MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION Program Quality Assurance Services COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Charter School or District: Tri County Regional Vocational Technical CPR Onsite Year: 2011-2012 Program Area: Special Education All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report dated 10/20/2012. Mandatory One-Year Compliance Date: 10/20/2013 Summary of Required Corrective Action Plans in this Report Criterion SE 2 Criterion Title Required and optional assessments SE 6 Determination of transition services SE 7 Transfer of parental rights at age of majority and student participation and consent at the age of majority IEP Team composition and attendance SE 8 SE 9 SE 13 Timeline for determination of eligibility and provision of documentation to parent Progress Reports and content SE 18A IEP development and content CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Criterion SE 18B Criterion Title Determination of placement; provision of IEP to parent SE 22 IEP implementation and availability SE 24 Notice to parent regarding proposal or refusal to initiate or change the identification, evaluation, or educational placement of the child or the provision of FAPE Parental consent SE 25 SE 29 SE 34 Communications are in English and primary language of home Continuum of alternative services and placements SE 54 Professional development CR 7 Information to be translated into languages other than English Student handbooks and codes of conduct CR 10A CR 16 Notice to students 16 or over leaving school without a high school diploma, certificate of attainment, or certificate of completion CPR Rating Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented Partially Implemented COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 2 Required and optional assessments Partially Implemented Department CPR Findings: A review of student records indicated for those students undergoing a re-evaluation, not all areas of suspected disability are consistently evaluated. Record review also demonstrated that the Educational Assessment, which includes the history of the student's progress in the general education curriculum, was not consistently completed. Description of Corrective Action: Previous administrative direction allowed for the school psychologist to use only one evaluative tool, the Woodcock Johnson III. There was previously no oversight with regard to the completion of Education Assessments. This administration has completed the following actions in order to ensure that all areas of suspected disability are evaluated. - The School Psychologist no longer chairs IEP Team meetings. She is now entirely responsible for testing. - On August 12, 2012, the School Psychologist and special education staff were provided a full-day training on FBA and BSPs by Amy Collins, BCBA. - The School Psychologist was provided a second day of FBA training with Amy Collins. - The School Psychologist and Special Education Facilitator developed a tracking sheet that annotates the specific tests used to evaluate disability. - On November 6, 2012 (Special Education Department) and on November 9, 2012 (Guidance Department) the Educational Assessment was reviewed. The Department of Student Services purchased protocols for a variety of tests. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - Evaluation tracking sheet that is updated weekly. - Educational assessments that were completed for Triennials held in the fall of 2012. Description of Internal Monitoring Procedures: The Director of Student Services receives a copy of the evaluation form on a monthly basis. The annual Special Education audit will determine whether compliance is being maintained. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 2 Required and optional assessments Corrective Action Plan Status: Approved Status Date: 11/20/2012 Basis for Partial Approval or Disapproval: The district has already begun to provide training and order additional assessment instruments for the school psychologist, special education staff and guidance staff. The district has also developed a tracking mechanism for internal monitoring of the assessment process. Department Order of Corrective Action: Required Elements of Progress Report(s): The district will provide training on selecting assessment instruments to address any identified areas of suspected disability for the school psychologist and special education staff. The district will provide a narrative description of their new procedures related to MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 3 the completion of Educational Assessment A forms along with evidence of staff training on these procedures, which will include but not be limited to a training agenda, attendance sheet and copies of the materials presented. Please submit this to the Department on or before by March 22, 2013. Submit the description of the internal oversight and tracking system and identify the person(s) responsible for the oversight, including the date of the system's implementation. Submit this information by March 22, 2013. Submit the results of an administrative review of student records to determine (a) that areas of suspected disability were assessed and (b) that the history of the student's experience in the general education curriculum. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the district to address any identified noncompliance. Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 4 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 6 Determination of transition services Partially Implemented Department CPR Findings: A review of student records indicated that the Transition Planning Form is not consistently reviewed and updated annually for students who are 14 years of age and older. Description of Corrective Action: Tri-County Team Chair and staff had not previously been trained in writing accurate and useful transition plans. On May 30, 2012, Carol Kosnitsky of Cristia Lesher Associates presented professional development to the Tri-County Team Chair and School Psychologist on Transition Planning. Follow-up training was to occur on October 29, 2012 but school was closed due to inclement weather. This follow-up training which will include all special education staff will occur on November 27, 2012. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 01/02/2013 Evidence of Completion of the Corrective Action: All Tri-County IEPs include the following: - Measurable Post-Secondary goals (vision) that includes: training or education, employment, and independent living skills or plans. - An Action Plan that includes instruction, employment, and community experience. - Disability related needs and assessments. - Measurable annual IEP goals. Description of Internal Monitoring Procedures: All IEPs, once completed, are reviewed by the Director of Student Services. The Team Chair and the Director of Student Services meet monthly to review progress on all team meeting practices and procedures. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 6 Determination of transition services Corrective Action Plan Status: Approved Status Date: 11/20/2012 Basis for Partial Approval or Disapproval: The district conducted a training for staff on completing the Transition Planning Form and updating it annually for students aged 14 and older. Please note that the Department has developed new guidance on transition planning and IEP development: http://www.doe.mass.edu/sped/advisories/13_1ta.html. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide evidence of training for staff to include the agenda and attendance sheet with name, role and signature for completion of the Transition Planning Form by March 22, 2013. It is recommended that the district also use the recently issued Department guidance as part of its training process with special education staff: http://www.doe.mass.edu/sped/advisories/13_1ta.html. Submit the results of the internal oversight to determine whether students have a Transition Planning Form that has been reviewed annually. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 5 the district to address any identified noncompliance. Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 6 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 7 Transfer of parental rights at age of majority and student Partially Implemented participation and consent at the age of majority Department CPR Findings: Interviews with staff members and a review of student records demonstrated that the district implements procedures to obtain consent from the student to continue the student's special education program at age 17, which is one year prior to the student reaching the age of majority. Description of Corrective Action: Previous administrative direction to the Tri-County special education staff was to obtain consent from the student one year prior to the student reaching age of majority, so that the signature was on file when the student turned 18. This practice was stopped by the present Director of Student Services. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 09/01/2012 Evidence of Completion of the Corrective Action: See attached documentation: - Newly developed notice regarding Age of Majority - Recently signed documentation of student choice of share decision- making with parent Description of Internal Monitoring Procedures: The annual special education audit will provide evidence that this practice remains in full effect. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 7 Transfer of parental rights at age of Approved majority and student participation and Status Date: 11/20/2012 consent at the age of majority Basis for Partial Approval or Disapproval: The district will train staff on a new procedure for documenting the provision of notice for age of majority that includes sending the student and the parent notice of decisionmaking options one year prior to the student turning 18 years of age. Also, the district needs to include in its procedure the means of documenting the student's choice and securing consent for the IEP to continue once the student turns 18. Please use the Department's guidance on documenting the age of majority: http://www.doe.mass.edu/sped/advisories/11_1.html Department Order of Corrective Action: Develop a procedure for staff to provide notice to the student and parent. Also include in the procedure the method of documenting the student's choice or having the parent provide evidence of guardianship if appropriate. The procedure must include steps to secure consent for the decision-maker student, delegated adult or parent shared) for the IEP services to continue. Once the procedure is developed the district will train relevant staff on the implementation of the procedure. Please use the Department's guidance on the development of these procedures: http://www.doe.mass.edu/sped/advisories/11_1.html. Required Elements of Progress Report(s): Provide a copy of the procedure and evidence of training for special education staff by MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 7 March 22, 2013. Submit the results of the internal oversight to determine whether (a) notice was provided to the student and the parent one year prior to the student turning 18 years of age, (b) the provision of notice is documented in the student's IEP, and (c) the consent, consistent with the choice of decision-maker or guardian, was secured at age 18. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the district to address any identified noncompliance. Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 8 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 8 IEP Team composition and attendance Partially Implemented Department CPR Findings: A review of student records and interviews with staff members indicated that members of the Team attend Team Meetings, however in instances when the district and the parent agree in writing to excuse a required Team member´s participation, the excused member does not consistently provide written input into the development of the IEP to the parent and the IEP Team prior to the meeting. Description of Corrective Action: Until 2011-2012 school year, there was limited administrative oversight with regard to specific procedures related to Team member input. Beginning with the 2011-2012 school year, the Director of Student Services met weekly with the Special Education Team Chair and the Special Education Facilitator to review procedures and protocols for Team meetings. Area of concern are participation, educational assessments, and input from excused Team members. It was determined that there needed to be a new protocol in place as well as additional professional development for teachers. Actions to be taken: 9/12/2012 ? Adele Sands, Director of Student Services, presented at a faculty meeting ?What?s New in Special Education?. This presentation included roles and responsibilities for Team members. - The Special Education Secretary sends meeting notices and educational report forms via email. - Teacher report forms are returned via email to the Special Education Secretary. The secretary then forwards the email to the Team Chair and prints copies of the report forms which are placed in the upcoming meeting file folders for review by the Special Education Consultants. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - Completed meeting attendance sheets with attached written input from excused team members - Copies of email reminders to teachers to deliver written input prior to Team meetings (cc: to the Academic Coordinator) - Faculty meeting PowerPoint presentation Description of Internal Monitoring Procedures: - The Team Chair will receive copies of the teacher report - The Team Chair and the Director of Student Services will meet monthly to assess the efficacy of the protocols and procedures of the IEP process at Tri-County. - The Director of Student Services will meet monthly with the Vocational Coordinator and the Academic Coordinator to review the pertinent issues around IEP meeting attendance, input, etc. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 8 IEP Team composition and attendance Corrective Action Plan Status: Approved Status Date: 11/20/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 9 Basis for Partial Approval or Disapproval: The district has identified a method to secure written reports ahead of the Team meeting for any excused required Team member. Department Order of Corrective Action: Required Elements of Progress Report(s): The district will provide a narrative description of their new procedures related to Team Meeting excusal forms along with evidence of staff training on these procedures, which will include but not be limited to a training agenda, attendance sheet and copies of the materials presented. Please submit this to the Department on or before by March 22, 2013. Submit the description of the internal oversight and tracking system and identify the person(s) responsible for the oversight, including the date of the system's implementation. Submit this information by March 22, 2013. Submit the results of an administrative review of student records on the excusal process and documentation of parental agreement to proceed with the meeting as well as copies of written input from the excused Team member. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the district to address any identified noncompliance. Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 10 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 9 Timeline for determination of eligibility and provision of Partially Implemented documentation to parent Department CPR Findings: A review of student records demonstrated that the district is not consistently determining eligibility and providing to the parent either a proposed IEP and a proposed placement or a written explanation of the finding of no eligibility within forty-five school working days after receiving the parent's written consent. Description of Corrective Action: An unwieldy IEP Team scheduling practice created an unmanageable backlog of IEPs for the Team Chairs. The following practice was put into place in September 2012, therefore creating highly effective oversight. The Special Education Secretary prints an internal tracking sheet for the Director of Student Services, which is reviewed monthly at the Special Education Department meeting. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - School Psychologist Student Learning Goal for new Educator Evaluation System - Internal Tracking Sheet Description of Internal Monitoring Procedures: The School Psychologist evaluation is based on evidence that Tri-County remains compliant with regard to the 45 day timeline. The Director of Student Services meets biweekly to monitor the goal. The Director of Student Services receives a monthly print-out of timeline. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 9 Timeline for determination of Approved eligibility and provision of documentation Status Date: 11/20/2012 to parent Basis for Partial Approval or Disapproval: The district has proposed a tightened monitoring process for the timeline issue, based on its conclusion that a complicated scheduling process created a backlog of IEP meetings for Team Chairs. Please provide a more detailed analysis of the district's root cause analysis. The district also provided a sample tracking form. Department Order of Corrective Action: Required Elements of Progress Report(s): Please submit a detailed narrative description of the root cause(s) of the noncompliance and the additional steps the district has taken to address those issues related to the 45 day timeline. As part of this, submit a description of the internal oversight and tracking system. Please identify the person(s) responsible for oversight of these activities. and the training provided to the persons responsible for oversight. Include the agenda, signed attendance sheets, indicating title/role of staff and the name and title of the presenter. Please submit this report by March 22, 2013. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 11 Subsequent to the training, please conduct a review of student records. Select a sample of 15-20 student records representative of the most recent IEP activity either an initial evaluation to determine eligibility, or a reevaluation. Review the records to determine whether the 45 day timeline has been met. Submit the number of student records reviewed, the number of records that complied with the requirements and for any record found in continued noncompliance, determine the root cause(s) of the noncompliance and provide the district's plan to remedy the identified noncompliance to ensure 100% compliance with this criterion. This progress report is due June 14, 2013. The district must maintain the following documentation and make it available to the Department onsite upon request: a) List of student names, building names and grade levels of the records reviewed: b) the date of the review: c) Name(s) of the person(s) who conducted the review, their role(s) and their signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 12 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 13 Progress Reports and content Partially Implemented Department CPR Findings: Interviews with staff members and a review of student records demonstrated that progress reports do not consistently include written information on the student's progress toward the annual goals in the IEP. Interviews also indicated that for students whose eligibility terminates because the student has graduated from secondary school or exceeded the age of eligibility, the district is not consistently providing the student with a summary of his or her academic achievement and functional performance, including recommendations on how to assist the student in meeting their postsecondary goals. Description of Corrective Action: Previous administrative direction to special educators was to write the following for progress reports ?X is/is not making effective progress toward the goal?. Carol Kosnitsky presented a workshop to all special educators entitled ?Writing Measurable IEP Goals?. At each weekly Special Education meeting, one Consultant would bring an IEP goal to discuss at the meeting. Consultants, School Psychologist, Team Chair, and Director of Student Services would analyze the example for measurability, accuracy relative to the PLP. Previously, the SAAFP was not completed at Tri-County. October 27, 2012 the Director of Student Services presented a workshop to Special Education staff on this subject. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - Professional Development: ?Writing Measurable Goals and Effective Progress Reports? - Recent Progress Reports - Behavior tracking sheet - Individual Observation Reports and Dojo data collection showing how behavior is tracked and measured for progress reports - Summary of Academic Achievement and Functional Performance Description of Internal Monitoring Procedures: Director of Student Services randomly chooses 5 students each quarter and reads all IEP goals and progress reports. Prior to each progress reporting period, each consultant meets with the Director of Student Services to review progress report examples. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 13 Progress Reports and content Corrective Action Plan Status: Partially Approved Status Date: 11/20/2012 Basis for Partial Approval or Disapproval: Since the district had not previously issued summaries of academic achievement and functional performance for students graduating or aging out of special education, the district must developed SAAFPs for the most recent group of graduating/aging out students. In order to meet compliance for progress reports, the district must also include an internal monitoring component for the provision of summary of academic achievement and functional performance for students who graduate or are terminated because of exceeding age eligibility MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 13 Department Order of Corrective Action: Develop SAAFPs for the most recent group of graduated special education/aged out students. Provide a list of students identified by initials only. Provide an blank example of an SAAFP. Develop an internal monitoring component to ensure that SAAFPs are consistently issued for graduating/aging out special education students. Required Elements of Progress Report(s): Provide a description of the procedure to ensure that a summary of academic achievement and functional performance is issued for each special education student who graduates or ages out of special education. Develop SAAFPs for the most recent group of graduated special education/aged out students. Provide a list of these students identified by initials only. Provide an blank example of an SAAFP. Develop an internal monitoring component to ensure that SAAFPs are consistently issued for graduating/aging out special education students. Please submit this to the Department by March 22, 2013. Submit the results of the internal oversight to determine whether students have appropriate content in progress reports related to the IEP goals and whether the students who graduate or reach age of eligibility have the summary of academic achievement and functional performance. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the district to address any identified noncompliance. Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 14 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 18A IEP development and content Partially Implemented Department CPR Findings: A review of student records and interviews with staff members indicated that skills and proficiencies needed to avoid and respond to bullying, harassment or teasing are not always included in the IEP for students on the autism spectrum and for students with other disabilities that affect social skills. Also, a review of records demonstrated that goals for many students were identically worded and lacked specificity for the individual students needs. Description of Corrective Action: Prior to the CPR, the Director of Student Services and the Team Chair had received various opinions from different sources with regard to SE# #18A. The Director of Student Services and the Team Chair have determined that this question will be asked at all Team meetings regardless of the student’s disability. For students on the spectrum and those with other communication disabilities, the counseling goals will be reviewed in detail at the IEP meeting in order to ensure that the goal is individualized and the outcomes are measurable. