Daimler-Chrysler Layered Process Audits (DCX LPA) Alberta Risner 1 6/28/2016 Goal Satisfy Daimler-Chrysler mandated LPA (Layered Process Audit) Training of Managers and Supervisors Satisfy Customer Specific Requirements and TS16949 requirements Continual Improvement 2 6/28/2016 Continual Improvement 3 6/28/2016 Where are we now? No Layered Process Audits (LPA) are currently being performed Training has been started at SRAF (Today) Input in Chrysler’s Powerway will begin when LPAs have started 4 6/28/2016 Training Training Training Training levels Training will be Painless will be Hands on will encompass all management will be completed 5 6/28/2016 Kinda Painless 6 6/28/2016 Past History No history on LPA We’re creating the line in the proverbial sand. Lessons Learned can and should apply 7 6/28/2016 What are our choices Not performing LPAs? Pitch in and get it done 8 6/28/2016 No Choice Pitch in and get it done Perform LPA as required Why No Choices ? 9 6/28/2016 Daimler-Chrysler Mandated 10 6/28/2016 What is a Layered Process Audit? (LPA) LPA is an ongoing system of process checks that verify proper methods, settings, operator craftsmanship, error proofing devices and other inputs are in place to ensure a defect free product. 11 6/28/2016 What is a Layered Process Audit (LPA)? Continued LPA’s assure that defined methods and work instructions are utilized, problem solving solutions are held in place, and all process issues are identified and quickly corrected. 12 6/28/2016 What is a Layered Process Audit? continued Two types of LPAs Auditing the Process itself Auditing the Error Proofing 13 6/28/2016 1. Process Audit 14 6/28/2016 LPA – Process Audit Process Audit: Auditor: All questions are to be answered with a checkmark "Y" or no "N" in the corresponding day's box. Non-conformances are to have corrective action recorded in the space provided and identified with the date (MM/DD/YY) Shift: __________ Mon Tues Wed Thurs Fri Item No. These Items Are to be Checked Every Audit Sat Please write the actual dates in the corresponding columns! Sun Corrective Action Taken Audit Area Section 1: Operator Instructions 1 2 3 4 5 Are operator instructions accessible at the work stations and made available without disruption to the work being performed? Do operators undersatnd their work instructions and is the work being performed follow the work instructions step by step? Do all operators performing containment activities have work instructions and have they been trained to the work instructions? Do all operators have a clear understanding of their jobs? Do they know the 'right' things to do, are they doing them correctly, and can they demonstrate Are operators filling out required forms and documentation and turning them into their supervisors per their work instructions? Section 2: Product Identification, Housekeeping and Workplace Organization 2 Is all product in the work area properly identified with product status clearly shown per work instructions and procedures QP-9 & 21. Are all containment, quarantine and product staging areas physically identified? 3 Are all work areas maintained in a state of order, well organized with good housekeeping? 4 Is suspect product properly identified per work instructions and procedure QP-9. 1 15 6/28/2016 LPA Process Audit continued Section 3: Process Monitoring and Process Control 1 Are Process Analysis Boards (PAB) filled out completely and correctly? 2 Are Process Analysis Board (PAB) charts filled out correctly and up-to-date? 3 Are Process Performance Boards (PPB) maintained? 4 Is all required information posted on Certified Operation Boards (COB)? 5 If required, are First Piece Approval tags being used and filled out correctly? Section 4: Customer Issues and Corrective Actions 1 Are operators aware of any customer complaints and internal quality issues / concerns? 2 Are corrective actions for customer complaints implemented and effective? (Obtain customer complaints from the Quality Manager.) 3 Are corrective actions for internal quality alerts and concerns implemented and effective? 4 5 If rework is being performed, are rework instructions available for the operator and are they being followed? Have operators reviewed and signed all orange boundary standard tags/parts? 16 6/28/2016 2. Error Proofing Audit 17 6/28/2016 Error Proofing Audit: Only Qualified Personnel can Perform Error Proofing Verification Audits Auditor: All questions are to be answered with a checkmark "Y" or no "N" in the corresponding day's box. Non-conformances are to have corrective action recorded in the space provided and identified with the date (MM/DD/YY) Shift: __________ Mon Tues Wed Thurs Fri Item No. These Items Are to be Checked Every Shift Sat Please write the actual dates in the corresponding columns! Sun Corrective Action Taken Audit Area Section 1: General 1 Are operators aware of the function and importance of any error proofing devices at their station? 2 Are all error proofing verification parts identified and maintained with due care? 3 Are all error proofing devices verified per work instructions? Are the verification results recorded? 4 When error proofing devices fail verification checks, are the proper employees notified? Is this contact documented? Is there any follow up? 5 Is there a 'reaction step' to direct operators when error proofing devices are not functioning? That is, how will the known defect or potential defect be detected in order to protect the customer in the absence of automotic error detection? 6 Are all operators performing error proofing verification checks trained to do so? Section 1: Work Cell Specific Will be unique for every work cell containing error proofing. 18 6/28/2016 How Long Will either LPA Take? On average 15 minutes 19 6/28/2016 What do we need to perform a LPA? A pen or pencil A Checklist Knowledge of the Process (A sense of humor helps) Commitment for success 20 6/28/2016 21 6/28/2016 LPA Frequency Plan Plant Manager-once a week Area Managers-once a week Production Supervisors-once a shift This Proposed Frequency will: Encourage Management Involvement Establish Operator Feedback Establishes Accountability 22 6/28/2016 First Layer of Management Supervisors Second Layer of Plant Staff and Plant Management Manager Third Layer of Management Corporate SRA Mold Supervisor / Manager Own Department Plating Supervisor / Manager Own Department Paint Supervisor / Manager Assembly Supervisor / Manager Quality Supervisor / Manager Quality Manager Maintenance Manger HR Manager Lean / Training Coordinator Assistant Plant Manager *Molding Manager *Plating Manager *Paint Manager *Assembly Manager Plant Manager Shipping Manager VP of Quality VP of Operations Quality Systems Engineer 1 Per Day 1 Per Day Own Department 1 Per Day Own Department 1 Per Day Own Department 1 Per Day Rotate Departments 1 Per Week Rotate Departments 1 Per Week Rotate Departments 1 Per Week Rotate Departments 1 Per Week Rotate Departments 1 Per Week Rotate Departments Rotate Departments Rotate Departments 1 Per Week 1 Per Week 1 Per Week Rotate Departments 1 Per Week Rotate Rotate Rotate Rotate Dock Audits Assembly Audit Assignment Paint Assigned Management Personnel Plating Assigned Management Category Molding SRA LPA Audit Frequency and Structure Departments Departments Departments Departments 1 Per Week 1 Per Week 1 Per Quarter 1 Per Quarter Rotate Departments 1 Per Quarter 23 Note: * = if there is no supervisor, then the area manager shall be considered the first layer of management. 6/28/2016