2013 Fall Asphalt Conference October 7, 2013 Gregory Whirley Commissioner CY 13 Advertisements ~ $1.9 B advertised to date out of $2B planned Engineering Outsourced $211 M Design Build $611 M Design Bid Build $882 M Localities $ 182 M TOTAL $1,886 M 2 % Fair or Better (Sufficient) Pavement Performance Percent Rated Fair or Better 90% Target ≥ 82% 85% 80% 75% 70% Target ≥ 65% 65% 60% 55% 50% 2010 2011 2012 2013 Interstate 78.4% 80.3% 82.9% 84.0% Primary 73.3% 77.6% 81.2% 83.3% Secondary 65.8% 64.2% 60.7% 59.6% 3 FY 2014 – FY 2019 Planned Funding for Paving ($ million) Roadway System Interstate Program Construction Maintenance Sub-Total Primary Construction Maintenance Sub-Total Secondary Construction Maintenance Sub-Total Total Construction Maintenance Grand Total FY 2014 $ 8.6 47.6 56.2 133.4 133.4 125.8 125.8 8.6 306.8 $ 315.4 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 $ 126.0 23.0 149.0 65.0 91.0 156.0 210.0 210.0 191.0 324.0 $ 515.0 $ 208.3 23.0 231.3 60.0 106.4 166.4 223.8 223.8 268.2 353.2 $ 621.4 $ $ $ 65.4 93.8 159.2 58.4 78.6 137.0 217.2 217.2 123.8 389.6 $ 513.4 47.1 86.6 133.7 53.8 107.0 160.8 226.0 226 100.8 419.6 $ 520.4 Total 0.0 $ 455.4 100.6 374.6 100.6 830.0 46.7 283.9 136.5 652.9 183.2 936.8 214.5 1,217.0 214.5 1,217.0 46.7 739.1 451.6 2,244.5 $ 498.3 $ 2,983.9 Note: components may not sum to totals because of rounding 4 FY 2014 – FY 2019 Planned Funding for Paving ($ million) FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 $ 315.4 $ 515.0 $ 621.4 $ 513.4 $ 520.4 Total $ 498.3 $ 2,983.9 Average Investment = ~ $500 M / Year Note: components may not sum to totals because of rounding 5 CY13 Paving Program • Mid-Cycle Advertisements • Focus on secondary system • July advertisement • Contract value ~ $90M • Fall Schedules • October – December advertisements • Contract value ~ $350M • Rehabilitation Projects (design-bid-build) • Richmond (3); Staunton (3); Bristol (1); Salem (1) • Contract value ~ $120M • Rehabilitation Projects (design-build) • Hampton Roads (3) • Contract Value ~ $115M 6 Maintenance Program Expended $120.1 million in June, for a year-to-date total of $1.63 billion. $144.6 million less than last year (an 8 percent decrease). Anticipated spending in FY 2013 was $1.65 billion. Actual spending for the fiscal year was within $20.4 million of forecast. Ended the fiscal year with a $88.9 million allocation balance, a significant reduction from the $176.7 million FY 2012 balance and from $485 million in FY 2011. (Dollars in millions) FY 2013 Service Area FY 2012 Expenditures % to Date Expended Allocations Expenditures % to Date Expended Allocations Difference Interstate Maintenance Primary Maintenance Secondary Maintenance Transportation Operations Services Program Management & Direction $ 481.5 532.5 431.4 181.5 87.5 $ 361.7 510.2 465.5 188.0 100.1 75% 96% 108% 104% 114% $ 585.2 678.7 454.7 144.9 83.4 $ 419.6 574.1 493.2 206.6 76.5 72% $ 85% 108% 143% 92% (58.0) (63.9) (27.7) (18.6) 23.6 TOTAL $ 1,714.4 $ 1,625.5 94.8% $ 1,946.9 $ 1,770.1 90.9% $ (144.6) Anticipated Spending Year to Date $ Variance $ 1,645.9 (20.4) 7 Maintenance Program DRAFT Expended $140.9 million in September, for a year-to-date total of $427 million Year-to-date spending is $91.6 million less than through the same period in FY 2013 (Dollars in millions) FY 2014 Service Area TOTAL Expenditures % to Date Expended Allocations Interstate Maintenance $ Primary Maintenance Secondary Maintenance Transportation Operations Services Program Management & Direction FY 2013 Expenditures Allocations to Date % Expended Difference 389.4 $ 477.8 472.0 201.7 81.8 102.5 117.1 114.2 52.8 40.5 26% 25% 24% 26% 50% $ 481.5 $ 530.5 434.2 180.8 87.5 111.1 161.9 168.3 46.6 30.9 23% $ 31% 39% 26% 35% (8.6) (44.8) (54.1) 6.2 9.6 1,622.7 $ 427.1 26.3% $ 1,714.4 $ 518.8 30.3% $ (91.6) Anticipated Spending Year to Date $ Variance $ 479.5 $ (52.3) 8 Delivery is Key. . . 9