Building System Integration
Energy and Cost Analysis
Dan Hanley
Architectural Engineering Senior Thesis Presentation
Pennsylvania State University
Mechanical Option
Dan Hanley
Mechanical
Option
Presentation Outline
Project Outline
Existing Mechanical System
Design Conditions
Air Side System
Hydronic System
ASHRAE Standards
Standard 90.1
Standard 62.1
Mechanical System Redesign
Redesign Objectives
Sizing the Ground Loop
Ground Source Heat Pump
Dedicated Outdoor Air System
System Comparison
Energy Comparison
Cost Comparison
Environmental Comparison
Structural Breadth
Load Comparison
Member Comparison
Cost Comparison
Electrical Breadth
North Pocono High School
Dan Hanley
Mechanical
Option
Project Outline
Project Location:
Covington Township, PA
Delivery Method:
Design – Bid – Build
Design Base Bid:
$30 Million
Construction Dates:
July 2007 – Sept. 2009
Project Size:
3 Levels
230,000 ft2
North Pocono High School
Dan Hanley
Mechanical
Option
Presentation Outline
Project Outline
Existing Mechanical System
Design Criteria
Air Side System
Hydronic System
North Pocono High School
Dan Hanley
Mechanical
Option
Existing Conditions
Design Criteria:
Restrained by Budget
Follow the 2005 International Mechanical Code
Design Conditions:
Indoor Design Conditions
Outdoor Design Conditions
Cooling DBT
72 oF
Latitude
41.14o
Heating DBT
72 oF
Longitude
75.52o
Relative Humidity
50 %
Elevation
550 ft
Cooling Design DBT
87 oF
Heating Design DBT
5 oF
North Pocono High School
Dan Hanley
Mechanical
Option
Existing Conditions
Air Side System
16 Direct Expansion Rooftop Air Handlers
12 VAV AHU with Duct Mounted Hot Water Coils
100 VAV Box Reheat Coils
North Pocono High School
Dan Hanley
Mechanical
Option
Existing Conditions
Air Side System
16 Direct Expansion Rooftop Air Handlers
4 CV AHU with Hot Water Coils
Condition: Auditorium
2 – Multi-Use Space
Locker Room Area
North Pocono High School
Dan Hanley
Mechanical
Option
Existing Conditions
Hydronic System
2 – 7,000 MBH Oil Fired Boilers
Heating Coils in the AHU
Reheat Coils in the VAV Terminal Units
Return
Water
Supply
Water
Boiler 1
Chemical
Treatment
Pumps
Boiler 2
Air Separator
Expansion Tanks
North Pocono High School
Dan Hanley
Mechanical
Option
Presentation Outline
Project Outline
Existing Mechanical System
Design Conditions
Air Side System
Hydronic System
ASHRAE Standards
Standard 90.1
Standard 62.1
North Pocono High School
Dan Hanley
Mechanical
Option
ASHRAE Standards
ASHRAE Standard 90.1
Building Envelope
Fenestration is <40% of Total Enclosure
Opaque Surfaces
Element
Insulation
R-Value
Standard
Min.
R-Value
Compliant
Assembly UValue
Assembly
Max. UValue
Compliant
Roof
10
20
No
0.681
0.48
No
Wall Type 1
10
11.4
No
0.67
0.09
Yes
Wall Type 2
10
11.4
No
0.093
0.09
No
Slab on Grade
NR
NR
NR
0.213
0.73
Yes
Max SHGC
Compliant
0.4
No
Fenestration
Fenestration
Metal Framing
North Pocono High School
Assembly UValue
0.5
Assembly
Max. U-Value
0.45
Assembly
SHGC
0.55
Dan Hanley
Mechanical
Option
ASHRAE Standards
ASHRAE Standard 90.1
Building Equipment
Building Area >25,000 ft2
Air Handler Compliancy
Unit
AHU-1
AHU-2
AHU-3
AHU-4
AHU-5
AHU-6
AHU-7
AHU-8
AHU-9
AHU-10
AHU-11
AHU-12
AHU-13
AHU-14
AHU-15
AHU-16
North Pocono High School
Air Flow
(cfm)
15,850
16,415
36,000
3,700
6,800
19,500
13,500
12,650
14,195
