The Commonwealth of Massachusetts Department of Education 350 Main Street, Malden, Massachusetts 02148-5023 Telephone: (781) 338-3700 TTY: N.E.T. Relay 1-800-439-2370 January 5, 2005 Mr. John T. Weldon, M.S.W. Executive Director St. Vincent’s Home 2425 Highland Avenue Fall River, MA Re: Onsite Follow-up Monitoring Report: Program Review Corrective Action Plan Verification and Mid-cycle Review Dear Mr. Weldon: Enclosed is the Department's Program Review Follow-up Monitoring Report together with findings regarding your private school’s Mid-Cycle Program Review. This report contains the Department's findings based on the onsite activities conducted in your school to verify the implementation status and effectiveness of corrective steps taken in response to your Program Review Report issued on December 13, 2002. This report also includes a report on the status of implementation for new state or federal special education requirements enacted since your school’s last Program Review. While the Department of Education found certain noncompliance issues to be resolved, others were partially corrected, not addressed at all and/or new issues were identified by the Department’s onsite team. Therefore, the Department is issuing a “Provisional Approval” status effective from the date of this letter and indicated on your approval certificate. Your “Provisional Approval” will expire on May 2, 2005. The reasons for the “Provisional Approval” are clearly indicated on the attached Corrective Action Plan Implementation Checklist. As the Department previously informed you, in cases where a private school fails to fully and effectively implement a Corrective Action Plan which was proposed by your school and approved by the Department, the Department must then prepare a Corrective Action Plan for the school which must be implemented without further delay. You will find these requirements for corrective action and further progress reporting included in the attached report together with any steps that must be taken by the school to fully implement new special education requirements. Please provide the Department with your written assurance that the Department's requirements for corrective action will be implemented by your private school within the timelines specified. Your statement of assurance must be submitted to the Department's Onsite Chairperson by January 25, 2005. Your staff's cooperation throughout these follow-up monitoring activities is appreciated. Should you require additional clarification of information included in our report, please do not hesitate to contact the Onsite Team Chairperson at 781-338-3711. Sincerely, Nina M. Marchese, M.Ed. Program Review Follow-up Chairperson Program Quality Assurance Services John D. Stager, Administrator Program Quality Assurance Services c: David P. Driscoll, Commissioner of Education Most Rev. George W. Coleman, Chairperson, Board of Directors Michelle Lorranger-Cruise, Local Program Review Coordinator Encl.: Follow-up Monitoring Report 2 MASSACHUSETTS DEPARTMENT OF EDUCATION PROGRAM REVIEW St. Vincent’s Home ONSITE VERIFICATION OF CORRECTIVE ACTION PLAN IMPLEMENTATION AND/OR IDENTIFICATION OF ADDITIONAL FINDINGS REQUIRING CORRECTIVE ACTION Onsite Visit Conducted on October 19 & 20, 2004 Date of this Report January 5, 2005 Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 1.2 Program & Student Description 1.3 Program’s Curriculum 28.09(9) Documentation Documentation Interviews The program and student description was updated and includes all requirements of this criterion for the approved program only. The on site team found that the school has developed a recreation and leisure activities appropriate to meet the needs of the students. The description needs to reflect the maximum capacity of the approved private school program. Documentation to be submitted that reflects the maximum capacity of the approved private school program only. St. Vincent’s must develop the curriculum across all required areas that is aligned with the Massachusetts Curriculum Provide a specific timeline on how the curriculum at St. Vincent’s will be developed so that it is fully aligned with the Massachusetts Curriculum Frameworks. Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Frameworks so that there is a school-wide curriculum. 2.2 Approvals, Licenses, Certificates of Inspection 28.09 (2)(b)4-5 28.09(5) 28.09(6) 18.04(1) Documentation St. Vincent’s maintains required licenses, approvals and certificates of inspection by state and local agencies in a place available for public and employee view. 102 CMR 3.06 (4)(b) 2 Also include the name and role of the staff person who is responsible and how staff will be trained on the updated curriculum by March 14, 2005 Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 2.3 OCCS Licensure (Not Applicable to Day Schools) 3.1 3.2 3.3 Policies and Procedures Manuals Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Documentation Interviews St. Vincent’s has a current full license from the Office of Child Care Services (OCCS). St. Vincent’s has a policy and procedure manual that is online for all staff to access, has a crosswalk of all requirements from regulatory agencies is clearly written and extremely thorough. 