VIDA Fitness Center Washington D.C. Penn State Architectural Engineering Capstone Project Clara Watson | Construction Option | Advisor: Dr. Robert Leicht Building Overview Building: Existing Results Gym + New Addition Project Participants Owner: David von Storch Building Location: 1612 U Street NW, Washington DC Architect: Core Architects; Stoneking von Storch Building Size: 60,370 SF MEP Engineer: Allen and Shariff Engineers Outline I. INTRODUCTION II. PROJECT OVERVIEW I. BUILDING OVERVIEW II. PROJECT PARTICIPANTS III. BUILDING LOCATION IV. CONSTRUCTION SITE PLAN Number of Stories: 4 Stories + Penthouse/Accessible Roof Structural Engineer: Rathgeber-Goss Associates Occupancy / Function Type: Fitness Gym, Salon, Spa, Restaurant Interior Designer: Wade Allyn Hallock Interiors Project Cost: $14 Million General Contractor: Forrester Construction Company Dates of Construction: September 2010 – August 2011 Project Delivery Method: Design – Bid – Build with Design Assist Contract Type: Negotiated III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Building Location Construction Site Plan Outline I. INTRODUCTION II. PROJECT OVERVIEW I. BUILDING OVERVIEW II. PROJECT PARTICIPANTS III. BUILDING LOCATION IV. CONSTRUCTION SITE PLAN III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Located on the U Street Corridor: D.C. Historic District Analysis 1: ReRev Energy Harvesting System ReRev System Overview Captures kinetic energy produced in the form of DC power generated from cardio equipment use and converts it to AC power to be fed back into the grid STEP 1: Kinetic Energy to DC Power STEP 2: DC Converted to AC Current STEP 3: AC Current Fed Back into Grid Cardio Equipment Usage Outline Crowd Farming: The collective impact of small contributions from a mass of people I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM Cardio Equipment Usage Summary Per Equipment Type Day Treadmills Ellipticals Sundays Mondays Tuesdays Wednesdays Thursdays Fridays Saturdays Average 14.00 18.00 18.00 18.00 18.00 18.00 14.00 16.86 13.00 18.00 18.00 18.00 18.00 18.00 14.00 16.71 Stair Masters Upright Bikes 12.00 18.00 18.00 17.00 18.00 17.00 14.00 16.29 10.00 18.00 17.00 17.00 16.00 16.00 14.00 15.43 Recumbent Daily Average Bikes 10.00 11.80 18.00 18.00 17.00 17.60 16.00 17.20 16.00 17.20 16.00 17.00 14.00 14.00 15.29 16.11 I. REREV SYSTEM OVERVIEW II. CARDIO EQUIPMENT USAGE III. POTENTIAL FUNDING AND INCENTIVES IV. COST AND PAYBACK ANALYSIS V. REREV SYSTEM SURVEY VI. SOCIAL IMPACT IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS The Total ReRev System Cost Provided is $148,000 IX. QUESTIONS Potential Funding and Incentives PEPCO C&I Energy Savings Program: Total $14,311.10 Brainstorming Renewable Energy Opportunities: $1,000.00 Renewable Energy Simulation Analysis for first 50,000 SF: $5,000.00 $0.03 is available for each additional SF: $311.10 Incorporating Designed Measures During Construction: $8,000.00 D.C. Renewable Energy Incentive Program: Total $16,500/Yr $1.50 Provided for first 3,000 Watts Produced: $4,500.00 $1.00 Provided for next 7,000 Watts Produced: $7,000.00 $0.50 Provided for next 10,000 Watts Produced: $5,000.00 Cost and Payback Analysis Year 1 2 3 4 5 Annual KW Savings $ 9,080.67 $ 9,534.70 $ 10,011.43 $ 10,512.01 $ 11,037.61 ReRev System Annual Savings Calculations With Incentives Annual A/C Potential Pepco Potential REIP Total Savings Savings Incentive Incentive $ 2,594.80 $ 14,311.10 $ 16,500.00 $ 42,486.57 $ 2,724.54 $ - $ 16,500.00 $ 71,245.81 $ 2,860.77 $ - $ 16,500.00 $ 100,618.01 $ 3,003.81 $ - $ 16,500.00 $ 130,633.82 $ 3,154.00 $ - $ 16,500.00 $ 161,325.42 Outline Potential Profit $ (105,513.43) $ (76,754.19) $ (47,381.99) $ (17,366.18) $ 13,325.42 I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM Months of Air Conditioning Savings: 11.43 Watts Generated Per Year: 70,175,160 REREV SYSTEM OVERVIEW II. CARDIO EQUIPMENT USAGE III. POTENTIAL FUNDING AND INCENTIVES IV. COST AND PAYBACK ANALYSIS Rise in Energy Costs Per Year: 5% ReRev Estimated Monthly Air Conditioning Savings: 30% I. V. REREV SYSTEM SURVEY VI. SOCIAL IMPACT IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Twenty Year Potential Profit of $582,371.52 ReRev System Survey Social Impact Outline Six Full Charges Would you consider using a fitness center that offered energy generating cardio equipment over a fitness center with typical cardio equipment? Survey – Question 3 8% 25% Kilograms of CO2 Saved: 41,648 kg Annually US EPA Study on Energy Generating Equipment: - Improved user understanding of renewable energy sources - Increased amount of participants engaging in positive environmental behavior INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM Ten Minutes of TV I. REREV SYSTEM OVERVIEW II. CARDIO EQUIPMENT USAGE III. POTENTIAL FUNDING AND INCENTIVES IV. COST AND PAYBACK ANALYSIS V. One Hour of Laptop Use LEED Gold Rating: 3 Additional Points for Renewable Energy REREV SYSTEM SURVEY VI. SOCIAL IMPACT IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. 67% Not Likely I. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT Neutral Very Likely Instead of an immeasurable quantity people find difficult to relate to, ReRev allows for energy to become a quantifiable value tied to activities and decisions in everyday life. 2.5 Hours of CFL Use VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS EQUIVALENT TO A 30 MINUTE WORKOUT Analysis 2: Overtime Effects on Productivity Overtime Effects on Productivity Wage Loss Calculations Outline Electrical Subcontractor Lost Wages (6-12s) Productivity levels decrease with: Increases in the number of work hours and work days per week Make Up Lost Time Scheduled Overtime Accelerate Project Schedule Ensure Project Doesn’t Fall Behind Productivity loss : Due mainly to the increase of disruptions Disruptions: The inability to acquire materials, tools, or other resources at an enhanced rate Regular OT Effective Regular Avg OT ProducEffective OT Hrs Week Hrs/ Hrs/ Regular Hrs Laborer Laborer tivity OT Hrs Lost Wk Wk Hrs Lost $/Hr $/Hr 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Total 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 0.80 0.75 0.71 0.65 0.61 0.57 0.54 0.50 0.48 0.46 0.45 0.44 0.43 0.42 0.41 0.41 32.0 30.0 28.4 26.0 24.4 22.8 21.6 20.0 19.2 18.4 18.0 17.6 17.2 16.8 16.4 16.4 345.2 25.6 24.0 22.7 20.8 19.5 18.2 17.3 16.0 15.4 14.7 14.4 14.1 13.8 13.4 13.1 13.1 276.2 8.0 10.0 11.6 14.0 15.6 17.2 18.4 20.0 20.8 21.6 22.0 22.4 22.8 23.2 23.6 23.6 294.8 6.4 8.0 9.3 11.2 12.5 13.8 14.7 16.0 16.6 17.3 17.6 17.9 18.2 18.6 18.9 18.9 235.8 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 48.25 48.25 48.25 48.25 48.25 48.25 48.25 48.25 48.25 48.25 48.25 48.25 48.25 48.25 48.25 48.25 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 72.38 Avg Lost $ Per Labor Laborer /Wk $ 849.20 $ 1,061.50 $ 1,231.34 $ 1,486.10 $ 1,655.94 $ 1,825.78 $ 1,953.16 $ 2,123.00 $ 2,207.92 $ 2,292.84 $ 2,335.30 $ 2,377.76 $ 2,420.22 $ 2,462.68 $ 2,505.14 $ 2,505.14 $ 31,293.02 6 9 9 11 11 9 8 9 10 10 9 12 12 15 12 11 Total Lost Wages $ 5,095.20 $ 9,553.50 $ 11,082.06 $ 16,347.10 $ 18,215.34 $ 16,432.02 $ 15,625.28 $ 19,107.00 $ 22,079.20 $ 22,928.40 $ 21,017.70 $ 28,533.12 $ 29,042.64 $ 36,940.20 $ 30,061.68 $ 27,556.54 $ 329,616.98 The Total Lost Wages for the Six Main Subs is $1,539,481 I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY I. BACKGROUND INFORMATION II. WAGE LOSS CALCULATIONS III. PRODUCTIVITY LOSS CALCULATIONS IV. OVERTIME SCHEDULE ALTERNATIVES V. V. COST COMPARISON ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Productivity Loss Calculations Overtime Schedule Alternatives 6-12s 100% Week Rolling 4-10s 5-8s Productivity 80% 4-9s & 1-8 5-10s 70% 6-9s 6-10s 60% 7-8s 5-12s 50% 7-9s 7-10s 40% 6-12s 30% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Week • The existing schedule used 621.4 effective hours Work Schedule Alternatives Work Schedule Productivity Per Week 90% Outline 7-12s 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Totals Rolling 4-10s 4-9s & 1-8 5-10s 0.80 0.75 0.71 0.65 0.61 0.57 0.54 0.50 0.48 0.46 0.45 0.44 0.43 0.42 0.41 0.41 57.6 54.0 51.1 46.8 43.9 41.0 38.9 36.0 34.6 33.1 32.4 31.7 31.0 30.2 29.5 29.5 621.4 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 1.00 0.99 0.99 0.98 0.98 0.97 0.97 0.96 0.95 0.94 0.93 0.92 0.91 0.89 0.88 0.87 40.0 39.6 39.6 39.2 39.2 38.8 38.8 38.4 38.0 37.6 37.2 36.8 36.4 35.6 35.2 34.8 605.2 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 1.00 0.99 0.99 0.99 0.98 0.97 0.94 0.92 0.88 0.85 0.82 0.78 0.79 0.79 0.79 0.79 44.0 43.6 43.6 43.6 43.1 42.7 41.4 40.5 38.7 37.4 36.1 34.3 34.8 34.8 34.8 34.8 627.9 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 0.97 0.95 0.93 0.89 0.87 0.84 0.82 0.79 0.77 0.75 0.74 0.73 0.72 0.71 0.70 0.69 48.5 47.5 46.5 44.5 43.5 42.0 41.0 39.5 38.5 37.5 37.0 36.5 36.0 35.5 35.0 34.5 643.5 INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 I. IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY • Meaning 621.4 hours of work took place in 16 weeks I. BACKGROUND INFORMATION II. WAGE LOSS CALCULATIONS III. PRODUCTIVITY LOSS CALCULATIONS IV. OVERTIME SCHEDULE ALTERNATIVES V. • Any alternative schedule must have at least 621.4 effective hours V. COST COMPARISON ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Overtime Schedule Alternatives OT Schedule Comparisons Alt. Schedule 4-10s 4-9s & 1-8 5-8s 5-10s 6-9s 6-10s 7-8s 5-12s 7-9s 7-10s 6-12s 7-12s Effective Hrs 605.2 627.9 570 643.5 662.6 690 597.5 599.4 605.4 651.7 621.4 672 The 4-9s and 1-8 Schedule was Selected Cost Comparison Lost Wages per Subcontractor 6-9s Schedule Vs 4-9s & 1-8 Schedule 72 Work Week Hours 6 Work Days Per Week 41% Productivity After 16 Weeks $1,539,481 Lost Wages 22% 44 Work Week Hours 5 Work Days Per Week Outline I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM 13% 10% IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY 13% 22% 79% Productivity After 16 Weeks BACKGROUND INFORMATION II. WAGE LOSS CALCULATIONS III. PRODUCTIVITY LOSS CALCULATIONS IV. OVERTIME SCHEDULE ALTERNATIVES 20% $192,790 Lost Wages I. V. V. COST COMPARISON ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT VII. CONCLUSIONS AND RECOMMENDATIONS The 4-9s & 1-8 