Joe Sharkey Structural Option Christiana Hospital 2010 Project Newark, DE Scope of Presentation • • • • • • • • Introduction Structural Overview Proposed Changes Effects of Sectioning Structure on the Lateral System Post-Tensioned Slab Design Cost/Schedule Comparison Acoustical Design Conclusions Introduction • • • • • • Occupant – Christiana Care Project Cost - $126 Million 360,000 ft2 addition Design-Bid-Build 8 Story Hospital 2 Story Conference Wing Creates additional: • 216 Beds • Operating Rooms • Catheterization Labs • Emergency Exam Rooms Structural Overview • • • • • Hospital (Main Tower) 42” thick mat foundation 9 ½” two-way reinforced concrete slab 5 ½” drop panels around columns 24”x24” concrete columns (11) 12” thick concrete shear walls Structural Overview • • • • • Conference Wing Spread Footings Steel Framing 3 ¼” lightweight concrete over 2” metal deck 4 concentrically braced frames Large 63’ span at the center Proposed Changes • Divide Main Tower into two independent structures Create a more symmetrical building Reduce lateral load due to torsional effects on shear walls Reduce size/number of shear walls for cost/schedule savings • Create a post-tensioned design Deletion of drop panels Save on formwork/labor Compare cost and schedule Effects of Sectioning Structure M 65 Effects of Sectioning Structure CM2 CM1 CR2 CR1 Effects of Sectioning Structure Shear WallForces Forces Shear Wall Wall # 4 O rigional Design My Design (With Expansion Joint) O rigional Design My Design (With Expansion Wall # Story V (k) M (ft-k) V (k) M (ft-k) Story V (k) M (ft-k) V (k) M (ft-k) 1 ROOF 32.03 426.036 -53.84 -969.052 EIG H TH STO R Y 32.03 579.452 81.88 -969.052 SEVENTH STO R Y 32.03 763.681 191.1 2488.788 SIXTH STO R Y 164.89 2029.899 284.95 5718.17 FIFTH STO R Y 169.2 2968.093 367.71 9885.573 FO U R TH STO R Y 192.92 4094.922 353.38 13890.51 TH IR D STO R Y 209.03 5305.472 345.6 17807.3 SECO ND STO R Y 229.41 7317.371 341.66 23046.11 FIR ST FLO O R 295.72 9534.092 363.29 28132.12 2 ROOF 80.04 838.906 28.65 515.65 EIG H TH STO R Y 80.04 833.181 114.32 1963.741 SEVENTH STO R Y 80.04 986.541 182.79 4279.142 SIXTH STO R Y 291.29 2559.436 240.9 7009.398 FIFTH STO R Y 332.05 3529.071 287.04 10262.57 FO U R TH STO R Y 394.53 4696.832 375.93 14523.06 TH IR D STO R Y 443.48 5939.244 448.64 19607.68 SECO ND STO R Y 456.38 8122.908 504.21 27338.96 FIR ST FLO O R 404.19 9049.62 537.96 34870.4 3 ROOF -12.5 149.955 82.33 1481.993 EIG H TH STO R Y 30.32 566.247 32.32 1891.401 SEVENTH STO R Y 30.32 749.492 -7.32 1891.401 SIXTH STO R Y 162.24 2013.333 -45.46 1798.705 FIFTH STO R Y 168.29 2966.602 -78.46 1283.441 FO U R TH STO R Y 196.1 4119.22 12.22 727.069 TH IR D STO R Y 216.8 5358.93 103.48 1815.459 SECO ND STO R Y 241.39 7414.164 163.51 4322.631 FIR ST FLO O R -47.05 302.44 -846.864 9566.676 172.55 6738.285 362.82 RO O F 20.16 4 ROOF -47.05 -846.864 20.16 362.82 EIG H TH FLO O R 100.39 -846.864 148.76 2247.115 EIG H TH FLO O R 100.39 -846.864 148.76 2247.115 SEVENTH SEVENTH FLO O R FLO O256.34 3671.634 314.8 6234.543 R 256.34 3671.634 314.8 6234.543 6181.244 449.81 11332.35 SIXTH FLOSIXTH O R FLO O R 221.44221.446181.244 449.81 11332.346 FIFTH FLO O R 295.62 9531.597 557.19 17647.18 FIFTH FLOFO OU RR TH FLO O295.62 9531.597 642.06 557.19 17647.181 R 356.81 13575.48 24923.84 FO U RTH FLO 13575.475 642.06 24923.839 TH IRO DR FLO O R 356.81 405.91 18175.79 726.1 33152.95 R 458.14 25200.61 764.3 44872.18 TH IRD FLOSECO O RND FLO O 405.91 18175.793 726.1 33152.952 FIR ST FLO O R 486.43 32010.63 718.19 54926.84 SECO ND FLO O R 458.14 25200.607 764.3 44872.184 5 ROOF -8.79 -158.246 4.46 80.22 FIRST FLOEIG O RH TH FLO O 486.43 718.19 54926.843 R 75.7532010.63 801.254 75.58 1037.542 SEVENTH FLO O R 167.33 2920.764 170.6 3198.524 SIXTH FLO O R 193.35 5112.008 243.95 5963.327 FIFTH FLO O R 248.88 7932.635 301.76 9383.289 FO U R TH FLO O R 286.13 11175.45 345.71 13301.37 TH IR D FLO O R 313.5 14728.5 390.42 17726.15 SECO ND FLO O R 339.56 19935.04 412.73 24054.66 FIR ST FLO O R 407.04 25633.53 481.4 30794.31 Joint) Effects of Sectioning Structure A C ASCE7-02 (9.5.2.8 & 9.5.5.7.1) Seismic Use Group: III I=1.5 Cd=4.5 ∆amplified=(Cd*∆)/I ∆allowable=0.01h=0.01(118’)=14.16” Building Deflections at Roof ∆x ∆xamplified ∆y ∆yamplified Original Design 3.93 11.79 3.67 11.02 Area A (after 7.02 21.05 4.73 14.18 sectioning) Area C (after sectioning) 8.07 24.21 6.41 19.22 Effects of Sectioning Structure Building Deflections at Roof ∆x ∆xamplified ∆y ∆yamplified New Design Area A 3.93 11.79 3.67 11.02 New Design Area B 4.71 14.13 4.23 12.71 65 Post-Tensioned Slab Design Main Tower (First Floor) • • • • • Class U (uncracked concrete): ft < 7.5√f’c 10” Slab 5000 psi concrete Largest Span = 30’ Tendons in groups of 4 @ 6’ o.c. Exterior Span Interior Span 1¼” 10” 5” 1¼” 1¼” Post-Tensioned Slab Design Uniformly Spaced Tendons Main Tower (First Floor) ½”Ф – 270 ksi unbonded tendons in groups of 4 @ 6’ o.c. Stressing Pockets Expansion Joint Banded Tendons Main Tower (First Floor) Banded Tendons # Tendons 22 In-Plane Curve 20 > 6:1 18 16 14 12 8 Sustained Service Load Deflection Plan ∆max = L/360 = 1” Uniformly Spaced Tendons Main Tower (Typical Floors) ½”Ф – 270 ksi unbonded tendons in groups of 3 @ 3¾’ o.c. Expansion Joint Banded Tendons Main Tower (Typical Floors) Conference Wing (Typical Floor) Prestressed Beam 24x42 w/ 30 Tendons RC Beam 24x42 8#6 T&B 15” Slab Slab Tendons in groups of 3 @ 4 ½’ o.c. Prestressed Beam 18x42 w/ 15 Tendons RC Beam 16x42 4#7 T&B Construction Management Total Structural System Cost Without Added Shear Walls Concrete Structural Steel/ Misc. Metals Total Savings of My Design As Built $11,880,127 $9,320,230 $205,958 $2,897,875 $12,086,085 $12,218,105 $132,020 Total Structural