8,565
3,000
3,800
18,200
10,300
15,300
3,000
CFM*0.0015
Fan HP
Complaint
23.8
24.6
54.0
5.6
10.2
29.3
20.3
19.0
21.3
12.8
4.5
5.7
27.3
15.5
23.0
4.5
25
25
25
5
15
20
20
20
25
15
5
NA
30
10
25
5
No
No
Yes
Yes
No
Yes
Yes
No
No
No
No
NA
No
Yes
No
No
Dan Hanley
Mechanical
Option
ASHRAE Standards
ASHRAE Standard 62.1
ASHREA Standard
Designer Value
AHU-1
(cfm)
4,195
(cfm)
4,355
AHU-2
5,025
7,360
AHU-3
4,810
10,270
AHU-5
2,750
3,860
AHU-6
2,865
19,500
AHU-7
4,525
4,800
AHU-8
3,895
4,315
AHU-9
5,370
6,225
AHU-10
1,670
3,685
AHU-11
465
3,000
AHU-12
2,400
2,255
AHU-13
5,105
10,725
AHU-14
1,985
2,470
AHU-15
3,950
5,890
AHU-16
470
3,000
Total
Difference
49,480
91,710
Label
North Pocono High School
42,230
Dan Hanley
Mechanical
Option
Presentation Outline
Project Outline
Existing Mechanical System
Design Conditions
Air Side System
Hydronic System
ASHRAE Standards
Standard 90.1
Standard 62.1
Mechanical System Redesign
Redesign Objectives
Sizing the Ground Loop
Ground Source Heat Pump
Dedicated Outdoor Air System
North Pocono High School
Dan Hanley
Mechanical
Option
Mechanical System Redesign
Redesign Objectives
Lower Energy Use
Lower Life Cycle Cost
Lower Emissions
North Pocono High School
Dan Hanley
Mechanical
Option
Mechanical System Redesign
Dedicated Outdoor Air System (DOAS)
15 DOAS Units Replaced 15 DX AHU
Saved Energy
Saved in Operating Cost
Ground Source Heat Pumps (GSHP)
Sized to Handle the Majority of the Sensible Load
3 Different Models were Selected
North Pocono High School
Dan Hanley
Mechanical
Option
Mechanical System Redesign
DOAS
ASHRAE Standard 90.1
DOAS Compliancy
Unit
DOAS-1
DOAS-2
DOAS-3
DOAS-5
DOAS-6
DOAS-7
DOAS-8
DOAS-9
DOAS-10
DOAS-11
DOAS-12
DOAS-13
DOAS-14
DOAS-15
North Pocono High School
Air Flow
(cfm)
4,195
4,815
4,810
2,750
2,865
4,525
3,895
4,910
1,670
935
2,115
5,105
1,985
3,950
CFM*0.001
5
6.3
7.2
7.2
4.1
4.3
6.8
5.8
7.4
2.5
1.4
3.2
7.7
3
5.9
Fan HP
Compliant
5
5
5
3
3
5
5
5
1.5
1
3
5
2
5
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Dan Hanley
Mechanical
Option
Mechanical System Redesign
Sizing the Ground Loop
Building Heat Gains and Losses
Hours
8 a.m. – Noon
Noon – 4 p.m.
4 p.m. – 8 p.m.
8 p.m. – 8 a.m.
North Pocono High School
Heat Losses (MBh)
15186.2
15779.0
851.0
0
Heat Gains (MBh)
11621.7
11133.4
623.2
0
Dan Hanley
Mechanical
Option
Mechanical System Redesign
Sizing the Ground Loop
Piping Properties
North Pocono High School
Ground Properties
Dan Hanley
Mechanical
Option
Mechanical System Redesign
Sizing the Ground Loop
Ground Loop Layout and Location
Vertical Closed Loop
30 rows x 35 loops with 8 bores per a loop
140,000 ft2
North Pocono High School
Dan Hanley
Mechanical
Option
Mechanical System Redesign
Ground Loop Performance
Heating Capacity - 3,200 MBH
Heating Needed - 5,100 MBH
Ground
Loop
Conditioned
spaces
Boiler
North Pocono High School
Dan Hanley
Mechanical
Option
Mechanical System Redesign
GSHP Selection
Classroom Spaces
Console Water Source Heat Pumps
Dedicated Outdoor Air Ceiling Diffusers
Carrier’s Console Model
Typical Classroom
Space
Console Heat
Pump
North Pocono High School
Dan Hanley
Mechanical
Option
Mechanical System Redesign
GSHP Selection
Gymnasium
Auditorium
Carrier’s
Rooftop Heat Pump
North Pocono High School
Administrative Area
Cafeteria
Carrier’s Packaged
Heat Pump