Schedule Saved $1,346,619 in Labor Costs Steel Sub Masonry Sub VIII. ACKNOWLEDGEMENTS Electrical Sub Plumbing Sub IX. QUESTIONS Drywall Sub Mechanical Sub Analysis 3: Implementation of Job Order Contracting Job Order Contracting Allows Owner to achieve many smaller contracts under the umbrella of a larger, competitively bid contract Project Implementation 1 - Construction Need Identified Step 1 Outline I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM 2 - Criteria & Objectives Determined 3 - RFQ Issued 4 - Selection Criteria Weighted Step 2 IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. Step 3 ANALYSIS 3: JOB ORDER CONTRACTING I. BACKGROUND INFORMATION II. PROJECT IMPLEMENTATION III. COMPREHENSIVE COST ANALYSIS Step 4 IV. DECREASED PRECONSTRUCTION DURATIONS VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT 5 - Contractors Submit Coefficients Step 5 VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS 6 - Contractor Selected Succeeding construction projects won on previous performance 7 - Contract Negotiated Step 6 Step 7 IX. QUESTIONS Comprehensive Cost Analysis – GC Savings Comprehensive Cost Analysis – Sub Savings Forrester Construction Cost Savings from Employing JOC VIDA Name U Street Metropole Verizon Center Renaissance Hotel TOTAL Square Footage 80,000 65,000 60,000 32,000 Cost/SF $ $ $ $ 199.91 199.91 199.91 199.91 Total Cost $ $ $ $ $ 15,992,800.00 12,994,150.00 11,994,600.00 6,397,120.00 47,378,670.00 The GC total savings for all four VIDA’s is $7,106,800 Min Savings (9%) $ 1,439,352.00 $ 1,169,473.50 $ 1,079,514.00 $ 575,740.80 $ 4,264,080.30 Max Savings (21%) $ 3,358,488.00 $ 2,728,771.50 $ 2,518,866.00 $ 1,343,395.20 $ 9,949,520.70 Avg Savings (15%) $ 2,398,920.00 $ 1,949,122.50 $ 1,799,190.00 $ 959,568.00 $ 7,106,800.50 Avg Savings (15%) $ 2,398,920.00 $ 1,949,122.50 $ 1,799,190.00 $ 959,568.00 $ 7,106,800.50 The total subcontractor savings for all four VIDA’s is $356,222 Avg Savings (11.5%) $ 120,244.00 $ 97,698.25 $ 90,183.00 $ 48,097.60 $ 356,222.85 U Street Metropole Verizon Center Renaissance Hotel TOTAL Square Footage 80,000 65,000 60,000 32,000 Steel Cost/SF $ 13.07 $ 13.07 $ 13.07 $ 13.07 Total Cost $ 1,045,600.00 $ 849,550.00 $ 784,200.00 $ 418,240.00 $ 3,097,590.00 Min Savings (8%) $ 83,648.00 $ 67,964.00 $ 62,736.00 $ 33,459.20 $ 247,807.20 Max Savings (15%) $ 156,840.00 $ 127,432.50 $ 117,630.00 $ 62,736.00 $ 464,638.50 I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING I. BACKGROUND INFORMATION II. PROJECT IMPLEMENTATION III. COMPREHENSIVE COST ANALYSIS IV. DECREASED PRECONSTRUCTION DURATIONS VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT Steel Subcontractor Cost Savings from Employing JOC VIDA Name Outline Avg Savings (11.5%) $ 120,244.00 $ 97,698.25 $ 90,183.00 $ 48,097.60 $ 356,222.85 VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Decreased Preconstruction Durations U Street Durations (Days) Min (75%) Savings Max (85%) Avg (80%) New 10.00 7.50 8.50 8.00 2.00 10.00 7.50 8.50 8.00 2.00 10.00 7.50 8.50 8.00 2.00 20.00 15.00 17.00 16.00 4.00 10.00 7.50 8.50 8.00 2.00 Fabricate Monumental Stair 25.00 18.75 21.25 20.00 5.00 TOTAL 85.00 63.75 72.25 68.00 17.00 Structural Steel Shop Drawings Review Structural Steel Shop Drawings Monumental Stair Submittals Fabricate Structural Steel Monumental Stair Submittal Review Actual [ Revised schedule allows Task Durations Savings Per VIDA Gym Task Name Decreased Preconstruction Durations The Steel Precon Schedule Could be Reduced by 68 days Outline I. INTRODUCTION fabricated steel to be II. PROJECT OVERVIEW completed 6 weeks sooner III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM [ Revised schedule allows fabricated monumental stair to be completed 8 weeks sooner IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING I. BACKGROUND INFORMATION II. PROJECT IMPLEMENTATION III. COMPREHENSIVE COST ANALYSIS IV. DECREASED PRECONSTRUCTION DURATIONS VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Analysis 4: Mechanical System Layout Quantity Take-Off Optional Ductwork Layouts Existing Layout: Supply & Exhaust lines located outside Ext Supply Layout 1: Move Supply & Exhaust lines to SW corner Remove Y Duct in GM Office on 3rd Floor Ext Exhaust Add 3 additional branch lines on 2nd Floor Add 2 additional branch lines on 3rd Floor Layout 2: Move Supply & Exhaust lines to elevator New Supply New Exhaust Outline I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT I. QUANTITY TAKE-OFF II. OPTIONAL DUCTWORK LAYOUTS III. COST ANALYSIS IV. SCHEDULE ANALYSIS Reroute Supply through GM Office on 3rd Floor V. Remove Y Duct in GM Office on 3rd Floor VI. MECHANICAL BREADTH Add 3 additional branch lines on 2nd Floor Add 2 additional branch lines on 3rd Floor METRICS CHART AND EXAMINATION VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Cost Analysis Schedule Analysis Outline Average Cost Per LF of Ductwork Duct Supply Exhaust Supply Exhaust Supply Exhaust Layout Linear Feet Avg $/LF Exst Exst 1 1 2 2 1106.35 438.48 1926.49 764.19 1217.53 445.40 $ $ $ $ $ $ 768.03 768.03 768.03 768.03 768.03 768.03 Duct Cost Difference $ 849,709.99 $ $ 336,765.79 $ $ 1,479,602.11 $ 629,892.12 $ 586,920.85 $ 250,155.05 $ 935,099.57 $ 85,389.58 $ 342,082.87 $ 5,317.07 Layout Exst - Supply Exst - Return 1 - Supply 1 - Return 2 - Supply 2 - Return % Difference 0.00% 0.00% 74.13% 74.28% 10.05% 1.58% Layout Cost $ 1,186,475.78 Difference $ % Difference - 0.00% $ 2,066,522.96 $ 880,047.18 74.17% $ 1,277,182.43 $ 7.65% 90,706.65 Layout Duct Cost $ 849,709.99 $ 336,765.79 $ 1,479,602.11 $ 586,920.85 $ 935,099.57 $ 342,082.87 INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM Duration (Days) Exst - Supply Exst - Return 1 - Supply 1 - Return 2 - Supply 2 - Return I. IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY 109.65 43.46 190.93 75.74 120.67 44.14 V. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT I. QUANTITY TAKE-OFF II. OPTIONAL DUCTWORK LAYOUTS III. COST ANALYSIS IV. SCHEDULE ANALYSIS V. Average Duration Per LF of Ductwork Duct Supply Exhaust Supply Exhaust Supply Exhaust Layout Linear Feet Avg LF/Day Duration (Days) Difference % Difference Exst Exst 1 1 2 2 1106.35 438.48 1926.49 764.19 1217.53 445.40 10.09 10.09 10.09 10.09 10.09 10.09 109.65 43.46 190.93 75.74 120.67 44.14 0.00 0.00 81.28 32.28 11.02 0.69 0.00% 0.00% 74.13% 74.28% 10.05% 1.58% METRICS CHART AND EXAMINATION VI. MECHANICAL BREADTH Total Duration (Days) Difference % Difference 153.11 0.00 0.00% VIII. ACKNOWLEDGEMENTS 266.67 113.56 74.17% IX. QUESTIONS 164.81 11.70 7.65% VII. CONCLUSIONS AND RECOMMENDATIONS Metrics Chart and Examination Mechanical Breadth Each layout was evaluated on 4 design variables with a 0-5 scale 91-100% 81-90% 71-80% 61-70% 51-60% 41-50% 31-40% 21-30% 11-20% 0 0.5 1 1.5 2 2.5 3 3.5 4 Ductwork Layout Metrics Measuring Chart Aesthetics Cost Schedule Constructability 0.5 5 5 2 3.5 1.5 1.5 4 4.5 4.5 4.5 4 Layout Existing Layout 1 Layout 2 Very Poor 0 0.5 Poor 1 1.5 Weak 2 2.5 Neutral 3 3.5 Good 4 Layout 2 was Chosen as the Best Option 1-10% 4.5 Outline Calculate CFM of Outside Air for each space 0% 5 CFM Requirements Per Space Space Name Bang Salon Lobby Break Room Office Total Women's Lockers 12.5 Men's Lockers 10.5 Sales Rm 1 Sales Rm 2 17.5 Cardio Area Group Fitness Equipment Area Excellent Office 4.5 5 Spin Class GTS Pilates Inner Fitness Open Fitness Laundry Floor Area (SF) 1 1 1 1 2 2 2 2 2 3 3 3 3 4 4 4 4 4 1500 1800 505 50 2400 2400 120 120 4525 2040 7350 190 605 375 400 1100 1850 250 Occupant Density Occupants OA Per OA Per SF (#/1000SF) (#) Occupant (CFM) (CFM) 25.00 37.50 7.50 0.06 10.00 18.00 5.00 0.06 5.00 2.53 15.00 0.06 5.00 0.25 5.00 0.06 10.00 24.00 30.00 0.12 10.00 24.00 30.00 0.12 15.00 1.80 7.50 0.12 15.00 1.80 7.50 0.12 10.00 45.25 20.00 0.06 40.00 81.60 20.00 0.06 10.00 73.50 20.00 0.06 5.00 0.95 5.00 0.06 40.00 24.20 20.00 0.06 40.00 15.00 20.00 0.06 40.00 16.00 20.00 0.06 40.00 44.00 20.00 0.06 40.00 74.00 20.00 0.06 10.00 2.50 35.00 0.12 I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM OA Provided (CFM) 371.25 198.00 68.18 4.25 1008.00 1008.00 27.90 27.90 1176.50 1754.40 1911.00 16.15 520.30 322.50 344.00 946.00 1591.00 117.50 IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT I. QUANTITY TAKE-OFF II. OPTIONAL DUCTWORK LAYOUTS III. COST ANALYSIS IV. SCHEDULE ANALYSIS V. METRICS CHART AND EXAMINATION VI. MECHANICAL BREADTH VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Mechanical Breadth Mechanical Breadth Outline All outside air and occupancy requirements were calculated I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM using ASHRAE IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. • Calculate CFM for Each Area Step 1 Step 2 • Redesign Layout ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT • Size Ductwork I. QUANTITY TAKE-OFF II. OPTIONAL DUCTWORK LAYOUTS III. COST ANALYSIS IV. SCHEDULE ANALYSIS Step 3 V. METRICS CHART AND EXAMINATION VI. MECHANICAL BREADTH VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Conclusions and Recommendations Conclusions and Recommendations – Analysis 1 Analysis 1: ReRev Energy Harvesting System Conclusions and Recommendations – Analysis 2 Analysis 2: Overtime Effects on Productivity Twenty Year Potential Profit: $582,371.52 Total Labor Wages Saved: $1,346,619 Forty Year Potential Profit: $1,936,704.75 Total Work Hours Saved Per Week: 32 Hours Outline I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT Kilograms of CO2 Saved: 41,648 kg Annually Simple Payback with Incentives: 5 Years Overtime Hours Saved: 28 Hours Work Days Saved Per Week: 1 Day Various Other Social and Environmental Benefits An Accrued Potential Profit of $1,936,704.75 Over 40 Years The 4-9s & 1-8 Schedule Saved $1,346,619 in Labor Costs VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Conclusions and Recommendations – Analysis 3 Analysis 3: Job Order Contracting Conclusions and Recommendations – Analysis 4 Analysis 4: Mechanical System Layout Steel Precon Schedule Reduction: 68 Days Layout 2 Additional Costs: $85,422.06 Steel Construction Could Start: 6 to 8 Weeks Earlier Approximate Aesthetic Increase: 89% Outline I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. ANALYSIS 3: JOB ORDER CONTRACTING VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT GC total savings for all four VIDA’s : $7,106,800 GC total savings for U St VIDA: $2,398,920 Approximate Schedule Decrease: 10% Approximate Constructability Increase: 50% Subcontractor total savings for all four VIDA’s : $356,222 Subcontractor total savings for U St VIDA: $120,244 GC and Subcontractor U St VIDA Savings of $2,519,164 Layout 2 Accrues Additional Material & Labor Costs of $85,422 VII. CONCLUSIONS AND RECOMMENDATIONS VIII. ACKNOWLEDGEMENTS IX. QUESTIONS Conclusions and Recommendations Conclusions and Recommendations Outline Analysis 1: An Accrued Potential Profit of $582,371.52 Over 20 Years Analysis 2: The 4-9s & 1-8 Schedule Saved $1,346,619 in Labor Costs Analysis 3: GC and Subcontractor U St VIDA Savings of $2,519,164 Analysis 4: Layout 2 Accrues Additional Material & Labor Costs of $85,422 [ I. INTRODUCTION II. PROJECT OVERVIEW III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY V. VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT Total Cost Savings with Implementation of all Analyses Party Analysis 1 Owner $ 582,371.52 GC Subcontractors Total Analysis 2 Analysis 3 Analysis 4 $ (85,422.06) $ $ 2,398,920.00 $ 1,346,619.00 $ 120,244.00 ANALYSIS 3: JOB ORDER CONTRACTING Total VII. CONCLUSIONS AND RECOMMENDATIONS 496,949.46 VIII. ACKNOWLEDGEMENTS $ 2,398,920.00 $ 1,466,863.00 $ 582,371.52 $ 1,346,619.00 $ 2,519,164.00 $ (85,422.06) $ 4,362,732.46 Total Savings of $ 4,362,732.46 IX. QUESTIONS Works Cited "Average Energy Prices in the Washington-Baltimore Area." U.S. Bureau of Labor Statistics. Web. 13 Feb. 2012. <http://www.bls.gov/ro3/apwb.htm>. Basu, Chirantan. "Effect of Overtime on Construction Labor Efficiency Rates | How to Videos, Articles & More - Discover the Expert in You. | EHow.com. Web. 12 Feb. 2012. <http://www.ehow.com/info_8714577_effect-construction-labor-efficiencyrates.html>. The Gordian Group. "Job Order Contracting: An Overview." General Services Department. Sonoma. Lecture. Hoover, C. S. JOB-ORDER CONSTRUCTION QUANTIFICATION: AN APPLICATION OF FUZZY THINKING. Thesis. Arizona State University, 1994. Print. "Job Order Contracting Information." Job Order Contracting Information. Web. 22 Feb. 2012. <http://www.jocinfo.com/HowItWorks.aspx> Koch, Wendy. "Exercise Converted to Electricity." USA Today 31 Aug. 2010, Special Reprint Edition ed. Print. Acknowledgements Penn State Architectural Engineering Faculty Dr. Robert Leicht – CM Thesis Advisor Seth Glinski – Forrester Construction PM Works Cited National Energy Foundation."Simple Carbon Calculator." NEF. Web. 26 Mar. 2012. <http://www.nef.org.uk/greencompany/co2calculator.htm>. Odato, Nicki. "ReRev System Design." 14 Feb. 2012. E-mail. Luis Ortiz – Forrester Construction Super Parks, Bob. "High-Voltage Workouts." Bicycling Magazine Nov. 2009. Web. 4 Dec. 2011. Ryan Major – Forrester Construction APM "Pepco C&I Energy Savings Program Eligibility." Pepco. Web. 27 Mar. 2012. <https://cienergyefficiency.pepco.com/Eligibility.aspx>. Casey Mowery – Forrester Construction APM Emory Land – VIDA Fitness General Manager Britnei Godusky – MAE Student Graduate Tom Horensky – MAE Student Graduate PACE Industry Members Family and Friends Pulaski, Michael. Job Order Contracting (JOC). Tech. Print. Raynar, Karl A., and Randolph Thomas. “Scheduled Overtime and Labor Productivity: Quantitative Analysis." Journal of Construction Engineering and Management 123.2 (1997). Print. "Renewable Energy Incentive Program (REIP) for Businesses." District of Columbia. Web. 27 Mar. 2012. <http://green.dc.gov/service/renewable-energy-incentiveprogram-reip-businesses>. Questions Supplemental Slides Cardio Equipment Usage – Page 39 Usage Summary Prepared for Every Day of the Week Time 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM Total Hours Cardio Equipment Usage Summary - Sundays Upright Treadmills Ellipticals StairMasters Bikes In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use In Use 14 13 12 10 Cardio Equipment Usage – Page 39 VIDA Cardio Equipment Type Number Treadmill 36 Elliptical 25 Recumbent Stairmaster 4 Bikes Upright Bike 6 Recumbent 6 X-Trainer 8 Arc Trainer 5 Spin 30 In Use Total 120 In Use Cardio Equipment Usage Summary Per Equipment Type In Use Stair Upright Recumbent In Use Day Treadmills Ellipticals Masters Bikes Bikes In Use Sundays 14.00 13.00 12.00 10.00 10.00 In Use Mondays 18.00 18.00 18.00 18.00 18.00 In Use Tuesdays 18.00 18.00 18.00 17.00 17.00 In Use Wednesdays 18.00 18.00 17.00 17.00 16.00 In Use Thursdays 18.00 18.00 18.00 16.00 16.00 In Use Fridays 18.00 18.00 17.00 16.00 16.00 Saturdays 14.00 14.00 14.00 14.00 14.00 10 Average 16.86 16.71 16.29 15.43 15.29 Wattage Generation Calculations – Page 40 Day Sundays Mondays Tuesdays Wednesdays Thursdays Fridays Saturdays Average Daily Average 11.80 18.00 17.60 17.20 17.20 17.00 14.00 16.11 Average Watts Produced Per Day of the Week Daily Hours of Watts Produced Number of Use Per Hour Machines 11.80 100.00 120.00 18.00 100.00 120.00 17.60 100.00 120.00 17.20 100.00 120.00 17.20 100.00 120.00 17.00 100.00 120.00 14.00 100.00 120.00 16.11 