Communication and Information Technologies (CIT) *** Three Year Technology Plan*** 2010-2013 As of December 20, 2012 Note: This Plan will constantly be monitored and updated following the availability of funds . 1.0 Vision, Mission and Core Values TSU CIT Vision Tennessee State University aspires to achieve national and international prominence, building on its heritage and preparing leaders for a global society. To become the paradigm support unit committed to providing excellence in administrative services and cutting-edge technology in all initiatives as we “Think, Work, and Serve.” Mission Tennessee State University, an Historically Black College/University (HBCU), fosters scholarly inquiry and research, life-long learning, and a commitment to service. To support the university’s mission by providing and continuously enhancing the unit’s human and technological resources in support of students, faculty, administrators, and staff in the achievement of their potential and objectives. Core Values Excellence Learning Accountability Integrity Shared governance Diversity Service * Proactivity Forward thinking, anticipate customer needs in advance, develop and implement effective and efficient policies and processes to satisfy those needs. * Teamwork CIT strives to foster individual commitment and unity of effort to achieve maximum CIT-Three Year Technology Plan Page 1 of 25 productivity. Partnership and consolidation of expertise and energies of all employees to accomplish our mission. * Accountability Answerable for level of productivity and work quality; commitment to managing and protecting the environment; responsible for stewardship of resources. * Quality-of-Service Superiority in work quality and deliverance of service; pride in work performance; excellence and high standards; and responsive and accessible services. * Integrity Firm adherence to a code or standard of values; probity; the state of being unimpaired; soundness; the quality or condition of being undivided; completeness. CIT-Three Year Technology Plan Page 2 of 25 2.0 GOALS The relevant goals from the University Strategic Plan (Transforming Tennessee State University) 2010-2015 at http://www.tnstate.edu/strategicplan , the Academic Master Plan (Envisioning Tennessee State University) 2008-2028 at http://www.tnstate.edu/uploads/documents/AMPSept08FINAL.pdf , and from the Tennessee Board of Regents CHARTING THE COURSE Strategic Plan 2010-2015 are given in parentheses below each CIT goal. The responsible person(s) for each goal are also given in parentheses. A. Technology Administration Goal-I: Establish technology standards for the TSU campus including hardware, software, policies, and procedures that reflect current technology requirements. (CIO, Director of Systems and Director of Client Support) University Strategic Cornerstone 3: User-friendly Business Practices University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success TBR Key Priority 4: Resourcefulness & Efficiency Goal-II: Establish a technology security program including policies and procedures for central and desktop computing, networking, and storage functions. (CIO, Director of Systems and Director of Client Support) University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Comprehensive Standards-3.3.1.2: Administrative Support Services Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success Goal-III: Establish university assessment requirements for each unit within the CIT division (CIO, Director of Systems, Director of Client Support and Manager of MIS) University Strategic Cornerstone 1: Commitment to Academic Quality and Reputation University Strategic Cornerstone 3: User-friendly Business Practices (Analyze current Service Level Agreements and modify for improvement in service delivery for all CIT units) University Strategic Objective – IPA 01 – Integrated Assessment and Improvement model University Strategic Objective – IPA 02 – Strengthened administrative arrangement for management of assessment and improvement TBR Key Priority Goal 2.1.6: Continue and improve the one-stop shop for admissions processing, registration, and financial aid at CIT-Three Year Technology Plan Page 3 of 25 both Main Campus and Avon Williams Campus through increased use of technology as appropriate Core Requirement-2.5: Continuous Improvement in Institutional Quality Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Comprehensive Standards-3.3.1.2: Administrative Support Services Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 3: Quality Goal-IV: Expand resources and optimize administrative and operational efficiencies (CIO, Director of Systems and Director of Client Support) Core Requirement-2.5: Continuous Improvement in Institutional Quality Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Comprehensive Standards-3.3.1.2: Administrative Support Services Comprehensive Standards-3.3.1.3: Educational