The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 I. Mission and Activities – The UTPB Information Resources Division The University of Texas of the Permian Basin can anticipate a continued and increasing reliance on information technologies for the accomplishment of University goals and objectives. This increasing reliance on technology will span a broad spectrum. Technology has impacted and will continue to impact every University student, faculty member and staff member. From an increasing use of automation for student recruitment to expanded delivery of instruction through distance learning technologies, the institution will continue to rely on information technology for the attainment of institutional goals and objectives. This reliance on information technology must be tempered, however, with the realization that such dependence gives rise to multiple challenges. The rate of technological change makes faculty and staff training a significant challenge. Additionally, continued investment in hardware and software technologies will be required to maintain technological relevance in the installed technology base. Such relevance is particularly important in the education enterprise since students must be exposed to current technologies to receive a quality education. As demands for technology continue to increase, the funding, recruiting and retention of additional qualified technical support staff continues to be an increasing challenge. Additionally, new federal, state and institutional priorities related to information security and additional citizen concerns over information privacy represent significant new demands for technical staffing. In fact, information security represents the most significant technology challenge currently facing the institution. Agency needs for information resources have historically been addressed through the assignment of strategic planning, implementation and operational responsibilities to the Information Resources Division (IRD). By providing a centralized resource for information system and telecommunications expertise, IRD has been a primary catalyst for institutional technology assimilation and utilization. In recent times, responsibility for information resource development has been distributed to other operational units within the university. This distribution will further complicate the coordination and management of information security enhancements. Like many institutional support areas the current quantity of IRD technical staff is inadequate. Staff depth and the ability of the division to absorb staff turnover is minimal. Additional staffing will be necessary to build organizational depth and to address many of the strategic initiatives outlined by the IRD compact. Specific staffing requirements are identified under corresponding departmental objectives. Information resource planning responsibilities are vested in the Information Resources Division (IRD). Coordination between planning activities and the university community is achieved through the actions of a formal Computer Committee structure and by placing the agency Information Resources Manager (IRM) on University Page 1 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 planning and budget committees. Members of the committees are appointed by the President and Vice Presidents each year. Members typically include representatives from each major academic division and representatives from major administrative areas. Priorities for information resource utilization and deployment are established through interactions between the Computer Committee and IRD. Resulting strategic planning documents are reviewed and approved by executive management. The overall mission of the UTPB Information Resources Division is to provide Information Resource vision, planning, design, implementation, operations support, security, compliance monitoring and management necessary for the support of the University’s mission and in support of the rules, regulations and initiatives of the UT System and the State of Texas. II. Environmental Factors A. Regulatory/Compliance Environment In 1967, the Texas Legislature began its efforts to contend with the challenges associated with the management of information resources. Starting with the State Auditor’s Office, several agencies have had responsibility for reviewing state expenditures for information technology. In 1989, the Department of Information Resources (DIR) was established in a comprehensive state statute that addressed the major aspects of information technology management. Since its creation, DIR’s responsibilities have evolved. Through its statewide planning, rulemaking and service structure, DIR provides an overall vision for statewide information resource utilization. All information resource procurement, implementation and operations of the university are subject to the monitoring and regulatory environment established through DIR and the Texas Information Resources Management Act. B. Information Security Information security and the protection of personal information continue to have a high priority within the state, within UT System and with the public at large. Significant new requirements for security monitoring and compliance have been promulgated by UT System, State and Federal sources. Meeting these requirements is fundamental to the preservation of citizen trust and asset stewardship and will require a significant commitment of additional financial and personnel resources. III. Major Short-Term Initiatives A. Support of Institutional Growth Page 2 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 The growth of any institution must involve more than just the addition of students and faculty. In order for systemic growth to occur consideration must be given to infrastructure growth components. These infrastructure growth components include not only bricks and mortar but also support facilities and information resources designed to service the growing number of faculty and students. 