ReRev provided approximate energy production to be 100 watts/hour Watts Produced Per Day 141600.00 216000.00 211200.00 206400.00 206400.00 204000.00 168000.00 193371.43 ReRev Cost Analysis– Page 41 Annual Kilowatt Savings: System Payback– Page 42 System Payback With Incentives– Page 45 System Information Price $148,000.00 Number of Machines 120 Hours per day usage 16.11 Average Watts per hour 100 Watts per Day 193,320 Days in Year 363 Watts per Year 70,175,160 Cost per kW $0.129 Energy Rise per Year 5.00% A/C Savings % 30.00% Months of A/C Savings 11.43 ReRev System Annual Savings Calculations Year ReRev System Proposal provided total cost to be $148,000 Annual Air Conditioning Savings: Total Annual Savings: Year 1 2 3 4 5 6 7 8 9 10 11 Annual KW Savings Annual A/C Savings $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 9,080.67 9,534.70 10,011.43 10,512.01 11,037.61 11,589.49 12,168.96 12,777.41 13,416.28 14,087.09 14,791.45 2,594.80 2,724.54 2,860.77 3,003.81 3,154.00 3,311.70 3,477.28 3,651.14 3,833.70 4,025.39 4,226.66 Total Savings $ $ $ $ $ $ $ $ $ $ $ 11,675.47 23,934.71 36,806.91 50,322.72 64,514.32 79,415.50 95,061.74 111,490.30 128,740.28 146,852.76 165,870.86 Potential Profit $ $ $ $ $ $ $ $ $ $ $ (136,324.53) (124,065.29) (111,193.09) (97,677.28) (83,485.68) (68,584.50) (52,938.26) (36,509.70) (19,259.72) (1,147.24) 17,870.86 Simple Payback 11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Annual KW Savings $ 9,080.67 $ 9,534.70 $ 10,011.43 $ 10,512.01 $ 11,037.61 $ 11,589.49 $ 12,168.96 $ 12,777.41 $ 13,416.28 $ 14,087.09 $ 14,791.45 $ 15,531.02 $ 16,307.57 $ 17,122.95 $ 17,979.10 $ 18,878.05 $ 19,821.95 $ 20,813.05 $ 21,853.70 $ 22,946.39 $ 24,093.71 $ 25,298.39 ReRev System Annual Savings Calculations With Incentives Annual A/C Potential Pepco Potential REIP Total Savings Savings Incentive Incentive $ 2,594.80 $ 14,311.10 $ 16,500.00 $ 42,486.57 $ 2,724.54 $ $ 16,500.00 $ 71,245.81 $ 2,860.77 $ $ 16,500.00 $ 100,618.01 $ 3,003.81 $ $ 16,500.00 $ 130,633.82 $ 3,154.00 $ $ 16,500.00 $ 161,325.42 $ 3,311.70 $ $ 16,500.00 $ 192,726.60 $ 3,477.28 $ $ 16,500.00 $ 224,872.84 $ 3,651.14 $ $ 16,500.00 $ 257,801.40 $ 3,833.70 $ $ 16,500.00 $ 291,551.38 $ 4,025.39 $ $ 16,500.00 $ 326,163.86 $ 4,226.66 $ $ 16,500.00 $ 361,681.96 $ 4,437.99 $ $ 16,500.00 $ 398,150.97 $ 4,659.89 $ $ 16,500.00 $ 435,618.43 $ 4,892.88 $ $ 16,500.00 $ 474,134.26 $ 5,137.53 $ $ 16,500.00 $ 513,750.88 $ 5,394.40 $ $ 16,500.00 $ 554,523.34 $ 5,664.12 $ $ 16,500.00 $ 596,509.42 $ 5,947.33 $ $ 16,500.00 $ 639,769.80 $ 6,244.70 $ $ 16,500.00 $ 684,368.20 $ 6,556.93 $ $ 16,500.00 $ 730,371.52 $ 6,884.78 $ $ 16,500.00 $ 777,850.01 $ 7,229.02 $ $ 16,500.00 $ 826,877.42 Potential Profit $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ (105,513.43) (76,754.19) (47,381.99) (17,366.18) 13,325.42 44,726.60 76,872.84 109,801.40 143,551.38 178,163.86 213,681.96 250,150.97 287,618.43 326,134.26 365,750.88 406,523.34 448,509.42 491,769.80 536,368.20 582,371.52 629,850.01 678,877.42 Energy Impact– Page 42 Case Study on The California State University of San Bernardino The 38,000 square foot fitness facility on campus had 20 machines retrofitted with ReRev back in 2009. This fitness center uses approximately 2,100 kilowatt hours of electricity per day. Energy Impact– Page 43 The estimated kilowatt hours per square foot used for one day was found to be approximately 0.055 kWh/SF. The kilowatt hours used daily at VIDA comes to approximately 3336.24 kWh/day or 1,217,726.45 kWh/year. The percentage of energy generated was estimated to be 5.76%. Greater than 5% in Renewable Energy Generation adds an additional 3 points to the LEED Scorecard making VIDA applicable for LEED Gold Social Impact – Page 43 Electrical Breadth – Wire/Breaker Sizing – Page 46 Electrical Breadth – Panel Sizing – Page 46 PANEL SCHEDULE Volts = 208/120 Phase / Wire = 3Φ 4W REV 1 CKT NO 1 2 3 4 5 6 NO LOAD 1 - ReRev Inverter 2 - ReRev Inverter 3 - ReRev Inverter 4 - ReRev Inverter 5 - ReRev Inverter 6 - ReRev Inverter PANEL SCHEDULE Volts = 208/120 Phase / Wire = 3Φ 4W DPB CKT NO 1 2 3 4 5 NO LOAD 1 - Panel 1A 2 - Panel 2A 3 - Panel 3A 4 - Panel REV1 5 - Panel 5A Amps = 150 Mounting = Surface Fed From = DPB TRIP 20 20 20 20 20 20 POLE 1 1 1 1 1 1 AIC = 10,000 Type = MCB Spaces = 12 VOLT 208 208 208 208 208 208 Amps = 800 Mounting = Surface Fed From = MDB TRIP 200 200 200 150 200 POLE 3 3 3 3 3 kVA 3.6 3.6 3.6 3.6 3.6 3.6 WIRE COND 3 #12 + 1#12g 3/4" EMT 3 #12 + 1#12g 3/4" EMT 3 #12 + 1#12g 3/4" EMT 3 #12 + 1#12g 3/4" EMT 3 #12 + 1#12g 3/4" EMT 3 #12 + 1#12g 3/4" EMT AIC = Existing Type = 800A Main Spaces = SWBD VOLT 208 208 208 208 208 kVA WIRE COND 30 3 #12 + 1#12g 3/4" EMT 23 3 #12 + 1#12g 3/4" EMT 13 3 #12 + 1#12g 3/4" EMT 22 3 #12 + 1#12g 3/4" EMT 20 3 #12 + 1#12g 3/4" EMT 108 = Total kVA Connected Electrical Breadth - Equations WEEK 5 Subcontractors Present on Site Date Steel Sub Masonry Sub Electrical Sub Plumbing Sub Drywall Sub Mechanical Sub 3/28/2011 X X X X 3/29/2011 X X X X 3/30/2011 X X X X X 3/31/2011 X X X X X 4/1/2011 X X X X X 4/2/2011 X X X X X 4/4/2011 X X X 4/5/2011 X X