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - Eligibility Information - Counseling Goals and Counseling Progress Reports Description of Internal Monitoring Procedures: An annual Special Education audit by an outside provider will assess the efficacy of our goal and progress reports for students with social skill or communication deficits. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 18A IEP development and content Corrective Action Plan Status: Approved Status Date: 11/20/2012 Basis for Partial Approval or Disapproval: The district will provide training on both parts (1) to identify the skills and proficiencies needed to avoid bullying, harassment and teasing, and (2) the writing of goals designed to meet individual student needs. Please use the Department's guidance on the development of IEP goals to address skills and proficiencies to respond to bullying: http://www.doe.mass.edu/sped/advisories/11_2ta.html. This is a requirement for all students on the autism spectrum and may be extended as well to students identified with behavioral/emotional issues. As an initial step the district provided four samples documentation for this criteria. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide evidence of training for staff to include the agenda and attendance sheet with name, role and signature for bullying, harassment and teasing, and for the development of individual student goals on the IEP by March 22, 2013. Submit the results of the internal oversight to determine whether students on the autism spectrum or other students with communication or social needs have the skills and MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 15 proficiencies identified in the IEP. Also conduct an internal monitoring to determine that IEP goals are written with sufficient specifics for individual students. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the district to address any identified noncompliance. Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 16 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 18B Determination of placement; provision of IEP to parent Partially Implemented Department CPR Findings: Interviews with staff members demonstrated that the district does not, immediately following the development of the IEP, provide the parent with two (2) copies of the proposed IEP and proposed placement along with the required notice. Description of Corrective Action: The Director of Student Services and the Tri-County Team Chair met to review all revised Team meeting procedures. The Team meeting has been changed so that the Team Chair projects the IEP on the wall and uses a laptop to make changes / additions to the IEP has the Team discusses the students services needs. As this is an entirely new practice or the Team Chair, she is not able to complete the IEP by the conclusion of the meeting. As she becomes more adept at the technology, the Team Chair will be presenting the parent(s)/guardian(s) with two copies of the IEP or a summary. The Team Chair is in the process of revising he summary report. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - 11/01/12 Team meeting summaries used at this time. - 6/19/2012 Revised Team meeting summary sheet example - 6/19/2012 Parent signature pages for receipt of either a summary or 2 copies of the IEP Description of Internal Monitoring Procedures: Annual Special Education Department audit that includes but is not entirely focused on CPR SEs. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 18B Determination of placement; Status Date: 11/20/2012 provision of IEP to parent Basis for Partial Approval or Disapproval: Please see Department guidance at http://www.doe.mass.edu/news/news.aspx?id=3182 for details on what the summary should contain. The district is not required to present the proposed IEP at the meeting if a summary is not used, but must propose the IEP with notice within 3-5 working days. If the district has presented the parent with a detailed summary with the goal areas and a service delivery grid, the IEP may be proposed within 10 working days. The district provided three sample summary of Team meeting forms. Department Order of Corrective Action: Required Elements of Progress Report(s): Please submit a copy of the training agenda, materials presented and sign-in sheet as evidence that training was provided to special education staff regarding the regulation that the district must always provide the parent with two (2) copies of the proposed IEP and proposed placement along with the required notice immediately by March 22, 2013. Provide a copy of the IEP summary template used by IEP Team chairs by March 22, 2013. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 17 Subsequent to the training, submit the results of an administrative review from a sample of student records for evidence that the district provides the parent with two copies of the proposed IEP and proposed placement along with the required notice immediately following the development of the IEP and whether a summary was provided at the Team meeting. Indicate the number of records reviewed and the number found to be compliant. For all records not in compliance with this criterion, determine the root cause(s) of the noncompliance and provide the school's plan to remedy the noncompliance to ensure 100% compliance with this criterion. This must be completed by June 14, 2013. The district must maintain the following documentation and make it available to the Department onsite upon request: a) List of student names, building names and grade levels of the records reviewed: b) the date of the review: c) Name(s) of the person(s) who conducted the review, their role(s) and their signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 18 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 22 IEP implementation and availability Partially Implemented Department CPR Findings: Interviews with staff members indicated that the district has in some instances delayed the implementation of the IEP due to a lack of personnel. Specifically, the district was without a speech and language pathologist for several months and a special education consultant was out for a period of time and the district did not inform parents in writing of any delayed services, reasons for the delay, actions the district was taking to address the personnel shortage and offer to meet the goals on the accepted IEP through alternative means. Description of Corrective Action: For several months at the beginning of the 2011-2012 school year, Tri-County did not have a speech pathologist or an occupational therapist for an OT assessment that was requested. The Homework Center Director who is a certified speech pathologist took over the delivery of services, a special education consultant substitute was hired immediately. The Director of Student Services called the parent who requested an OT assessment and assured her that Tri-County would pay for the assessment because she had access to an outside OT. The Director of Student Services personally called local physical therapy offices and collaborative looking for an OT to no avail. The Director of Student Services did not, however, send out a letter to this effect. A letter has been created and should this delay in services occur again, the Director of Student Services will send out a letter. The Team Chair and School Psychologist have been made aware of this practice and should a request be made, the Director of Student Services will be immediately notified. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - Letter Description of Internal Monitoring Procedures: The annual special education internal audit. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 22 IEP implementation and Status Date: 11/20/2012 availability Basis for Partial Approval or Disapproval: The district has developed a letter for use when IEP services are not implemented due to lack of classroom space or personnel. Please note that when the district must immediately inform parents in writing of any delayed services, this letter must include the reasons for delay, actions that the school district is taking to address the lack of space or personnel and an offer of alternative methods to meet the goals on the accepted IEP. Upon agreement of the parents, the school district implements alternative methods immediately until the lack of space or personnel issues are resolved. Department Order of Corrective Action: MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 19 Required Elements of Progress Report(s): Provide a copy of the letter to use when there is a personnel shortage that includes: the reason for the delayed services, actions that the district is taking to address the lack of personnel and alternative means to meet the goals on the accepted IEP. Please note that parents must agree to the alternate provision of services. Provide this to the Department by March 22, 2013. Progress Report Due Date(s): 03/22/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 20 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 24 Notice to parent regarding proposal or refusal to initiate or Partially Implemented change the identification, evaluation, or educational placement of the child or the provision of FAPE Department CPR Findings: A review of student records and staff interviews demonstrated that the district does not consistently provide written notice to parents that meets all of the content requirements set forth in M.G.L. c.71B. Specifically, the Notice of Proposed School District Action (N1) form does not consistently address the federally required questions in the narrative description section of the notice. Description of Corrective Action: The Team Chair was unaware that the N1 forms were filled out inconsistently. In meeting with the Director of Student Services, the Team Chair determined that she would immediately address this finding. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - recently completed N1 forms Description of Internal Monitoring Procedures: The Director of Student Services will annually choose 25 Special Education files and assess whether all aspects of the IEP meet the regulatory criteria. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 24 Notice to parent regarding Approved proposal or refusal to initiate or change Status Date: 11/20/2012 the identification, evaluation, or educational placement of the child or the provision of FAPE Basis for Partial Approval or Disapproval: The district needs to provide a training for the Team Chair to develop appropriate narrative to address the guiding questions on the Notice form such that the information reflects the Team meeting discussion. Two samples were provided. Department Order of Corrective Action: Training should be provided to the Team Chair and any staff that complete the notice form to propose an evaluation, an IEP or to inform the parent that the student has a finding of no eligibility (N2). Required Elements of Progress Report(s): Provide evidence of training on the completion of the notice forms for evaluations, IEPs and a finding of no eligibility that includes the training agenda, materials and attendance sheet with name, role and signature(s) by March 22, 2013. Submit the results of the internal oversight to determine whether the notices for evaluation, IEP or a finding of no eligibility have appropriate responses to the six guiding questions. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the district to address any identified noncompliance. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 21 Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 22 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 25 Parental consent Partially Implemented Department CPR Findings: Interviews with staff members and a review of student records indicated that when the participation or consent of the parent is required and the parent fails or refuses to participate, the district does not consistently document the attempts to secure the consent of the parent through multiple attempts using a variety of methods. Description of Corrective Action: Previously, there was no internal tracking mechanism in place. The Director of Student Services met with the Special Education Facilitator and the School Psychologist to review the protocol. The School Psychologist developed an internal consent log that she maintains and shares with the special education staff at the weekly meeting. Title/Role(s) of responsible Persons: Expected Date of Completion: Director of Student Services 06/19/2013 Evidence of Completion of the Corrective Action: - Consent log maintained by School Psychologist Description of Internal Monitoring Procedures: - Director of Student Services reviews all tracing sheets monthly. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 25 Parental consent Corrective Action Plan Status: Partially Approved Status Date: 11/20/2012 Basis for Partial Approval or Disapproval: The district needs a procedure to document the methods and attempts to secure consent in the student record. The proposed consent log does not provide the information within the student record. Department Order of Corrective Action: Develop a procedure for seeking parent consent with timelines to ensure that any lack of consent beyond the 30 days provided to the parent is documented through a variety of methods. This documentation must also be included in the student record. Required Elements of Progress Report(s): Provide a copy of the procedure to secure consent and submit evidence of training on the procedure that includes a variety of methods to secure consent by March 22, 2013. Conduct internal monitoring to determine whether attempts to secure consent are documented in the student record. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the district to address any identified noncompliance. Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 23 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 29 Communications are in English and primary language of Partially Implemented home Department CPR Findings: Staff interviews indicated that the district does not have a process in place to document when they have provided oral translations to parents who have a primary language other than English. Description of Corrective Action: Prior to the 2012-2013 school year, Tri-County did not have an established protocol for providing or documenting oral translations or ASL interpreting. Tri-County has established the following procedure ? Home Language surveys are collected by the Guidance Secretary. All Home Language Surveys that include parents indicating translation/ASL interpreter is necessary are collected, copied, and placed in two folders. One folder is given to the 9th grade guidance counselor who reviews student files for ELE. One folder is given to the Special Education Secretary who compares the HLS list to the list of Special Education students. - A list of parents who will require interpreting services is sent to the Team Chair. When IEP meetings are scheduled the Team Chair will notify the Special Education Secretary who will call the interpreting service to secure an interpreter. At this time, the Director of Student Services has contacted local interpreting / translation services providers and is receiving quotes. Title/Role(s) of responsible Persons: Expected Date of Completion: Director of Student Services 06/19/2013 Evidence of Completion of the Corrective Action: - IEP attendance sign-in sheets with interpreters listed. Description of Internal Monitoring Procedures: - The Special Education annual audit. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved SE 29 Communications are in English and Status Date: 11/20/2012 primary language of home Basis for Partial Approval or Disapproval: The district should also indicated on the N3As that are sent with the meeting invitation that an interpreter will be present at the Team meeting. Please ensure that interpreters sign the N3A at Team meetings and are identified as such. Department Order of Corrective Action: Required Elements of Progress Report(s): The district will submit copies of the procedures and evidence of staff training on these procedures, which will include but not be limited to a training agenda, attendance sheet and copies of the materials presented. Please submit this to the Department on or before by March 22, 2013. Submit the description of the internal oversight and tracking system and identify the person(s) responsible for the oversight, including the date of the system's implementation. Submit this information by March 22, 2013. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 24 Submit the results of an administrative review of student records for evidence that interpreters attended Team meetings and signed the N3A at the meeting. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the district to address any identified noncompliance. Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 25 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 34 Continuum of alternative services and placements Partially Implemented Department CPR Findings: A review of documentation, student record review and interviews with staff members indicated that the district does not consistently provide or arrange for the provision of each element of a student's IEP, ensuring that a continuum of services and alternative placements is available to meet the needs of all students with disabilities. Specifically, when incoming students have a consented to IEP from the sending school that requires a more restrictive setting or a substantially separate program, the district does not attempt to meet the needs of the individual student within the school. The district's practice is to place all incoming special education students in a full inclusion setting regardless of their individual level of need and agreed upon placement. The district then, within the first few months of the school year, convenes an IEP Team Meeting and proposes an IEP that offers a full inclusion placement with the services that are available within the district rather than developing an IEP that provides the services and placement that would best address the student's individual level of need. Description of Corrective Action: Tri-County is a program placement Vocational Technical high school. Students go through an admissions process. Tri-County provides a continuum of services that ensure students with disabilities are able to access both the academic and vocational/technical programs. Our services are appropriate to meet the needs of students who are admitted to the school and whose goals are college or career readiness. It is a Team decision whether Tri-County is the program and has services that will meet the needs of each student. We are proud of our services that include; summer transition services for students who have been identified as needing more transition support; flexible 1:1 support for students who have social/emotional, behavioral or communication needs, cotaught classes for students needing a highly restrictive academic setting, supported classes with paraprofessional support and ongoing consultation with a special educator, for students needing a more restrictive learning environment, and classes with minimal consultation for those who need the least restrictive environment. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - Summer 2012 Transition Program for Identified Students - Co-Teaching Professional Development - Progress Report on students who required additional support transition from classroom to classroom - Teacher schedules - Consultant observation report and recommendations Description of Internal Monitoring Procedures: Annual Special Education Audit CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Partially SE 34 Continuum of alternative services Approved and placements Status Date: 11/20/2012 Basis for Partial Approval or Disapproval: MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 26 The district did not address incoming freshmen and the placement and services in their IEPs. Department Order of Corrective Action: The district must address the requirements of students coming into the district with IEPs that include partial inclusion or intensive special education. The district must develop procedures to address the Teams prior to the beginning of school or the provision of additional services until the student is assessed and placement to match the student's needs is identified. Required Elements of Progress Report(s): Provide a procedure to establish services and placement prior to the beginning of the school year for incoming freshmen and a procedure for other students whose needs require additional direct services and specialized instruction by March 22, 2013. In addition, provide training to special education and general education staff on the procedure for the continuum of services. Provide evidence of training for staff to include the agenda and attendance sheet with name, role and signature for the continuum of services and for the development of individualized special education by March 22, 2013. Submit the results of the internal oversight to determine whether the continuum of services for entering freshmen matches the needs for service and the placement on their IEP and the needs for individualized special education for older students. Indicate the number of records reviewed, the number found to be compliant, an explanation of the root cause for any continued noncompliance and a description of additional corrective actions taken by the district to address any identified noncompliance. Please submit this to the Department on or before by June 14, 2013. *Please note when conducting administrative monitoring the district must maintain the following documentation and make it available to the Department upon request: a) List of student names and grade levels for the records reviewed; b) Date of the review; c) Name of person(s) who conducted the review, with their role(s) and signature(s). Progress Report Due Date(s): 03/22/2013 06/14/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 27 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: SE 54 Professional development Partially Implemented Department CPR Findings: Interviews with staff members and a review of district documentation demonstrated that not all general education and special education staff members have received professional development on the required topics. Specifically, the state and federal special education requirements and methods of collaboration have not been provided to all staff. Also, documentation showed that the transportation providers who transport special needs students have not received the required training on meeting the needs of these students and how to deal with emergencies for student with disabilities. Description of Corrective Action: Though professional development had previously been provided to all academic, vocational and special education personnel, this professional development had not been provided by Tri-County to bus personnel, cafeteria, maintenance, etc. In order to ensure that all staff members receive the required training, the Director of Student Services will annually present to all staff on the required topics. Title/Role(s) of responsible Persons: Expected Date of Director of Student Services Completion: 06/19/2013 Evidence of Completion of the Corrective Action: - PowerPoint presentation used for trainings - Schedule for 2013-2014 school year - Sign in sheets Description of Internal Monitoring Procedures: Annual Special Education audit CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: SE 54 Professional development Corrective Action Plan Status: Approved Status Date: 11/20/2012 Basis for Partial Approval or Disapproval: The district will provide training on required special education topics annually as well as providing training for transportation providers. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide the evidence of training (agenda, signed attendance sheets, and training materials) for special education and general education staff on: state and federal special education requirements and related local special education policies and procedures; analyzing and accommodating diverse learning styles; methods of collaboration among teachers, paraprofessionals and teacher assistants to accommodate diverse learning styles in the general education classroom by March 22, 2013. Provide evidence of training to transportation providers (hired and contracted) on student's specific needs as written and information on emergency procedures by March 22, 2013. Progress Report Due Date(s): 03/22/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 28 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 7 Information to be translated into languages other than Partially Implemented English Department CPR Findings: Staff interviews indicated that the district has not established a system of oral interpretation to assist parents/guardians with limited English skills, including those who speak low-incidence languages. Description of Corrective Action: Prior to the 2012-2013 school year, Tri-County did not have an established protocol for providing or documenting oral translations or ASL interpreting. Tri-County has established the following procedure ? Home Language surveys are collected by the Guidance Secretary. All Home Language Surveys that include parents indicating translation/ASL interpreter is necessary are collected, copied, and placed in two folders. One folder is given to the 9th grade guidance counselor who reviews student files for ELE. One folder is given to the Special Education Secretary who compares the HLS list to the list of Special Education students. - A list of parents who will require interpreting services is sent to the Team Chair. When IEP meetings are scheduled the Team Chair will notify the Special Education Secretary who will call the interpreting service to secure an interpreter. At this time, the Director of Student Services has contacted local interpreting / translation services providers and is receiving quotes. Title/Role(s) of responsible Persons: Expected Date of Completion: Director of Student Services 06/19/2013 Evidence of Completion of the Corrective Action: - IEP attendance sign-in sheets with interpreters listed. Description of Internal Monitoring Procedures: - The Special Education annual audit. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved CR 7 Information to be translated into Status Date: 11/20/2012 languages other than English Basis for Partial Approval or Disapproval: See SE 29. Department Order of Corrective Action: Required Elements of Progress Report(s): The district will develop procedures to document translations and use of interpreters. The district will submit copies of the procedures and evidence of staff training on these procedures, which will include but not be limited to a training agenda, attendance sheet and copies of the materials presented. Please submit this to the Department on or before by March 22, 2013.. Submit the description of the internal oversight and tracking system and identify the person(s) responsible for the oversight, including the date of the system's implementation. Submit this information by March 22, 2013. Progress Report Due Date(s): 03/22/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 29 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 10A Student handbooks and codes of conduct Partially Implemented Department CPR Findings: A review of documentation demonstrated that the student handbook does not contain a reference to the nondiscrimination citation, M.G.L. c 76 s. 5, in the code of conduct. Description of Corrective Action: The Dean of Students will work with the Principal and the School Council to re-write the Code of Conduct to ensure that it includes M.G.L. c 76 s. 5. The Dean of Students will attend the January School Council meeting to seek input on a revised Code of Conduct. The Dean of Students will work with the student members to gather student input and rewrite the Code of Conduct. The Dean of Students will all present the revisions to the Student Handbook in April to the School Council for their review. The Dean of Student will present all revisions to the Student Handbook to the Policy Subcommittee of the School Committee in May. Title/Role(s) of responsible Persons: Expected Date of Dean of Students Completion: 06/15/2013 Evidence of Completion of the Corrective Action: Updated Student Handbook with Code of Conduct approved by School Committee. Description of Internal Monitoring Procedures: School Council Meeting Notes Policy Subcommittee Meeting Notes School Committee Meeting Notes Updated Student Handbook for the 2013-2014 School Year CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: Corrective Action Plan Status: Approved CR 10A Student handbooks and codes of Status Date: 11/20/2012 conduct Basis for Partial Approval or Disapproval: The district has a plan for the review of the code of conduct in order to add the reference, M.G.L. c 76 s. 5. within the code of conduct. Please also see the Commissioner's Board Memorandum on the addition of gender identity to the list of protected classes: http://www.doe.mass.edu/boe/docs/2012-04/item6.html and the subsequent regulatory requirements http://www.doe.mass.edu/lawsregs/603cmr26.html?section=all. As the district is updating its code of conduct and handbooks, please ensure that gender identity is added to its non-discrimination policy. This regulatory language was passed by the Legislature in July 2012 and requires immediate implementation. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide a copy of the changes made to the code of conduct to include the reference of non-discrimination within this section of the handbook. Please ensure that gender identity is added to the district's list of protected classes, if it has not already done so. Please submit this progress report by March 22, 2013. Progress Report Due Date(s): 03/22/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 30 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN Criterion & Topic: CPR Rating: CR 16 Notice to students 16 or over leaving school without a Partially Implemented high school diploma, certificate of attainment, or certificate of completion Department CPR Findings: A review of documentation and interviews demonstrated that the district does not send annual written notice to former students who have not yet earned their competency determination and who have not transferred to another school, to inform them of the availability of publicly funded post-high school academic support programs and to encourage them to participate in those programs. Description of Corrective Action: A meeting was held with the Director of Student Services, the Principal, and the Data Analyst to discuss procedures to put in place to ensure that written notice is sent to former students who have not yet earned their competency determination. 1. The Data Analyst will compile a list of students who have been coded as drop-outs using the SIMS reporting data cross-referenced with MCAS Student Assessment History Summaries. 2. The Data Analyst will meet with the Director of Student Services to determine which students should receive the letter advising them of the availability of publicly funded posthigh school academic support programs. The MCAS Nonparticipation Form will be included with the letter to verify the school’s efforts to reach out to the former students. 3. The Data Analyst will add Steps 1 and 2 to her list of responsibilities in her SIMS Data Reference Notebook. 4. The Director of Student Services will send a memo to the Principal verifying the issuance of the letters. Additional Documents Uploaded: Letter to Student MCAS Nonparticipation Form Title/Role(s) of responsible Persons: Director of Student Services Expected Date of Completion: 12/15/2012 Evidence of Completion of the Corrective Action: Copies of Letters to Students Copies of MCAS Nonparticipation Form Copy of Memo to Principal Description of Internal Monitoring Procedures: The Data Analyst will consult with the Director of Student Services and the Principal when drop-out data is available through the DESE Security Portal. The Director of Student Services will arrange for the preparation of letters for the principal's signature. CORRECTIVE ACTION PLAN APPROVAL SECTION Criterion: CR 16 Notice to students 16 or over leaving school without a high school diploma, certificate of attainment, or certificate of completion Corrective Action Plan Status: Approved Status Date: 11/20/2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 31 Basis for Partial Approval or Disapproval: The district has a plan to maintain a list of students who have not reached competency or who have not transferred to another school. Please note that this document must be sent to parents as well as students and must be translated as appropriate in the language of the home. Department Order of Corrective Action: Required Elements of Progress Report(s): Provide a copy of the letter sent to students who have not reached competency or transferred to another school and provide the list of identified students by initials as of March 22, 2013. Progress Report Due Date(s): 03/22/2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 32 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW District: Tri County Regional Vocational High School Corrective Action Plan Forms Program Area: English Learner Education Prepared by: CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: October 20, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 5 Program Placement and Structure Rating: Partially Implemented Department of Elementary and Secondary Education Findings: District documentation indicated a very low enrollment of English language learners (ELLs). The district serves high school students. The single documented ELL met the re-designation criteria and was exited from the SEI program. The district has not developed an ESL curriculum. Therefore, there is no alignment with the Massachusetts Curriculum Framework or the English Language Proficiency Benchmarks and Outcomes (ELPBO). Concerning the ESL curriculum, the district should note that the Department has new regulations in place, which may affect the school’s corrective action plan (CAP). Please refer to: http://www.doe.mass.edu/retell/ for more information. Because there are no ELLs enrolled at this time, ESE could not review the hours of direct ESL instruction that the district provides to students. See ELE 15 for comments on SEI Professional Development. Although this is a very low incidence district, in order to be in compliance with Chapter 71A, the district must have an SEI program in place that can be implemented when ELLs are enrolled in the district, which includes the development of an ESL curriculum, provision of hours of direct ESL instruction that are consistent with ESE guidelines, instruction by an ESL licensed teacher, and having a multi-year plan of SEI professional development for the teaching staff. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 33 Title/Role of Person(s) Responsible for Implementation: Director of Student Services Expected Date of Completion for Each Corrective Action Activity: Phase 1 complete 1/7/13. Phase 2 complete once students are enrolled and one year has passed in order to evaluate program as developed Evidence of Completion of the Corrective Action: Phase 1 – Tri County ELE program as developed. See all enclosures. Phase 2 – As Common Core curriculum maps are designed the maps will have attachments that address the specific learning needs of ELLs. Description of Internal Monitoring Procedures: The Director of Student Services will meet annually in October with the ELE Team to review the numbers of enrolled students at Tri County and review their service needs. The Director of Student Services will meet annually in May with the Principal, the Vocational Director and the Curriculum Coordinator to review the progress of ELLs in both academic and vocational programs. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 5 Program Placement and Structure Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Tri-County Regional Vocational High School is a Cohort 3 RETELL district, but must still be prepared to offer students English as a Second Language (ESL) support should an English Language Learner be identified. Required Elements of Progress Report(s): Provide a detailed description how Tri-County Regional Vocational High School will make ESL and language acquisition support available to an ELL student by June 21, 2013. Progress Report Due Date(s): June 21, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 8 Declining Entry to a Rating: Partially Implemented Program Department CPR Finding: A review of documentation indicated that the district policy has parents opt out of the Sheltered English Immersion program, however there are no policies in place to address English language development or English as a Second Language services Narrative Description of Corrective Action: The new Tri County ELL program addresses all potential services for students enrolled at Tri County. New forms have been developed including a parents rights form that allow parents opportunity to request services other than SEI. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Services Corrective Action Activity: 12/20/12 Evidence of Completion of the Corrective Action: Enclosed forms and program plan statement. Description of Internal Monitoring Procedures: The annual ELE program evaluation will be conducted by the Director of Student Services and the ELE Team. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 34 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 8 Declining Entry to a Program Status of Corrective Action: Approved X Partially Approved Disapproved Basis for Partial Approval or Disapproval: Please note that a yearly proficiency assessment (ACCESS) and annual parent notification must be completed annually for opted out students. Department Order of Corrective Action: Revise the district’s procedures to include the annual proficiency assessment and parent notification to the opt-out procedure. Please see guidance for SE 8 in the document entitled English Learner Education in Public Schools-Chapter 71A at http://www.doe.mass.edu/ell/guidance_laws.html. Required Elements of Progress Report(s): Provide revised procedures for opted out students by June 21, 2013. Progress Report Due Date(s): June 21, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 10 Parental Notification Rating: Partially Implemented Department CPR Finding: A review of district documentation and interviews with staff members indicated that the Parent Notification is not complete. The following elements are missing from the notification: the reason for identification of the student as an English language learner; program placement or method of instruction and the parents’ right to apply for a waiver or to decline to enroll their child in the program Narrative Description of Corrective Action: All parent notification forms have been redesigned to include missing elements. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Services Corrective Action Activity: 12/20/12 Evidence of Completion of the Corrective Action: Parent Notification form Description of Internal Monitoring Procedures: Annual program evaluation. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 10 Parental Notification Status of Corrective Action: Approved X Partially Approved Disapproved Basis for Partial Approval or Disapproval: The district’s letter does not contain all required elements. Department Order of Corrective Action: Please use the parent notification letter developed by the ESE at http://www.doe.mass.edu/ell/news12/TitleIII-ParentNotification.pdf#search=%22title%22 . Required Elements of Progress Report(s): Progress Report Due Date(s): No further progress reporting required MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 35 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 15 Professional Development Rating: Partially Implemented Requirements Department CPR Finding: There are some teachers in the district who have completed Categories 1 and 2 although the majority has not completed the four categories of SEI professional development. The district does not have a multi-year SEI professional development plan. Please note that the Department’s regulations concerning SEI professional development requirements have changed. Refer to: http://www.doe.mass.edu/retell/ for more information. Narrative Description of Corrective Action: Tri County is a low incidence district and is not required to have SEI professional development completed until 2015-2016 academic year. A professional development plan has been developed. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Services, Corrective Action Activity: PD Plan Principal, Vocational Director, Academic completed 2013. The SEI professional Coordinator development for all vocational and academic teachers will be completed at the end of 2014. Evidence of Completion of the Corrective Action: All teachers will receive DESE endorsement. Description of Internal Monitoring Procedures: License and Certification review occurs annually at the beginning of the year during administrative council SEI endorsement will be required and all teachers who have not yet received the SEI training will be given professional development for this purpose (this includes new hires) CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 15 Professional Development Requirements Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): As a Cohort 3 district, Tri-County Regional Vocational High School will provided required information to the ESE during its assigned year. Progress Report Due Date(s): No further progress reporting required COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 17 Program Evaluation Rating: Partially Implemented MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 36 Department CPR Finding: A review of documentation and interviews with staff members indicated that the district has generated a set of questions for a program evaluation; however an evaluation has not been completed. Narrative Description of Corrective Action: Tri County has recently become the process of developing a program for ELLs who will be entering the school. The program will continue to be developed, as the administration and teachers become better acquainted with WIDA and SEI requirements. A program evaluation will occur regardless of the ELL enrollment in the school, as the program development is ongoing. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Services Corrective Action Activity: May 2013 Evidence of Completion of the Corrective Action: A completed program evaluation. Description of Internal Monitoring Procedures: The Director of Student Services will meet annually with the Principal to review the program evaluation results. These results will then be disseminated to the ELE team then to both vocational and academic teachers. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 17 Program Evaluation Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): Provide a copy of the district’s completed evaluation procedures. Progress Report Due Date(s): June 21, 2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 37 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW District: Tri County Regional Vocational High School Corrective Action Plan Forms Program Area: English Learner Education Prepared by: CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: October 20, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 5 Program Placement and Structure Rating: Partially Implemented Department of Elementary and Secondary Education Findings: District documentation indicated a very low enrollment of English language learners (ELLs). The district serves high school students. The single documented ELL met the re-designation criteria and was exited from the SEI program. The district has not developed an ESL curriculum. Therefore, there is no alignment with the Massachusetts Curriculum Framework or the English Language Proficiency Benchmarks and Outcomes (ELPBO). Concerning the ESL curriculum, the district should note that the Department has new regulations in place, which may affect the school’s corrective action plan (CAP). Please refer to: http://www.doe.mass.edu/retell/ for more information. Because there are no ELLs enrolled at this time, ESE could not review the hours of direct ESL instruction that the district provides to students. See ELE 15 for comments on SEI Professional Development. Although this is a very low incidence district, in order to be in compliance with Chapter 71A, the district must have an SEI program in place that can be implemented when ELLs are enrolled in the district, which includes the development of an ESL curriculum, provision of hours of direct ESL instruction that are consistent with ESE guidelines, instruction by an ESL licensed teacher, and having a multi-year plan of SEI professional development for the teaching staff. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 38 Title/Role of Person(s) Responsible for Implementation: Director of Student Services Expected Date of Completion for Each Corrective Action Activity: Phase 1 complete 1/7/13. Phase 2 complete once students are enrolled and one year has passed in order to evaluate program as developed Evidence of Completion of the Corrective Action: Phase 1 – Tri County ELE program as developed. See all enclosures. Phase 2 – As Common Core curriculum maps are designed the maps will have attachments that address the specific learning needs of ELLs. Description of Internal Monitoring Procedures: The Director of Student Services will meet annually in October with the ELE Team to review the numbers of enrolled students at Tri County and review their service needs. The Director of Student Services will meet annually in May with the Principal, the Vocational Director and the Curriculum Coordinator to review the progress of ELLs in both academic and vocational programs. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 5 Program Placement and Structure Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Since the “Narrative Description of Corrective Action” is missing in this document, it is not sufficiently clear how the school plans to address the concerns identified in the Department’s CPR finding for ELE 5. However, the district should note that the new regulations as they pertain to WIDA were passed prior to the on-site visit and the Department will be neither approving nor disapproving any curriculum documents/plans that were made for on-site visits conducted before the state’s adoption of the WIDA standards in June 2012. The Department will be communicating with all districts during the upcoming school year to provide them with further guidance on developing Department approved ESL/ELD curriculum. No further submission is required at this time. Department Order of Corrective Action: N/A Required Elements of Progress Report(s): 1) Please provide information regarding the number of ELL students currently enrolled in the school. In case there are ELL students enrolled in the school, please provide a detailed plan that shows that the district is providing sufficient ESL instruction to all ELL students during the 2013-2014 school year based on the Department's Guidance on using MEPA Results to Plan Sheltered English Immersion (SEI) Instruction and make Reclassification Decisions for Limited English Proficient (LEP) Students from September 2009 found at http://www.doe.mass.edu/mcas/mepa/2009/guidance.doc 2) Please complete information in the attached spreadsheet labeled ELL List for each ELL student in the school. Progress Report Due Date(s): September 30, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 8 Declining Entry to a Program Rating: Partially Implemented MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 39 Department CPR Finding: A review of documentation indicated that the district policy has parents opt out of the Sheltered English Immersion program, however there are no policies in place to address English language development or English as a Second Language services Narrative Description of Corrective Action: The new Tri County ELL program addresses all potential services for students enrolled at Tri County. New forms have been developed including a parents rights form that allow parents opportunity to request services other than SEI. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Services Corrective Action Activity: 12/20/12 Evidence of Completion of the Corrective Action: Enclosed forms and program plan statement. Description of Internal Monitoring Procedures: The annual ELE program evaluation will be conducted by the Director of Student Services and the ELE Team. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 8 Declining Entry to a Program Status of Corrective Action: Approved X Partially Approved Disapproved Basis for Partial Approval or Disapproval: Please note that a yearly proficiency assessment (ACCESS) and annual parent notification must be completed annually for opted out students. Department Order of Corrective Action: Revise the district’s procedures to include the annual proficiency assessment and parent notification to the opt-out procedure. Please see guidance for SE 8 in the document entitled English Learner Education in Public Schools-Chapter 71A at http://www.doe.mass.edu/ell/guidance_laws.html. Required Elements of Progress Report(s): Provide revised procedures for opted out students by June 21, 2013. Progress Report Due Date(s): September 30, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 10 Parental Notification Rating: Partially Implemented Department CPR Finding: A review of district documentation and interviews with staff members indicated that the Parent Notification is not complete. The following elements are missing from the notification: the reason for identification of the student as an English language learner; program placement or method of instruction and the parents’ right to apply for a waiver or to decline to enroll their child in the program Narrative Description of Corrective Action: All parent notification forms have been redesigned to include missing elements. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Services Corrective Action Activity: 12/20/12 Evidence of Completion of the Corrective Action: Parent Notification form Description of Internal Monitoring Procedures: Annual program evaluation. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 40 CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 10 Parental Notification Status of Corrective Action: Approved X Partially Approved Disapproved Basis for Partial Approval or Disapproval: The district’s letter does not contain all required elements. Department Order of Corrective Action: Please use the parent notification letter developed by the ESE at http://www.doe.mass.edu/ell/news12/TitleIII-ParentNotification.pdf#search=%22title%22 . Required Elements of Progress Report(s): N/A Progress Report Due Date(s): No further progress reporting required COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 15 Professional Development Rating: Partially Implemented Requirements Department CPR Finding: There are some teachers in the district who have completed Categories 1 and 2 although the majority has not completed the four categories of SEI professional development. The district does not have a multi-year SEI professional development plan. Please note that the Department’s regulations concerning SEI professional development requirements have changed. Refer to: http://www.doe.mass.edu/retell/ for more information. Narrative Description of Corrective Action: Tri County is a low incidence district and is not required to have SEI professional development completed until 2015-2016 academic year. A professional development plan has been developed. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Services, Corrective Action Activity: PD Plan Principal, Vocational Director, Academic completed 2013. The SEI professional Coordinator development for all vocational and academic teachers will be completed at the end of 2014. Evidence of Completion of the Corrective Action: All teachers will receive DESE endorsement. Description of Internal Monitoring Procedures: License and Certification review occurs annually at the beginning of the year during administrative council SEI endorsement will be required and all teachers who have not yet received the SEI training will be given professional development for this purpose (this includes new hires) CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 15 Professional Development Requirements Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: The Department accepts the district’s plan to ensure that all core academic teachers with ELLs and administrators that supervise core academic teachers of ELLs will be endorsed. No further submission is required at this time. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 41 Department Order of Corrective Action: N/A Required Elements of Progress Report(s): None required Progress Report Due Date(s): N/A COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: ELE 17 Program Evaluation Rating: Partially Implemented Department CPR Finding: A review of documentation and interviews with staff members indicated that the district has generated a set of questions for a program evaluation; however an evaluation has not been completed. Narrative Description of Corrective Action: Tri County has recently become the process of developing a program for ELLs who will be entering the school. The program will continue to be developed, as the administration and teachers become better acquainted with WIDA and SEI requirements. A program evaluation will occur regardless of the ELL enrollment in the school, as the program development is ongoing. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Services Corrective Action Activity: May 2013 Evidence of Completion of the Corrective Action: A completed program evaluation. Description of Internal Monitoring Procedures: The Director of Student Services will meet annually with the Principal to review the program evaluation results. These results will then be disseminated to the ELE team then to both vocational and academic teachers. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: ELE 17 Program Evaluation Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): Provide a copy of the district’s completed evaluation procedures. Progress Report Due Date(s): September 30, 2013 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 42 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION COORDINATED PROGRAM REVIEW Charter School or District: Tri-County Regional High School Corrective Action Plan Forms Program Area: Career/Vocational Technical Education Prepared by Tri-County RVTHS/Jean George CAP Form will expand to as many lines as necessary. Before completing and emailing to pqacap@doe.mass.edu, please see separate Instructions for Completing Corrective Action Plans. All corrective action must be fully implemented and all noncompliance corrected as soon as possible and no later than one year from the issuance of the Coordinated Program Review Final Report to the school or district. Mandatory One-Year Compliance Date: October 14, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CVTE 9 Rating: Partially Implemented Department CPR Finding: Documentation reviewed by the Department’s Audit and Compliance Unit revealed that the district’s system for recording graduate information to complete the CVTE Graduate Follow-up Report was inadequate and did not support the data submitted. The district reported a return rate of 81.25% on its follow-up for 2010 graduates, while the documentation maintained by the District supported a 57.7% return rate. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 43 Narrative Description of Corrective Action: Tri-County personnel met with Charles McCarthy of the DESE Audit and Compliance Unit on January 11, 2012. As a result of the meeting, procedures outlining communication and data collection have been revised. The revised procedures went into effect with the Class of 2012. The Vocational Director, the administrator in charge of the Perkins grant, will oversee the communication and data collection of the Career/Vocational Technical Education Follow-up Report. The Vocational Director will ensure that all procedures outlined in the attached Tri-County RVTHS Graduate Follow-up (Perkins) Updated Procedures are followed. The revised procedures resulted in the changes to two existing forms and the creation of a telephone log. Additional contact information – student cell phone number – was added to the 2012 Senior Placement Form/Career Plan form. An Administrative Use Only box was added to the Career and Technical Education 2012 Graduate Survey listing the date the survey was received, the way the information was gathered (survey, phone, email) and who collected the data. In addition, information received verbally will be recorded on a Career and Tech Ed Graduate Survey Form. A new form, the CVTE Graduate Survey Call Log for the Class of _____ was created to consistently and accurately record verbal information. The Vocational Director will also review all data collected prior to its submission to DESE to verify its accuracy. The Vocational Director will, in turn, submit a statement of assurance to the Superintendent. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Vocational Director Corrective Action Activity: June 2013 Evidence of Completion of the Corrective Action: Tri-County RVTHS Graduate Follow-up (Perkins) Updated Procedures Verification Use of Career and Technical Education 2012 Graduate Survey Completed CVTE Graduate Survey Call Log for the Class Description of Internal Monitoring Procedures: The Vocational Director will monitor all aspects of the process meeting with the Grade 12 Guidance Counselor and the Guidance Secretary on a quarterly basis to ensure implementation of all activities noted on the Tri-County RVTHS Graduate Follow-up (Perkins) Updated Procedures. The Vocational Director will, in turn, submit a statement of assurance to the Superintendent. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CVTE 9 Status of Corrective Action: X Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): District will report on the implementation of their revised data collection procedures. District will submit the completed CVTE Graduate Survey Log for the Class of 2012. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 44 Progress Report Due Date(s): June 14, 2013 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CVTE 10 Rating: Partially Implemented Department CPR Finding: Documentation submitted by the district indicated that the district’s program advisory committees do not have the composition as required by the MA Vocational Technical Education Regulations 603 CMR 4.03 (1) or a written plan in place to make them inclusive. Specifically: the Auto Collision, Carpentry, Cosmetology, Facilities Management, Graphic Communications, Health Assisting, Metal Fabrication and Plumbing program advisory committees do not have postsecondary representation. The Auto Collision and Construction Craft Laborers program advisory committees do not have parent/ guardian representation. The Carpentry, Electrical, HVAC/R and Plumbing program advisory committees do not include representatives of registered apprenticeship programs. The Auto Collision, Carpentry and Plumbing program advisory committees do not have female representation. The Auto Collision, Carpentry, CIS, Construction Craft Laborers, Cosmetology, Culinary Arts, Dental Assisting, Electrical, Engineering, Facilities Management, HVAC/R, Graphic Communications, Health Assisting, Metal Fabrication and Plumbing program advisory committees do not include individuals who can represent the concerns of people with disabilities. The Auto Collision, Cosmetology, Culinary Arts, Dental Assisting, HVAC/R, Graphic Communications, Health Assisting, Metal Fabrication and Plumbing program advisory committees do not include individuals who can represent the concerns of racial and linguistic minorities. Narrative Description of Corrective Action: The Vocational Director and the Director of Cooperative Education will meet with all vocational/technical teachers to review the Advisory Committee Member lists for their respective vocational areas. Teachers will submit names and addresses of possible members by accessing directories of local businesses, including the Yellow Pages and the Internet White Pages, searching for members through the Directory of Certified Businesses, published by the State Office of Minority and Women Business Assistance and contacting Tri-County local community college partners for nominations. To solicit members from organized labor, teachers will contact the Massachusetts AFL-CIO for assistance. The Vocational Director will contact the Massachusetts Division of Apprentice Training for assistance in locating Joint Apprenticeship and Training Committees that may have members to serve on our Program Advisory Committees. Lastly, the Vocational Director will consult with the Massachusetts Rehabilitation Commission in order to recruit members with disabilities. Letters of invitation will be sent through the office of the Vocational Director. The Superintendent will send a letter to the local Chamber of Commerce to solicit lists of businesses from their membership. The Superintendent will follow up with a phone call to the Chairperson of the Chamber of Commerce. The Director of Cooperative Education will contact all cooperative education employers by telephone to solicit nominations for Advisory Committee membership. She will follow up with any verbal commitments with a letter. The Superintendent will meet with the Vocational Director and the Director of Cooperative Education one month prior to Program Advisory Committee Meetings to review composition of the respective vocational program Advisory Committees. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 45 Title/Role of Person(s) Responsible for Implementation: Vocational Director and the Director of Cooperative Education Expected Date of Completion for Each Corrective Action Activity: Meeting with vocational teachers to review Advisory Committee Membership Forms: November 19, 2012 Submission of contact names and addresses to the Vocational Director: January 30, 2013 Letters of invitation sent to the respective organizations: February 15, 2013 Telephone calls to cooperative education employers: December 15, 2012 Teachers will complete Advisory Committee Membership Forms at the Spring 2013 Program Advisory Committee Meeting: April 2, 2013 Evidence of Completion of the Corrective Action: List of names and addresses of potential members from the vocational teachers Letters of invitation Completed Advisory Committee Membership Forms with required composition as required by the MA Vocational Technical Education Regulations 603 CMR 4.03 (1) Description of Internal Monitoring Procedures: Program Advisory Committee Forms will be reviewed and updated one month prior to the Program Advisory Committee Meetings by the Superintendent, Vocational Director and Director of Cooperative Education. Advisory Committee Members will update information at each Program Advisory Committee Meeting and submit with the minutes of the meeting. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CVTE 10 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): Progress Report #1: District will report on progress on outreach efforts for new advisory members. Progress Report #2: District will report on results of recruitment efforts and submit completed advisory committee member forms and minutes of Spring Advisory Committee meetings. Progress Report Due Date(s): Progress Report #1 due March 22, 2013. Progress Report #2 due June 14, 2013. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 46 COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CVTE 12 Rating: Partially implemented Department CPR Finding: Documentation and interviews revealed that, although there are articulation agreements, many were out of date and there is no system for annual review and approval. Narrative Description of Corrective Action: The Director of Student Services, the Vocational Director, the Principal and the Grade 11 and 12 Guidance Counselors met to review the procedures used to annually review and approve articulation agreements. The group developed a written system for the annual review and approval of articulation agreements. System for Annual Review and Approval of Articulation Agreements 1. By December 15, 2012, the Grade 11 Guidance Counselor will update the database of current articulation agreements to include a field labeled “date of annual review”. 2. By January 30, 2013, the Grade 11 Guidance Counselor will schedule a meeting with postsecondary representatives and the appropriate vocational teachers to review and update current articulation agreements. 3. By April 15, 2013, the updated articulation agreements will be reviewed at the April Program Advisory Committee Meeting. The Grade 11 Guidance Counselor will complete steps 1 and 2 in the 2012-2013 school year and in subsequent school years. The Director of Student Services will conduct a quarterly review of the articulation database. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Director of Student Services Corrective Action Activity: April 2013 Evidence of Completion of the Corrective Action: Articulation Database Minutes of Meeting with Postsecondary Partners Program Advisory Agendas Description of Internal Monitoring Procedures: The Director of Student Services will review the articulation database on a quarterly basis to ensure that all agreements are reviewed each year. The System for Annual Review and Approval of Articulation Agreements will be placed in the Grade 11 Guidance Counselor list of duties and responsibilities notebook. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CVTE 12 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): Progress Report #1: District will report on progress made MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 47 on updating articulation agreements. Progress Report #2: District will submit evidence of updated articulation agreements and review by Advisory Committees. Progress Report Due Date(s): Progress Report #1 due on March 22, 2013. Progress Report #2 due on June 14, 2013. COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CVTE 14 Rating: Partially Implemented Department CPR Finding: Documentation and interviews indicated that the district does not have a written policy governing work-based learning and therefore does not have a consistent policy regarding CORI checks on individuals who may have unsupervised contact with students in clinical placements and work-based learning settings. Narrative Description of Corrective Action: Students in the Early Childhood Careers Program, Dental Assisting Program, Medical Careers Program and Automotive Technology Program participate in unpaid work-based learning settings. The Vocational Director has met with the teachers to discuss and review the agreement between the unpaid work-based learning settings. The agreement shall include the following: 1. Agreement by both parties that the teacher will make an initial visit to conduct a safety check of the premises. A checklist will be completed and kept on file in the Vocational Director’s Office. 2. Agreement by both parties that if the student will have unsupervised contact with a supervisor during the student’s participation in an unpaid work-based learning setting, the supervisor will consent to a CORI check to be conducted at Tri-County Regional Vocational Technical High School prior to the student being placed at the center. 3. Agreement that the teacher (except in cases where the teacher remains with the student) will make unannounced visits to the center at least three times during the student’s placement for the purpose of safety and student performance assessment. 4. Agreement that the supervisor at all unpaid work-based learning settings shall comply with the Tri-County Regional Vocational Technical School District CORI Policy for the term of the agreement. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Implementation: Vocational Director Corrective Action Activity: Vocational Director will meet with teachers to revise agreements: November 15, 2012 All agreements will be revised and all forms will be submitted to the Vocational Director: November 22, 2012 The new procedures will be implemented for all unpaid work-based learning settings: November 27, 2012 MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 48 Evidence of Completion of the Corrective Action: Agreement documents signed by the teacher, supervisor, student and student’s parent/guardian Safety checklists Log of visitations by the teacher CORI reports on file at Tri-County RVTHS Description of Internal Monitoring Procedures: The Vocational Director will review the above procedure in September of each school year with teachers whose students participate in unpaid workbased learning placements. She will review the logs of visitations, signed agreements and safety checklists at the end of each grading period. She will check with the appropriate office at Tri-County to ensure that all CORI reports are complete and appropriate before students are allowed to participate in work-based learning placements. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CVTE 14 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): District will report on the implementation of the new procedures related to CORI policies for unpaid work-based learning and will submit the written policy and samples of the forms used to implement the policy (names redacted). Progress Report Due Date(s): Progress Report due on March 22, 2013. COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CVTE 20 Rating: Partially Implemented Department CPR Finding: A physical review of the facility indicated that not all instructional facilities and equipment used for career/vocational technical education meet current occupational standards. The Office for Career/Vocational Technical Education sends a Safety Survey Report, which includes details specific to each program, to the superintendent under separate cover. Narrative Description of Corrective Action: The Director of Facilities received the Hazard Descriptions and Correction Recommendations in February, 2012. The Director of Facilities and the Vocational Director addressed all items related to the facilities. All but one corrective action has been completed and reported to Mr. Dave Edmunds. The Director of Facilities is installing eyewash stations in each vocational program area. That will be completed by February, 2013. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 49 Title/Role of Person(s) Responsible for Implementation: Director of Facilities, Thomas Shanahan Expected Date of Completion for Each Corrective Action Activity: February 2013 Vocational Director, Mrs. Jean George Evidence of Completion of the Corrective Action: Follow-up report approved by Dave Edmunds. Description of Internal Monitoring Procedures: The Director of Facilities and the Vocational Director will perform inspections of all facilities and equipment three times per school year. The Director of Facilities will document all requests for maintenance and completion of all requested work through the “School Dude” program. The Superintendent will review the reports of requests and completion of all work. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CVTE 20 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): Evidence of approval from DESE safety inspector. Progress Report Due Date(s): Progress report due on March 22, 2013. COORDINATED PROGRAM REVIEW CORRECTIVE ACTION PLAN (To be completed by school district/charter school) Criterion & Topic: CVTE 21 Rating: Partially Implemented Department CPR Finding: A physical review of the facility indicated that not all instructional facilities and equipment used for career/vocational technical education meet current occupational standards. The Office for Career/Vocational Technical Education sends a Safety Survey Report, which includes details specific to each program, to the superintendent under separate cover. Narrative Description of Corrective Action: The Director of Facilities received the Hazard Descriptions and Correction Recommendations in February, 2012. The Director of Facilities and the Vocational Director addressed all items related to equipment. All corrective action has been completed and reported to Mr. Dave Edmunds. Title/Role of Person(s) Responsible for Expected Date of Completion for Each Corrective Action Activity: September 2012 Implementation: Director of Facilities, Thomas Shanahan Vocational Director, Mrs. Jean George Evidence of Completion of the Corrective Action: Follow-up report approved by Dave Edmunds. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 50 Description of Internal Monitoring Procedures: Teachers in each Vocational Program will perform inspections of all equipment three times per school year. They will report any equipment repair, maintenance or replacement needs through “School Dude” to the Vocational Director. The Director of Facilities will receive all requests and will take appropriate action. The Superintendent will receive reports of all equipment repairs, maintenance and replacement requests for review. CORRECTIVE ACTION PLAN APPROVAL SECTION (To be completed by the Department of Elementary and Secondary Education) Criterion: CVTE 21 Status of Corrective Action: Approved Partially Approved Disapproved Basis for Partial Approval or Disapproval: Department Order of Corrective Action: Required Elements of Progress Report(s): All concerns addressed. None required Progress Report Due Date(s): None required. MA Department of Elementary & Secondary Education, Program Quality Assurance Services Tri County Regional Vocational Technical CPR Corrective Action Plan 51