Massachusetts Department of Elementary and Secondary Education 75 Pleasant Street, Malden, Massachusetts 02148-4096 Telephone: (781) 338-3700 TTY: N.E.T. Relay 1-800-439-2370 August 31, 2010 Peter Sanchioni, Ph.D., Superintendent Natick Public Schools 13 East Central Street Natick, MA 01760 Re: Mid-cycle Report Dear Superintendent Sanchioni: Enclosed is the Department of Elementary and Secondary Education's Mid-cycle Report based on the Mid-cycle Review conducted in your district in March 2010. In this Midcycle Review, the Department monitored selected special education criteria to determine your district’s compliance with special education laws and regulations. The review consisted of information gathered from one or more of the following activities: staff interviews, review of student records, examination of documentation, and/or classroom observation. The Department found one or more of the criteria monitored in your district to be “Partially Implemented” or “Not Implemented.” In all instances where noncompliance has been found, the Department has prescribed corrective action for the district. This corrective action must be implemented as soon as possible, but in no case later than a year from the date of this report. You will find these requirements for corrective action included in the enclosed report, along with requirements for submitting progress reports using the enclosed form. Please provide the Department with your written assurance that all of the required corrective action will be implemented by your district within the timelines specified in the report. You must submit your statement of assurance to Darlene Lynch, Director, Program Quality Assurance Services, by September 17, 2010. Your staff's cooperation throughout this Mid-cycle Review is appreciated. If you have questions about this letter or the enclosed report, please do not hesitate to contact Jane 1 Ewing at (781) 338-3741. Sincerely, Jane L. Ewing, Ed.D., Mid-cycle Review Chairperson Program Quality Assurance Services Darlene A. Lynch, Director Program Quality Assurance Services cc: Mitchell D. Chester, Ed.D., Commissioner of Elementary and Secondary Education Dean Paolillo, Supervisor, Program Quality Assurance Services Dirk Coburn, School Committee Chairperson, Natick Public Schools Lauren Gilbert, Local Program Review Coordinator, Natick Public Schools Encs: Mid-cycle Report Mid-cycle Progress Report form 2 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION MID-CYCLE REPORT NATICK PUBLIC SCHOOLS Dates of the Mid-cycle Review Onsite: March 29, 2010 Date of this Report: August 31, 2010 PLEASE NOTE THAT THIS REPORT IS IN TWO SECTIONS. Required Special Education Criteria Monitored in this Mid-cycle Review Current special education criteria available by scrolling down to the special education instrument at http://www.doe.mass.edu/pqa/review/cpr/default.html Criterion SE 3 Special requirements for the determination of specific learning disability Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion Partially Implemented Student record review, Interview The district’s high school special education staff is not using the required documentation to make a finding for a specific learning disability (SLD). In cases where the discrepancy model is used, the student’s testing scores do not show discrepancies among the subtests. In cases where the determination is based on the student’s response to research- If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Please provide training to Natick High School special education staff and team leaders on the requirements for making a determination of a specific learning disability (SLD). Post training; please conduct a sample record review of high school students determined to have an SLD subsequent to an initial or Natick Public Schools Coordinated Program Review Mid-cycle Report August 31, 2010 Page 1 of 10 (b) Progress Report Due Date(s) and Required Elements Please provide evidence of the high school special education staff training on the requirements for making a determination of SLD, including an agenda, Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation (b) Progress Report Due Date(s) and Required Elements based interventions, documentation from the pre-referral team is not always attached. re-evaluations to review the documentation for findings of SLD. Select records that represent both methods of determining eligibility, including the discrepancy model and the research-based response model. Provide a detailed summary of the district’s record review, including the type of evaluation (initial or reevaluation); student’s grade level; method of determination; and the results of the review. signed attendance sheets, and the name and title of the presenter by October 11, 2010. Please note that when conducting internal monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s) Natick Public Schools Coordinated Program Review Mid-cycle Report August 31, 2010 Page 2 of 10 After the training has been completed, please submit: 1) The number of student records reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the noncompliance; and 4) The district’s plan to remedy the non- Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation (b) Progress Report Due Date(s) and Required Elements compliance by December 17, 2010. SE 52A Registration of educational interpreters Implemented Document review, Interview The district submitted a Request for an Interpreter form for Massachusetts Commission for the Deaf and Hard of Hearing interpreters as part of their protocol. Natick Public Schools Coordinated Program Review Mid-cycle Report August 31, 2010 Page 3 of 10 Additional Special Education Criteria Monitored in this Mid-cycle Review Current special education criteria available by scrolling down to the special education instrument