Award Number: PR/J Number: R8230100233 P ROJECT A BSTRACT Colorado Plateau Cooperative Ecosystem Studies Unit (Cooperative Agreement # H1200-09-0005) Park: Grand Canyon-Parashant National Monument Project Title: Targeted Vegetation Survey and Preparation of NPS Technical Report on the Flora of Grand Canyon-Parashant National Monument, Arizona (OR Annotated Vascular Plant Database and Publication for Grand Canyon-Parashant National Monument – Phase II) Funding Amount: $49,893.00 CPCESU Partner Institution: Southern Utah University Principal Investigator: Terri J. Hildebrand, Professor, Department of Biology, College of Science, Southern Utah University, 351 West University Boulevard, Cedar City, UT 84720; 435.586.7943; hildebrand@suu.edu Floristic Consultant: Walter Fertig, Moenave Botanical Consulting, 1117 West Grand Canyon Drive, Kanab, UT 84741; 435.644.8129; walt@kanab.net NPS Key Official/ATR: Jeff Bradybaugh, Superintendent, Grand Canyon-Parashant National Monument, 345 East Riverside Drive, St. George, UT; 435.688.3226; jeff_bradybaugh@nps.gov NPS Advisors: Jeff Bradybaugh, Superintendent, Grand Canyon-Parashant National Monument, 345 East Riverside Drive, St. George, UT; 435.688.3226; jeff_bradybaugh@nps.gov Start Date: 21 June 2010 End Date: 02 April 2012 ABSTRACT The completion of Phase I of the Annotated Vascular Plant Database and Publication for Grand Canyon-Parashant National Monument yielded a Report and Master Species Checklist. The Master Species Checklist was subdivided into four lists based on the following groups of species: 1) occurring within boundaries of the monument as confirmed by voucher specimens, 2) reported in the literature, but not confirmed by a specimen, 3) known from the vicinity, but not recorded from PARA, and 4) falsely reported or highly questionable as occurring within monument boundaries. A total of 1012 taxa, representing 93 families, were recorded as present or reported in the flora of the Monument. Also accomplished during Phase I was the mounting and deposition of 300 1 herbarium specimens at PARA. Six regions were targeted for future field vegetation inventories including monument lands lying close to lands just outside PARA boundaries: Lime Kiln Canyon, Black Rock Area, Toroweap Area, Grand Wash Bay, Main Street Valley, and Mount Trumbull School Area. This project (Phase II) is an expansion of Phase I with the specific objectives to: 1) inventory regions of interest identified during Phase I, 2) collect flora specimens from sampled areas, 3) contribute collections to the Grand Canyon-Parashant Monument and Southern Utah University Herbaria, 4) provide service-learning outreach opportunity with Southern Utah University students, and 5) generate a NPS General Technical Series publication summarizing the flora of Grand Canyon-Parashant National Monument. Accomplishment of these tasks will occur through a series of field surveys over two growing seasons (2010 and 2011) and consist of 30+ days of inventory. Floristic collections will document species occurrences, including information on rare and weedy species. An Annual Progress Report summarizes results from the 2010 inventories whereas the project culminates in an NPS Technical Report detailing data collected and conclusions reached after both sampling periods. Information gathered in this effort will help Monument managers better understand the flora of PARA leading to more informed management decisions. Keywords: Inventory Floristic Survey Vouchers Herbarium Service-Learning 2