4/10 - Final Presentation

advertisement
VIDA Fitness Center
Washington D.C.
Penn State Architectural Engineering Capstone Project
Clara Watson | Construction Option | Advisor: Dr. Robert Leicht
Building Overview
Building: Existing Results Gym + New Addition
Project Participants
Owner: David von Storch
Building Location: 1612 U Street NW, Washington DC
Architect: Core Architects; Stoneking von Storch
Building Size: 60,370 SF
MEP Engineer: Allen and Shariff Engineers
Outline
I.
INTRODUCTION
II.
PROJECT OVERVIEW
I.
BUILDING OVERVIEW
II.
PROJECT PARTICIPANTS
III. BUILDING LOCATION
IV. CONSTRUCTION SITE PLAN
Number of Stories: 4 Stories + Penthouse/Accessible Roof
Structural Engineer: Rathgeber-Goss Associates
Occupancy / Function Type: Fitness Gym, Salon, Spa, Restaurant
Interior Designer: Wade Allyn Hallock Interiors
Project Cost: $14 Million
General Contractor: Forrester Construction Company
Dates of Construction: September 2010 – August 2011
Project Delivery Method: Design – Bid – Build with Design Assist
Contract Type: Negotiated
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Building Location
Construction Site Plan
Outline
I.
INTRODUCTION
II.
PROJECT OVERVIEW
I.
BUILDING OVERVIEW
II.
PROJECT PARTICIPANTS
III. BUILDING LOCATION
IV. CONSTRUCTION SITE PLAN
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Located on the U Street Corridor: D.C. Historic District
Analysis 1: ReRev Energy Harvesting
System
ReRev System Overview
Captures kinetic energy produced in the form of DC power
generated from cardio equipment use and converts it to AC power
to be fed back into the grid
STEP 1:
Kinetic
Energy to DC
Power
STEP 2: DC
Converted to
AC Current
STEP 3: AC
Current Fed
Back into
Grid
Cardio Equipment Usage
Outline
Crowd Farming: The collective impact of small contributions
from a mass of people
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
Cardio Equipment Usage Summary Per Equipment Type
Day
Treadmills
Ellipticals
Sundays
Mondays
Tuesdays
Wednesdays
Thursdays
Fridays
Saturdays
Average
14.00
18.00
18.00
18.00
18.00
18.00
14.00
16.86
13.00
18.00
18.00
18.00
18.00
18.00
14.00
16.71
Stair Masters Upright Bikes
12.00
18.00
18.00
17.00
18.00
17.00
14.00
16.29
10.00
18.00
17.00
17.00
16.00
16.00
14.00
15.43
Recumbent
Daily Average
Bikes
10.00
11.80
18.00
18.00
17.00
17.60
16.00
17.20
16.00
17.20
16.00
17.00
14.00
14.00
15.29
16.11
I.
REREV SYSTEM OVERVIEW
II.
CARDIO EQUIPMENT USAGE
III. POTENTIAL FUNDING AND INCENTIVES
IV. COST AND PAYBACK ANALYSIS
V.
REREV SYSTEM SURVEY
VI. SOCIAL IMPACT
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
The Total ReRev System Cost Provided is $148,000
IX. QUESTIONS
Potential Funding and Incentives
PEPCO C&I Energy Savings Program: Total $14,311.10
Brainstorming Renewable Energy Opportunities: $1,000.00
Renewable Energy Simulation Analysis for first 50,000 SF: $5,000.00
$0.03 is available for each additional SF: $311.10
Incorporating Designed Measures During Construction: $8,000.00
D.C. Renewable Energy Incentive Program: Total $16,500/Yr
$1.50 Provided for first 3,000 Watts Produced: $4,500.00
$1.00 Provided for next 7,000 Watts Produced: $7,000.00
$0.50 Provided for next 10,000 Watts Produced: $5,000.00
Cost and Payback Analysis
Year
1
2
3
4
5
Annual KW
Savings
$
9,080.67
$
9,534.70
$
10,011.43
$
10,512.01
$
11,037.61
ReRev System Annual Savings Calculations With Incentives
Annual A/C Potential Pepco Potential REIP
Total Savings
Savings
Incentive
Incentive
$
2,594.80 $
14,311.10 $
16,500.00 $
42,486.57
$
2,724.54 $
- $
16,500.00 $
71,245.81
$
2,860.77 $
- $
16,500.00 $ 100,618.01
$
3,003.81 $
- $
16,500.00 $ 130,633.82
$
3,154.00 $
- $
16,500.00 $ 161,325.42
Outline
Potential Profit
$ (105,513.43)
$ (76,754.19)
$ (47,381.99)
$ (17,366.18)
$
13,325.42
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
Months of Air Conditioning Savings: 11.43
Watts Generated Per Year: 70,175,160
REREV SYSTEM OVERVIEW
II.
CARDIO EQUIPMENT USAGE
III. POTENTIAL FUNDING AND INCENTIVES
IV. COST AND PAYBACK ANALYSIS
Rise in Energy Costs Per Year: 5%
ReRev Estimated Monthly Air Conditioning Savings: 30%
I.
V.
REREV SYSTEM SURVEY
VI. SOCIAL IMPACT
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Twenty Year Potential Profit of $582,371.52
ReRev System Survey
Social Impact
Outline
Six Full Charges
Would you consider using a fitness center that offered energy
generating cardio equipment over a fitness center with typical
cardio equipment?
Survey – Question 3
8%
25%
Kilograms of CO2 Saved: 41,648 kg Annually
US EPA Study on Energy Generating Equipment:
- Improved user understanding of renewable energy
sources
- Increased amount of participants engaging in positive
environmental behavior
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
Ten Minutes of TV
I.
REREV SYSTEM OVERVIEW
II.
CARDIO EQUIPMENT USAGE
III. POTENTIAL FUNDING AND INCENTIVES
IV. COST AND PAYBACK ANALYSIS
V.
One Hour of Laptop Use
LEED Gold Rating: 3 Additional Points for Renewable Energy
REREV SYSTEM SURVEY
VI. SOCIAL IMPACT
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
67%
Not Likely
I.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
Neutral
Very Likely
Instead of an immeasurable quantity people find difficult to
relate to, ReRev allows for energy to become a quantifiable
value tied to activities and decisions in everyday life.