3 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 4.4 Advanced Notice of Program/ Facility Change 28.09(5)(c) Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation St. Vincent’s has provided the Department with written notification prior to any substantial change. St. Vincent’s consistently maintains communication with the private school liaison, from the Department of Education, to provide updates the status of form 1’s. 4 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 4.5 Immediate Notification 18.03(10) 18.05(7) 28.09(12) Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Student Records St. Vincent’s provides immediate notification to the parent, the public school district special education administrator, and any State Agency involved in the student’s care or placement and Department of Education through form 2 requirements. St. Vincent’s staff provide appropriate follow-up when needed. 5 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Although St. Vincent’s has updated the student admissions criteria policies and procedures to reflect the approved residential education program, consent forms must be added to the policy and procedure, including the procedure St. Vincent’s will follow to ensure consents are updated on an annual basis. St. Vincent’s must submit a policy that specifies how consents will be updated for all students on an annual basis by March 14, 2005. Documentation 5.1 Student Admissions 6 Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Although St. Vincent’s has updated numerous policies and procedures that fall under this criterion, a policy specific to contents and general arrangements for executing contracts with placing school districts must include language as required under 603 CMR 28.06(3)(f). St. Vincent’s must update its policy specific to contents and general arrangements for executing contracts with placing school districts must include language as required under 603 CMR 28.06(3)(f) by March 14, 2005. 5.3 Contents of Coordination and Collaboration with Public School Districts 28.06(2-3) 28.07(5) 28.09(9)(c)&(d) 28.09(2)(b)7 Federal Regulations: 300.349 and 300.400-401 5.4 Training Documentation Interviews St. Vincent’s trains staff with school district responsibility regarding their roles. 7 Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting St. Vincent’s is meeting the required number of instructional hours per school day for elementary and secondary age students during the school year but must increase the daily instructional hours to maintain the requirements over the summer months. St. Vincent’s is approved by the Department as a 12-month program, so the average hours must meet the average of 5 hours per school day for elementary age students and 5.5 hours per school day for the secondary age students. St. Vincent’s must revise the school hours that it is in session from June through August that meets the daily instructional hours of 5 hours per day for elementary age students and 5.5 hours per day for secondary age students. In addition to providing an updated calendar, provide meeting notes from staff meetings that address this and how others will be notified. This schedule must be implemented for the summer of 2005. The plan is due to the Department no later than March 14, 2005. 6.1 Daily Instructional Hours 603 C.M.R. 27.00 Documentation Interviews Observations of the on-site team determined that when students are removed from the classrooms during the school day they are primarily working on IEP related goals. 8 Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting St. Vincent’s needs to add 5 extra calendar days to account for unforeseen circumstances. St. Vincent’s must provide an updated calendar to the Department that includes 5 extra calendar days to account for unforeseen circumstances by March 14, 2005. St. Vincent’s must continue to work with teaching staff on how to align the curriculum and use Curriculum frameworks when designing and implementing instruction to students. Please refer to criterion 1.3. Please refer to criterion 1.3. 6.4 School Days per Year 28.09(9) Documentation 7.1 Curriculum Frameworks 28.09(9)(b) Documentation Interviews 9 Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 7.2 Staff Training Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Interviews St. Vincent’s ensures that all staff responsible for implementing services as specified on students’ Individualized Education Programs have an understanding and knowledge of the general curriculum expectations and learning standards of the Massachusetts Curriculum Frameworks and shall incorporate such knowledge into the school’s educational program. 10 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Although St. Vincent’s has specified how all required educational services are implemented for the described population. St. Vincent’s must hire a Physical Education teacher whose responsibility it is to conduct physical education classes and work with teachers to ensure all students are receiving appropriate physical activity. Provide a detailed plan to the Department by March 14, 2005 that addresses this mandate. 