WCC Group Project Progress Report V1.0 01 March 2016 Group Project Progress Report Version 1.0 01 March 2016 Template for UK based forest carbon projects seeking verification to the Woodland Carbon Code Project-Group Name: [insert name] Name of Group Manger [insert nearest town, county, country (E/S/W/NI)] UK Woodland Carbon Registry Unique Group ID [insert unique ID] Name of submitting organisation: [insert organisation name] Completed by: [insert author’s name] Completed & Submitted to verification body on: [insert dd/mm/yyyy] Email contact: [insert email address] For each constituent project, please give the location, grid reference and size: WCC Project Location - Location - Grid Gross Unique Name County Country Reference Area (ha) project ID Total Area of the Project-group: 1 Net Area (ha) WCC Group Project Progress Report V1.0 01 March 2016 NOTE: 1. When completing each section of this document please refer to the requirements set out in the relevant section of the Woodland Carbon Code and online guidance. Boxes for text can be expanded if not large enough. 2. Some of the questions or statements in this document need to be answered for each constituent project as indicated. Additional rows can be added to tables as necessary if more than 5 projects in a group. Other questions or statements can be answered for the project-group. 3. Your Project Progress Report and Monitoring Report will be made available in the UK Woodland Carbon Registry once you are verified. 4. At the end of each section, a table allows you to indicate which Additional Evidence you will make available to the verification body. 5. The Group Manager should keep a copy of the Progress Report, Monitoring Documents and all additional information for the duration of the project. For info: Updates to PDD template: Summary – Completed by FC Version No Date 0.4 18 March 2015 1.0 01 March 2016 Amendment Author Vicky West Amends following pilot feedback. PIU table 3. Vicky West For Projects: Version Control of completed Project Progress Reports: Version No Date Amendment Author All statements made in this document are correct to the best of my knowledge. I agree/I disagree [Delete as applicable] 2 WCC Group Project Progress Report V1.0 01 March 2016 Contents 1. Eligibility ........................................................................................................................... 4 1.0 Commitment View online guidance .............................................. 4 1.1 Project Start Date and Duration View online guidance .............................................. 5 1.2 Eligible Activities View online guidance ............................................... 5 1.3 Eligible Land View Online Guidance ............................................ 5 1.4 Compliance with the law View online guidance ............................................. 6 1.5 Additionality View online guidance ............................................... 6 2. Governance ....................................................................................................................... 7 2.1 Registry View online guidance .............................................. 7 2.2 Project Design View online guidance ............................................... 7 2.3 Management Plan and Capacity View online guidance .............................................. 7 2.4 Management of risks and permanence View online guidance .............................................. 8 2.5 Management of Group Schemes View online guidance ............................................... 9 2.6 Monitoring View online guidance ............................................. 9 2.7 Carbon Statements and Reporting View online guidance ............................................ 12 2.8 Woodland Carbon Code Trademark View online guidance .......................................... 13 3. Carbon Sequestration .................................................................................................... 13 3.1 Units ............................................................................................................................................................................... 13 3.2 Carbon baseline View online guidance ............................................. 13 3.3 Carbon Leakage View online guidance ............................................ 13 3.4 Project Carbon sequestration View online guidance ............................................ 14 3.5 Net carbon sequestration View online guidance ............................................. 14 4. Environmental quality View online guidance ................ 15 5. Social Responsibility View online guidance ................. 