US CMS HCAL Meeting Boston University Vasken Hagopian Florida State University October 2002 US CMS HCAL at BU 1 HPD QE & K27 Spectrum HPD Quantum Efficiency and Spectra 25 RM2 20 RM3 RM4 % 15 RM6 10 RM7 RM8 5 Megatile 0 450 500 550 600 650 Wavelength in nm October 2002 US CMS HCAL at BU 2 Test Beam results HPD Variation 1.40 1.30 Ratio of QIE 1.20 Pi- 1.10 e+ 1.00 Mu- 0.90 LED 0.80 0.70 0.60 0 2 4 6 8 Phi segment October 2002 US CMS HCAL at BU 3 QE x K27 Spectrum RM's in Test Beam 1.40 1.30 1.20 1.10 Ratio QE x K27 spectrum 100 GeV e- 1.00 225 GeV mu150 GeV pi- 0.90 0.80 0.70 0.60 1 2 3 4 5 6 7 8 9 RM number October 2002 US CMS HCAL at BU 4 Conclusions 1. The test beam measurements are not compatible with the QE of the HPD’s. 2. The HPD QE provided by DEP are not standard bi-alkali nor green extended bi-alkali. 3. We need to find out what DEP is actually measuring. October 2002 US CMS HCAL at BU 5 HB/HE LED and Laser • • • • From Test Beam at CERN in 2002 Nichia blue LED barely excites K27 fluor. The LED light to HPD is mostly scattered blue light. Easy to correct so LED light to HPD should be very similar to megatile. Use green LED that is 2.5 times brighter. (See K. Johnson talk). Green LED at 5 volt and 25 nsec should correspond to over 1 TeV. October 2002 US CMS HCAL at BU 6 HB/HE LED and Laser • Basic calibration module design is good. • Laser distribution has been measured in the lab with splitters and the correct length of quartz fibers. Measurements with Pin Diodes and corrected for HPD. • QE of Pin Diode 80%, QE of HPD ~10% with a gain of 2000. October 2002 US CMS HCAL at BU 7 Laser system • 1. 2. 3. 4. Laser to Calorimeter sector (e.g HB+) to Calibration box to HPD. 337 nm UV. Pin1 = 25pC. Pin2 = 3pC, HPD = 30 pC. 380 nm with dye laser. Pin1 = 50pC, Pin2 = 6pC, HPD = 60 pC. UV laser to megatile 4 pC. Dye Laser to megatile 0.3 pC. October 2002 US CMS HCAL at BU 8 Progress • HB Calibration box on hold waiting for VECSEL connection determination. Most optical parts completed. • HE Calibration box, first prototype under construction (just completed). • HO Calibration box – box dimensions not yet specified. October 2002 US CMS HCAL at BU 9