Dan Hanley
Mechanical
Option
Presentation Outline
Project Outline
Existing Mechanical System
Design Conditions
Air Side System
Hydronic System
ASHRAE Standards
Standard 90.1
Standard 62.1
Mechanical System Redesign
Redesign Objectives
Sizing the Ground Loop
Ground Source Heat Pump
Dedicated Outdoor Air System
System Comparison
Energy Comparison
Cost Comparison
Environmental Comparison
North Pocono High School
Dan Hanley
Mechanical
Option
System Comparison
Energy Comparison
Energy Consumption Per Year
35,000,000
30,000,000
kBtu/yr
25,000,000
20,000,000
Current System
15,000,000
New System
10,000,000
5,000,000
0
Total Building Energy
75% Reduction In Building Energy
63% Reduction In Source Energy
North Pocono High School
Total Source Energy
Dan Hanley
Mechanical
Option
System Comparison
Cost Comparison
Total Utility Cost per Year
$300,000
Yearly Total
$250,000
$200,000
$150,000
Initial Cost
Column1
Cost ($)
New Mechanical Cost
50,291,756
Original Initial Cost
4,300,000
Difference
45,991,756
$279,972
$100,000
$50,000
$92,533
$0
Current System
New System
Current System – $1.30/ft2-yr
New System – $0.43/ft2-yr
North Pocono High School
New System Saves $187.4 Thousand
Dan Hanley
Mechanical
Option
System Comparison
Environmental Comparison
CO2 Yearly Emissions
SO2 and NOx Yearly Emissions
6,000,000
50,000
45,000
5,000,000
40,000
35,000
3,000,000
gm/yr
lbm/yr
4,000,000
2,000,000
1,000,000
30,000
25,000
Current System
20,000
New System
15,000
0
10,000
Current System
New System
5,000
0
Total Emissions Reduced by 75%
North Pocono High School
SO2
NOx
Dan Hanley
Mechanical
Option
Presentation Outline
Project Outline
Existing Mechanical System
Design Conditions
Air Side System
Hydronic System
ASHRAE Standards
Standard 90.1
Standard 62.1
Mechanical System Redesign
Redesign Objectives
Sizing the Ground Loop
Ground Source Heat Pump
Dedicated Outdoor Air System
System Comparison
Energy Comparison
Cost Comparison
Environmental Comparison
Structural Breadth
Load Comparison
Member Comparison
Cost Comparison
North Pocono High School
Dan Hanley
Mechanical
Option
Structural Breadth
Roof Structure
Non- Composite 1.5” 20 gauge steel deck – 7.0 psf
Supported by Steel Joists
Joists Bear on 8” CMU Walls
North Pocono High School
Dan Hanley
Mechanical
Option
Structural Breadth
Load Comparison
Controlling Snow Load – 39 psf
CURRENT ROOF LOADS
REDESIGNED ROOF LOADS
Unit
Weight
(lbs)
Weight
(lbs/ft2)
Unit
Weight
(lbs)
Weight
(lbs/ft2)
AHU-1
AHU-2
AHU-3
AHU-4
AHU-5
AHU-6
AHU-7
AHU-8
AHU-9
AHU-10
AHU-11
AHU-12
AHU-13
AHU-14
AHU-15
AHU-16
CU-2a
CU-2b
CU-3
CU-4
CU-5
CU-8
Total
8,295
9,360
23,752
2,816
4,903
12,815
6,602
5,553
8,364
4,903
4,891
1,896
9,965
4,731
8,364
4,891
4,057
4,057
3,998
484
484
531
135,712
61.4
32.8
52.8
33.4
45.5
46.1
43.2
39.6
41.2
45.5
55.7
26.2
32
39.1
41.2
55.7
43.4
43.4
29.4
28.9
28.9
20.9
886.3
DOAS-1
DOAS-2
DOAS-3
AHU-4
DOAS-5
DOAS-6
DOAS-7
DOAS-8
DOAS-9
DOAS-10
DOAS-11
DOAS-12
DOAS-13
DOAS-14
DOAS-15
RTG-1 (3)
RTG-2 (2)
x
x
x
x
x
Totals
4,975
4,975
5,575
2,816
3,280
3,260
4,975
3,260
4,975
3,160
2,720
2,855
5,075
3,160
3,260
1,960
1,770
x
x
x
x
x
62,051
43.7
43.7
49.0
33.4
38.2
38.0
43.7
38.0
43.7
36.8
31.7
33.3
44.4
36.8
38.0
59.6
53.9
x
x
x
x
x
705.9
North Pocono High School
55% Reduction in Weight
Dan Hanley
Mechanical
Option