2.5 Hours of CFL Use
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
EQUIVALENT TO A 30 MINUTE WORKOUT
Analysis 2: Overtime Effects on
Productivity
Overtime Effects on Productivity
Wage Loss Calculations
Outline
Electrical Subcontractor Lost Wages (6-12s)
Productivity levels decrease with: Increases in the number of
work hours and work days per week
Make Up Lost Time
Scheduled
Overtime
Accelerate Project
Schedule
Ensure Project
Doesn’t Fall Behind
Productivity loss : Due mainly to the increase of disruptions
Disruptions: The inability to acquire materials, tools, or other
resources at an enhanced rate
Regular OT
Effective
Regular
Avg
OT
ProducEffective
OT Hrs
Week Hrs/
Hrs/
Regular
Hrs
Laborer Laborer
tivity
OT Hrs
Lost
Wk
Wk
Hrs
Lost
$/Hr
$/Hr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Total
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
0.80
0.75
0.71
0.65
0.61
0.57
0.54
0.50
0.48
0.46
0.45
0.44
0.43
0.42
0.41
0.41
32.0
30.0
28.4
26.0
24.4
22.8
21.6
20.0
19.2
18.4
18.0
17.6
17.2
16.8
16.4
16.4
345.2
25.6
24.0
22.7
20.8
19.5
18.2
17.3
16.0
15.4
14.7
14.4
14.1
13.8
13.4
13.1
13.1
276.2
8.0
10.0
11.6
14.0
15.6
17.2
18.4
20.0
20.8
21.6
22.0
22.4
22.8
23.2
23.6
23.6
294.8
6.4
8.0
9.3
11.2
12.5
13.8
14.7
16.0
16.6
17.3
17.6
17.9
18.2
18.6
18.9
18.9
235.8
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
48.25
48.25
48.25
48.25
48.25
48.25
48.25
48.25
48.25
48.25
48.25
48.25
48.25
48.25
48.25
48.25
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
72.38
72.38
72.38
72.38
72.38
72.38
72.38
72.38
72.38
72.38
72.38
72.38
72.38
72.38
72.38
72.38
Avg
Lost $ Per
Labor
Laborer
/Wk
$
849.20
$ 1,061.50
$ 1,231.34
$ 1,486.10
$ 1,655.94
$ 1,825.78
$ 1,953.16
$ 2,123.00
$ 2,207.92
$ 2,292.84
$ 2,335.30
$ 2,377.76
$ 2,420.22
$ 2,462.68
$ 2,505.14
$ 2,505.14
$ 31,293.02
6
9
9
11
11
9
8
9
10
10
9
12
12
15
12
11
Total Lost
Wages
$ 5,095.20
$ 9,553.50
$ 11,082.06
$ 16,347.10
$ 18,215.34
$ 16,432.02
$ 15,625.28
$ 19,107.00
$ 22,079.20
$ 22,928.40
$ 21,017.70
$ 28,533.12
$ 29,042.64
$ 36,940.20
$ 30,061.68
$ 27,556.54
$ 329,616.98
The Total Lost Wages for the Six Main Subs is $1,539,481
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
I.
BACKGROUND INFORMATION
II.
WAGE LOSS CALCULATIONS
III. PRODUCTIVITY LOSS CALCULATIONS
IV. OVERTIME SCHEDULE ALTERNATIVES
V.
V.
COST COMPARISON
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Productivity Loss Calculations
Overtime Schedule Alternatives
6-12s
100%
Week
Rolling 4-10s
5-8s
Productivity
80%
4-9s & 1-8
5-10s
70%
6-9s
6-10s
60%
7-8s
5-12s
50%
7-9s
7-10s
40%
6-12s
30%
1
2
3
4
5
6
7
8 9 10 11 12 13 14 15 16
Week
• The existing schedule
used 621.4 effective
hours
Work Schedule Alternatives
Work Schedule Productivity Per Week
90%
Outline
7-12s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Totals
Rolling 4-10s
4-9s & 1-8
5-10s
0.80
0.75
0.71
0.65
0.61
0.57
0.54
0.50
0.48
0.46
0.45
0.44
0.43
0.42
0.41
0.41
57.6
54.0
51.1
46.8
43.9
41.0
38.9
36.0
34.6
33.1
32.4
31.7
31.0
30.2
29.5
29.5
621.4
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
1.00
0.99
0.99
0.98
0.98
0.97
0.97
0.96
0.95
0.94
0.93
0.92
0.91
0.89
0.88
0.87
40.0
39.6
39.6
39.2
39.2
38.8
38.8
38.4
38.0
37.6
37.2
36.8
36.4
35.6
35.2
34.8
605.2
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
1.00
0.99
0.99
0.99
0.98
0.97
0.94
0.92
0.88
0.85
0.82
0.78
0.79
0.79
0.79
0.79
44.0
43.6
43.6
43.6
43.1
42.7
41.4
40.5
38.7
37.4
36.1
34.3
34.8
34.8
34.8
34.8
627.9
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0.97
0.95
0.93
0.89
0.87
0.84
0.82
0.79
0.77
0.75
0.74
0.73
0.72
0.71
0.70
0.69
48.5
47.5
46.5
44.5
43.5
42.0
41.0
39.5
38.5
37.5
37.0
36.5
36.0
35.5
35.0
34.5
643.5
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
72
72
72
72
72
72
72
72
72
72
72
72
72
72
72
72
I.
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
• Meaning 621.4 hours
of work took place in
16 weeks
I.
BACKGROUND INFORMATION
II.
WAGE LOSS CALCULATIONS
III. PRODUCTIVITY LOSS CALCULATIONS
IV. OVERTIME SCHEDULE ALTERNATIVES
V.
• Any alternative
schedule must have
at least 621.4
effective hours
V.
COST COMPARISON
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Overtime Schedule Alternatives
OT Schedule Comparisons
Alt. Schedule
4-10s
4-9s & 1-8
5-8s
5-10s
6-9s
6-10s
7-8s
5-12s
7-9s
7-10s
6-12s
7-12s
Effective Hrs
605.2
627.9
570
643.5
662.6
690
597.5
599.4
605.4
651.7
621.4
672
The 4-9s and 1-8 Schedule was Selected
Cost Comparison
Lost Wages per Subcontractor
6-9s Schedule Vs 4-9s & 1-8 Schedule
72 Work Week Hours
6 Work Days Per Week
41% Productivity After 16 Weeks
$1,539,481 Lost Wages
22%
44 Work Week Hours
5 Work Days Per Week
Outline
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
13%
10%
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
13%
22%
79% Productivity After 16 Weeks
BACKGROUND INFORMATION
II.
WAGE LOSS CALCULATIONS
III. PRODUCTIVITY LOSS CALCULATIONS
IV. OVERTIME SCHEDULE ALTERNATIVES
20%
$192,790 Lost Wages
I.
V.
V.
COST COMPARISON
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
VII. CONCLUSIONS AND RECOMMENDATIONS
The 4-9s & 1-8 Schedule Saved $1,346,619 in Labor Costs
Steel Sub
Masonry Sub
VIII. ACKNOWLEDGEMENTS
Electrical Sub
Plumbing Sub
IX. QUESTIONS
Drywall Sub
Mechanical Sub
Analysis 3: Implementation of Job
Order Contracting
Job Order Contracting
Allows Owner to achieve many smaller contracts under the
umbrella of a larger, competitively bid contract
Project Implementation
1 - Construction Need Identified
Step 1
Outline
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
2 - Criteria & Objectives Determined
3 - RFQ Issued
4 - Selection Criteria Weighted
Step 2
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
Step 3
ANALYSIS 3: JOB ORDER CONTRACTING
I.
BACKGROUND INFORMATION
II.
