9.15.08 Mgmt Council Presentation

advertisement

ABA Management Council

September 15, 2008

UBAC Considerations

– Strategic Goal #1

• Meet Enrollment Targets

– Recruit New Students

– Class Schedule Supports

Enrollment Targets

• Student Retention

• Graduation Rates

– Cross Division Collaboration

– Division Priorities

– Multi-Year Financial Planning

• Position campus for recovery

Process

Extensive Review of Campus

Financial Information

Carry-forward Funds

Reserves

Baseline Allocations

All University Expenses/Central Costs

Long Term Obligations - Loans

Conversations with the

Provost and Vice Presidents

Questions/Conversation with

President and Cabinet

January Financial Assumptions

-

$4.4 M Campus Carry Forward Gap

$1.9 M Net New fees – Assuming 4%

- $6.3 M Net Reduction - Governor’s Budget

Funding to meet CSU “enrollment growth” and 4% cost increases

10% General Fund reduction ($16.6M)

- $2.0 M Unfunded Costs

- $ .5 M Reduction in Retirement Costs

-$10.3M Projected Structural Deficit

Recommendations

1. Eliminate Structural Gap in 08/09

– Concern for 2009/10 and beyond

2. Use One Time Funds

– Reduce Structural Gap

– Large One-Time Costs

3. Reserves

Recommendations – Step 1

1. Eliminate Structural Gap in 08/09

– Concern for 2009/10 and beyond

2. Use One Time Funds

– Reduce Structural Gap

– Large One-Time Costs

3. Reserves

1a. Reduce Gap from $10.3M to $7.1M

-

$4.4 M Campus Carry Forward Gap

$4.8 M Net New fees 10% (+ $2.9 M)

- $6.3 M Net Reduction - Governor’s Budget

Funding to meet CSU “enrollment growth” and

4% cost increases

10% General Fund reduction ($16.6M)

$1.3 M Interest Earnings (+ $1.3 M)

$3.0 M Unfunded Costs ( - $1.0 M)

- $ .5 M Reduction in Retirement Costs

- $7.1 M Projected Structural Deficit (+ $3.2M)

1b. Eliminate Remaining $7.1M Gap

• All University Expense $2.2M

– Pay Off Loans

• $1.445M Baseline Savings

– Various All University Cost

Decreases - $.7M

• Research Admin Space

• Sac State Magazine

• Risk Pool Premium

1b. Eliminate Remaining Gap (cont ’ d)

• Baseline Reductions to Divisions - $4.9 Million

– Academic Affairs

– Admin and Business Affairs

– Athletics

– Govt & Civic Affairs

– Info Resources & Tech

– Student Affairs

– Human Resources

– Office of the President

– University Advancement

-3.5% -$3.566 M

-3.5% -$.561 M

-1.0% -$.032 M

-0.0% -$.000 M

-5.0% -$.287 M

-2.0% -$.182 M

-3.0% -$.055 M

-3.5% -$.035 M

-3.5% -$.144 M

Recommendations – Step 2

1. Eliminate Structural Gap in 08/09

– Concern for 2009/10 and beyond

• Use One Time Funds

– Reduce Structural Gap

– Large One-Time Costs

1. Reserves

Sources of One-Time Funds - $8.61 M

• 2006/07 Central Carry Forward

– $3.1M AUE/Mandatory Costs

– $1.8M Interest Earnings

• 2007/08 Central Projected Surpluses

– $1.9M Benefits Pool

– $1.8M All University Expenses

• Insurance, Utilities, Space Rental, etc.

Use Central One Time Funds - $8.34M

• Pay Off Loans – $4.3 Million

• 2 CMS Loans $3.356 Million

• Benicia Hall

• Energy Bond

• Electrical Sub

$ .350 Million

$ .515 Million

$ .120 Million

– Baseline Savings $1.445 Million

• Old Bookstore Remodel - $3.5 Million

• One-Time Funding Requests - $.5 Million

Recommendations

1. Eliminate Structural Gap in 08/09

– Concern for 2009/10 and beyond

2. Use One Time Funds

– Reduce Structural Gap

– Large One-Time Costs

3. Reserves

Reserves

• Reserves

– $3.75M - Emergency/Disaster Reserve

• This is NOT an operating reserve!

– $0.25M - Liability Claim Reserve (1 claim)

• Should be at least $.5M (2 claims)

– $1.80M Operating Reserve (< 1%)

• Cushions

– $0.75M – Revenue offset (enrollment)

– $0.46M – Held for Final Adjustments

Addressed….

• If the State Budget is passed at the

January 2008 level (additional $97.6M reduction at CSU level)

– Sac State’s reduction will be ~ -$5.7M

• Our campus has one-time funds to absorb reductions

• Structural deficit will be carry forward into next fiscal year

Not Addressed….

Surprises

Future State or CSU Cuts – 2009/10 and beyond

– State Structural Gap – expect multi-year

– Unfunded Mandates

Divisions’

• Ongoing in 08/9 State Budget

Structural gap renewal costs

– Equipment, computing, telecom, voice mail, vehicles, furniture, etc.

– 60 year old campus – Deferred Maintenance

• mechanical/ electrical

• heating/cooling,

• water/sewer,

• painting, carpet, flooring, etc.

Questions?

Download