Support Services University Strategic Goal 6.1.6: Cost Reduction TBR Key Priority 3: Quality TBR Key Priority 4: Resourcefulness & Efficiency B. Client Support Services Goal-V: Establish and maintain high quality, technology classrooms that meet the instructional needs of faculty by following campus hardware and software standards established by the Technology Vision Committee (TEKV) (Director of Client Support) University Strategic Cornerstone 1: Commitment to Academic Quality and Reputation Strategic Goal 1.1: Strengthening Undergraduate Education through the Quality Enhancement Plan Strategic Goal 1.2: Faculty and Staff Support and Development Strategic Goal 1.3.1: Strengthening Student Engagement and Experience Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success (Optimize new technologies to enhance teaching, research, service and learning) Goal-VI: Establish and support high quality, state-of-the-art academic computing labs (Director of Client Support) University Strategic Goal 2.6: Facilities Planning University Strategic Goal 1.5.2: Engaged Academic Technology and Digital Leadership University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services CIT-Three Year Technology Plan Page 4 of 25 TBR Key Priority 2: Student Success TBR Key Priority 3: Quality Goal-VII: Develop new hardware and software standards for the delivery of flexible desktop computing environments and applications. (Director of Client Support) University Strategic Cornerstone 3: User-friendly Business Practices University Strategic Goal 2.2: Library Infrastructure and Services University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success TBR Key Priority 3: Quality Goal- VIII: Improve client serving processes and services to promote a high quality of service and greater customer satisfaction (Director of Client Support) University Strategic Cornerstone 3: User-friendly Business Practices (Analyze current Service Level Agreements and modify for improvement in service delivery for all CIT units) University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority Goal 2.1.6: Continue and improve the one-stop shop for admissions processing, registration, and financial aid at both Main Campus and Avon Williams Campus through increased use of technology as appropriate TBR Key Priority 3: Quality C. Systems Support Services Goal-IX: Maintain a current information technology infrastructure--including hardware, software, communications, and networking resources—that supports the various missions of the university (Director of Systems) Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services University Strategic Goal 2.6: Facilities Planning University Strategic Goal 1.5: Technology Innovation and Instruction TBR Key Priority 1: Access TBR Key Priority 3: Quality CIT-Three Year Technology Plan Page 5 of 25 Goal-X: Expand and maintain the existing telecommunications infrastructure to provide reliable service that supports the University mission. (Director of Systems) University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 1: Access TBR Key Priority 3: Quality Goal-XI: Provide a secure and reliable platform for accumulating, storing, and making available all data in support of the administrative functions of the university. (Director of Systems) Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services Comprehensive Standards-3.3.1.4: Support Research within Institutional Mission if Appropriate University Strategic Goal 1.5: Technology Innovation and Instruction TBR Key Priority 3: Quality TBR Priority 4: Resourcefulness & Efficiency D. Management Information Systems Goal-XII: Implement and maintain management information systems (Banner Systems and Third Party Systems) required to effectuate business processes and to facilitate administrative operations and planning activities at the University. (Manager of MIS) University Strategic Cornerstone 3: User-friendly Business Practices University Strategic Goal 1.5: Technology Innovation and Instruction University Strategic Goal 2.3: Enhancing Our Web Presence (Develop a user friendly, transactional and interactive website) University Strategic Goal 2.4: Environmental Sustainability Comprehensive Standards-3.3.1.2: Administrative Support Services Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success TBE Key Priority 3: Quality E. Financial Support Services Goal-XIII: Improve financial reporting processes and procedures (CIO, Financial Analyst) University Strategic Goal 6.1.6: Cost Reduction CIT-Three Year Technology Plan Page 6 of 25 TBR Key Priority 4: Resourcefulness & Efficiency 3.0 PROGRESS ON GOALS A. Technology Administration Goal-I: Establish technology standards for the TSU campus including hardware, software, policies, and procedures that reflect current technology requirements. (CIO, Director of Systems and Director of Client Support) University Strategic Cornerstone 3: User-friendly Business Practices University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success TBR Key Priority 4: Resourcefulness & Efficiency Objectives 1. Review central computing and network standards annually. 