service training is provided on effective practices to improve parental and community involvement. In-service and pre-service training is provided on effective use of scientifically based research and data to improve instruction. Education programs are supported for teachers of CTE in public schools and other public school personnel who are involved in the direct delivery of educational services to CTE students, to ensure that such teachers and personnel stay current with all aspects of an industry. Professional development programs are provided, including internship programs that provide relevant business experience. Programs are provided to train teachers specifically in the effective use and application of technology to improve instruction. The use of technology in CTE – which may include training of CTE teachers, faculty, and administrators to use technology (which may include distance learning) – is being developed, improved, or expanded. Secondary CTE teachers follow a formal, professional development plan focused on instruction. Postsecondary CTE teachers participate annually in formal, program-related professional development focused on instruction. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Source Section 134(b)(4); Goal 5a Section 135(b)(5)(A)(i) Section 135(b)(5)(A)(ii) Section 135(b)(5)(A)(iii) Section 135(b)(5)(A)(iv) Section 135(b)(5)(B) Section 135(b)(5)(C) Section 135(b)(5)(D) Section 135(b)(4)(A) Goal 5b.1 Goal 5b.2 Page 16 Discuss your status on the Indicator(s) you have chosen as your focus. Include the reasons you chose each Indicator. Indicator PD10 Secondary CTE teachers follow a formal, professional development plan focused on instruction. Each CTE instructor has a formal professional development plan with their building principal. Teachers Current Status of Indicator participate in relevant CTE PD focused on instruction. All PD development plans are kept on file with PACTEC or in their building. Opportunities for collaboration between content areas are supported by PACTEC. Perkins IV Basic Grant Plan for Indicator 95% teachers in Region 2A will attend at least one professional development during the 2014-15 school year as SMART Goal for Indicator evidenced through the PD approval process or attendance records. Evidence That Will Show Attendance at the event will measure the goal. Sharing of resources or promising practices with other members Achievement of Goal of the region and improved classroom practice. Description of Planned Activity to Achieve SMART Goal Evidence That Will Show Success of Activity Description of Planned Activity to Achieve SMART Goal Evidence That Will Show Success of Activity Planned Activity #1 Region 2A CTE instructors will participate in trainings offered through PACTEC, or ‘mega’ region and dual credit meetings. These trainings will focus on the use of current technology, instruction, promising practices in CCSS and CCTC. Teacher reported survey responses Increased number of dual credits awarded to students as a result of teacher training Increased use of current technology by students as a result of teacher training Planned Activity #2 Teachers will attend conferences related to CTE or their specific industry to gain knowledge and skills to use in their teaching. Teacher reported survey responses. Sharing the information gathered by participants with other teachers in the region. Increased understanding of industry requirements by students as a result of teachers attending conferences or trainings. Planned Activity #3 Description of Planned Activity to Teachers will work with their cohort participants to develop materials to improve instruction. Achieve SMART Goal Evidence That Will Show The teaching materials created from this activity will be shared with other teachers in Region 2A and in other Success of Activity regions around the state. Briefly describe how you will ensure maintenance or continuous improvement on the Indicators on which you have chosen to focus. Indicator Plan for Maintenance or Continuous Improvement in 2015-2016 PD10 Secondary CTE teachers follow a formal, PACTEC will use feedback from teachers as well as guidance of teacher leaders to help improve the opportunities for creating quality professional development. Currently the desire to increase the enrollment of students in CTE 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 17 professional development plan focused on instruction. programs is of concern among teachers. There has been a great deal of work done lately related to CCSS so we will take time this year to work on increasing enrollment and technology trainings. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 18 LOCAL IMPROVEMENT PLANNING PROCESS Back to Introduction (For guidance in completing this section refer to the Guide.) List the Improvement Planning Team members and their roles and responsibilities in the planning process. Team Member Beth Molenkamp, Regional Coordinator Role and Responsibility Facilitator, mediator, negotiator, organizer of meetings Jon Warren, Industry Partner Kendra Cawley, PCC Dean Industry connection to keep our plan real and help move us along with what industry needs. Has worked closely with us in relation to manufacturing and school planning. Industry connection to keep our plan real and help move us along with what industry needs. Has worked closely with us in relation to manufacturing and school planning. ECE – Provides groundtruthing on what barriers and challenges instructors have in daily school building. Provides leadership within CTE teacher group. Teacher leader in trainings. AG- Provides groundtruthing on what barriers and challenges instructors have in daily school building. Provides leadership within CTE teacher group. Teacher leader in trainings. BCT - Provides groundtruthing on what barriers and challenges instructors have in daily school building. Provides leadership within CTE teacher group. Teacher leader in trainings. BCT - Provides groundtruthing on what barriers and challenges instructors have in daily school building. Provides leadership within CTE teacher group. Teacher leader in trainings. District-wide perspective and mentor to Regional Coordinator Kirk Garrison, PCC Instructor BCT – represents CTE and Dual Credit in BCT, helped develop statewide POS for BCT Jan Wetzel- Volinski, PCC Staff Liaison to PCC Perkins Advisors Dan Findley, PCC Dean Provided holistic view of regional programs and PCC’s role John Niebergall, CTE Instructor Engineering - Provides groundtruthing on what barriers and challenges instructors have in daily school building. Provides leadership within CTE teacher group. Teacher leader in trainings. Charlie Hopewell, Industry Partner Robyn Grabhorn, CTE Instructor Scappoose Tim Eggleston, CTE Instructor, Banks Wade Sims, CTE Instructor, Gaston Joe Mauck, CTE Instructor, St Helens Describe the different people/groups that you consulted for this Local Plan Update beyond Improvement Planning Team members, and how you worked with them. Name of Person or Group Megan Helzerman Contribution(s) Clackamas Regional Coordinator gave additional support during my first Basic Grant Lynn Wilson-Dean Provided history related to PACTEC grants and goals Robin Foleen Provided technical assistance related to information and what is needed for grant submission 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 19 Stephanie Hinkle Developed plans for PD opportunities planned for next year and related them to region goals Niki Taylo, CTE instructor, Sunset Served on leadership team to guide planning Rebecca Hufford, CTE instructor, Glencoe Sandie Grinnell, CTE TOSA, Hillsboro Served on leadership team to guide planning Supported each other in this first year in current positions Briefly describe the processes used for the following: (If there was one process, describe it in the first cell; address all items.) Evaluating Indicator status Identifying priority Indicators Developing SMART Goals Identifying strategies and activities Developing Planned Activities Developing monitoring and evaluation plans Utilized reported data and related it to the work being done in the region and the needs still remaining. Used responses from team members and contributors. Shared information from other regions to help develop relevant goals. Worked with teams and incorporated successful strategies to build on those successes. Worked with leadership team that includes Leadership team helped form plans Data Analysis and Planning Each grantee is responsible for generating their own data and reports concerning the goals used to manage the grant, determine student achievement, and evaluate improvement, including data for the Perkins Performance Measures. Trend Data Worksheets are required for any Performance Measure that did not meet the 90% threshold, and must be submitted with the Improvement Plan. Trend Data Worksheets are available on the ODE website (http://www.ode.state.or.us/search/page/?id=1625), but recipients may use other tools. Describe the data tools and processes used for analysis. 