1. Objective A1 – Network Cost Allocation & Bandwidth Maintenance The university’s computer network has become an increasingly important strategic asset. Over the years, this communication resource has evolved from a text-based e-mail “convenience” to a mission-critical information delivery resource responsible for everything from environmental control to academic course delivery. The expansion of this resource such that adequate network bandwidth continues to be available in the face of constantly increasing demand is essential to the growth of the institution. a. Strategy A11 Establish a bandwidth management/funding model that insures adequate bandwidth in the face of anticipated increases in bandwidth demand. This model should map bandwidth costs to bandwidth consumers. b. Strategy A12 Ensure that available bandwidth both on the local area network and to wide area network destinations beyond the campus boundary is adequate for the needs of the university. c. Strategy A13 Establish a high bandwidth interconnect between the UTPB main campus and the CEED site. d. Strategy A14 Insure that UT Permian Basin is a full participant in the LEARN network. Performance Measure A1: Bandwidth utilization at peak demand. 2. Objective A2 – Strengthen Desktop Computer Support And Planning The university’s growth and the growth in per capita information resource consumption combine to produce a phenomenal growth rate in the installed microcomputer base. This growth rate has not been matched by an expansion in either staffing for user support or funding for ongoing equipment replacement. The situation is made worse by the fact that increases in computer population have no direct or indirect impact on the budgets of requesting budget heads. Consequently, no rationalization or evaluation of need occurs. While this model may be appropriate for early stages of technology assimilation, the model is inappropriate for the control phase of technology utilization. The existing allocation model must be replaced with a model that more carefully scrutinizes the growth Page 3 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 rate of desktop computers. a. Strategy A21 Establish a desktop computer cost allocation and funding model that transfers the life-cycle cost of equipment ownership to the using budget. b. Strategy A22 Separate funding for growth of the installed base from funding for replacement of existing units and insure that replacement funding allocations grow proportionally with the installed base c. Strategy A23 Enhance and streamline the user service request system through the addition of web-based facilities for the submission and tracking of service requests. d. Strategy A24 Improve client support through the addition of at least one FTE for client desktop support. Performance Measure A2: Average time to resolution for service requests and problem reports. 3. Objective A3 – Grow Student Computing Resources As student enrollment increases, the demand for on-campus computing resources also increases. Industry trends suggest that more and more students arrive at college with their own computers. However in order to insure that all students have access to appropriate computing resources, the campus must continue to offer high quality computing facilities for students. This strategy will minimize the digital divide and insure that the lack of technology is not a barrier to success for economically disadvantaged students. a. Strategy A31 Expand the number of seats available in both walk-in computer lab environments and in formal computer classroom environments. b. Strategy A32 Insure that computing resources available to students are maintained at current hardware and software levels. Performance Measure A3: Number of general access computers per student FTE enrollment. 4. Objective A4 – Improve Information Storage and Management As the demand for on-line information storage increases, the current technical implementation for network-accessible data storage becomes less and less adequate. The current implementation associates primary storage resources with specific physical server resources. This Page 4 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 configuration does not scale well. To cope with the increasing demand for on-line storage, newer storage technologies will be required. These technologies such as fiber channel disk arrays and network attached storage arrays will be required. a. Strategy A41 Utilize fiber channel and network storage technologies to establish scalable network storage resources for multiple server platforms. b. Strategy A42 Provide IRD professional staff with advanced training on storage technologies. c. Strategy A43 Utilize advanced disk mirroring techniques to eliminate the need for routine backup of information to tape. d. Implement server virtualization strategy to make multiple server images available from a single physical platform. Performance Measure A4: Percentage of total available storage implemented in storage array facilities. B. Support of Quality Quality and growth are closely related. This relationship stems from the fact that the quality of information services is frequently dependent on how close to capacity the delivery system must operate in order to meet the demand for services. This is true for technical systems as well as institutional processes. 1. Objective B1 – Enhance Network Stability A stable, secure and responsive network is fundamental to the delivery of high quality services. Toward these objectives additional resources will need to be devoted to the management and monitoring of this vital university asset. a. Strategy B11 Enhance network security and reliability through the use of advanced technology, staff training, policy development and policy enforcement. b. Strategy B12 In support of the incident response plan, construct, equip and document a network incident response console capable of providing command and control capabilities for network defense. c. Strategy B13 Improve network support staff depth through the addition of at least one FTE for network support, monitoring and management. Performance Measure B1: Number of network outages per unit of time. Page 5 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 2. Objective B2 – Stabilize Client Environment A stable and consistent client workstation environment is fundamental to the quality of university programs. The workstation hardware environment and associated office automation software provide the basis for much of what university employees produce in the way of administrative and academic output. a. Strategy B21 Enhance the ability to manage client software configurations through the mandatory participation of all client stations in a Windows Server domain structure b. Strategy B22 Enforce defined group policy restrictions at each domain client to enhance the stability and security of domain workstations. c. Strategy B23 Implement automated client configuration control to insure that appropriate software patches are applied in a timely manner to all machines connected to the network. d. Strategy B24 Implement client configuration lockdown technology to aggressively control client software configuration. Performance Measure B2: Percentage of network client stations that implement explicit configuration control. 