PROJECT IMPLEMENTATION
III. COMPREHENSIVE COST ANALYSIS
Step 4
IV. DECREASED PRECONSTRUCTION DURATIONS
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
5 - Contractors Submit Coefficients
Step 5
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
6 - Contractor Selected
Succeeding construction projects won on previous performance
7 - Contract Negotiated
Step 6
Step 7
IX. QUESTIONS
Comprehensive Cost Analysis – GC Savings
Comprehensive Cost Analysis – Sub Savings
Forrester Construction Cost Savings from Employing JOC
VIDA Name
U Street
Metropole
Verizon Center
Renaissance Hotel
TOTAL
Square
Footage
80,000
65,000
60,000
32,000
Cost/SF
$
$
$
$
199.91
199.91
199.91
199.91
Total Cost
$
$
$
$
$
15,992,800.00
12,994,150.00
11,994,600.00
6,397,120.00
47,378,670.00
The GC total savings for all
four VIDA’s is $7,106,800
Min Savings
(9%)
$ 1,439,352.00
$ 1,169,473.50
$ 1,079,514.00
$
575,740.80
$ 4,264,080.30
Max Savings
(21%)
$ 3,358,488.00
$ 2,728,771.50
$ 2,518,866.00
$ 1,343,395.20
$ 9,949,520.70
Avg Savings
(15%)
$ 2,398,920.00
$ 1,949,122.50
$ 1,799,190.00
$
959,568.00
$ 7,106,800.50
Avg Savings
(15%)
$ 2,398,920.00
$ 1,949,122.50
$ 1,799,190.00
$
959,568.00
$ 7,106,800.50
The total subcontractor savings
for all four VIDA’s is $356,222
Avg Savings
(11.5%)
$ 120,244.00
$ 97,698.25
$ 90,183.00
$ 48,097.60
$ 356,222.85
U Street
Metropole
Verizon Center
Renaissance Hotel
TOTAL
Square
Footage
80,000
65,000
60,000
32,000
Steel
Cost/SF
$ 13.07
$ 13.07
$ 13.07
$ 13.07
Total Cost
$ 1,045,600.00
$
849,550.00
$
784,200.00
$
418,240.00
$ 3,097,590.00
Min Savings
(8%)
$ 83,648.00
$ 67,964.00
$ 62,736.00
$ 33,459.20
$ 247,807.20
Max Savings
(15%)
$ 156,840.00
$ 127,432.50
$ 117,630.00
$ 62,736.00
$ 464,638.50
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
I.
BACKGROUND INFORMATION
II.
PROJECT IMPLEMENTATION
III. COMPREHENSIVE COST ANALYSIS
IV. DECREASED PRECONSTRUCTION DURATIONS
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
Steel Subcontractor Cost Savings from Employing JOC
VIDA Name
Outline
Avg Savings
(11.5%)
$ 120,244.00
$ 97,698.25
$ 90,183.00
$ 48,097.60
$ 356,222.85
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Decreased Preconstruction Durations
U Street Durations (Days)
Min
(75%)
Savings
Max
(85%)
Avg
(80%)
New
10.00
7.50
8.50
8.00
2.00
10.00
7.50
8.50
8.00
2.00
10.00
7.50
8.50
8.00
2.00
20.00
15.00
17.00
16.00
4.00
10.00
7.50
8.50
8.00
2.00
Fabricate Monumental Stair
25.00
18.75
21.25
20.00
5.00
TOTAL
85.00
63.75
72.25
68.00
17.00
Structural Steel Shop
Drawings
Review Structural Steel
Shop Drawings
Monumental Stair
Submittals
Fabricate Structural Steel
Monumental Stair Submittal
Review
Actual
[
Revised schedule allows
Task Durations Savings Per VIDA Gym
Task Name
Decreased Preconstruction Durations
The Steel Precon Schedule Could be Reduced by 68 days
Outline
I.
INTRODUCTION
fabricated steel to be
II.
PROJECT OVERVIEW
completed 6 weeks sooner
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
[
Revised schedule allows
fabricated monumental stair
to be completed 8 weeks
sooner
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
I.
BACKGROUND INFORMATION
II.
PROJECT IMPLEMENTATION
III. COMPREHENSIVE COST ANALYSIS
IV. DECREASED PRECONSTRUCTION DURATIONS
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Analysis 4: Mechanical System Layout
Quantity Take-Off
Optional Ductwork Layouts
Existing Layout: Supply & Exhaust lines located outside
Ext Supply
Layout 1: Move Supply & Exhaust lines to SW corner
Remove Y Duct in GM Office on 3rd Floor
Ext Exhaust
Add 3 additional branch lines on 2nd Floor
Add 2 additional branch lines on
3rd
Floor
Layout 2: Move Supply & Exhaust lines to elevator
New Supply
New Exhaust
Outline
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
I.
QUANTITY TAKE-OFF
II.
OPTIONAL DUCTWORK LAYOUTS
III. COST ANALYSIS
IV. SCHEDULE ANALYSIS
Reroute Supply through GM Office on 3rd Floor
V.
Remove Y Duct in GM Office on 3rd Floor
VI. MECHANICAL BREADTH
Add 3 additional branch lines on 2nd Floor
Add 2 additional branch lines on 3rd Floor
METRICS CHART AND EXAMINATION
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Cost Analysis
Schedule Analysis
Outline
Average Cost Per LF of Ductwork
Duct
Supply
Exhaust
Supply
Exhaust
Supply
Exhaust
Layout Linear Feet Avg $/LF
Exst
Exst
1
1
2
2
1106.35
438.48
1926.49
764.19
1217.53
445.40
$
$
$
$
$
$
768.03
768.03
768.03
768.03
768.03
768.03
Duct Cost
Difference
$ 849,709.99 $
$ 336,765.79 $
$ 1,479,602.11 $ 629,892.12
$ 586,920.85 $ 250,155.05
$ 935,099.57 $ 85,389.58
$ 342,082.87 $
5,317.07
Layout
Exst - Supply
Exst - Return
1 - Supply
1 - Return
2 - Supply
2 - Return
% Difference
0.00%
0.00%
74.13%
74.28%
10.05%
1.58%
Layout Cost
$ 1,186,475.78
Difference
$
% Difference
-
0.00%
$ 2,066,522.96 $ 880,047.18
74.17%
$ 1,277,182.43 $
7.65%
90,706.65
Layout
Duct Cost
$ 849,709.99
$ 336,765.79
$ 1,479,602.11
$ 586,920.85
$ 935,099.57
$ 342,082.87
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
Duration (Days)
Exst - Supply
Exst - Return
1 - Supply
1 - Return
2 - Supply
2 - Return
I.
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
109.65
43.46
190.93
75.74
120.67
44.14
V.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
I.
QUANTITY TAKE-OFF
II.
OPTIONAL DUCTWORK LAYOUTS
III. COST ANALYSIS
IV. SCHEDULE ANALYSIS
V.
