Risk Plan Template If you are the Project Manager on a project whose complexity level has been calculated to be Medium or High, you will need to determine the following information. For entry into the required Risk plan in PMIT: Risk Number Risk Name & Desc. Probability Impact of (B) Occurrence (A) Weight (C) Mitigation Description Time Strategy of Frame Mitigation 1. Number your risks beginning with 1 and incrementing by 1. 2. Develop a name and description of the risk. Use language that is clear and understandable by the majority of stakeholders to describe the risk and the impact on the project if the risk materializes. 3. (A) Determine the likelihood of the risk materializing. This is measured by the probability of occurrence as a percentage range. This determines the score used in the calculation of Weight: Chance of Occurance Score Unlikely (1 – 39%) 1 Probable (40 – 69%) 2 Likely (70 – 100%) 3 4. (B) Determine the impact or the risk and assign a number between 1 – 5, with 5 being the greatest impact. 5. (C)Weight will be a system calculated number between 1 – 5 with 5 being the greatest weight using this formula: B + (A-1). Risks with the most weight have the highest potential to negatively impact the project and require the most careful monitoring. 6. Determine your risk mitigation strategy: Accept Mitigate Transfer 7. Describe the risk strategy including who is responsible for monitoring and carrying out the strategy should the risk materialize. 8. Establish the date range the risk must be monitored. Specify the date to begin monitoring and the date when monitoring can safely end. For more information on the type and contents of the above data fields in PMIT, refer to the Risk Plan guide in the Instructions area of the PMO Web site.