System Cost With Added Shear Walls Concrete Structural Steel/ Misc. Metals Total Added Cost of My Design As Built $12,096,298 $9,320,230 $205,958 $2,897,875 $12,302,256 $12,218,105 $84,151 Construction Management Project Schedule Main Tower Conference Wing Start Date Finish Date Start Date Finish Date As Built 9/1/2004 3/1/2005 1/17/2005 3/11/2005 My Design 9/1/2004 1/12/2005 1/17/2005 3/31/2005 Time Savings Time Lost 49 Days 20 Days Acoustics 12’ Ceiling Height Materials Used: 63’ •5/8” Gypsum •4’x4’ Armstrong Optima Ceiling Tiles •Softwall ½” Acousticotton •Carpeting •Upholstered Seats 61’ Acoustics As Built Room Surface Floor Floor Wall Wall Wall Wall Wall Ceiling Material Carpet on Concrete Audience in U polstered Seats 5/8" G ypsum on Metal Studs Wood Paneling and Doors Softwall - 1/2" Acousticotton G lass Curtin Armstrong O ptima 3255 4'x4' Tile 5/8" G ypsum Ceiling Target R everb. Time: 0.7-1.1 sec. Area (ft 2 ) Price/ft 2 Cost $0.32 $231.82 $1.50 $2,632.71 0.97 $4.10 $11,657.08 0.03 7699.55 0.03 7963.56 $0.32 $1,334.32 $15,855.93 0.32 0.31 3304 500 0.14 Absorption Coefficient (H z) 1000 2000 0.37 0.6 4000 0.65 1220.6 0.88 0.96 0.93 0.85 724.45 0.05 0.03 0.03 0.03 619.75 0.17 0.09 0.1 0.11 1755.14 0.22 0.54 0.81 1 35.33 98 0.18 0.4 0.12 0.4 0.07 0.5 0.04 0.5 2843.19 0.84 1.01 1.02 4169.75 a= ?Sα T 60 (sec.) 0.05 4706.73 0.03 6459.69 0.59 0.39 $15,855.93 Acoustics My Design Surface Floor Material Area (ft 2) Carpet on Concrete 3304 Audience in Floor 1220.6 U polstered Seats 5/8" Gypsum on Wall 2289.57 Metal Studs Wood Paneling Wall 619.75 and Doors Softwall - 1/2" Wall 192 Acousticotton Wall G lass 35.33 Wall Curtin 98 Armstrong Ceiling O ptima 3255 0 4'x4' Tile 5/8" Gypsum Ceiling 7012.94 Target Reverb. Time: a=∑Sα 0.7-1.1 sec. T60 (sec.) Price/ft 2 Cost $0.32 $732.66 $1.50 $288.00 0.97 $4.10 $0.00 0.03 3774.77 0.66 $0.32 $2,244.14 $3,264.80 500 0.14 Absorption Coefficient (Hz) 1000 2000 0.37 0.6 4000 0.65 0.88 0.96 0.93 0.85 0.05 0.03 0.03 0.03 0.17 0.09 0.1 0.11 0.22 0.54 0.81 1 0.18 0.4 0.12 0.4 0.07 0.5 0.04 0.5 0.84 1.01 1.02 0.05 2194.97 1.14 0.03 2876.23 0.87 0.03 3665.6 0.68 $3,264.80 Acoustics Benefits: •Target Reverberation Time Met •Cost Savings of $12,591 Conclusions Sectioning Structure into two Independent Structures: • Increased Forces • Required Additional Walls • Increased Both Cost and Schedule Post-Tensioned Design: • • • • Created a Lighter Building Allowed for Deletion of Drop Panels Decreased Both Cost and Schedule in Main Tower Increased Schedule in Conference Wing Acoustical Redesign: • Target Reverberation Time Met • Decreased Cost of Conference Room by $12,591 Acknowledgments •Cagley & Associates Frank Malits Joe Ajello James Lakey •Wilmot Sanz Sheila Williams •AE Faculty Dr. Memari Dr. Lepage Professor Parfitt •Suncoast Post-Tension •Acoustical Panel Resources •Armstrong •Marjam Supply Questions