at http://www.doe.mass.edu/pqa/review/cpr/default.html Criterion SE 4 Reporting Assessment results Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Partially Implemented Student record review, Interview A review of student records indicated that educational assessment report summaries do not always include recommendations for the students needs, including explicit means of meeting those needs. Please provide training to all special education staff members who conduct educational assessments on the requirements for assessment summaries. Post-training, please review a sample of approximately 12 records for initial or re-evaluations to review the educational assessment reports to ensure summary reports include the recommendations of the evaluator. Provide a detailed summary of the district’s record review, including the type of evaluation (initial or re-evaluation); student’s grade level; and the results of the review by record. Please note that when conducting internal monitoring the district must maintain the following documentation and make it Natick Public Schools Coordinated Program Review Mid-cycle Report August 31, 2010 Page 4 of 10 (b) Progress Report Due Date(s) and Required Elements Please provide evidence of the special education staff training on the requirements for educational assessment summaries, including an agenda, signed attendance sheets and the name and title of the presenter by October 11, 2010. After the training has been completed, please submit: 1) The number of student records Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation available to the Department upon request: a) List of student names and grade level for the record review; b) Date of the review; c) Name of person(s) who conducted the review, their roles(s), and their signature(s) SE 9A Elements of eligibility determination Yes Interview The Pupil Personnel Director confirmed that the district discontinued the practice of providing special education services to students who had been determined not eligible for services. This practice was discontinued immediately following the district’s 2007 Coordinated Program Review. SE 29 Communication in English and Yes Document review, Student Documentation demonstrated that the district developed a process for staff to request translated Natick Public Schools Coordinated Program Review Mid-cycle Report August 31, 2010 Page 5 of 10 (b) Progress Report Due Date(s) and Required Elements reviewed; 2) The number of student records in compliance; 3) For all records not in compliance with this criterion, determine the root cause(s) of the non-compliance; and 4) The district’s plan to remedy the noncompliance by December 17, 2010. Criterion Criterion Implemented primary language of home Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion record review, Interview documents and oral interpretation services. Student records indicated that documents were translated as requested. SE 34 Continuum of alternative services and placements Yes Student records, Interview The district developed in-district vocational/occupational opportunities for its high school students on IEPs, including a high school transition program, the availability of in-district job coaches, and the purchase of an apartment building for students to use for life skills development. SE 36 IEP implementation, accountability, and financial responsibility Yes Interview The district implemented a practice to ensure that all teachers are aware of the accommodations on their students’ IEPs. Teachers are required to review the accommodations for incoming students and provide a signature that demonstrates they have reviewed the content of the IEP, particularly for accommodations. SE 55 Special education facilities and classrooms Yes Walkthrough of facilities A walk-through of the BennettHemenway Elementary and Johnson Elementary Schools demonstrated that all related service provision is provided in If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation Natick Public Schools Coordinated Program Review Mid-cycle Report August 31, 2010 Page 6 of 10 (b) Progress Report Due Date(s) and Required Elements Criterion Criterion Implemented Criterion Partially Implemented (PI) or Not Implemented (NI) Method(s) of Investigation Basis of Determination about Criterion If Partially Implemented or Not Implemented: (a) Required Corrective Action and Timelines for Implementation office spaces or classrooms. The instructional space for the LEAP program (Literacy Extension and Practice Program) was moved from the small classroom to a full-sized room in another part of the Wilson Middle School. Natick Public Schools Coordinated Program Review Mid-cycle Report August 31, 2010 Page 7 of 10 (b) Progress Report Due Date(s) and Required Elements MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION MID-CYCLE REVIEW NATICK PUBLIC SCHOOLS M I D – CY C L E P R O G R E S S R E P O R T Date Prepared: ____________________________________ Prepared by: __________________________________________________________________ (name and title) Criterion: _______________________ Topic: ________________________________________________________________________ For each criterion for which you prepare a progress report, please make a copy of this cover page, fill in the information requested above, and attach a complete description of the corrective action taken and any accompanying documentation. (Description of corrective action for each criterion and any accompanying documentation should include all of the “Progress Report Required Elements” for that criterion in the Mid-cycle Report.) Send the whole set of completed progress reports to: Darlene Lynch, Director Program Quality Assurance Services Massachusetts Department of Elementary and Secondary Education 75 Pleasant Street Malden, MA 02148-4906