NZQA registered unit standard 28727 version 1 Page 1 of 4 Title Interpret the requirements of contract documents for infrastructure works supervision activities Level 4 Purpose Credits 10 This unit standard is designed for people in the infrastructure works industry who are responsible for executing the requirements of contract documents for infrastructure works activities. People credited with this unit standard are able to: interpret the requirements of infrastructure works contract documents; describe roles, duties, and responsibilities of parties empowered by infrastructure works contract documents; and determine communication and reporting requirements for infrastructure works contract documents. Classification Infrastructure Works > Infrastructure Works Supervision Available grade Achieved Explanatory notes 1 The following legislation and requirements apply to this unit standard, and must be complied with: Traffic Regulations 1976; NZS 3910:2003 Conditions of Contract for Building and Civil Engineering Construction, Standards New Zealand available at http://www.standards.co.nz; Local authority regulations; Contract documents. 2 Assessment against this unit standard must be based on evidence from a workplace context. 3 Definitions Company procedures refers to all documented policies, procedures, and methodologies of the candidate’s employer at the time of training including but not limited to those relating to health, safety, environment, quality, and operations. Contract documents refers to, all documents included in the signed contract. These usually include: general conditions of contract, special conditions of contract, operational requirements, project specifications, schedule of quantities, plans, and appendices. Infrastructure ITO SSB Code 101813 New Zealand Qualifications Authority 2016 NZQA registered unit standard 28727 version 1 Page 2 of 4 Outcomes and evidence requirements Outcome 1 Interpret the requirements of infrastructure works contract documents. Evidence requirements 1.1 Components of contract documents and their purpose and function are interpreted. Range 1.2 includes but is not limited to – general conditions, special conditions, project specifications, operational requirements, technical specifications, schedule of prices, appendices. Legislative and local authority requirements generally contained in contract documents are interpreted. Range requirements include but are not limited to – health, public safety, staff safety, Traffic Regulations 1976, resource consents, environmental protection, hazardous substances. 1.3 Requirements for bonds and insurance are interpreted in general terms. 1.4 The relationship between specific contract requirements and the duties of infrastructure works supervisors are interpreted. Range 1.5 requirements – payment schedules, contract period, contract programme, quality assurance, traffic management, variations, maintenance, penalties, performance measures, reporting procedures. Requirements of a nominated contract are described in accordance with the project and technical specifications. Outcome 2 Describe roles, duties, and responsibilities of parties empowered by infrastructure works contract documents. Evidence requirements 2.1 Roles, duties, and status of empowered persons are described in accordance with contract documents. Range Infrastructure ITO SSB Code 101813 roles – responsibility, authority, communication; duties – inspection, quality assurance. New Zealand Qualifications Authority 2016 NZQA registered unit standard 2.2 28727 version 1 Page 3 of 4 Duties and responsibilities of supervisors are described in accordance with contract documents and company procedures. Range work programming, organising materials, plant and labour, obtaining weather reports, directing, complying, recording (including weather conditions), monitoring, traffic safety, public, client and staff relations. Outcome 3 Determine communication and reporting requirements for infrastructure works contract documents. Evidence requirements 3.1 Communication requirements for a contract are determined in accordance with contract documents and company procedures. Range 3.2 traffic control, notifications, permits, approvals, safety, public relations, engineer, principal’s representative. Contract progress and final reporting procedures are determined in accordance with contract documents and company procedures. Range inspections, notices, records, output reports, performance reports, quality reports, measurement of areas and quantities, payment claims, variances in programmed work, variations. Replacement information This unit standard replaced unit standard 1502 Planned review date 31 December 2019 Status information and last date for assessment for superseded versions Process Version Date Last Date for Assessment Registration 1 19 February 2015 N/A Consent and Moderation Requirements (CMR) reference 0101 This CMR can be accessed at http://www.nzqa.govt.nz/framework/search/index.do. Please note Providers must be granted consent to assess against standards (accredited) by NZQA, before they can report credits from assessment against unit standards or deliver courses of study leading to that assessment. Industry Training Organisations must be granted consent to assess against standards by NZQA before they can register credits from assessment against unit standards. Infrastructure ITO SSB Code 101813 New Zealand Qualifications Authority 2016 NZQA registered unit standard 28727 version 1 Page 4 of 4 Providers and Industry Training Organisations, which have been granted consent and which are assessing against unit standards must engage with the moderation system that applies to those standards. Requirements for consent to assess and an outline of the moderation system that applies to this standard are outlined in the Consent and Moderation Requirements (CMR). The CMR also includes useful information about special requirements for organisations wishing to develop education and training programmes, such as minimum qualifications for tutors and assessors, and special resource requirements. Comments on this unit standard Please contact the Infrastructure ITO qualifications@infrastructureito.org.nz if you wish to suggest changes to the content of this unit standard. Infrastructure ITO SSB Code 101813 New Zealand Qualifications Authority 2016