8.1 Implementation Educational Services Documentation Interviews Observations Students are not receiving appropriate physical education requirements. 11 Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting St. Vincent’s is not providing the appropriate occupational therapy services as required on student IEP’s. St. Vincent’s must hire an Occupational Therapist who will work directly with students to ensure their IEP goals are being implemented. Provide a detailed plan to the Department by March 14, 2005 that addresses this mandate. 8.2 Implementatio n – Related Services 8.3 Implementation on Supplementary Aids/Services Documentation Student Records Interviews Documentation St. Vincent’s provided a list of the supplementary aids and services that are available for students in the program. 12 Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 8.4 Current IEP & Student Roster 28.09 8.5 Education Case Manager Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Student Records Interviews St. Vincent’s has on file a current IEP for each enrolled Massachusetts student that has been issue by the responsible school district and consented to by the student’s parent(s) (or student in applicable situations) for each student enrolled ion the program. Documentation Student Records St. Vincent’s assigns an educational case manager to each student. 13 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified 8.6 IEP Implementation Documentation Interviews Observations St. Vincent’s implements all services on the students’ with the exception of Occupational Therapy. Please refer to criterion 8.2. 8.7 IEP Progress Reports Documentation Student Record In IEP Progress Reports, St. Vincent’s includes written information on the student’s progress toward the annual goals in the IEP, including information on the extent to which such progress is sufficient to enable the child to achieve the goals by the end of the year. Progress reports are thorough and well written. 14 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified 8.8 IEP Revisions and Changes Documentation Student Record St. Vincent’s has identified the person responsible for notifying the public school and parents whenever an IEP needs to be revised and has a written procedure that outlines this practice. 8.9 IEP- Less Restrictive Placement 28.09(9(c) Documentation St. Vincent’s has developed and implemented procedures to ensure opportunities for students to return to a less restrictive educational program. 15 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 9.1 Policies and Procedures Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Interviews St. Vincent’s has a comprehensive set of policies and procedures dealing with discipline and behavior management that meet all federal special education requirements as well as all applicable state and federal requirements pertaining to the use of restraint that are consistently implemented by staff. Staff have received training and supervision on policies and procedures to ensure appropriate implementation. 16 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified 9.3 Runaway Students Documentation Interviews St. Vincent’s has a policy and procedure on the use of runaway students that distinguishes between “out of location” from “run away.” 10.1 Student: Teacher Ratios 28.06(6)(d)&(g) 28.09(7)(e) Documentation School schedules The student: teacher ratios in the school at St. Vincent’s are 1:4 which exceeds the requirements of the student: teacher ratios. 17 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 10.4 Documentation Work Schedules Documentation Student: Child Care Ratios 28.09(7) 18.01(2) 11.1 Personnel Policies 28.09(7) 28.09(11)(a) 18.05(11) Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified The student: Child Care ratios at St. Vincent’s are not lower that 4:1 nor greater that 6:1 during non “school-day” waking hours and not lower than 6:1 or greater than 8:1 during sleeping hours. St. Vincent’s has written personnel policies and procedures that meet the requirements of criterion 11.1. 18 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified 11.4 Teachers Special Education Teachers and Regular Education Teachers 28.09(7)(b)(c) 18.05(11)(f) Documentation Interviews St. Vincent’s ensures that all teaching staff have teaching licenses appropriate to meet the needs of the population being served or who are on an approved waiver issued from the Department of Education. 11.5 Related Services Staff 28.09(7)(d) Documentation Interviews St. Vincent’s is currently filling the position of Speech and Language. An Occupational Therapist is not included as part of the approved program. Please refer to criterion 8.2. 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified 11.6 Master Staff Roster 28.09(7) Documentation St. Vincent’s maintains a master list of all staff for every position within the program that includes job titles together with corresponding UFR title numbers and full-time equivalencies. 