17433 version 3 Page 1 of 4 Carry out controlled shutdown of thermal electricity generation plant Level 6 Credits 10 Purpose People credited with this standard are able to: demonstrate knowledge of thermal plant shutdowns; operate and monitor plant during a unit shutdown; and identify and respond to deviations in a controlled shutdown. Subfield Electricity Supply Domain Electricity Supply - Thermal Operations and Control Status Registered Status date 23 October 2001 Date version published 25 June 2007 Planned review date 31 December 2008 Entry information Recommended: National Certificate in Energy and Chemical Plant (Process Operation) (Level 4) with optional strands in Refrigeration, Steam Generation, Ancillary Operations, Geothermal, Waste Treatment, and Co-generation [Ref: 0141]; and National Certificate in Electricity Supply (Thermal Plant Operator) (Level 4) with strands in Thermal Operations, Combined Cycle Operations, and Co-generation Operations [Ref: 0894]; Unit 17448, Monitor turbine supervisory from a thermal electricity generation control room; and Unit 17428, Operate steam raising equipment from a thermal electricity generation control room; or demonstrate equivalent knowledge and skills. Accreditation Evaluation of documentation and visit by NZQA and industry. Standard setting body (SSB) Electricity Supply Industry Training Organisation Accreditation and Moderation Action Plan (AMAP) reference 0120 This AMAP can be accessed at http://www.nzqa.govt.nz/framework/search/index.do. New Zealand Qualifications Authority 2016 17433 version 3 Page 2 of 4 Special notes 1 This unit standard is intended for, but not restricted to, workplace assessment. The range statements within the unit standard can be applied according to industry specific equipment, procedures and processes. 2 Safety of personnel and plant must be a priority throughout the assessment. If the safety requirements are not met the assessment must stop and the candidate will be assessed as not yet competent. 3 Performance and work practices in relation to the elements and performance criteria must comply with all current legislation, especially the Electricity Act 1992, and any regulations and codes of practice recognised under that statute; the Health and Safety in Employment Act 1992; and the Resource Management Act 1991. Electricity supply industry codes of practice and documented industry procedures include the Safety Manual – Electricity Industry (SM-EI) (2004) Wellington: Electricity Engineers’ Association. A full list of current legislation and industry codes is available from the Electricity Supply Industry Training Organisation, PO Box 1245, Hamilton. 4 ‘Industry requirements’ include all the documented workplace policies, procedures, specifications, business and quality management requirements relevant to the workplace in which assessment is carried out. 5 The term ‘operate’ is defined as the remote operation, testing and commissioning of main and auxiliary thermal plant systems associated with large steam/electrical generation plant from a control room environment. Elements and performance criteria Element 1 Demonstrate knowledge of thermal plant shutdowns. Performance criteria 1.1 Shutdown steps are explained in accordance with industry requirements. Range 1.2 includes but is not limited to – de-loading, system shutdowns, dosing, cooling water systems, condensate and feedwater system, electrical, taking unit off load, offer profile. Shutdown unit responsibilities are described in accordance with industry requirements. Range includes but is not limited to – observations after trip, purge, topping up boiler, feedpump shutdown, breaking vacuum, system shutdowns, oil pumps, barring gear. New Zealand Qualifications Authority 2016 17433 version 3 Page 3 of 4 Element 2 Operate and monitor plant during a unit shutdown. Performance criteria 2.1 Status of systems is monitored throughout the shutdown procedure. 2.2 Routine operations are carried out in accordance with industry requirements. Range includes but is not limited to – unit shutdown. 2.3 Actions are logged in accordance with industry requirements. 2.4 Operating decisions are determined in accordance with plant status and industry requirements. Range 2.5 includes but is not limited to – plant availability and service condition, resource consent and loading limits, impact on operations, options. Plant and equipment are monitored in accordance with industry requirements. Element 3 Identify and respond to deviations in a controlled shutdown. Performance criteria 3.1 Deviations from normal operating conditions are identified, reported and explained in accordance with industry requirements. Range 3.2 Possible emergency situations are identified and plant procedures are located and explained in accordance with industry requirements. Range 3.3 includes but is not limited to – drum level excursions, barring gear fail to start, electrical supply failures, drain valves failed to open, unit fail to de-excite, over pressurisation. includes but is not limited to – turbine stop and control valve fail to close, overspeed, post trip flame detection. Plant safety procedures are followed in accordance with industry requirements. Please note Providers must be accredited by NZQA, or an inter-institutional body with delegated authority for quality assurance, before they can report credits from assessment against unit standards or deliver courses of study leading to that assessment. Industry Training Organisations must be accredited by NZQA before they can register credits from assessment against unit standards. New Zealand Qualifications Authority 2016 17433 version 3 Page 4 of 4 Accredited providers and Industry Training Organisations assessing against unit standards must engage with the moderation system that applies to those standards. Accreditation requirements and an outline of the moderation system that applies to this standard are outlined in the Accreditation and Moderation Action Plan (AMAP). The AMAP also includes useful information about special requirements for organisations wishing to develop education and training programmes, such as minimum qualifications for tutors and assessors, and special resource requirements. Comments on this unit standard Please contact the Electricity Supply Industry Training Organisation info@esito.org.nz if you wish to suggest changes to the content of this unit standard. New Zealand Qualifications Authority 2016