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 20 CONSORTIUM REGIONAL INVESTMENT PLANNING (Required for Consortium Basic Grant Plans ONLY) Back to Introduction (For guidance in completing this section refer to the Guide.) Reminder: When submitting the application, please attach a signed copy of the complete consortium operational agreement and copies of job descriptions of staff funded by the consortium. Consortium Member Roster PACTEC – Region 2A CONSORTIUM: (Add lines to tables as needed) Name School Districts Robyn Grabhorn, Tim Eggleston Wade Sims Joe Mauck Niki Taylo Rebecca Hufford Sandie Grinnell John Niebergall Organization & Position CTE Instructor - Scappoose CTE Instructor, Banks CTE Instructor, Gaston CTE Instructor, St Helens CTE instructor, Sunset CTE instructor, Glencoe CTE TOSA, Hillsboro CTE Instructor, Sherwood Level of Participation [planning, implementing and/or evaluating] Planning, and evaluating Planning, and evaluating Planning, and evaluating Planning, and evaluating Planning, and evaluating Planning, and evaluating Evaluating Evaluating Postsecondary Partners (Community College, Private Career College, Apprenticeship Programs, University, etc.) Kirk Garrison, PCC Instructor Dual Credit Liaison Planning & Implementing Kendra Cawley PCC Dean Planning, implementing & evaluating Robin Foleen PCC Support Planning, implementing & evaluating Jan Wetzel-Volinski PCC Staff Planning Dan Findley PCC Staff Planning, evaluating Business or Industry Partners Jon Warren Charlie Hopewell Business Business Planning & Evaluating Planning & Evaluating FUNDS TO CONSORTIUM – Funds allocated to a consortium formed to meet Perkins IV requirements shall be used only for the purposes and programs that are mutually beneficial to all members of the consortium and can be used only for authorized programs. Such funds may not be reallocated to individual members of 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 21 the consortium for purposes or programs benefiting only one member of the consortium. [PL 109-270, Sec. 131 (f)] No more than 5% of consortium funds may be used for Indirect Costs and Administration including salaries and benefits. [Section 135(d)] 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 22 Back to Introduction 2014-2015 Perkins IV Basic Grant Budget Spending Report (For guidance in completing this section refer to the Guide.) Function Codes Function Code Totals Standards & Content 2210 Alignment & Articulation 2210 Accountability & Assessment 2230 including Technical Skills Assessment Student Support Services 2100 Professional / Personnel Development 2240 Support Services - Central Activities – 2600 Research "Scientifically Based Research" 262X Total $$ Planned* 120,571 $$ Spent** % Change Approval date for Changes >10% Justification for % change (What changed in your plan?) 1 9,356 9,000 38,395 9,333 1 186,657 *As approved in August/September 2014 **Ending (September 2015) online CIP Budget Narrative totals 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 23 Object Codes Object Code Totals 111 Licensed Salaries $$ Planned* 0 112 Classified Salaries 11X Support Staff Salaries 0 0 11X Program Coordinator Salaries 2XX Licensed Benefits 1 2XXClassified/Support Staff Benefits 2XX Program Coordinators Benefits 12X Substitute Salaries 1 Approval date for Changes >10% Justification for % change (What changed in your plan?) 1 13,000 18,897 410 Consumable Supplies and Materials. 460 Non-consumable Equipment Items 470 Computer Software 12,957 541 Initial /Additional Equipment - Depreciable 690 Grant Indirect Charges (5% maximum) Total % Change 1 31X Local Instructional Services 31X Regional Instructional Services 34X Travel 480 Computer Hardware $$ Spent** 1 15,500 54,435 22,534 3,100 36,895 9,334 186,657 Comments: *As approved in August/September 2014 **Ending (September 2015) online CIP Budget Narrative totals 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 24 Back to Introduction 2014-2015 Perkins IV Basic Grant Equipment & Non-Consumable Supply Inventory Include all 2014-2015 Perkins-funded purchases of equipment or non-consumable supplies with a unit cost of $200 or more (For guidance in completing this section refer to the Guide.) Item Purchased ID or Serial # Acquisition Date Physical Location of Item Unit Cost (Add lines/pages as needed) 2014-2015 Update to the Perkins IV Local 5-Year Plan, Local Improvement Plan, Basic Annual Application, and Basic Annual Report Oregon Department of Education | Oregon Department of Community Colleges and Workforce Development | February 2014 Page 25