2. 3. Review existing technology policies for necessary modifications or additions based upon new computing and network standards. Explore state wide initiatives for shared computing and storage resources Tasks 1. Determine current inventory and technology levels 2. Review inventory in anticipation of new projects/initiatives 3. Write summary of review outcomes 1. Assign policies to appropriate Director 2. Directors will review policies with staff 3. Write recommended modifications/additions 4. Submit to CIT committee to finalize 5. Submit to President’s Cabinet for approval 1. Attend state-wide IT meetings 2. Develop partnerships with state IT resources, local academic leaders, and vendors 3. Develop pilot projects CIT-Three Year Technology Plan FY-2010-11 FY-2011-12 FY-2012-13 Status -Ongoing- 2011-Developed and implemented a policy to eliminate unauthorized access points connected to the wireless network. November 2011 – Submitted new e-mail policy for review by President’s cabinet. -Ongoing- Page 7 of 25 Goal-II: Establish a technology security program including policies and procedures for central and desktop computing, networking, and storage functions. (CIO, Director of Systems and Director of Client Support) University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Comprehensive Standards-3.3.1.2: Administrative Support Services Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success Tasks Objectives Develop a technology security plan for central computing and network resources. 1. 2. FY-2010-11 Review existing technology policies for missing or outdated procedures and mandates Partner with Red Flag officer to review policies FY-2011-12 FY-2012-13 Status -Ongoing- Goal-III: Establish university assessment requirements for each unit within the CIT division (CIO, Director of Systems, Director of Client Support and Manager of MIS) University Strategic Cornerstone 1: Commitment to Academic Quality and Reputation University Strategic Cornerstone 3: User-friendly Business Practices (Analyze current Service Level Agreements and modify for improvement in service delivery for all CIT units) University Strategic Objective – IPA 01 – Integrated Assessment and Improvement model University Strategic Objective – IPA 02 – Strengthened administrative arrangement for management of assessment and improvement TBR Key Priority Goal 2.1.6: Continue and improve the one-stop shop for admissions processing, registration, and financial aid at both Main Campus and Avon Williams Campus through increased use of technology as appropriate Core Requirement-2.5: Continuous Improvement in Institutional Quality Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Comprehensive Standards-3.3.1.2: Administrative Support Services Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 3: Quality CIT-Three Year Technology Plan Page 8 of 25 1. Objectives Review existing SLAs and performance outcomes 1. 2. 3. 4. 2. Review current assessment methods within CIT 1. 2. 3. 3. Develop solutions in response to Customer Service Satisfaction Surveys 1. 2. 3. Tasks Determine if existing SLAs are realistic given existing resources. Modify SLAs according to review outcome Develop new SLAs based upon new technologies and modified service requirements Review performance outcomes data for Spring 2010 Determine if additional assessment methods should be incorporated Define additional assessment methods Recommend improvements to current assessment methods Prioritize issues Select top four issues to concentrate improvement efforts Write report on improvements for Compliance Assist FY-2010-11 FY-2011-12 FY-2012-13 Status December 2011 Current SLAs for work order turnaround are not met due to limited staffing in CIT. -Ongoing- -Ongoing- Goal-IV: Expand resources and optimize administrative and operational efficiencies (CIO, Director of Systems and Director of Client Support) Core Requirement-2.5: Continuous Improvement in Institutional Quality Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Comprehensive Standards-3.3.1.2: Administrative Support Services Comprehensive Standards-3.3.1.3: Educational Support Services University Strategic Goal 6.1.6: Cost Reduction TBR Key Priority 3: Quality TBR Key Priority 4: Resourcefulness & Efficiency 1. Objectives Increase efficiency in delivering courses via distance education and/or technology Tasks Reduce costs by implementing Cloud computing, Virtual Desktop Infrastructure (VDI), Virtual Computer Labs (VCL), and green initiative in the server room CIT-Three Year Technology Plan FY-2010-11 Target following reductions: Equipment: $240,000 FY-2011-12 Target following reductions: Equipment: $240,000 FY-2012-13 Target