Average Duration Per LF of Ductwork
Duct
Supply
Exhaust
Supply
Exhaust
Supply
Exhaust
Layout
Linear
Feet
Avg
LF/Day
Duration (Days)
Difference
%
Difference
Exst
Exst
1
1
2
2
1106.35
438.48
1926.49
764.19
1217.53
445.40
10.09
10.09
10.09
10.09
10.09
10.09
109.65
43.46
190.93
75.74
120.67
44.14
0.00
0.00
81.28
32.28
11.02
0.69
0.00%
0.00%
74.13%
74.28%
10.05%
1.58%
METRICS CHART AND EXAMINATION
VI. MECHANICAL BREADTH
Total Duration
(Days)
Difference
%
Difference
153.11
0.00
0.00%
VIII. ACKNOWLEDGEMENTS
266.67
113.56
74.17%
IX. QUESTIONS
164.81
11.70
7.65%
VII. CONCLUSIONS AND RECOMMENDATIONS
Metrics Chart and Examination
Mechanical Breadth
Each layout was evaluated on 4 design variables with a 0-5 scale
91-100% 81-90% 71-80% 61-70% 51-60% 41-50% 31-40% 21-30% 11-20%
0
0.5
1
1.5
2
2.5
3
3.5
4
Ductwork Layout Metrics Measuring Chart
Aesthetics
Cost
Schedule
Constructability
0.5
5
5
2
3.5
1.5
1.5
4
4.5
4.5
4.5
4
Layout
Existing
Layout 1
Layout 2
Very Poor
0
0.5
Poor
1
1.5
Weak
2
2.5
Neutral
3
3.5
Good
4
Layout 2 was Chosen as the Best Option
1-10%
4.5
Outline
Calculate CFM of Outside Air for each space
0%
5
CFM Requirements Per Space
Space Name
Bang Salon
Lobby
Break Room
Office
Total
Women's Lockers
12.5
Men's Lockers
10.5
Sales Rm 1
Sales Rm 2
17.5
Cardio Area
Group Fitness
Equipment Area
Excellent Office
4.5
5
Spin Class
GTS
Pilates
Inner Fitness
Open Fitness
Laundry
Floor Area (SF)
1
1
1
1
2
2
2
2
2
3
3
3
3
4
4
4
4
4
1500
1800
505
50
2400
2400
120
120
4525
2040
7350
190
605
375
400
1100
1850
250
Occupant Density Occupants
OA Per
OA Per SF
(#/1000SF)
(#)
Occupant (CFM)
(CFM)
25.00
37.50
7.50
0.06
10.00
18.00
5.00
0.06
5.00
2.53
15.00
0.06
5.00
0.25
5.00
0.06
10.00
24.00
30.00
0.12
10.00
24.00
30.00
0.12
15.00
1.80
7.50
0.12
15.00
1.80
7.50
0.12
10.00
45.25
20.00
0.06
40.00
81.60
20.00
0.06
10.00
73.50
20.00
0.06
5.00
0.95
5.00
0.06
40.00
24.20
20.00
0.06
40.00
15.00
20.00
0.06
40.00
16.00
20.00
0.06
40.00
44.00
20.00
0.06
40.00
74.00
20.00
0.06
10.00
2.50
35.00
0.12
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
OA Provided
(CFM)
371.25
198.00
68.18
4.25
1008.00
1008.00
27.90
27.90
1176.50
1754.40
1911.00
16.15
520.30
322.50
344.00
946.00
1591.00
117.50
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
I.
QUANTITY TAKE-OFF
II.
OPTIONAL DUCTWORK LAYOUTS
III. COST ANALYSIS
IV. SCHEDULE ANALYSIS
V.
METRICS CHART AND EXAMINATION
VI. MECHANICAL BREADTH
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Mechanical Breadth
Mechanical Breadth
Outline
All outside air and occupancy requirements were calculated
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
using ASHRAE
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
• Calculate
CFM for
Each Area
Step 1
Step 2
• Redesign
Layout
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
• Size
Ductwork
I.
QUANTITY TAKE-OFF
II.
OPTIONAL DUCTWORK LAYOUTS
III. COST ANALYSIS
IV. SCHEDULE ANALYSIS
Step 3
V.
METRICS CHART AND EXAMINATION
VI. MECHANICAL BREADTH
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Conclusions and Recommendations
Conclusions and Recommendations – Analysis 1
Analysis 1: ReRev Energy Harvesting System
Conclusions and Recommendations – Analysis 2
Analysis 2: Overtime Effects on Productivity
Twenty Year Potential Profit: $582,371.52
Total Labor Wages Saved: $1,346,619
Forty Year Potential Profit: $1,936,704.75
Total Work Hours Saved Per Week: 32 Hours
Outline
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
Kilograms of CO2 Saved: 41,648 kg Annually
Simple Payback with Incentives: 5 Years
Overtime Hours Saved: 28 Hours
Work Days Saved Per Week: 1 Day
Various Other Social and Environmental Benefits
An Accrued Potential Profit of $1,936,704.75 Over 40 Years
The 4-9s & 1-8 Schedule Saved $1,346,619 in Labor Costs
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Conclusions and Recommendations – Analysis 3
Analysis 3: Job Order Contracting
Conclusions and Recommendations – Analysis 4
Analysis 4: Mechanical System Layout
Steel Precon Schedule Reduction: 68 Days
Layout 2 Additional Costs: $85,422.06
Steel Construction Could Start: 6 to 8 Weeks Earlier
Approximate Aesthetic Increase: 89%
Outline
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
ANALYSIS 3: JOB ORDER CONTRACTING
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
GC total savings for all four VIDA’s : $7,106,800
GC total savings for U St VIDA: $2,398,920
Approximate Schedule Decrease: 10%
Approximate Constructability Increase: 50%
Subcontractor total savings for all four VIDA’s : $356,222
Subcontractor total savings for U St VIDA: $120,244
GC and Subcontractor U St VIDA Savings of $2,519,164
Layout 2 Accrues Additional Material & Labor Costs of $85,422
VII. CONCLUSIONS AND RECOMMENDATIONS
VIII. ACKNOWLEDGEMENTS
IX. QUESTIONS
Conclusions and Recommendations
Conclusions and Recommendations
Outline
Analysis 1: An Accrued Potential Profit of $582,371.52 Over 20
Years
Analysis 2: The 4-9s & 1-8 Schedule Saved $1,346,619 in Labor
Costs
Analysis 3: GC and Subcontractor U St VIDA Savings of
$2,519,164
Analysis 4: Layout 2 Accrues Additional Material & Labor Costs
of $85,422
[
I.
INTRODUCTION
II.
PROJECT OVERVIEW
III. ANALYSIS 1: REREV ENERGY HARVESTING SYSTEM
IV. ANALYSIS 2: OVERTIME EFFECTS ON PRODUCTIVITY
V.
VI. ANALYSIS 4: MECHANICAL SYSTEM LAYOUT
Total Cost Savings with Implementation of all Analyses
Party
Analysis 1
Owner
$ 582,371.52
GC
Subcontractors
Total
Analysis 2
Analysis 3
Analysis 4
$ (85,422.06) $
$ 2,398,920.00
$ 1,346,619.00 $
120,244.00
ANALYSIS 3: JOB ORDER CONTRACTING
Total
VII. CONCLUSIONS AND RECOMMENDATIONS
496,949.46
VIII. ACKNOWLEDGEMENTS
$ 2,398,920.00
$ 1,466,863.00
$ 582,371.52 $ 1,346,619.00 $ 2,519,164.00 $ (85,422.06) $ 4,362,732.46
Total Savings of $ 4,362,732.46
IX. QUESTIONS
Works Cited
"Average Energy Prices in the Washington-Baltimore Area." U.S. Bureau of Labor
Statistics. Web. 13 Feb. 2012. <http://www.bls.gov/ro3/apwb.htm>.