16 3 WCC Group Project Progress Report V1.0 01 March 2016 1. Eligibility 1.0 Commitment View online guidance NOTE Earlier projects will not have completed a ‘landowner commitment’ at validation. This should be provided at year-5 verification where: No commitment was provided at validation, or The landowner has changed since validation If a signed commitment already exists, go to Section 1.1 1) Are there contract(s) with or statement(s) from the landowner(s) which demonstrate(s) their commitment to: Conform to the WCC standard Permanent land-use change Manage land as per current Management Plan for the establishment period and as per longer-term management intentions for the project duration and beyond Comply with the law Restock where projects involve harvesting Replant or undertake compensatory planting if an area is lost due to wind, fire, pests, disease or development Inform future landowners of the commitment to the Woodland Carbon Code and any carbon contracts Make true and accurate carbon statements about the project Abide by the WCC logo rules of use Note these things could be covered in the Group Agreement. Yes/ No [Delete as applicable] 2) Do you, as the group manager commit to: Conform to this standard Comply with the law Ensure the project/group, any PIU listings, sales to carbon buyers, retirement for use of verified Woodland Carbon Units is accurately represented in the UK Woodland Carbon Registry Make true and accurate carbon statements about the project Make carbon buyers aware of the WCC guidance on carbon claims and include in contracts with buyers Abide by the WCC logo rules of use and make carbon buyers and landowners aware of the WCC logo rules of use Yes/ No [Delete as applicable] 3a) Do you, as the Group Manager commit to monitor and maintain verification for the project duration as per WCC guidance? Yes/ No [Delete as applicable] 4 WCC Group Project Progress Report V1.0 01 March 2016 3b) if the Group Manager does not commit, is there a contract with the landowner(s) to monitor and maintain verification for the project duration as per WCC guidance? Yes/ No [Delete as applicable] You shall provide the following additional evidence to confirm the land owner(s)’ commitment: Choose at least Project names/ Further details one Contract(s) with landowner(s) contain terms Yes/ No set out above Signed statement(s) from landowner(s) contain terms Yes/ No set out above Specify what Project names/ Further details Other evidence 1.1 Project Start Date and Duration View online guidance No information required – See 2.6 Monitoring 1.2 Eligible Activities View online guidance No information required 1.3 Eligible Land View Online Guidance 1) For each project in the group, please state the landowner’s name and contact details [copy and paste table as necessary] Landowner Name: Project(s) owned: Landowner Address Landowner Postcode Landowner Phone Number Landowner Email 5 WCC Group Project Progress Report V1.0 01 March 2016 If the landowner(s) have changed since the last validation/verification, you shall provide the following additional evidence to confirm the owner(s) and, if the land is leased, the owner(s)’ consent: Choose at least one or To confirm owner: Project names/ Further details specify what other evidence Solicitor’s letter Yes/ No Title deeds Yes/ No Land registry records To confirm owners consent if leased: Certified copy of lease Yes/ No Choose if leased or specify what other evidence Yes/ No Specify what evidence Project Names/ Further details Other evidence 1.4 Compliance with the law View online guidance 1) As far as you are aware, do all the projects in the group comply with all existing forestry legislation in the UK at the time of completing this document? Yes/No [delete as applicable] 2) As far as you are aware, are there any current, past (within the last 5 years) or pending prosecutions relating to any of the constituent projects. Yes/No [delete as applicable] 3) As far as you are aware, are there any injunctions or notices relating to any of the constituent projects issued by the Environment Agency/SEPA/Natural Resources Wales or issued under the Town and Country Planning Regulations. Yes/No [delete as applicable] 1.5 Additionality View online guidance No information required 6 WCC Group Project Progress Report V1.0 01 March 2016 2. Governance 2.1 Registry View online guidance 1a) Is the project-group or any constituent project validated or approved by another carbon standard or has it applied to be? Yes/No [delete as applicable] 1b) If yes, please state which: WCC Unique Other carbon standard applied project ID or to/validated by project name 2.2 Project Design Relevant unique ID from other carbon standards View online guidance 1) The project-group’s key aims and long term objectives remain as set out in the PDD Yes/No [Delete as applicable] 1a) If No, Please confirm the project’s key aims and long term objectives and the changes since the PDD: WCC Unique project ID or Aims and objectives of project-group or constituent project name project(s) and changes since PDD 2.3 Management Plan and Capacity View online guidance 1) Do all the constituent projects continue to be managed in accordance with the UK Forestry Standard? Yes/No [Delete as applicable] 2) The longer-term management intentions of each constituent project (incl. the woodland management regime to be applied – e.g. no intervention, thinning only, regular clearfell, CCF (and type)) remain as set out in the PDD Yes/No [Delete as applicable] 7 WCC Group Project Progress Report V1.0 01 March 2016 2a) If no, please clarify the current longer-term management intentions and the change from the last validation/verification: (i) Where are WCC Unique management intentions (ii) Longer-term management intentions project ID or over establishment for the project duration and beyond