following reductions: Equipment: $240,000 Status 1.2011-550 VDI clients have been installed on lab computers. An additional 550 licenses have been purchased so phase 2 can begin. Page 9 of 25 enhancements 2. Increase operational efficiencies by optimizing administrative structures Reduce costs by re-organizing various units such as merging Help Desk Services and the Call Center operations etc. Target following reductions: $60,000 Target following reductions: $250,000 TBD 6/2011 – Call Center moved to Enrollment Management 3. Use volume purchase agreements for purchasing and for maintaining software and hardware Use TBR agreements for reducing costs in maintaining and supporting Banner and add-on software, network costs, and renewal fees for software licenses Target following reductions: Software: $60,000 Network: $160,000 Maintenance: $75,000 Target following reductions: Software: $60,000 Network: $160,000 Maintenance: $75,000 Target following reductions: Software: $60,000 Network: $160,000 Maintenance: $75,000 2. 2011-Added storage area network to existing SEI maintenance contract saving $85,000 annually. B. Client Support Services The mission of Client Support Services is to provide end user computing services for faculty, staff, and students including desktop computing, academic computing labs facilities, technology classrooms, Help Desk and Call Center services in support of the University mission of scholarly inquiry, research, life-long learning, and community service. Goal-V: Establish and maintain high quality, technology classrooms that meet the instructional needs of faculty by following campus hardware and software standards established by the Technology Vision Committee (TEKV) (Director of Client Support) University Strategic Cornerstone 1: Commitment to Academic Quality and Reputation Strategic Goal 1.1: Strengthening Undergraduate Education through the Quality Enhancement Plan Strategic Goal 1.2: Faculty and Staff Support and Development Strategic Goal 1.3.1: Strengthening Student Engagement and Experience Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success (Optimize new technologies to enhance teaching, research, service and learning) Objectives Tasks CIT-Three Year Technology Plan FY-2010-11 FY-2011-12 FY-2012-13 Page 10 of 25 Status 1. 2. Establish New Technology classrooms based upon TEKV recommendations 1. 2. Maintain the quality of existing technology classrooms through equipment upgrades. 1. 3. 2. 3. 3. 4. Maintain quality of existing technology classrooms through equipment repairs. Maintain appropriate consumables inventory for technology classrooms for the whole academic year Goal-VI: 1. 2. Determine budget availability Review recommendations from TEKV Implement new technology classrooms TSU has a total of 129 technology classrooms in operation on both the main and downtown campuses. $61,200 $95,000 $95,000 2010-2011 – Upgrades 10 classrooms New AWC 353 & 354 Establish criteria for upgrading existing classrooms Identify 10 classrooms meeting the criteria that have the highest incidents of failure Establish timeline for removal/installation of equipment based upon academic schedule $80, 000 Write Blanket PO for up to $4,000 in repair Maintain documentation of repairs Determine inventory stock levels to ensure consumables are available $16, 000 $16, 000 $16, 000 -Ongoing- $56,650 $56,650 $56,650 -Ongoing- 2011-2012 15 Projectors replaced 8 rooms will be evaluated for upgrades of all equipment Establish and support high quality, state-of-the-art academic computing labs (Director of Client Support) University Strategic Goal 2.6: Facilities Planning University Strategic Goal 1.5.2: Engaged Academic Technology and Digital Leadership University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success TBR Key Priority 3: Quality CIT-Three Year Technology Plan Page 11 of 25 Objectives 1. Establish new academic computing labs based upon TEKV recommendations Tasks 1. Determine budget availability 2. Review recommendations from TEKV FY-2010-11 FY-2011-12 FY-2012-13 Status There are 78 academic computing labs on the TSU main and downtown campuses. One additional lab facility (the WRITE center) has been approved for 2010-2011 and will be paid for by other funding sources. August 2011 - Currently there are no new lab facilities for TAF funding under consideration. 2. Maintain quality of existing academic computing labs 1. Replace Macintosh Computers $18,314 2. Replace laser printers based upon age and maximum print life. Replace monitors, keyboards, and mice when quality has diminished or parts no longer function. Maintain appropriate consumables inventories for paper, toner, Maintain appropriate parts/locks inventories for repairs $18,000 $18,000 $18,000 $ 3,000 $ 3,000 $ 3,000 $51,000 $51,000 $51,000 $10,000 $10,000 $10,000 3. 4. 