11.9 Organizational Structure 28.09(7) 28.07(c) Documentation Interviews St. Vincent has an organizational structure that is clearly understood by staff and staff implementing IEP services are consistently supervised by appropriately licensed and qualified educators. 20 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 11.10 Supervision of Child Care Workers (Direct Care Staff) Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Interviews St. Vincent’s provides ongoing and regular supervision by a professional staff person who has supervisory and administrative responsibility within the school and consistently provides this support to child care workers. 21 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 11.11 Supervision of Students Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Interviews St. Vincent’s implements a detailed plan that describes how appropriate supervision is provided to students while they are engaged in any schoolrelated activity on and off school grounds. In addition, St. Vincent’s has a plan to deal with crisis situations that may arise. 22 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting St. Vincent’s is not ensuring that newly hired staff receive all mandated trainings prior to providing direct care duties with students. St. Vincent’s must provide a detailed policy that specifies how newly hired staff will receive all mandated trainings before they have direct care duties with students. The plan must also include provisions if a staff member is absent for part of the training as well as the staff member who is responsible for overseeing this by March 14, 2005. 12.1 Staff Orientation Training Documentation Interviews Personnel Records 23 Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified 12.2 Annual InService Training Plan and Calendar 28.09(7)(f) 18.05(11)(h) Documentation Interviews Personnel Records 12.2(a) Behavior Management and Restraint Training 28.09(11) 18.05(5) Documentation St. Vincent’s has a written plan for staff training that is consistent with the needs of the student population, appropriate to meet the role of each staff member and provides, on average, at least two (2) hours per month of relevant training for all staff including nonprofessional staff. St. Vincent’s maintains all requirements of behavior management and restraint training as outlined under this criterion. 24 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Documentation St. Vincent’s has a policy that includes reporting to the Disabled Persons Protection Commission (DPPC). Personnel records Staff receive evaluations according to the policy outlined by St. Vincent’s. 12.2(b) Child Abuse Reporting 12.2 (i) Staff Evaluations Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified 25 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 13.1 Educational Facilities and Materials Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Interviews Observations St. Vincent’s provides the facilities, textbooks, equipment, technology, materials and supplies needed to provide the special education and related services specified on the IEP’s of the enrolled students. St. Vincent’s now has a computer lab for students use. 26 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 15.1 Parental Involvement and Parents’ Advisory Group 18.05(4)(a) 15.6 Consent at Age of Majority Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Documentation Student Records Interviews St. Vincent’s now provides numerous opportunities for parents to be involved in the program. St. Vincent’s has a Parents’ Advisory Group that provides the school with feedback that addresses the education, health and safety of the students. St. Vincent’s works collaboratively with the responsible school district to ensure consent is obtained from the student to continue the special education program upon turning age eighteen or to ensure that another mechanism is in place to obtain consent. 27 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation 16.1 HealthCare Policy and Procedure Manual Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation St. Vincent’s has a comprehensive health care policy and procedure manual that clearly describes the provisions made for medical, nursing and infirmary care of students and that is approved by a licensed physician. 28 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirement s or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verifica-tion Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting St. Vincent’s does not maintain all required elements of the face sheets on student records, specifically: The name of the education case manager, the starting and expiration dates of the current IEP and the most recent special education evaluation. Provide a random sample of the face sheets from 10 student records with all required information by March 14, 2005. 18.2 Student Records 28.09(10) Student Records Interviews MGL c. 71, s. 34H 603 CMR 23.00 Family Educational Rights and Privacy Act (FERPA) 29