project name period set out? 3) Please state the name and contact details of any other parties involved in each constituent project (eg land managers). [Copy and paste table if more than one party]. Role: Project(s): Name: Address Postcode Phone Number Email 2.4 Management of risks and permanence View online guidance 1) If there are any new or increased risks to the project, please state them here, and also the mitigation action you are taking to reduce the risk. WCC Unique project ID or Project Name Risk Category – New or increased risks 8 Mitigation Action (if any) WCC Group Project Progress Report V1.0 01 March 2016 2.5 Management of Group Schemes View online guidance Do you have a signed Group Agreement which is current and meets the requirements as specified in the WCC guidance? Yes/No [delete as applicable] You shall provide all the following additional evidence: Check all Further details boxes Current Group Agreement which meets the requirements as set out in WCC group Yes/ No scheme guidance 2.6 Monitoring View online guidance 1 Dates: Please enter below key dates for your project-group: Activity Group Implementation date (Start of tree planting) Date [dd-mmm-yyyy] Group Start date (End of tree planting) [dd-mmm-yyyy] Date of validation [dd-mmm-yyyy] Date verification due [dd-mmm-yyyy] Date(s) of survey(s): Project Name(s) and [dd-mmm-yyyy] 2 Survey Team: Please enter below key information about the survey team, their experience and relationship to the project. If different surveyors have been used for constituent projects, please give details of all surveyors and the projects they worked on. [Cut and paste table as required] Surveyor Details Name of surveyor Projects surveyed: Contact details of surveyor (phone/email) Phone: Email: Relevant survey experience Relationship to project 9 Landowner Project developerGroup Manager Land Manager Independent - ICF member Independent – other WCC Group Project Progress Report V1.0 01 March 2016 3. Strata and number of plots 1. For each constituent project, please describe the survey area, whether and how it has been divided into strata and how many plots were assessed in each strata [cut and paste the table for each project in the group]: Project Name: Stratum 1 Stratum 2 Stratum 3 Stratum 4 Stratum 5 Open Ground (if mapped) Total area Gross area of each stratum (ha - incl OG if not mapped). Net planted area of each stratum (ha) Anticipated Species (List species with % of each) Anticipated spacing (m) Anticipated stocking density (trees/ha) Plot radius (m) if circular or length (m) if square. Number of plots Please include as an appendix or separate document, a map of each constituent project indicating the location of the various strata. 10 WCC Group Project Progress Report V1.0 01 March 2016 4. Survey Results 4a) Please submit with this report: 1. A ‘Plot survey sheet’ for each plot undertaken for each project 2. A ‘Stratum Summary Sheet’ for each stratum in each project 3. 2 or 3 site level photos for each project (preferably geo-tagged) 4. Photos of each plot within each project (preferably geo-tagged) 1 and 2 can be found in the ‘WCC Year 5 Monitoring – Data Collection and Calculation Sheet V1.0’ workbook. 4b) Please give here any further clarification of, or comment on, your survey results: 5. Quality Assurance If an independent party quality assured a proportion of the fieldwork sample plots of any constituent project prior to verification, please indicate who undertook this work and the proportion of the plots that were quality assured. Quality Assurance – Fieldwork Name of quality assurer Phone Contact details Email Project(s) checked % of plots checked Any issues found If an independent party quality assured the ‘office’ calculations of any constituent project prior to verification, please state who undertook this work and their contact details. Quality Assurance – Calculations Name of quality assurer Phone Contact details Email Project(s) checked % of plots checked Any issues found 11 WCC Group Project Progress Report V1.0 01 March 2016 You shall provide the following additional evidence to summarise the monitoring work undertaken: All projects Data collection and calculation sheets Yes/ No Site-level photos and locations Yes/ No Plot-based photographs and locations Yes/No Updated map of site with any boundary changes marked. Where required Map of site demonstrating the strata used for survey Yes/No Report or evidence from independent quality assurance Where relevant Project Names/ Further details 7a) Is the project-group or any constituent project certified or applying for certification to the UK Woodland Assurance Standard? Yes/No [delete as applicable] 7b) If yes, please state for group or constituent projects whether certification is via FSC or PEFC and give the relevant certificate number. WCC Unique project ID or FSC or PEFC? FSC or PEFC certificate number project name You shall provide the following additional evidence to demonstrate certification to the UK Woodland Assurance Standard: All FSC/PEFC Project names/ Further details certified projects FSC or PEFC certificate for the group or each constituent Yes/ No project Note: You will be required to upload your FSC/PEFC certificate to the registry upon WCC validation if you