3. Objective B3 – Improve Classroom Instructional Technology The university currently enjoys multimedia instructional technology in every classroom. This technology has been embraced by faculty and is routinely used to improve the quality of instruction. However, the existing technology can be made more effective and reliable through the introduction of “next generation” (nextgen) designs. a. Strategy B31 – Build And Deploy Nextgen Instructional Pods Deplot nextgen instructional technology to simplify the use, improve the reliability and increase the availability of in-room instructional technology. b. Strategy B32 – Provide Additional Support Staff Provide at least one additional FTE in IRD dedicated to the support of multimedia and instructional television technologies. Performance Measure B3: Number of classrooms equipped with nextgen equipment. 4. Objective B4 - Unified Messaging Upgrade the institutions various messaging functions to improve the Page 6 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 quality of communication between university employees and between faculty and their students. a. Strategy B41 – Central Fax & Voicemail Implement a unified fax, e-mail and voicemail messaging service. Performance Measure B4: Number of users supported by a unified messaging system. 5. Objective B5 – Establish Identity Management System With the continued growth of on-line services, organizations are wrestling with the challenge of managing secure access to information and applications scattered across a wide range of internal and external computing systems. Furthermore, access must be provided to a growing number of users, both inside and outside of the organization, without diminishing security or exposing sensitive information. The management of multiple versions of user identities across multiple applications makes the task even more daunting. The systems being built to address these issues are frequently referred to as Identity Management Systems. The systems typically include facilities to assist users with password change, password synchronization, unified sign-on, and access management. The availability of Identity Management services is essential to the delivery of high quality user experiences in the evolving on-line environment. a. Strategy B51 Complete the deployment of an institutional LDAP directory system including the integration of automated directory data feeds from the DEFINE personnel system and the POISE student information system. b. Strategy B52 Integrate the LDAP directory system with the Windows Active Directory to achieve a single point of password administration between the two directory systems. c. Strategy B53 Utilize the integrated directory system in conjunction with Shibboleth technologies to facilitate single sign-on capabilities for multiple web-based applications. Performance Measure B5: Number of applications in the installed base capable of Shibbolized authentication. 6. Objective B6 – Enhanced Administrative Software UTPB IRD must continue to reduce the backlog of administrative software system implementations. Each of these administrative applications is intended to improve the utility and quality of institutional information Page 7 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 systems in specific functional areas. a. Strategy B61 Assist the Registrar’s Office in the implementation of the Astra Schedule classroom scheduling system. b. Strategy B62 Begin the conceptual design and concept demonstration of an institutional data warehouse. Performance Measure B6: Number of purchased but non-implemented applications in the application implementation portfolio. 7. Objective B7 – Improve Institutional Collaboration Tools The university has an increasing need for improved collaboration tools. These tools would facilitate the collaborative development of a variety of materials ranging from the university catalog to material for accreditation. a. Strategy B71 Establish storage space for the storage of collaborative information. b. Strategy B72 Implement collaboration software tools. C. Support of Research UTPB IRD is poorly staffed and poorly equipped to directly assist faculty with research efforts. Considering the existing backlogs in application implementation and development and the current crush of ongoing service requests, it is unlikely that significant IRD manpower can be made available to directly assist faculty in their research efforts. However, there are several process items that could be used to assist in this area. 1. Objective C1 – Consultation Review of faculty research proposals by IRD is no longer required by the existing proposal review process. Historically, research proposals have tended to fall into one of two categories. Proposals from faculty who are highly knowledgeable in the areas of information technology tend to propose reasonable and feasible technology utilization as one element in the research effort. These proposals frequently result in successful research efforts. Proposals from faculty who are not highly knowledgeable in the areas of information technology tend to place unreasonable expectations on technology and tend to view technology as a black box capable of resolving any difficulty. These proposals, if funded at all, frequently produce high levels of frustration, consume disproportionate amounts of technical support resources and result in less than acceptable outcomes. Page 8 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 a. Strategy C11 Insure that all research proposals are evaluated with respect to technical feasibility prior to being issued. b. Strategy C12 Insure that all research proposals are evaluated with respect to technical support feasibility prior to being issued. Insure that all technical support implied by the proposed activities has a designated source of funding and that the technical skill sets implied by the proposal are actually available. Performance Measure C1: Number of grant proposals reviewed. 