Development of Analog Front-End

advertisement
SiGe BiCMOS
for
Liquid Argon Front End Electronics
May 4, 2007
Mitch Newcomer, Sergio Rescia
LAr Signal Processing for SLHC
It’s likely that front end boards for LAr will need to be
redesigned to meet radiation tolerance, rate and shaping
requirements for SLHC.
SiGe bipolar is being explored for the inner detector offers a
potentially ideal technology for a next generation front end.
Low rb  good noise performance
Hi Gm/Ic  best current gain vs power technology.
Mixture of bipolar with CMOS  excellent for analog design
Lateral PNP’s ?? Possibly rad hard enough for LAr.
3 May 2007
LAr Upgrade work FY08
2
LAr Upgrade FEB baseline design
3 May 2007
LAr Upgrade work FY08
3
FY07 - 08 Objectives
• Finish qualifying round of Radiation Studies with SCT.
• Study radiation effects on matching, noise on selected
technology.
• Design work First Round :
Building Blocks: current sources / references…
Preamp topologies
Shaper block
Input protection
• Prototype run:
Shared IBM run with SCT (8WL thru MOSIS $90K)
IHP??
3 May 2007
LAr Upgrade work FY08
4
BNL
• Finish 8WL irradiation
• Help develop noise testing program
• Examine/develop Preamp topologies and
associated test structures.
• Organize prototype run
3 May 2007
LAr Upgrade work FY08
5
Preliminary work on Preamp
3 May 2007
LAr Upgrade work FY08
6
Spice Simulations
3 May 2007
LAr Upgrade work FY08
7
Preamp Linearity Optimization
3 May 2007
LAr Upgrade work FY08
8
BNL manpower
Analog Design
Sergio Rescia (EE) - 35%
JF Pratte
(EE) - 25%
SiGe Device Measurement
R. Hackenberg
J. Kierstead
S. Rescia
Technician
3 May 2007
-
20% (Meas. Firm/soft ware)
10% ( Gamma irradiation)
15% ( Measurement/ Org.)
20%
LAr Upgrade work FY08
9
Penn
•
•
•
•
•
Investigate Noise in SiGe Bipolar Devices with BNL.
Understand / Design input protection structures.
Study/design SiGe BiCMOS Shaping Blocks.
Facilitate front end Preamp Design.
Measure fabricated devices.
3 May 2007
LAr Upgrade work FY08
10
Shaper Design Work
Reduce Power
3 May 2007
LAr Upgrade work FY08
11
SiGe Resources
People
Mitch Newcomer
Nandor Dressnandt
Student (EE)
Travel
3 May 2007
25 %
20 %
50 %
$3K
LAr Upgrade work FY08
12
Nevis
• Setting up a device measurement facility
to participate in radiation testing program.
• Postdoc arrives in May: will get started with
visit to Penn to go over parametric testing.
• Tasks:
Proton exposure at Mass General.
Measure devices pre/post rad …
3 May 2007
LAr Upgrade work FY08
13
FY08 Preliminary Budget
3 May 2007
LAr Upgrade work FY08
14
Download