Odd Fellows Road Interchange and Roadway Improvements Pardon Our Dust Meeting January 12, 2016 Objectives Project Overview Status Schedule Maintenance of Traffic Contract Information Project Overview Odd Fellows Segment A US 460 Top Ridge Roundabout Design Features: New interchange with US 29/460 and Odd Fellows Road Extension New roundabout at Top Ridge Road Project Overview Segment B1 Design Features: Roadway improvements along Odd Fellows Road New roundabout at Mayflower Drive Project Status 1. Final plans for Segment A have been submitted to VDOT for final approval 2. Right of way acquisition is underway for Segment A 3. Right of way plans are being finalized for Segment B1; right of way acquisition will follow 4. Environmental permits are being obtained from state and federal agencies 5. Utility relocation plans are being finalized 6. Wagman has set up construction trailers on site Project Schedule Project Awarded: January 15, 2015 Notice to Proceed: February 18, 2015 (Design Start Date) Construction Start: January 2016 Early Completion Date: December 21, 2017 Contract Completion Date: August 3, 2018 Construction Timeline Maintenance of Traffic for Route 29/460 Key Points • Speed limit reduced to 45 mph when work is adjacent to mainline • Vehicles entering and exiting Route 460, caution urged • Temporary lane restrictions used when necessary (predominately in 2017) Maintenance of Traffic for Odd Fellows Road Key Points • Phase 1 – Construct east side of Odd Fellows Rd • Phase 2 – Construct west side of Odd Fellows Rd • Maintain access to all parcels at all times • One-lane, one-way traffic (southbound) between Mayflower Dr and Bradley Dr (24 hours a day) • One-lane with flaggers south of Bradley in offpeak hours; two-lanes during peak hours • Speed limit reduced to 25 mph Detour for Mayflower Drive Roundabout Construction Key Points • Odd Fellows Road/Mayflower Dr intersection closed for 90 days – Summer of 2017 Contract Information Contractor: Wagman Heavy Civil Designer: David Lyle Design-Build Project Manager Paul Phillips Design-Build Construction Manager Johnson, Mirmiran & Thompson, Inc. Rodney Hayzlett, P.E VDOT Project Manager: Raina Rosado, P.E. Contract Price: $29,846,350 Design Manager Please Join Us at the Displays For More Information