2. Objective C2 – Enhanced Network Services For some research activities (particularly NSF-funded activities), enhanced wide-area networking resources will be an important factor. These “next generation” networks are increasingly being used to facilitate information exchange and to coordinate research efforts across a broad spectrum of research topics. In some cases, the advanced networks themselves are a significant part of the research. a. Strategy C21 Insure that the institution can achieve connection to the Internet 2 network (I2) should a research proposal establish a need for such a connection and obtain funding for such a connection. b. Strategy C22 Insure that the institution can achieve a high-bandwidth connection to the Lonestar Education and Research Network (LEARN) should a research proposal establish a need for such a connection and obtain funding for such a connection. Performance Measure C2: Number of grant proposals submitted requiring I2 or similar high-speed network access. 3. Objective C3 – Compliance With Research Data Security Requirements UTS165 includes significant requirements for digital research data to insure the security and integrity of such data. The university will be required to meet these requirements. a. Strategy C31 Provide researchers with a spectrum of local and central data storage resources for the protection of appropriately classified research data. b. Strategy C32 Assist research faculty in properly classifying digital research data. D. Support of Partnerships Page 9 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 UTPB IRD supports the development and use of partnerships in a number of ways. Through the operation of the REACH interactive television system, UTPB IRD is able to establish interactive instructional communications connections between UTPB and a number of education partners. In addition to providing channels for the delivery of instruction, this approach also establishes a “presence” for the university at the remote site. This is an advantage offered by ITV not available through other distance learning technologies. UTPB IRD also partners with other entities in order to exploit networking cost reductions available through bandwidth aggregation. These partnerships not only establish good will among the cooperating entities but also serve to significantly reduce the unit cost of bandwidths in the wide area network. The overall approach to partnership support is to continue existing partnerships and to expand the partnerships where demonstrated programmatic need warrants such expansion. 1. Objective D1- Interactive Instruction Continue the utilization of existing interactive television and explore other interactive instructional technologies. a. Strategy D11 Establish a funding source for and implement dialup videoconferencing capabilities. b. Strategy D12 Explore new technologies for interactive, real time instruction including IP-based remote computer control and web-based real time meeting technologies. Performance Measure D1: The number of hours of ITV production completed. 2. Objective D2 – Remote Teaching Sites Support existing and emerging remote teaching sites through standardization of hardware and software and through the provisioning of TheNet network connectivity where appropriate. a. Strategy D21 Insure that instructional technology available to UTPB faculty at remote teaching sites is comparable to equipment available at the main campus. b. Objective D22 Insure that software available to UTPB faculty at remote teaching sites is comparable to software available at the main campus. c. Objective D23 Insure that technical support is available at remote teaching sites. Performance Measure D2: The number of remote teaching sites supported. Page 10 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 3. Objective D3 – Cooperative Technology Partnerships Continue existing cooperative networking partnerships and search for additional opportunities. a. Strategy D31 Continue existing hardware co-location agreement with the Texas Attorney General’s office. b. Strategy D32 Continue existing agreement with UT System Office of Telecommunications Services for primary campus Internet connectivity. c. Strategy D33 Explore other opportunities for cooperative partnerships with area junior colleges and school districts for TheNet, I2 and LEARN connectivity initiatives. d. Strategy D34 Establish equipment co-location agreement with UT Lands office in Midland. Performance Measure D3: The number of cooperative technology agreements in place. E. Support For Graduation Rate Improvement Improvements in graduation rates can be achieved through improved management of the advising and degree planning process. Additionally, the early identification of and assistance for at-risk students can also help to reduce the number of dropouts. 1. Objective E1 – Improve degree plan and student progress tracking a. Strategy E11 Complete the implementation of the POISE Degree Audit System. b. Strategy E12 Provide hardware and O/S support for the Early Alert System (EAS) to identify at-risk students and work to incorporate EAS data into the data warehouse. F. Public Trust And Accountability As previously mentioned, information resource expenditures and management in the state of Texas are subject special statutory scrutiny. Consequently, a portion of UTPB IRD resources will be devoted to specific compliance activities. A significant commitment of staff resources will need to be committed to enhancing the university’s information security posture. Page 11 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 1. Objective F1 – Improve Information Confidentiality and Security Growing concerns about identity theft and the increasing use of Internet technologies for e-commerce have given rise to an increasing number of federal, state and UT System regulations related to information system security. Most significantly UT System has released a revised and unified policy on information resource use and security. This new document (UTS165) combines previous BPMs related to information resource security, Social Security number confidentiality and integrity of research data. Compliance with the new UTS165 will require a significant and ongoing commitment of resources. a. Strategy F11 Continue efforts to improve information security through the development and implementation of a detailed security enhancement plan as defined by the UT System information security initiative. b. Strategy F12 Continue efforts to reduce the use of Social Security numbers and to improve the security of Social Security number data. c. Strategy F13 Initiate efforts to improve the confidentiality and integrity of digital research data. Performance Measure F1: The number of UTS165 requirements fulfilled. 