X X X 4/6/2011 X X X X X 4/7/2011 X X X X X 4/8/2011 X X X X X X 4/9/2011 X X X 4/11/2011 X X X X X 4/12/2011 X X X X X X 4/13/2011 X X X X X X 4/14/2011 X X X X X X 4/15/2011 X X X X X X 4/16/2011 X X X X X X 4/18/2011 X X X X X X 4/19/2011 X X X X X X 4/20/2011 X X X X X X 4/21/2011 X X X X X X 4/22/2011 X X X X X X 4/23/2011 X X X X X 4/25/2011 X X X X X 4/26/2011 X X X X X X 4/27/2011 X X X X X X 4/28/2011 X X X X X X 4/29/2011 X X X X X 4/30/2011 X X X X X Productivity Loss Calculations – Page 53 Wage Loss Calculations – Page 54 Productivity levels decrease with: Increases in the number of work hours and work days per week Work Schedule Productivity Per Week 100% Rolling 4-10s 90% 5-8s 80% Productivity WEEK 4 WEEK 3 WEEK 2 WEEK 1 Subcontractors Present on Site – Page 53 4-9s & 1-8 5-10s 70% 6-9s 6-10s 60% 7-8s 5-12s 50% 7-9s 40% 7-10s Electrical Subcontractor Lost Wages (6-12s) Regular OT Effective Regular Avg OT ProducEffective OT Hrs Week Hrs/ Hrs/ Regular Hrs Laborer Laborer tivity OT Hrs Lost Wk Wk Hrs Lost $/Hr $/Hr 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Totals 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 0.80 0.75 0.71 0.65 0.61 0.57 0.54 0.50 0.48 0.46 0.45 0.44 0.43 0.42 0.41 0.41 32.0 30.0 28.4 26.0 24.4 22.8 21.6 20.0 19.2 18.4 18.0 17.6 17.2 16.8 16.4 16.4 345.2 6-12s 30% 1 2 3 4 5 6 7 8 9 Week 10 11 12 13 14 15 16 7-12s 25.6 24.0 22.7 20.8 19.5 18.2 17.3 16.0 15.4 14.7 14.4 14.1 13.8 13.4 13.1 13.1 276.2 8.0 10.0 11.6 14.0 15.6 17.2 18.4 20.0 20.8 21.6 22.0 22.4 22.8 23.2 23.6 23.6 294.8 6.4 8.0 9.3 11.2 12.5 13.8 14.7 16.0 16.6 17.3 17.6 17.9 18.2 18.6 18.9 18.9 235.8 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 48.25 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 $ 72.38 Lost $ Per Laborer $ 849.20 $ 1,061.50 $ 1,231.34 $ 1,486.10 $ 1,655.94 $ 1,825.78 $ 1,953.16 $ 2,123.00 $ 2,207.92 $ 2,292.84 $ 2,335.30 $ 2,377.76 $ 2,420.22 $ 2,462.68 $ 2,505.14 $ 2,505.14 $ 31,293.02 Avg Labor/ Wk 6 9 9 11 11 9 8 9 10 10 9 12 12 15 12 11 Total Lost Wages $ 5,095.20 $ 9,553.50 $ 11,082.06 $ 16,347.10 $ 18,215.34 $ 16,432.02 $ 15,625.28 $ 19,107.00 $ 22,079.20 $ 22,928.40 $ 21,017.70 $ 28,533.12 $ 29,042.64 $ 36,940.20 $ 30,061.68 $ 27,556.54 $ 329,616.98 Total Lost Wages per Subcontractor (6-12s) Steel Sub Masonry Sub Electrical Sub Plumbing Sub Drywall Sub Mechanical Sub Total $ 205,874.14 $ 151,021.89 $ 329,616.98 $ 299,003.37 $ 224,169.08 $ 329,796.02 $ 1,539,481.48 Alternative Schedules – Page 59 Alternative Schedules – Page 59 Alternative Schedules – Page 59 Work Schedule Alternatives - Part 1 4-9s & 1-8 5-8s Work Schedule Alternatives - Part 2 6-10s 7-8s Work Schedule Alternatives - Part 3 7-10s 6-12s Rolling 4-10s Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Totals 6-9s 5-10s 5-12s 7-9s 7-12s Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Week Week Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs Hrs tivity Hrs 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 1.00 0.99 0.99 0.98 0.98 0.97 0.97 0.96 0.95 0.94 0.93 0.92 0.91 0.89 0.88 0.87 40.0 39.6 39.6 39.2 39.2 38.8 38.8 38.4 38.0 37.6 37.2 36.8 36.4 35.6 35.2 34.8 605.2 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 1.00 0.99 0.99 0.99 0.98 0.97 0.94 0.92 0.88 0.85 0.82 0.78 0.79 0.79 0.79 0.79 44.0 43.6 43.6 43.6 43.1 42.7 41.4 40.5 38.7 37.4 36.1 34.3 34.8 34.8 34.8 34.8 627.9 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 0.99 0.98 0.97 0.96 0.95 0.93 0.91 0.89 0.87 0.86 0.85 0.84 0.83 0.81 0.81 0.80 39.6 39.2 38.8 38.4 38.0 37.2 36.4 35.6 34.8 34.4 34.0 33.6 33.2 32.4 32.4 32.0 570.0 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 0.97 0.95 0.93 0.89 0.87 0.84 0.82 0.79 0.77 0.75 0.74 0.73 0.72 0.71 0.70 0.69 48.5 47.5 46.5 44.5 43.5 42.0 41.0 39.5 38.5 37.5 37.0 36.5 36.0 35.5 35.0 34.5 643.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Totals 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 0.96 0.93 0.90 0.87 0.84 0.81 0.78 0.75 0.73 0.71 0.69 0.68 0.67 0.66 0.65 0.64 51.8 50.2 48.6 47.0 45.4 43.7 42.1 40.5 39.4 38.3 37.3 36.7 36.2 35.6 35.1 34.6 662.6 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 0.94 0.91 0.87 0.83 0.79 0.75 0.72 0.68 0.66 0.65 0.64 0.63 0.62 0.61 0.60 0.60 56.4 54.6 52.2 49.8 47.4 45.0 43.2 40.8 39.6 39.0 38.4 37.8 37.2 36.6 36.0 36.0 690.0 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 0.89 0.86 0.83 0.78 0.74 0.7 0.66 0.63 0.6 0.59 0.58 0.57 0.56 0.56 0.56 0.56 49.8 48.2 46.5 43.7 41.4 39.2 37.0 35.3 33.6 33.0 32.5 31.9 31.4 31.4 31.4 31.4 597.5 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 0.88 0.84 0.80 0.75 0.70 0.65 0.63 0.59 0.57 0.55 0.53 0.52 0.51 0.50 0.49 0.48 52.8 50.4 48.0 45.0 42.0 39.0 37.8 35.4 34.2 33.0 31.8 31.2 30.6 30.0 29.4 28.8 599.4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Totals 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 0.87 0.83 0.77 0.73 0.68 0.63 0.59 0.56 0.54 0.53 0.51 0.50 0.48 0.47 0.46 0.46 54.8 52.3 48.5 46.0 42.8 39.7 37.2 35.3 34.0 33.4 32.1 31.5 30.2 29.6 29.0 29.0 605.4 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 0.85 0.80 0.75 0.70 0.65 0.60 0.58 0.55 0.53 0.50 