Measure C Funding request for the ETS Instructional Technical Solutions Systems Engineer Measure C Project Numbers: 713, 613, 714, 614 Requesting 30% of the Instructional Technical Solutions Systems Engineer (Bill Matsumoto) position be funded by the Multimedia New and Refresh project budgets. The break down for each budget per year for the remainder of the bond is as follows: Based on 50% Contribution for Each College $ Per year to fund 30% of Position De Anza Multimedia Refresh 713: De Anza Multimedia New 714: 48.57% 51.43% $9,588.51 $10,153.13 $19,741.64 Foothill Multimedia Refresh 613: Foothill Multimedia New 614: 27.53% 72.47% $5,434.87 $14,306.77 $19,741.64 $39,483.28 TOTAL Funds Needed Annually Current Deployment Guidelines state 38 Multimedia Rooms will be installed or refreshed per year. The cost per room is $1040 to fund 30% of the Instructional Technical Solutions Systems Engineer's position. Without this funding, additional staff reductions will occur within the Networks & Client Services ETS team. Therefore, it will be necessary for the Instructional Technical Solutions Systems Engineer to perform daily maintenance and support work. This will lead to a 50% reduction in the number of multimedia projects ETS is able to manage. Summer Break Winter Break Spring Break DA Current DA Reduced FH Current FH Reduced 10 5 4 5 3 2 10 5 4 5 3 2