Study Program Period : S0673 / Building Construction II : 2007 FLOOR CONSTRUCTION Meeting 8 Learning Outcome By the end of this meeting, expected student will be able to : • Student can explain elementary floor construction and mount from concrete along with details. 3 Bina Nusantara Outline Items • Items 1 • Items 2 • Items 3 : Link mains log Detail at wall. : Log Compile : Log construct 4 Bina Nusantara Location of Logs Floor. • Mains logs, its back parts stand up above columns or wall. • Mains logs ever unfold short side. • At one particular floor plate to have big require to be strengthened with floor logs and child log namely strong log at compared to smaller fairish floor of king sized mains log. 5 Bina Nusantara 6 Bina Nusantara 7 Bina Nusantara • Wood logs have surface size measure and limited length. Become if used as floor log can only be used to unfold just small (4m - 5m). • If to unfold big and remain to be used by wood, hence can be made by log compile or made by form construct or earn is also used lengthwise especial logs unfold longest constructively contributor pillars. 8 Bina Nusantara • Log Compile 9 Bina Nusantara • Wood Construct 10 Bina Nusantara Log with Contributor. At floor mount from wood, need equipments: • Yoke at the end of planted log into wall. • Obligatory yoke two overall log most edge. 11 Bina Nusantara • Yoke fasten log through nail; yoke fasten wall through to inform against brick couple or concrete. Tip of planted yoke bended by elbow with its plate area of angular shape 45 to straightening direction. 12 Bina Nusantara Click to edit Master title style 13 Bina Nusantara Yoke of Log Blind Yoke : • Yoke do not see from outside and also from within. Yoke Penetrate : • Yoke penetrating wall till see from outside, during this secretory shares do not destroy view. This yoke type enough strength. 14 Bina Nusantara 15 Bina Nusantara Common function of yoke are : • Specifying at domiciling which is log remain to be pertinent at place which wish to be inculcated. • Yoke attached at one of the back part or both its back part. And this yoke have to earn to fasten to become one better, at materials where that yoke is inculcated. 16 Bina Nusantara • Ichnograph Floor Level. 17 Bina Nusantara • Detail A 18 Bina Nusantara • Detail B 19 Bina Nusantara • Detail C 20 Bina Nusantara 21 Bina Nusantara 22 Bina Nusantara 23 Bina Nusantara • Location of board direction dance at variance with location of floor log. • Between log floor with given certain places of lasing log. 24 Bina Nusantara • Link Log floor with Pillar Isolator. 25 Bina Nusantara