5. CIT-Three Year Technology Plan $18,314 $18,314 -Ongoing2011 – Replace 4 Laser printers Page 12 of 25 Goal-VII: Develop new hardware and software standards for the delivery of flexible desktop computing environments and applications. (Director of Client Support) University Strategic Cornerstone 3: User-friendly Business Practices University Strategic Goal 2.2: Library Infrastructure and Services University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success TBR Key Priority 3: Quality Objectives 1. Adopt a virtual desktop infrastructure for academic computing labs 2. Adopt a virtual desktop infrastructure for faculty/staff (2011-12) 3. Implement VCL Pilot 4. 5. Implement campus software applications per TEKV recommendations Partner with the library to implement required library systems Tasks 1. Implement test labs 2. Test functionality of software access, storage capabilities, and printing 3. Purchase necessary licenses to cover 1/3 of the campus labs 4. Purchase blades for servers 5. Train technical staff on the server installation and image development 6. Roll out to campus Continue implementation strategy used in computer lab implementations. FY-2010-11 FY-2011-12 FY-2012-13 $164,500 $164,500 $164,500 $129,341 $129,341 $129,341 1. 2. Develop scope of project Receive pricing from IBM partners Complete Purchase Host implementation team Review recommendations Determine license requirements Implement software $89,300 $268,972 $268,972 $268,972 -Ongoing Review library systems requirements covered by TAF Determine license requirements Implement software/subscriptions $100,000 $75,000 $75,000 -Ongoing- 3. 4. 1. 2. 3. 1. 2. 3. CIT-Three Year Technology Plan Status TSU has a traditional desktop computing deployment in both the academic labs and on faculty/staff desktops. There are approximately 1750 computers in academic labs and 1,400 computers on faculty/staff desks. -Ongoing- -Ongoing- Page 13 of 25 Goal- VIII: Improve client serving processes and services to promote a high quality of service and greater customer satisfaction (Director of Client Support) University Strategic Cornerstone 3: User-friendly Business Practices (Analyze current Service Level Agreements and modify for improvement in service delivery for all CIT units) University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority Goal 2.1.6: Continue and improve the one-stop shop for admissions processing, registration, and financial aid at both Main Campus and Avon Williams Campus through increased use of technology as appropriate TBR Key Priority 3: Quality Objectives 1. Educate campus on Windows Live Tasks 1. Develop campus communications plan 2. Send communications to campus FY-2010-11 FY-2011-12 FY-2012-13 2. 1. License Fee $20,673 License Fee $20,673 License Fee $20,673 Additional Features: $35,000 onetime fee. $4,000 $4,000 Integrate Right Now customer relationship management system with telephone system 2. 3. 3. Implement new TSU ID Card System 1. 2. 3. 4. 4. Provide faculty development seminars 1. 2. Determine necessary components to provide integration of the telephone system to Right Now Write an assessment of the impact this application would have in key areas of student registration and admissions . Write RFP with CIT and other stakeholders. Status -OngoingScheduled to switch over after the Luminis IV Upgrade is completed Windows Live Fully implemented August 8, 2011 -OngoingIntegration of Right Now with the Telephone System will cost $35,000 onetime. And, it will cost $4,000 annually to support additional functionalities Need to illustrate to administration the payoff this system would have to the campus. Research system features desired Write RFP with CIT and other stakeholders Receive Proposals Purchase and implement the new System $70,000 -OngoingRFP has been written December 2011: Committee has been appointed. Project funding will be sought through Title III. Survey faculty on needs Develop year long series of $35,000 Dr. Seay is being consulted to partner on this objective. CIT-Three Year Technology Plan Page 14 of 25 training Survey effectiveness of each course/session 3. 5. Implement new TSU website and Content Management System 1. 2. 3. 4. Interact with vendors (contractor and sub-contractor) to implement new web site and Content Management System. Participate in vendor technical training. Convert existing departmental websites. Schedule departmental Webmasters and Content Managers training to maintain new websites. License Fee; $117,050 Annual Maintenance Fee: $10,000 Annual Maintenance Fee: $10,000 -Completed/Ongoing1. 2. 3. 4. 