Structural Breadth
Equipment Location
Current Locations
North Pocono High School
Redesigned Locations
Dan Hanley
Mechanical
Option
Structural Breadth
Member Comparison
Joist Comparison
Section
Joist Span
Joist Spacing
Current Joist
Redesigned Joist
Section 1
Section 2
29'- 4"
34'-8"
13'-1"
13'-0"
34'-8"
13'-4"
38'-0"
13'-0"
13'-0"
11'-4"
10'-0"
43'-8"
10'-8"
25'-8"
13'-0"
34'-4"
5'-2"
5'-8"
5'-6"
5'-10 1/8"
5'-7 1/2"
5'-0"
5'-7 1/2"
5'-10 1/8"
5'-4"
4'-9"
4-9"
5'-6 1/2"
6'-2"
5'-7 1/2"
5'-10 3/4"
5'-9"
22K9
24K9
16KCS3
12K3
24k9
16KCS3
24K9
12K3
16KCS3
16KCS3
12K5
28K12
12K3
20K6
12K3
24K9
16K2
18K3
10K1
10K1
26k6
10K1
28k6
10K1
10K1
10K1
10K1
30K9
10K1
24K4
10K1
22K4
Section3
Section 4
Section 5
North Pocono High School
Dan Hanley
Mechanical
Option
Structural Breadth
Cost Comparison
Material and Construction Cost
$250,000.00
$200,000.00
$150,000.00
$100,000.00
$50,000.00
$0.00
Current System
New System
New System saves 17% of the Initial Cost
North Pocono High School
Dan Hanley
Mechanical
Option
Presentation Outline
Project Outline
Existing Mechanical System
Design Conditions
Air Side System
Hydronic System
ASHRAE Standards
Standard 90.1
Standard 62.1
Mechanical System Redesign
Redesign Objectives
Sizing the Ground Loop
Ground Source Heat Pump
Dedicated Outdoor Air System
System Comparison
Energy Comparison
Cost Comparison
Environmental Comparison
Structural Breadth
Load Comparison
Member Comparison
Cost Comparison
Electrical Breadth
North Pocono High School
Dan Hanley
Mechanical
Option
Electrical Breadth
Electrical Load Comparison
Current Electrical Data
Equipment
AHU-1
AHU-2
AHU-3
AHU-5
AHU-6
AHU-7
AHU-8
AHU-9
AHU-10
AHU-11
AHU-12
AHU-13
AHU-14
AHU-15
AHU-16
Pump-1
Pump-2
Pump-3
Boiler -1
Boiler -2
CU-2a
CU-2b
CU-3
CU-4
CU-5
Total
Amps
230.56
226.25
66.51
134.40
71.00
180.10
166.25
230.00
135.94
17.19
49.6
135.69
109.12
103.02
17.19
46.75
46.75
46.75
6.33
6.33
230
230
75.81
43.38
43.38
2648.3
North Pocono High School
KVA
110.67
108.60
138.56
64.53
34.08
86.46
79.80
110.40
65.25
8.25
23.82
282.69
52.38
214.63
8.25
22.44
22.44
22.44
13.19
13.19
110.4
110.4
157.93
20.82
20.82
1902.44
New Electrical Data
Equipment
DOAS-1
DOAS-2
DOAS-3
DOAS-5
DOAS-6
DOAS-7
DOAS-8
DOAS-9
DOAS-10
DOAS-11
DOAS-12
DOAS-13
DOAS-14
DOAS-15
Pump-1
Pump-2
RTG-1a
RTG-1b
RTG-1c
RTG-2a
RTG-2b
Total
Amps
95.62
105.63
103.75
67.50
72.50
88.12
80.00
175.00
59.37
49.37
62.50
292.50
59.37
80
46.75
46.75
67.36
67.36
67.36
40.31
40.31
1767.43
KVA
45.90
50.70
49.80
32.40
34.80
42.30
38.40
84.00
28.50
23.70
30.00
140.40
28.50
38.4
22.44
22.44
32.34
32.34
32.34
19.35
19.35
848.4
33% Reduction in Amps
55% Reduction in KVA
Dan Hanley
Mechanical
Option
Electrical Breadth
Current Main Panel
Redesigned Main Panel
North Pocono High School
Dan Hanley
Mechanical
Option
Conclusions
• $46 Million Increase in Mechanical First Cost
•$187.4 Thousand in Utility Savings
• Yearly Energy Consumption Reduced by 75%
•Building Emissions Reduced by 75%
•17% Material and Construction Cost for Smaller Roof Structure
•Electrical Consumption was Reduced by 55%
North Pocono High School
Dan Hanley
Mechanical
Option
Acknowledgments
North Pocono School District
Crabtree Rohrbaugh Assoc.
Greenman and Pedersen Inc.
Penn State AE Faculty
North Pocono High School
Thank You
Questions?
Download