wish to demonstrate dual certification 2.7 Carbon Statements and Reporting View online guidance 1a) Do you ensure that all carbon buyers (existing and future) are aware of the WCC claims guidance? Yes/No [Delete as applicable] 12 WCC Group Project Progress Report V1.0 01 March 2016 1b) Statements or claims made by the landowner, project developer or corporate buyer comply with Woodland Carbon Code guidance. Yes/No [Delete as applicable] 2.8 Woodland Carbon Code Trademark View online guidance 1a) Does the group manager agree to ensure that the group and its constituent projects abide by the Logo Rules of Use as set out currently and as may be updated from time to time by the Forestry Commission? Yes/No [Delete as applicable] 1b) Will you ensure that others with an interest in your project-group (e.g landowner, project developer or corporate buyers) who may also use this logo are fully aware of the Rules of Use? Yes/No [Delete as applicable] 3. Carbon Sequestration 3.1 Units Note: All projections and measurements of carbon sequestration must be expressed in tCO2e. Positive values represent sequestration, negative values represent emissions. 3.2 Carbon baseline View online guidance No information required 3.3 Carbon Leakage View online guidance 1) My assessment of leakage for each constituent project remains as stated in the PDD Yes/No [Delete as applicable] 1a) If no, please state how any assessment of leakage has changed, and calculate the level of leakage (in tCO2e) for the duration of the project. You shall provide the following additional evidence to confirm leakage assumptions or calculations: If leakage Project names/ Further details significant choose both Map of site and surrounding area with leakage risks Yes/ No highlighted More detailed leakage Yes/ No calculations Specify what Other evidence 13 Project names/ Further details WCC Group Project Progress Report V1.0 01 March 2016 3.4 Project Carbon sequestration View online guidance Carbon in Biomass, Soil and Emissions from Woodland Management The following changes may make it necessary to re-evaluate project carbon sequestration: Changes in actual species composition or areas of open space, stocking density not achieved, extensive beat-up, change to long-term management intentions. The Certification Body will inform you whether it is necessary to reevaluate your predicted carbon sequestration. 1) The predicted carbon sequestration at each constituent project in the group remains as set out in the PDD. Yes/No [Delete as applicable] 1a) If no, please clarify: If recalculating, you shall provide the following additional evidence to confirm carbon sequestration assumptions and calculations: All projects Project names/ Further details Updated Carbon Calculation Spreadsheet Yes/ No Specify what Project names/ Further details Other evidence NOTE: You will be required to upload your updated Carbon Calculations to the registry upon verification. 3.5 Net carbon sequestration View online guidance For each constituent project, please indicate the predicted and actual number of carbon units to be delivered within the vintage under assessment. At the first (year 5) assessment, provided the actual stocking density is within 10% of the predicted density and there are no concerns about tree growth or health, we will assume that all predicted units are delivered. [Please cut and paste Table 3 for each constituent project within the group]. 14 WCC Group Project Progress Report V1.0 01 March 2016 Table 3: Planned and actual units delivered within the Vintage under assessment Vintage Start Date: [ddmmyyyy] Vintage End Date: [ddmmyyyy] Total PIUs in vintage to be listed PIUs to Buffer PIUs to Project Predicted Units in Vintage being assessed Actual Units in Vintage being assessed PIUs to be cancelled Extra WCUs to be issued 4. Environmental quality View online guidance 1) If you have monitored environmental quality, please state the added benefits of any constituent project or the project-group so far. WCC Unique project ID or project name Added Benefits You shall provide the following additional evidence to confirm details of the environmental impact or benefit of the project: Specify what Evidence confirming the environmental benefits of the project so far 15 Project names/ Further details WCC Group Project Progress Report V1.0 01 March 2016 5. Social Responsibility View online guidance 1a) If you have consulted any stakeholders since the last validation/verification, please describe for which constituent project, the consultation process and its outcome. 1b) If you have had any complaints or concerns about any constituent project raised since the last validation/verification, please describe how you have dealt with these. 2) If you have monitored social benefits, please state the added benefits of any constituent project or the project-group so far. WCC Unique project ID or project name Added Benefits You shall provide the following additional evidence to confirm details of ongoing consultation or to confirm the social benefits of the project so far: Specify what Evidence confirming ongoing consultation or how complaints are dealt with Evidence confirming the social benefits of the project so far. Yes/ No Yes/ No 16 Project names/ Further details