5. CIT-Three Year Technology Plan Page 15 of 25 The new TSU website has been tested, implemented and released to users Any future changes to the “Look Feel” of our website will be coordinated through the office of Media Relations as the Web Designer position has been transferred from CIT to Media Relations The departmental websites are being converted to the new design format The training for departmental Webmasters is being scheduled CIT Webmaster has been working with the vendors (contractor (OmniUpdate and sub-contractor Stamats), departmental Webmasters and Content Managers to establish new websites and convert/ transfer existing data to new website design format. December 2011 Modifications requested by the President have been completed to the home page 6. Assist the University Web Committee in formulating policies and guidelines for maintaining a functional and user friendly website 1. 2. 3. 4. Develop set of best practices with content management vendor (OmniUpdate) Familiarize the committee and the primary content managers about the new policies and guidelines. Document policy violations Establish remedial training to correct policy violations -Ongoing1. The Web Committee is in place and has been meeting regularly 2. CIT is represented on this Committee by the Webmaster and the Director of Client Support December 2011 The web designer position has been moved to Media Relations. C. Systems Support Services The mission of Systems Support Services is to provide centralized computing services, data and telecommunications network distribution and systems, and campus television distribution for faculty, staff, and students. These services provide the backbone for the University mission of scholarly inquiry, research, life-long learning, and community service. CIT-Three Year Technology Plan Page 16 of 25 Goal-IX: Maintain a current information technology infrastructure--including hardware, software, communications, and networking resources—that supports the various missions of the university (Director of Systems) Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services University Strategic Goal 2.6: Facilities Planning University Strategic Goal 1.5: Technology Innovation and Instruction TBR Key Priority 1: Access TBR Key Priority 3: Quality Objectives 1. Provide reliable network connectivity to the Internet 2. Tasks 1. XO Communications 2. Net-TN-Annual 3. Net-TN- AWC 4. Net-TN-DSL to AWC (Testing) 1. 2. Maintain existing network infrastructure 3. Pomeroy - Packeteer Pomeroy - CISCO Smartnet Audible Magic FY-2010-11 $ 48,000 $ 240,000 $ 24,000 $ 600 FY-2011-12 $ 48,000 $ 240,000 $ 24,000 $ 600 FY-2012-13 $ 48,000 $ 240,000 $ 24,000 $ 600 Status 2011-A RFP has been completed and submitted to procurement for a redundant internet connection at the Avon Williams campus. 1. $56,000 $56,000 $56,000 2. 3. 4. 3. Maintain servers/storage/power/ backup/software 1. 2. 3. 4. 5. Research in Motion-Blackberry server Sun Server Maintenance Dewpoint - Sun Drive Arrays Windows Server Maintenance EMC SAN Maintenance CIT-Three Year Technology Plan $4,500 $4,500 $4,500 $23,000 $23,000 $23,000 $5,000 $5,000 $100,000 $5,000 $100,000 1. 2. Page 17 of 25 2011-purchased intrusion detection systems for both main and Avon Williams campuses. 2011-Purchased a second Audible Magic device to monitor per to peer traffic on the Avon Williams campus. 2011-Installed wireless access points in 103 technology classrooms. 2011-upograded network switches from 100mb to 1gb per port. 2011-Installed additional UPS in main server room . 2011—Replaced main air conditioning unit with a more efficient 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. $17,000 33000 $17,000 33000 $17,000 33000 $18,000 $4,200 $8,700 $120 $2,200 $500 $20,000 $4,200 $8,700 $3,500 $4,500 $120 $2,200 $500 $20,000 $4,200 $8,700 $3,500 $4,500 $120 $2,200 $500 $350 $350 $350 3. 4. unit. 2011-Added UPS at the Avon Williams campus to existing maintenance contract with JT Packard. 2011-Added redundant wireless network controllers. 18. 4. Goal-X: Symantec-E-vault VMWare Licensing/Maintenance Microsoft – Data Center TIVOLI Backup Iron Mountain - Tape Storage ENS- Omnilert JT Packard - Server Room UPS JT Packard - Symantra UPS Calendar Wiz Solar-winds Sunbelt - Print Manager Share it- Screen Saver Expand and maintain the existing telecommunications infrastructure to provide reliable service that supports the University mission. (Director of Systems) University Strategic Goal 1.5: Technology Innovation and Instruction Core Requirement-2.5: Demonstrate the Institution is Effectively Accomplishing its Mission Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 1: Access TBR Key Priority 3: Quality Objectives Tasks CIT-Three Year Technology Plan FY-2010-11 FY-2011-12 FY-2012-13 Page 18 of 25 Status 1. Leverage the existing IT infrastructure to provide VoIP telecommunications services as the needs are presented. 1. 2. 3. 2. 3. Maintain the existing telecommunication equipment and distribution to provide cost effective and reliable services. 1. 