Basu, Chirantan. "Effect of Overtime on Construction Labor Efficiency Rates | How to
Videos, Articles & More - Discover the Expert in You. | EHow.com. Web. 12 Feb. 2012.
<http://www.ehow.com/info_8714577_effect-construction-labor-efficiencyrates.html>.
The Gordian Group. "Job Order Contracting: An Overview." General Services
Department. Sonoma. Lecture.
Hoover, C. S. JOB-ORDER CONSTRUCTION QUANTIFICATION: AN APPLICATION OF
FUZZY THINKING. Thesis. Arizona State University, 1994. Print.
"Job Order Contracting Information." Job Order Contracting Information. Web. 22 Feb.
2012. <http://www.jocinfo.com/HowItWorks.aspx>
Koch, Wendy. "Exercise Converted to Electricity." USA Today 31 Aug. 2010, Special
Reprint Edition ed. Print.
Acknowledgements
Penn State Architectural Engineering Faculty
Dr. Robert Leicht – CM Thesis Advisor
Seth Glinski – Forrester Construction PM
Works Cited
National Energy Foundation."Simple Carbon Calculator." NEF. Web. 26 Mar. 2012.
<http://www.nef.org.uk/greencompany/co2calculator.htm>.
Odato, Nicki. "ReRev System Design." 14 Feb. 2012. E-mail.
Luis Ortiz – Forrester Construction Super
Parks, Bob. "High-Voltage Workouts." Bicycling Magazine Nov. 2009. Web. 4 Dec. 2011.
Ryan Major – Forrester Construction APM
"Pepco C&I Energy Savings Program Eligibility." Pepco. Web. 27 Mar. 2012.
<https://cienergyefficiency.pepco.com/Eligibility.aspx>.
Casey Mowery – Forrester Construction APM
Emory Land – VIDA Fitness General Manager
Britnei Godusky – MAE Student Graduate
Tom Horensky – MAE Student Graduate
PACE Industry Members
Family and Friends
Pulaski, Michael. Job Order Contracting (JOC). Tech. Print.
Raynar, Karl A., and Randolph Thomas. “Scheduled Overtime and Labor Productivity:
Quantitative Analysis." Journal of Construction Engineering and Management 123.2
(1997). Print.
"Renewable Energy Incentive Program (REIP) for Businesses." District of Columbia.
Web. 27 Mar. 2012. <http://green.dc.gov/service/renewable-energy-incentiveprogram-reip-businesses>.
Questions
Supplemental Slides
Cardio Equipment Usage – Page 39
Usage Summary Prepared for Every Day of the Week
Time
7:00 AM
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
Total Hours
Cardio Equipment Usage Summary - Sundays
Upright
Treadmills
Ellipticals StairMasters
Bikes
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
In Use
14
13
12
10
Cardio Equipment Usage – Page 39
VIDA Cardio Equipment
Type
Number
Treadmill
36
Elliptical
25
Recumbent Stairmaster
4
Bikes
Upright Bike
6
Recumbent
6
X-Trainer
8
Arc Trainer
5
Spin
30
In Use
Total
120
In Use
Cardio Equipment Usage Summary Per Equipment Type
In Use
Stair
Upright
Recumbent
In Use
Day
Treadmills Ellipticals
Masters
Bikes
Bikes
In Use
Sundays
14.00
13.00
12.00
10.00
10.00
In Use
Mondays
18.00
18.00
18.00
18.00
18.00
In Use
Tuesdays
18.00
18.00
18.00
17.00
17.00
In Use
Wednesdays
18.00
18.00
17.00
17.00
16.00
In Use
Thursdays
18.00
18.00
18.00
16.00
16.00
In Use
Fridays
18.00
18.00
17.00
16.00
16.00
Saturdays
14.00
14.00
14.00
14.00
14.00
10
Average
16.86
16.71
16.29
15.43
15.29
Wattage Generation Calculations – Page 40
Day
Sundays
Mondays
Tuesdays
Wednesdays
Thursdays
Fridays
Saturdays
Average
Daily
Average
11.80
18.00
17.60
17.20
17.20
17.00
14.00
16.11
Average Watts Produced Per Day of the Week
Daily Hours of Watts Produced
Number of
Use
Per Hour
Machines
11.80
100.00
120.00
18.00
100.00
120.00
17.60
100.00
120.00
17.20
100.00
120.00
17.20
100.00
120.00
17.00
100.00
120.00
14.00
100.00
120.00
16.11
ReRev provided approximate energy
production to be 100 watts/hour
Watts Produced
Per Day
141600.00
216000.00
211200.00
206400.00
206400.00
204000.00
168000.00
193371.43
ReRev Cost Analysis– Page 41
Annual Kilowatt Savings:
System Payback– Page 42
System Payback With Incentives– Page 45
System Information
Price
$148,000.00
Number of Machines
120
Hours per day usage
16.11
Average Watts per hour
100
Watts per Day
193,320
Days in Year
363
Watts per Year
70,175,160
Cost per kW
$0.129
Energy Rise per Year
5.00%
A/C Savings %
30.00%
Months of A/C Savings
11.43
ReRev System Annual Savings Calculations
Year
ReRev System Proposal provided total
cost to be $148,000
Annual Air Conditioning Savings:
Total Annual Savings:
Year
1
2
3
4
5
6
7
8
9
10
11
Annual KW Savings
Annual A/C Savings
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
9,080.67
9,534.70
10,011.43
10,512.01
11,037.61
11,589.49
12,168.96
12,777.41
13,416.28
14,087.09
14,791.45
2,594.80
2,724.54
2,860.77
3,003.81
3,154.00
3,311.70
3,477.28
3,651.14
3,833.70
4,025.39
4,226.66
Total Savings
$
$
$
$
$
$
$
$
$
$
$
11,675.47
23,934.71
36,806.91
50,322.72
64,514.32
79,415.50
95,061.74
111,490.30
128,740.28
146,852.76
165,870.86
Potential Profit
$
$
$
$
$
$
$
$
$
$
$
(136,324.53)
(124,065.29)
(111,193.09)