0.49 0.48 0.47 0.46 0.45 0.45 59.5 56.0 52.5 49.0 45.5 42.0 40.6 38.5 37.1 35.0 34.3 33.6 32.9 32.2 31.5 31.5 651.7 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 0.80 0.75 0.71 0.65 0.61 0.57 0.54 0.50 0.48 0.46 0.45 0.44 0.43 0.42 0.41 0.41 57.6 54.0 51.1 46.8 43.9 41.0 38.9 36.0 34.6 33.1 32.4 31.7 31.0 30.2 29.5 29.5 621.4 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 0.75 0.71 0.66 0.61 0.56 0.52 0.49 0.46 0.44 0.43 0.42 0.41 0.4 0.39 0.38 0.37 63.0 59.6 55.4 51.2 47.0 43.7 41.2 38.6 37.0 36.1 35.3 34.4 33.6 32.8 31.9 31.1 672.0 Wage Loss Calculations – Page 60 Cost Comparison – Page 60 Schedule Mechanical Subcontractor Lost Wages (4-9s & 1-8) Chosen Week 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Totals Regular Hrs/ Wk OT Hrs/ Wk 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Effective Regular Avg OT ProducEffective OT Hrs Regular Hrs Laborer Laborer tivity OT Hrs Lost Hrs Lost $/Hr $/Hr 1.00 0.99 0.99 0.99 0.98 0.97 0.94 0.92 0.88 0.85 0.82 0.78 0.79 0.79 0.79 0.79 40.0 39.6 39.6 39.6 39.2 38.8 37.6 36.8 35.2 34.0 32.8 31.2 31.6 31.6 31.6 31.6 570.8 4.0 4.0 4.0 4.0 3.9 3.9 3.8 3.7 3.5 3.4 3.3 3.1 3.2 3.2 3.2 3.2 57.1 0.0 0.4 0.4 0.4 0.8 1.2 2.4 3.2 4.8 6.0 7.2 8.8 8.4 8.4 8.4 8.4 69.2 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.5 0.6 0.7 0.9 0.8 0.8 0.8 0.8 6.9 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 45.95 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 $ 68.93 Lost $ Per Laborer $ $ 21.14 $ 21.14 $ 21.14 $ 42.27 $ 63.41 $ 126.82 $ 169.10 $ 253.64 $ 317.06 $ 380.47 $ 465.01 $ 443.88 $ 443.88 $ 443.88 $ 443.88 $ 3,656.70 Avg Labor Per Wk 3 8 4 10 11 13 12 12 11 12 12 12 12 11 12 12 Total Lost Wages $ $ 169.10 $ 84.55 $ 211.37 $ 465.01 $ 824.34 $ 1,521.86 $ 2,029.15 $ 2,790.08 $ 3,804.66 $ 4,565.59 $ 5,580.17 $ 5,326.52 $ 4,882.65 $ 5,326.52 $ 5,326.52 $ 42,908.11 6-12s 4-9s & 1-8 Savings % Savings Comparison of Lost Wages Between Actual and Proposed Work Schedules Mechanical Steel Sub Masonry Sub Electrical Sub Plumbing Sub Drywall Sub Sub $205,874.14 $151,021.89 $329,616.98 $299,003.37 $224,169.08 $329,796.02 $ 24,883.66 $ 18,826.21 $ 43,147.08 $ 38,423.87 $ 24,601.18 $ 42,908.11 $180,990.48 $132,195.68 $286,469.90 $260,579.50 $199,567.90 $286,887.91 88% 88% 87% 87% 89% 87% Cost Comparison – Page 61 Total Lost Wages per Subcontractor $ 1,539,481.48 $ 192,790.11 $ 1,346,691.37 87% 22% 6-9s Schedule Vs 4-9s & 1-8 Schedule 72 Work Week Hours 44 Work Week Hours 6 Work Days Per Week 5 Work Days Per Week 41% Productivity After 16 Weeks $1,539,481 Lost Wages 79% Productivity After 16 Weeks $192,790 Lost Wages The 4-9s & 1-8 Schedule Saved $1,346,619 in Labor Costs 13% 10% 13% 22% 20% Steel Sub Masonry Sub Electrical Sub Plumbing Sub Drywall Sub Mechanical Sub Decreased Preconstruction Durations – Page 70 Decreased Preconstruction Durations – Page 71 Decreased Preconstruction Durations – Page 71 Task Durations Savings Per VIDA Gym - Part 1 Task Durations Savings Per VIDA Gym - Part 2 Task Durations Savings Summary Per VIDA Gym Task Name Structural Steel Shop Drawings Review Structural Steel Shop Drawings Monumental Stair Submittals Fabricate Structural Steel Monumental Stair Submittal Review Fabricate Monumental Stair TOTAL U Street Durations (Days) Metropole Durations (Days) Avg (80%) New Actual Min (75%) Savings Max (85%) Avg (80%) Actual Min (75%) Savings Max (85%) 10.00 7.50 8.50 8.00 2.00 8.13 6.09 6.91 6.50 10.00 7.50 8.50 8.00 2.00 8.13 6.09 6.91 6.50 10.00 7.50 8.50 8.00 2.00 8.13 6.09 6.91 6.50 20.00 15.00 17.00 16.00 4.00 16.25 12.19 13.81 13.00 10.00 7.50 8.50 8.00 2.00 8.13 6.09 6.91 6.50 25.00 18.75 21.25 20.00 5.00 20.31 15.23 17.27 16.25 85.00 63.75 72.25 68.00 17.00 69.06 51.80 58.70 55.25 New Task Name Structural Steel Shop Drawings Review 1.63 Structural Steel Shop Drawings Monumental 1.63 Stair Submittals Fabricate 3.25 Structural Steel Monumental 1.63 Stair Submittal Review Fabricate 4.06 Monumental Stair 13.81 TOTAL 1.63 Verizon Center Durations (Days) Renaissance Hotel Durations (Days) Avg (80%) New Actual Min (75%) Savings Max (85%) Avg (80%) New Actual Min (75%) Savings Max (85%) 7.50 5.63 6.38 6.00 1.50 4.00 3.00 3.40 3.20 0.80 7.50 5.63 6.38 6.00 1.50 4.00 3.00 3.40 3.20 0.80 7.50 5.63 6.38 6.00 1.50 4.00 3.00 3.40 3.20 0.80 15.00 11.25 12.75 12.00 3.00 8.00 6.00 6.80 6.40 1.60 7.50 5.63 6.38 6.00 1.50 4.00 3.00 3.40 3.20 0.80 18.75 14.06 15.94 15.00 3.75 10.00 7.50 8.50 8.00 2.00 63.75 47.81 54.19 51.00 12.75 34.00 25.50 28.90 27.20 6.80 Task Name Structural Steel Shop Drawings Review Structural Steel Shop Drawings Monumental Stair Submittals Fabricate Structural Steel Monumental Stair Submittal Review Fabricate Monumental Stair TOTAL U Street Durations Metropole Durations Verizon Center Durations Renaissance Durations Actual New Actual New Actual New Actual New 10.00 2.00 8.13 1.63 7.50 1.50 4.00 0.80 10.00 2.00 8.13 1.63 7.50 1.50 4.00 0.80 10.00 2.00 8.13 1.63 7.50 1.50 4.00 0.80 20.00 4.00 8.13 3.25 15.00 3.00 8.00 1.60 10.00 2.00 16.25 1.63 7.50 1.50 4.00 0.80 25.00 5.00 8.13 4.06 18.75 3.75 10.00 2.00 85.00 17.00 56.88 13.83 63.75 12.75 34.00 6.80