2. Explore competitive television distribution providers to reduce costs and expand services Goal-XI: Work in conjunction with USDA to improve data/telecom wiring in the USDA occupied area on campus in support of their research initiatives. Install VoIP phone service for the USDA as part of their new research building construction. Expand USDA VoIP to all USDA occupied areas on campus. $200,000 Grant funded Maintain existing switching equipment. Repair copper infrastructure in university tunnel system $35,000 $35,000 $35,000 $75,000 $75,000 $75,000 Issue an RFP for distributed television services to support the campus community. $210,000 $210,000 $210,000 Building project funded $150,000 $150,000 Grant funded 2011-repaired all copper infrastructure in tunnels. -Ongoing- Provide a secure and reliable platform for accumulating, storing, and making available all data in support of the administrative functions of the university. (Director of Systems) Core Requirement-2.5: Continuous Improvement in Institutional Quality Comprehensive Standards-3.3.1.3: Educational Support Services Comprehensive Standards-3.3.1.4: Support Research within Institutional Mission if Appropriate University Strategic Goal 1.5: Technology Innovation and Instruction TBR Key Priority 3: Quality TBR Priority 4: Resourcefulness & Efficiency Objectives 1. Expand virtual computing to provide Cloud computing 1. Tasks Expand the Citrix Virtual Desktop Infrastructure (VDI) initiative to deliver centralized secure CIT-Three Year Technology Plan FY-2010-11 $165,000 FY-2011-12 $150,000 FY-2012-13 $100,000 Status 2011-550 client lab computers have been installed. Page 19 of 25 resources for both university and state wide needs. 2. Implement Sharepoint 2010 2. computing services to students and employees. Develop the Virtual Computing Laboratory (VCL) environment to provide flexible, easily deployed, and secure computing services in support of student learning to both on and off campus constituents. 1. Develop RFP for implementation support 2. Select vendor 3. Implement with knowledge transfer to CIT staff $219,000 $200,000 $200,000 $160,000 2010-Dell Consultant laid out infrastructure requirements for SharePoint 2010. Henry Vaughn Attended week long training on SharePoint 2010 in March 2011 D. Management Information Systems Goal-XII: Implement and maintain management information systems (Banner Systems and Third Party Systems) required to effectuate business processes and to facilitate administrative operations and planning activities at the University. (Manager of MIS) University Strategic Cornerstone 3: User-friendly Business Practices University Strategic Goal 1.5: Technology Innovation and Instruction University Strategic Goal 2.3: Enhancing Our Web Presence (Develop a user friendly, transactional and interactive website) University Strategic Goal 2.4: Environmental Sustainability Comprehensive Standards-3.3.1.2: Administrative Support Services Comprehensive Standards-3.3.1.3: Educational Support Services TBR Key Priority 2: Student Success TBE Key Priority 3: Quality Objectives Tasks CIT-Three Year Technology Plan FY-2010-11 FY-2011-12 FY-2012-13 Page 20 of 25 Status 1. Implement vendor’s current/latest version of Banner (ERP System) 2. Schedule and attend technical training required to maintain Banner Systems. 7. Install TBR/SMO Banner (ERP System) upgrades. 8. Install TBR/SMO Banner (ERP System) releases. 9. Install of TBR/SMO Banner (ERP System) modifications. 10. Install TBR/SMO Banner (ERP System) patches. 2. 4. Implement iDashboard facilitating display of Business Intelligence data 5. Provide the technical support required for the TouchNet system 1. 2. 6. Implement Student System Housing 1. 2. 3. $545,000 Nov-2010 Banner Systems Version 8 was installed. December 2011 Banner Version 8.3/8.5 Installed. -Completed- Nov2010 MIS staff attended Banner Systems training required for Banner 8 Migration. Implement necessary software and hardware Provide necessary training to the DBAs $13,380 $13,380 $13,380 -Completed-Nov-2010 ODS hardware and software installed. 1. Acquire the software 2. Implement the software 3. Train the users $39,890 $5,315 $5,315 October 2011 Implemented December 2011 Development ongoing Interact with TouchNet technical staff as required to maintain software support for Bill + Payment Client module. Interact with the users as required to provide functional support. $18,162 $18,162 $18,162 -Completed-Nov-2010 TouchNet module are currently implemented with Banner Systems, and implemented for the Banner 8 Migration testing. Contact StarRez System Project Leader to establish implementation schedule. Execute software implementation tasks. Provide functional users training and $13,050 $13,050 $13,050 -OngoingDecember 2011 Housing has chosen to not move forward with StarRez CIT-Three Year Technology Plan . $545,000 Attend TBR SMO technical training required for Banner Systems 8 upgrade and technical support. 1. 3. Implement ODS/EDW $545,000 Page 21 of 25 testing. 1. 7. Develop a new Vehicle Registration System. 2. 3. 8. Implement Xtender Solutions (Document Imaging System). 1. 2. 3. 4. 