DOWNLOAD FINAL POWERPOINT

advertisement
Gateway Community College
Integrated Education Building
Phoenix, Arizona
Yuduo Zhao
5 Decemeber 2011
Lighting Schematic Design
1
2
Image courtesy of SmithGroup
3
Image courtesy of SmithGroup
4
Image courtesy of SmithGroup
Occupant: students, faculty and staff
Estimated completion: June 2012
Area: 136,849 SF
Cost: $34.1M
Levels: 3
Smithgroup + JJR:
Architecture
Lighting Design
5
6
7
IEB
8
IEB
IEB – 2011.11.18
9
10
Photo courtesy of Jungle_Boy
11
Photo courtesy of MatthewPHX
Average Summer High: 104.3°F
Average Annual Rainfall: 8.3 inches
110 days above 100 °F
12
Photo courtesy of MatthewPHX
13
Photo courtesy of signejb
Solution?
14
Photo courtesy of signejb
15
Photo courtesy of Jashim Salam
16
Photo courtesy of Angelica Vis
17
Photo courtesy of Elif Sanem Karakoc
18
Photo courtesy of Danny Santos II
19
Photo courtesy of biblegeek
3
5
2
4
1
20
1. Exterior Space
21
Design Criteria
•
•
•
Safety and security
Avoid skyglow
Rain puddles –
humanized, frugal
lighting
22
23
Image courtesy of SmithGroup
24
Image courtesy of SmithGroup
25
26
27
28
2. Atrium
2
1
3
4
5
29
Design Criteria
•
•
•
•
2
Wayfinding and socializing
Daylight integration
Public and private Flynn 1
impression
Rain flow – vertical
3
4
illumination
5
30
31
Image courtesy of SmithGroup
32
33
34
35
Public
36
Private
37
38
3. Library
2
1
3
4
5
39
Design Criteria
•
•
•
•
2
Separate reading and
circulation areas
Visual clarity
Daylight integration
Rain leads the way to
3
4
knowledge
1
5
40
41
42
43
44
45
46
47
48
49
50
51
52
53
Images courtesy of Stacee Kalmanovsky
Day
54
Night
55
4. Corridor
56
Design Criteria
•
•
•
•
Wayfinding and socializing
Glare control
Daylight integration
Rain as navigator
57
58
59
60
61
62
63
64
65
5. Multipurpose
Classroom
1
2
3
4
5
66
Design Criteria
•
•
•
•
2
Flexible modes for different
functions
Point of interest = front of 1
classroom
Rain as aesthetic identity
3
4
Three design options
5
67
68
Image courtesy of SmithGroup
Task Lighting
System
69
Image courtesy of SmithGroup
70
Image courtesy of SmithGroup
71
Image courtesy of SmithGroup
i) Raindrops
72
Photo courtesy of freefotouk
73
74
ii) Rain Splatter
75
Photo courtesy of Anthony Redpath
76
77
iii) Rain Clouds
78
Photo courtesy of Joanna Paterson
79
80
Day
Photo courtesy of SmithGroup
81
Night
82
Gateway Community College
Integrated Education Building
Phoenix, Arizona
Yuduo Zhao
5 December 2011
Lighting Schematic Design
83
Download