2. Objective F2 – Improve Software Licensing Compliance Continue efforts toward improved software licensing compliance. a. Strategy F21 Complete deployment of automated software licensing audit facility. b. Strategy F22 Provide enhanced training opportunities for faculty, staff and student with respect to software licensing. Performance Measure F2: The number of client computers in the installed base for which detailed software inventory data is maintained. 3. Objective F3 – Improve Business Continuity Planning Continue efforts toward the establishment of a disaster recovery hot site at the CEED facility. a. Strategy F31 Establish high-capacity network interconnect between CEED facility and main campus. b. Strategy F32 Relocate backup web server and backup on-line course server to Page 12 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 CEED facility. b. Strategy F33 Replace existing air conditioning equipment serving the CEED equipment room with a new, redundant system. c. Strategy F34 Establish backup power facilities for the CEED equipment room which will allow continued operation in the event of a loss of onsite power. Performance Measure F3: The number of backup applications for which alternate hardware/software resources are maintained at the CEED recovery facility. 4. Objective F4 – Federal Discovery Compliance a. Strategy F41 Identify, procure, install and test e-mail archival hardware and software necessary to achieve compliance with Federal discovery rules. IV. Long Range Plans The rate of technological advancement and the dynamics of a web-centric word make technology planning beyond the 3 year horizon very difficult. However, given current technology trends, the university’s current situation, and reasonable expectations for growth, quality, research and partnerships; several long-range requirements quickly emerge. A. Data Center Consolidation Amid continuing pressures to improve the efficiency and effectiveness of stateowned data centers, the Texas Department of Information Resources has aggressively embraced a consolidation of state-owned data centers. Under this concept, operational efficiency improvements and cost savings are believed to be available through the creation and operation of a small number of large data centers rather than having each state agency own and operate its own data center. Conceptually, the centralized data center implementation can reduce the number of redundant production operations and save money. In response to this trend, the UT System has also embraced the data center consolidation concept and is currently moving aggressively in this direction. Regional UT System data centers have now been established in Arlington and in Houston. A third regional data center is also being considered to serve the Austin area. Given these significant investments in infrastructure, it seems likely that UTPB will eventually have the opportunity to move the bulk of its information system operations to one of these regional facilities. Planning should begin now for this eventuality. Page 13 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 rev 1 B. Identity Management The ability to establish and maintain digital identities for various university stakeholders will be essential enabling technology for the future delivery of services. Consequently, attention to the technological infrastructure necessary to establish, verify and maintain digital identities for students, faculty and staff is essential to the future of the university. C. Physical Facilities Current Mesa Building facilities used to house the central computing and telecommunications systems of the university are inadequate. While significant effort and expense have gone into retrofitting standard office space into the type of specialty space needed for a reliable central computing facility, the existing space continues to have a number of serious deficiencies. Many of these deficiencies including the need for physical monitoring, security, power redundancy, HVAC redundancy, signal distribution, environmental monitoring and fire suppression are being addressed during the design phase of a new facility. Care must be taken to insure that adequate funding for fundamental information facility infrastructure and equipment is preserved during the detail design phase of the new buildings. D. High Bandwidth Networking The amount of digital information that can be transmitted in a fixed amount of time will continue to be one of the most significant determinants of technology utility. Advances in instructional technology can only be as effective as the delivery mechanism. As the content for on-line course material becomes more sophisticated (through the inclusion of advanced content such as audio and video) and as the delivery mode for on-line instruction evolves from a one-to-many topology to a web or mesh topology where all learners can directly interact with each other and with the instructor, the demand for transmission capacity or bandwidth will continue to grow at a significant rate. This growth in bandwidth demand will impact not only the campus network but perhaps more significantly, the wide area network. The institution must actively identify and pursue every opportunity to address the bandwidth issue. This will include insuring that the next generation of campus network is defined, funded and under construction well before the practical capacities of the existing network are reached. Similarly, opportunities to participate in high capacity, wide area networking systems such as the LEARN network and future networks must be identified and exploited. E. Local Area Network Technology Refresh The primary equipment used to provide basic network data transport services for the campus local area network is nearing the end of its life. Some of the critical equipment is already at end of life. Because maintenance services are generally no longer available from equipment manufacturers when equipment reaches end of life, plans for funding new network infrastructure should be developed now. Page 14 The University of Texas of the Permian Basin Information Resources Division – Compact 2009 Rev 11-14-2007 Page 15 rev 1