(97,677.28)
(83,485.68)
(68,584.50)
(52,938.26)
(36,509.70)
(19,259.72)
(1,147.24)
17,870.86
Simple
Payback
11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Annual KW
Savings
$
9,080.67
$
9,534.70
$ 10,011.43
$ 10,512.01
$ 11,037.61
$ 11,589.49
$ 12,168.96
$ 12,777.41
$ 13,416.28
$ 14,087.09
$ 14,791.45
$ 15,531.02
$ 16,307.57
$ 17,122.95
$ 17,979.10
$ 18,878.05
$ 19,821.95
$ 20,813.05
$ 21,853.70
$ 22,946.39
$ 24,093.71
$ 25,298.39
ReRev System Annual Savings Calculations With Incentives
Annual A/C
Potential Pepco Potential REIP
Total Savings
Savings
Incentive
Incentive
$
2,594.80 $ 14,311.10 $ 16,500.00 $ 42,486.57
$
2,724.54 $
$ 16,500.00 $ 71,245.81
$
2,860.77 $
$ 16,500.00 $ 100,618.01
$
3,003.81 $
$ 16,500.00 $ 130,633.82
$
3,154.00 $
$ 16,500.00 $ 161,325.42
$
3,311.70 $
$ 16,500.00 $ 192,726.60
$
3,477.28 $
$ 16,500.00 $ 224,872.84
$
3,651.14 $
$ 16,500.00 $ 257,801.40
$
3,833.70 $
$ 16,500.00 $ 291,551.38
$
4,025.39 $
$ 16,500.00 $ 326,163.86
$
4,226.66 $
$ 16,500.00 $ 361,681.96
$
4,437.99 $
$ 16,500.00 $ 398,150.97
$
4,659.89 $
$ 16,500.00 $ 435,618.43
$
4,892.88 $
$ 16,500.00 $ 474,134.26
$
5,137.53 $
$ 16,500.00 $ 513,750.88
$
5,394.40 $
$ 16,500.00 $ 554,523.34
$
5,664.12 $
$ 16,500.00 $ 596,509.42
$
5,947.33 $
$ 16,500.00 $ 639,769.80
$
6,244.70 $
$ 16,500.00 $ 684,368.20
$
6,556.93 $
$ 16,500.00 $ 730,371.52
$
6,884.78 $
$ 16,500.00 $ 777,850.01
$
7,229.02 $
$ 16,500.00 $ 826,877.42
Potential Profit
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
(105,513.43)
(76,754.19)
(47,381.99)
(17,366.18)
13,325.42
44,726.60
76,872.84
109,801.40
143,551.38
178,163.86
213,681.96
250,150.97
287,618.43
326,134.26
365,750.88
406,523.34
448,509.42
491,769.80
536,368.20
582,371.52
629,850.01
678,877.42
Energy Impact– Page 42
Case Study on The California State University of San Bernardino
The 38,000 square foot fitness facility on campus had 20 machines
retrofitted with ReRev back in 2009.
This fitness center uses approximately 2,100 kilowatt hours of
electricity per day.
Energy Impact– Page 43
The estimated kilowatt hours per square foot used for one day
was found to be approximately 0.055 kWh/SF.
The kilowatt hours used daily at VIDA comes to approximately
3336.24 kWh/day or 1,217,726.45 kWh/year.
The percentage of energy generated was estimated to be 5.76%.
Greater than 5% in Renewable Energy Generation adds an
additional 3 points to the LEED Scorecard making VIDA
applicable for LEED Gold
Social Impact – Page 43
Electrical Breadth – Wire/Breaker Sizing – Page 46
Electrical Breadth – Panel Sizing – Page 46
PANEL SCHEDULE
Volts = 208/120
Phase / Wire = 3Φ 4W
REV 1
CKT NO
1
2
3
4
5
6
NO
LOAD
1 - ReRev Inverter
2 - ReRev Inverter
3 - ReRev Inverter
4 - ReRev Inverter
5 - ReRev Inverter
6 - ReRev Inverter
PANEL SCHEDULE
Volts = 208/120
Phase / Wire = 3Φ 4W
DPB
CKT NO
1
2
3
4
5
NO
LOAD
1 - Panel 1A
2 - Panel 2A
3 - Panel 3A
4 - Panel REV1
5 - Panel 5A
Amps = 150
Mounting = Surface
Fed From = DPB
TRIP
20
20
20
20
20
20
POLE
1
1
1
1
1
1
AIC = 10,000
Type = MCB
Spaces = 12
VOLT
208
208
208
208
208
208
Amps = 800
Mounting = Surface
Fed From = MDB
TRIP
200
200
200
150
200
POLE
3
3
3
3
3
kVA
3.6
3.6
3.6
3.6
3.6
3.6
WIRE
COND
3 #12 + 1#12g 3/4" EMT
3 #12 + 1#12g 3/4" EMT
3 #12 + 1#12g 3/4" EMT
3 #12 + 1#12g 3/4" EMT
3 #12 + 1#12g 3/4" EMT
3 #12 + 1#12g 3/4" EMT
AIC = Existing
Type = 800A Main
Spaces = SWBD
VOLT
208
208
208
208
208
kVA
WIRE
COND
30
3 #12 + 1#12g 3/4" EMT
23
3 #12 + 1#12g 3/4" EMT
13
3 #12 + 1#12g 3/4" EMT
22
3 #12 + 1#12g 3/4" EMT
20
3 #12 + 1#12g 3/4" EMT
108 = Total kVA Connected
Electrical Breadth - Equations
WEEK 5
Subcontractors Present on Site
Date
Steel Sub Masonry Sub Electrical Sub Plumbing Sub Drywall Sub Mechanical Sub
3/28/2011
X
X
X
X
3/29/2011
X
X
X
X
3/30/2011
X
X
X
X
X
3/31/2011
X
X
X
X
X
4/1/2011
X
X
X
X
X
4/2/2011
X
X
X
X
X
4/4/2011
X
X
X
4/5/2011
X
X
X
X
X
4/6/2011
X
X
X
X
X
4/7/2011
X
X
X
X
X
4/8/2011
X
X
X
X
X
X
4/9/2011
X
X
X
4/11/2011
X
X
X
X
X
4/12/2011
X
X
X
X
X
X
4/13/2011
X
X
X
X
X
X
4/14/2011
X
X
X
X
X
X
4/15/2011
X
X
X
X
X
X
4/16/2011
X
X
X
X
X
X
4/18/2011
X
X
X
X
X
X
4/19/2011
X
X
X
X
X
X
4/20/2011
X
X
X
X
X
X
4/21/2011
X
X
X
X
X
X
4/22/2011
X
X
X
X
X
X
4/23/2011
X
X
X
X
X
4/25/2011
X
X
X
X
X
4/26/2011
X
X
X
X
X
X
4/27/2011
X
X
X
X
X
X
4/28/2011
X
X
X
X
X
X
4/29/2011
X
X
X
X
X
4/30/2011
X
X
X
X
X
Productivity Loss Calculations – Page 53
Wage Loss Calculations – Page 54
Productivity levels decrease with: Increases in the number of
work hours and work days per week
Work Schedule Productivity Per Week
100%
Rolling 4-10s
90%
5-8s
80%
Productivity
WEEK 4
WEEK 3
WEEK 2
WEEK 1
Subcontractors Present on Site – Page 53
4-9s & 1-8
5-10s
70%
6-9s
6-10s
60%
7-8s
5-12s
50%
7-9s
40%
7-10s
Electrical Subcontractor Lost Wages (6-12s)
