URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building EXISTING CONDITIONS 1 • Located in Columbus, Ohio • 5 story – 100,000 SF building • March 2000 – January 2001 construction duration • Total project cost $7 million David Lee Structural Option URS – Arena District Office Building Building Statistics EXISTING CONDITIONS 2 OHIO BASIC BUILDING CODE 1998 STRUCTURAL STEEL CAST IN PLACE CONCRETE ACI 318 – “Building Code Requirement for Reinforced Concrete” ACI 301-89 – “Specification for Structural Concrete for Buildings” PRECAST CONCRETE ACI 318 – “Building Code Requirement for Reinforced Concrete” PCI MNL 120 – “PCI Design Handbook Pre-cast and Pre-stressed Concrete” METAL DECK MASONRY David Lee Structural Option URS – Arena District Office Building AISC Manual of Steel Construction AISI – “Specification for the Design of Cold-formed Steel Structural Members” SDI – “Design Manual for Composite Decks, Form Deck, and Roof Decks” ACI 530.1/ASCE 6/TMS 602 Table 1 Building Code EXISTING CONDITIONS David Lee Structural Option URS – Arena District Office Building 3 Typical Floor Framing EXISTING CONDITIONS 4 Y X Lateral Load Direction Factored Base Shear Due to WIND Factored Base Shear Due to SEISMIC North-South Loading Considered Y 281.38 kip 169.30 kips East-West Loading Considered X 142.8 kips 169.30 kips David Lee Structural Option URS – Arena District Office Building Existing Lateral System EXISTING CONDITIONS 5 X (inch) Y (inch) Seismic Story Drift Limit 0.672 0.164 3.36 0.825 0.185 3.36 0.948 0.232 3.36 1.011 0.229 3.36 0.912 0.209 3.84 Story Drift Center of Mass Center of Rigidity Height (feet) Floor to Floor Height X (inch) Y (inch) R 72 14 1.456 1.019 5 58 14 1.232 0.855 4 44 14 0.957 0.67 3 30 14 0.641 0.438 2 16 16 0.304 0.209 Floor David Lee Structural Option URS – Arena District Office Building Max Displacement Drift and Torsion PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building DEPTH STUDY 1 OBJECTIVES • Eliminate Moment Frames • Reduce Floor Depth CONSTRAINTS • North and West façade must be free of obstruction • Large open floor space must be maintained David Lee Structural Option URS – Arena District Office Building Objectives and Constraints DEPTH STUDY 2 Design: • Removed both moment frames • Added a braced frame Result: • Reduced eccentricity David Lee Structural Option URS – Arena District Office Building Steel Alternative DEPTH STUDY 3 Steel Member Size New steel frame identical to braced frame 1 David Lee Structural Option URS – Arena District Office Building Steel Alternative DEPTH STUDY 4 Constraint Met & Design Goal Achieved David Lee Structural Option URS – Arena District Office Building Steel Alternative DEPTH STUDY 5 Drift and Story Drift Floor R 5 4 3 2 Height (feet) 72 58 44 30 16 Floor to Floor Height 14 14 14 14 16 Max Displacement X (inch) Y (inch) 1.004 1.101 0.831 0.917 0.602 0.716 0.383 0.465 0.168 0.222 H/400 Drift 2.16 1.74 1.32 0.9 0.48 Story Drift X (inch) Y (inch) 0.519 0.184 0.687 0.201 0.657 0.251 0.645 0.243 0.504 0.222 H/400 Story Drift 0.42 0.42 0.42 0.42 0.48 Calculated Maximum Drift L/780 *due to wind David Lee Structural Option URS – Arena District Office Building Steel Alternative DEPTH STUDY 6 Concrete Design •Flat plate 2 way PT slab •CIP columns •Shearwalls David Lee Structural Option URS – Arena District Office Building Concrete Alternative DEPTH STUDY 7 Recalculate Loads •Self weight of building increase from 52 PSF to 106 PSF •Seismic lateral load controls in both X and Y direction David Lee Structural Option URS – Arena District Office Building 8.5” concrete slab with density of 150PCF = 106PSF LOAD TYPE WIND SEISMIC Factored Load In X direction Factored Load In Y direction 143 kip 323 kip 281 kip 323 kip Concrete Alternative DEPTH STUDY 8 PT Slab Design •Feasibility domain created to obtain possible force, eccentricity combination •Steel envelop developed after tendon force is determined David Lee Structural Option URS – Arena District Office Building Y X Concrete Alternative DEPTH STUDY Limit Floor Deflection 9 L = l/360 D+L = l/240 Max initial deflection = 0.1” Max sustained deflection = 0.46” Max long term deflection = 1.58” David Lee Structural Option URS – Arena District Office Building Concrete Alternative DEPTH STUDY 10 Interaction Diagram CIP Column 2500 •Perform gravity design •Consider slenderness effects •Check punching shear Force (k) 2000 1500 1000 500 0 0 100 200 300 400 500 600 700 Moment (ft-k) David Lee Structural Option URS – Arena District Office Building Concrete Alternative DEPTH STUDY 11 Shearwalls •Coincide with elevator shaft and stairwell •Max Drift = l/1000 Foundation •Larger footings needed •Existing foundations require 350CY of concrete •Concrete design require 1000CY of concrete for foundation David Lee Structural Option URS – Arena District Office Building Concrete Alternative PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building BREADTH STUDY 1 Considerations •Cost •Construction Duration •Constructability David Lee Structural Option URS – Arena District Office Building RS MEANS Steel Concrete Cost ($/SF) 15.58 16.80 Duration (days) 27 53 Cost and Schedule PRESENTATION OUTLINE 1. EXISTING CONDITIONS 2. DEPTH STUDY 3. BREADTH STUDY 4. CONCLUSION & RECOMMENDATION David Lee Structural Option URS – Arena District Office Building CONCLUSION & RECOMMENDATION Steel Concrete •Construction cost savings of $122,000 •Shorter construction duration •Majority of office building in Columbus use steel frame •Cost savings due to reduced floor depth •Flexibility in on-site alterations •No lead time David Lee Structural Option URS – Arena District Office Building Recommendation ACKNOWLEDGEMENTS URS Corporation Bill Huckleberry, Structural Engineer ONCORE Construction Raymond E. Sowers AE Faculty Professor Andres Lepage Professor M. Kevin Parfitt Professor Jelena Srebric Professor John Messner Rest of the AE Faculty AE Students Sean Flynn Brian Ault AND David Lee All my family and friends Structural Option URS – Arena District Office Building QUESTIONS ?