5. Design Vehicle Registration System based on user specifications. Develop new Vehicle Registration System. Implement new Vehicle Registration System. Install SunGard Xtender Solutions Document Imaging System. Schedule Xtender Solutions technical Training for MIS staff. Schedule functional users training. Implement Xtender System to replace FileNet System. Implement Xtender System for other functional users. -OngoingVehicle Registration System will be developed by MIS staff contingent upon the staff workload and collaboration with Campus Security. $109,000 $13,000 $13,000 The Xtender Solutions Document Imaging System has been purchased and will be installed after Banner 8 Systems have been fully tested and have become fully functional. December 2011 Outsourcing the installation is under consideration. 9. Implement AXIOM, the bridge between Apply Yourself and Banner 1. 2. 3. Explore the functionalities of AXIOM Consult with Dean of Graduate Studies Implement and train the users CIT-Three Year Technology Plan $20,950 Annual Maintenance: $3,000 Page 22 of 25 --Ongoing -Dean of Graduate Studies has approved the purchase of AXIOM -Implementation and Training is underway 10. Implement TouchNet MarketPlace Module. Attend TouchNet MarketPlace technical training and implementation planning sessions. 11. Implement ID Numbers conversion (From SSNs to Tnumbers) in the Best Lock System Initiate contact with Stanley Software Solutions technical staff to schedule ID numbers conversion. Install Financial Aid jobs in AppWorx Job Scheduler. 12. Implement additional batch jobs in AppWorx Job Scheduler as required. 13. Provide technical support required for implementation of FileNet system to automate the storage and retrieval of records in the Bursar’s Office, Financial Aid Office and Finance and Accounting Office. 1. 2. 3. 4. License: $74,400 Maintenance: $14,880 $14,480 $14,480 -OngoingMIS contacted Stanley and initiated the ID Number conversion project. Conversion specification and data files have been sent to Stanley. This project will resume after Banner-8 becomes fully operational. $14,235 $14,235 $14,235 reate and test additional Capture Paths, Setting Collections, and Templates; and maintain existing ones Backup server repositories, scanning work stations and FileNet server Monitor and improve batch processing for efficiency and effectiveness as required Interact with vendor for technical support as required. -OngoingFinancial Aid System batch jobs will be added to AppWorx as specified by end users. -OngoingThe FileNet System is installed in Finance and Accounting Office and Financial Aid Office. FileNet will be replaced with the SunGard Xtender Solution Document Imaging System after Banner 8 is fully functional. -OngoingAll SCT Plus Systems have been replaced with SunGard Banner Systems. Functional users continue to use SIS Plus and HRS Plus. 14. Provide MIS technical support for installed SCT Plus systems. CIT-Three Year Technology Plan -Completed-Nov-2010 MarketPlace module has been purchased via Title III funding. Page 23 of 25 December 2011 Access is no longer available to SIS. 15. Provide technical support required to support Luminis (myTSU) software upgrades. 1. 2. 3. 4. Interact with the Systems Administrators for portal upgrades for Banner 8. Create Banner system data files required for portal conversion. Interact with Luminis vendor and Systems Administrators to test portal interface with Banner 8 Systems Implement Banner 8 Systems production interface with LuminisIV portal -OngoingMIS technical support provided as required E. Financial Support Services Goal-XIII: Improve financial reporting processes and procedures (CIO, Financial Analyst) University Strategic Goal 6.1.6: Cost Reduction TBR Key Priority 4: Resourcefulness & Efficiency Objectives 1. Upgrade the MicroCall Telephone Accounting Software and resolve all departmental billing issues 2. Conduct Self-Audit of Departmental Phones 3. Continue providing weekly reports on the status of various accounts especially the Tasks 1. Install the Software 2. Import records 3. Edit and correct records 4. Test Billing procedures 5. Go live Review all active lines / services and eliminate the unused phone lines. Prepare detailed financial status reports for the CIT Directors that will better illustrate the remaining funds that are CIT-Three Year Technology Plan FY-2010-11 FY-2011-12 FY-2012-13 Status -Completed-Completed-Completed-Completed-CompletedTask completed by Mr. Bill Sneed (Oct. 2011). An RFP to continue providing local phone service for TSU is currently being drafted. December 2011 John Ray has developed detailed financial reports and assists with contract processing. Page 24 of 25 details of expenses out of the Technology Access Fee available during the 2011-2012 fiscal year. Total Estimated Expenses: $3,780,287 $3,374,192 $2,791,242 Three Year Total Estimated Expenses: $9,945,721 CIT-Three Year Technology Plan Page 25 of 25