Regular OT
Effective
Regular
Avg
OT
ProducEffective
OT Hrs
Week Hrs/ Hrs/
Regular
Hrs
Laborer Laborer
tivity
OT Hrs
Lost
Wk
Wk
Hrs
Lost
$/Hr
$/Hr
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Totals
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
0.80
0.75
0.71
0.65
0.61
0.57
0.54
0.50
0.48
0.46
0.45
0.44
0.43
0.42
0.41
0.41
32.0
30.0
28.4
26.0
24.4
22.8
21.6
20.0
19.2
18.4
18.0
17.6
17.2
16.8
16.4
16.4
345.2
6-12s
30%
1
2
3
4
5
6
7
8
9
Week
10
11
12
13
14
15
16
7-12s
25.6
24.0
22.7
20.8
19.5
18.2
17.3
16.0
15.4
14.7
14.4
14.1
13.8
13.4
13.1
13.1
276.2
8.0
10.0
11.6
14.0
15.6
17.2
18.4
20.0
20.8
21.6
22.0
22.4
22.8
23.2
23.6
23.6
294.8
6.4
8.0
9.3
11.2
12.5
13.8
14.7
16.0
16.6
17.3
17.6
17.9
18.2
18.6
18.9
18.9
235.8
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 48.25
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
$ 72.38
Lost $ Per
Laborer
$
849.20
$ 1,061.50
$ 1,231.34
$ 1,486.10
$ 1,655.94
$ 1,825.78
$ 1,953.16
$ 2,123.00
$ 2,207.92
$ 2,292.84
$ 2,335.30
$ 2,377.76
$ 2,420.22
$ 2,462.68
$ 2,505.14
$ 2,505.14
$ 31,293.02
Avg
Labor/
Wk
6
9
9
11
11
9
8
9
10
10
9
12
12
15
12
11
Total Lost
Wages
$ 5,095.20
$ 9,553.50
$ 11,082.06
$ 16,347.10
$ 18,215.34
$ 16,432.02
$ 15,625.28
$ 19,107.00
$ 22,079.20
$ 22,928.40
$ 21,017.70
$ 28,533.12
$ 29,042.64
$ 36,940.20
$ 30,061.68
$ 27,556.54
$ 329,616.98
Total Lost Wages per Subcontractor (6-12s)
Steel Sub
Masonry Sub
Electrical Sub
Plumbing Sub
Drywall Sub
Mechanical Sub
Total
$ 205,874.14
$ 151,021.89
$ 329,616.98
$ 299,003.37
$ 224,169.08
$ 329,796.02
$ 1,539,481.48
Alternative Schedules – Page 59
Alternative Schedules – Page 59
Alternative Schedules – Page 59
Work Schedule Alternatives - Part 1
4-9s & 1-8
5-8s
Work Schedule Alternatives - Part 2
6-10s
7-8s
Work Schedule Alternatives - Part 3
7-10s
6-12s
Rolling 4-10s
Week
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Totals
6-9s
5-10s
5-12s
7-9s
7-12s
Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective
Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective
Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective Weekly Produc- Effective
Week
Week
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
Hrs
tivity
Hrs
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
1.00
0.99
0.99
0.98
0.98
0.97
0.97
0.96
0.95
0.94
0.93
0.92
0.91
0.89
0.88
0.87
40.0
39.6
39.6
39.2
39.2
38.8
38.8
38.4
38.0
37.6
37.2
36.8
36.4
35.6
35.2
34.8
605.2
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
44
1.00
0.99
0.99
0.99
0.98
0.97
0.94
0.92
0.88
0.85
0.82
0.78
0.79
0.79
0.79
0.79
44.0
43.6
43.6
43.6
43.1
42.7
41.4
40.5
38.7
37.4
36.1
34.3
34.8
34.8
34.8
34.8
627.9
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
0.99
0.98
0.97
0.96
0.95
0.93
0.91
0.89
0.87
0.86
0.85
0.84
0.83
0.81
0.81
0.80
39.6
39.2
38.8
38.4
38.0
37.2
36.4
35.6
34.8
34.4
34.0
33.6
33.2
32.4
32.4
32.0
570.0
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
0.97
0.95
0.93
0.89
0.87
0.84
0.82
0.79
0.77
0.75
0.74
0.73
0.72
0.71
0.70
0.69
48.5
47.5
46.5
44.5
43.5
42.0
41.0
39.5
38.5
37.5
37.0
36.5
36.0
35.5
35.0
34.5
643.5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Totals
54
54
54
54
54
54
54
54
54
54
54
54
54
54
54
54
0.96
0.93
0.90
0.87
0.84
0.81
0.78
0.75
0.73
0.71
0.69
0.68
0.67
0.66
0.65
0.64
51.8
50.2
48.6
47.0
45.4
43.7
42.1
40.5
39.4
38.3
37.3
36.7
36.2
35.6
35.1
34.6
662.6
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
0.94
0.91
0.87
0.83
0.79
0.75
0.72
0.68
0.66
0.65
0.64
0.63
0.62
0.61
0.60
0.60
56.4
54.6
52.2
49.8
47.4
45.0
43.2
40.8
39.6
39.0
38.4
37.8
37.2
36.6
36.0
36.0
690.0
56
56
56
56
56
56
56
56
56
56
56
56
56
56
56
56
0.89
0.86
0.83
0.78
0.74
0.7
0.66
0.63
0.6
0.59
0.58
0.57
0.56
0.56
0.56
0.56
49.8
48.2
46.5
43.7
41.4
39.2
37.0
35.3
33.6
33.0
32.5
31.9
31.4
31.4
31.4
31.4
597.5
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
0.88
0.84
0.80
0.75
0.70
0.65
0.63
0.59
0.57
0.55
0.53
0.52
0.51
0.50
0.49
0.48
52.8
50.4
48.0
45.0
42.0
39.0
37.8
35.4
34.2
33.0
31.8
31.2
30.6
30.0
29.4
28.8
599.4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Totals
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
0.87
0.83
0.77
0.73
0.68
0.63
0.59
0.56
0.54
0.53
0.51
0.50
0.48
0.47
0.46
0.46
54.8
52.3
48.5
46.0
42.8
39.7
37.2
35.3
34.0
33.4
32.1
31.5
30.2
29.6
29.0
29.0
605.4
70
70
70
70
70
70
70
70
70
70
70
70
70
70
70
70
0.85
0.80
0.75
0.70
0.65
0.60
0.58
0.55
0.53
0.50
0.49
0.48
0.47
0.46
0.45
0.45
59.5
56.0
52.5
49.0
45.5
42.0
40.6
38.5
37.1
35.0
34.3
33.6
32.9
32.2
31.5
31.5
651.7
72
72
72
72
72
72
72
72
72
72
72
72
72
72
72
72
0.80
0.75
0.71
0.65
0.61
0.57
0.54
0.50
0.48
0.46
0.45
0.44
0.43
0.42
0.41
0.41
57.6
54.0
51.1
46.8
43.9
41.0
38.9
36.0
34.6
33.1
32.4
31.7
31.0
30.2
29.5
29.5
621.4
84
84
84
84
84
84
84
84
84
84
84
