SiGe BiCMOS for Liquid Argon Front End Electronics May 4, 2007 Mitch Newcomer, Sergio Rescia LAr Signal Processing for SLHC It’s likely that front end boards for LAr will need to be redesigned to meet radiation tolerance, rate and shaping requirements for SLHC. SiGe bipolar is being explored for the inner detector offers a potentially ideal technology for a next generation front end. Low rb good noise performance Hi Gm/Ic best current gain vs power technology. Mixture of bipolar with CMOS excellent for analog design Lateral PNP’s ?? Possibly rad hard enough for LAr. 3 May 2007 LAr Upgrade work FY08 2 LAr Upgrade FEB baseline design 3 May 2007 LAr Upgrade work FY08 3 FY07 - 08 Objectives • Finish qualifying round of Radiation Studies with SCT. • Study radiation effects on matching, noise on selected technology. • Design work First Round : Building Blocks: current sources / references… Preamp topologies Shaper block Input protection • Prototype run: Shared IBM run with SCT (8WL thru MOSIS $90K) IHP?? 3 May 2007 LAr Upgrade work FY08 4 BNL • Finish 8WL irradiation • Help develop noise testing program • Examine/develop Preamp topologies and associated test structures. • Organize prototype run 3 May 2007 LAr Upgrade work FY08 5 Preliminary work on Preamp 3 May 2007 LAr Upgrade work FY08 6 Spice Simulations 3 May 2007 LAr Upgrade work FY08 7 Preamp Linearity Optimization 3 May 2007 LAr Upgrade work FY08 8 BNL manpower Analog Design Sergio Rescia (EE) - 35% JF Pratte (EE) - 25% SiGe Device Measurement R. Hackenberg J. Kierstead S. Rescia Technician 3 May 2007 - 20% (Meas. Firm/soft ware) 10% ( Gamma irradiation) 15% ( Measurement/ Org.) 20% LAr Upgrade work FY08 9 Penn • • • • • Investigate Noise in SiGe Bipolar Devices with BNL. Understand / Design input protection structures. Study/design SiGe BiCMOS Shaping Blocks. Facilitate front end Preamp Design. Measure fabricated devices. 3 May 2007 LAr Upgrade work FY08 10 Shaper Design Work Reduce Power 3 May 2007 LAr Upgrade work FY08 11 SiGe Resources People Mitch Newcomer Nandor Dressnandt Student (EE) Travel 3 May 2007 25 % 20 % 50 % $3K LAr Upgrade work FY08 12 Nevis • Setting up a device measurement facility to participate in radiation testing program. • Postdoc arrives in May: will get started with visit to Penn to go over parametric testing. • Tasks: Proton exposure at Mass General. Measure devices pre/post rad … 3 May 2007 LAr Upgrade work FY08 13 FY08 Preliminary Budget 3 May 2007 LAr Upgrade work FY08 14