84
84
84
84
84
0.75
0.71
0.66
0.61
0.56
0.52
0.49
0.46
0.44
0.43
0.42
0.41
0.4
0.39
0.38
0.37
63.0
59.6
55.4
51.2
47.0
43.7
41.2
38.6
37.0
36.1
35.3
34.4
33.6
32.8
31.9
31.1
672.0
Wage Loss Calculations – Page 60
Cost Comparison – Page 60
Schedule
Mechanical Subcontractor Lost Wages (4-9s & 1-8)
Chosen
Week
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Totals
Regular
Hrs/
Wk
OT
Hrs/
Wk
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
Effective
Regular
Avg
OT
ProducEffective
OT Hrs
Regular
Hrs
Laborer Laborer
tivity
OT Hrs
Lost
Hrs
Lost
$/Hr
$/Hr
1.00
0.99
0.99
0.99
0.98
0.97
0.94
0.92
0.88
0.85
0.82
0.78
0.79
0.79
0.79
0.79
40.0
39.6
39.6
39.6
39.2
38.8
37.6
36.8
35.2
34.0
32.8
31.2
31.6
31.6
31.6
31.6
570.8
4.0
4.0
4.0
4.0
3.9
3.9
3.8
3.7
3.5
3.4
3.3
3.1
3.2
3.2
3.2
3.2
57.1
0.0
0.4
0.4
0.4
0.8
1.2
2.4
3.2
4.8
6.0
7.2
8.8
8.4
8.4
8.4
8.4
69.2
0.0
0.0
0.0
0.0
0.1
0.1
0.2
0.3
0.5
0.6
0.7
0.9
0.8
0.8
0.8
0.8
6.9
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 45.95
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
$ 68.93
Lost $ Per
Laborer
$
$
21.14
$
21.14
$
21.14
$
42.27
$
63.41
$ 126.82
$ 169.10
$ 253.64
$ 317.06
$ 380.47
$ 465.01
$ 443.88
$ 443.88
$ 443.88
$ 443.88
$ 3,656.70
Avg
Labor
Per Wk
3
8
4
10
11
13
12
12
11
12
12
12
12
11
12
12
Total Lost
Wages
$
$
169.10
$
84.55
$
211.37
$
465.01
$
824.34
$ 1,521.86
$ 2,029.15
$ 2,790.08
$ 3,804.66
$ 4,565.59
$ 5,580.17
$ 5,326.52
$ 4,882.65
$ 5,326.52
$ 5,326.52
$ 42,908.11
6-12s
4-9s & 1-8
Savings
% Savings
Comparison of Lost Wages Between Actual and Proposed Work Schedules
Mechanical
Steel Sub
Masonry Sub Electrical Sub Plumbing Sub Drywall Sub
Sub
$205,874.14 $151,021.89 $329,616.98 $299,003.37 $224,169.08 $329,796.02
$ 24,883.66 $ 18,826.21 $ 43,147.08 $ 38,423.87 $ 24,601.18 $ 42,908.11
$180,990.48 $132,195.68 $286,469.90 $260,579.50 $199,567.90 $286,887.91
88%
88%
87%
87%
89%
87%
Cost Comparison – Page 61
Total
Lost Wages per Subcontractor
$ 1,539,481.48
$ 192,790.11
$ 1,346,691.37
87%
22%
6-9s Schedule Vs 4-9s & 1-8 Schedule
72 Work Week Hours
44 Work Week Hours
6 Work Days Per Week
5 Work Days Per Week
41% Productivity After 16 Weeks
$1,539,481 Lost Wages
79% Productivity After 16 Weeks
$192,790 Lost Wages
The 4-9s & 1-8 Schedule Saved $1,346,619 in Labor Costs
13%
10%
13%
22%
20%
Steel Sub
Masonry Sub
Electrical Sub
Plumbing Sub
Drywall Sub
Mechanical Sub
Decreased Preconstruction Durations – Page 70
Decreased Preconstruction Durations – Page 71
Decreased Preconstruction Durations – Page 71
Task Durations Savings Per VIDA Gym - Part 1
Task Durations Savings Per VIDA Gym - Part 2
Task Durations Savings Summary Per VIDA Gym
Task Name
Structural Steel
Shop Drawings
Review
Structural Steel
Shop Drawings
Monumental
Stair Submittals
Fabricate
Structural Steel
Monumental
Stair Submittal
Review
Fabricate
Monumental
Stair
TOTAL
U Street Durations (Days)
Metropole Durations (Days)
Avg
(80%)
New
Actual
Min
(75%)
Savings
Max
(85%)
Avg
(80%)
Actual
Min
(75%)
Savings
Max
(85%)
10.00
7.50
8.50
8.00
2.00
8.13
6.09
6.91
6.50
10.00
7.50
8.50
8.00
2.00
8.13
6.09
6.91
6.50
10.00
7.50
8.50
8.00
2.00
8.13
6.09
6.91
6.50
20.00
15.00
17.00
16.00
4.00
16.25
12.19
13.81
13.00
10.00
7.50
8.50
8.00
2.00
8.13
6.09
6.91
6.50
25.00
18.75
21.25
20.00
5.00
20.31
15.23
17.27
16.25
85.00
63.75
72.25
68.00
17.00
69.06
51.80
58.70
55.25
New
Task Name
Structural Steel
Shop Drawings
Review
1.63 Structural Steel
Shop Drawings
Monumental
1.63
Stair Submittals
Fabricate
3.25
Structural Steel
Monumental
1.63 Stair Submittal
Review
Fabricate
4.06 Monumental
Stair
13.81 TOTAL
1.63
Verizon Center Durations (Days)
Renaissance Hotel Durations (Days)
Avg
(80%)
New
Actual
Min
(75%)
Savings
Max
(85%)
Avg
(80%)
New
Actual
Min
(75%)
Savings
Max
(85%)
7.50
5.63
6.38
6.00
1.50
4.00
3.00
3.40
3.20
0.80
7.50
5.63
6.38
6.00
1.50
4.00
3.00
3.40
3.20
0.80
7.50
5.63
6.38
6.00
1.50
4.00
3.00
3.40
3.20
0.80
15.00
11.25
12.75
12.00
3.00
8.00
6.00
6.80
6.40
1.60
7.50
5.63
6.38
6.00
1.50
4.00
3.00
3.40
3.20
0.80
18.75
14.06
15.94
15.00
3.75
10.00
7.50
8.50
8.00
2.00
63.75
47.81
54.19
51.00
12.75
34.00
25.50
28.90
27.20
6.80
Task Name
Structural Steel
Shop Drawings
Review Structural
Steel Shop
Drawings
Monumental Stair
Submittals
Fabricate
Structural Steel
Monumental Stair
Submittal Review
Fabricate
Monumental Stair
TOTAL
U Street Durations
Metropole Durations
Verizon Center Durations Renaissance Durations
Actual
New
Actual
New
Actual
New
Actual
New
10.00
2.00
8.13
1.63
7.50
1.50
4.00
0.80
10.00
2.00
8.13
1.63
7.50
1.50
4.00
0.80
10.00
2.00
8.13
1.63
7.50
1.50
4.00
0.80
20.00
4.00
8.13
3.25
15.00
3.00
8.00
1.60
10.00
2.00
16.25
1.63
7.50
1.50
4.00
0.80
25.00
5.00
8.13
4.06
18.75
3.75
10.00
2.00
85.00
17.00
56.88
13.83
63.75
12.75
34.00
6.80
Download