Measure E Town Hall November 24, 2003 Donna Jones Dulin Gilbane Building Co Parking Lots A & B One-Way Perimeter Road Measure E - Major Project Timeline Commencment Completion of of Construction Construction Science Center Nov 2001 Apr 2004 Parking Structure Dec 2003 Sep 2004 Student Community Services Dec 2003 Apr 2005 Kirsch Center Jan 2004 Feb 2005 Open Sep 2004 Sep 2004 May 2005 May 2005 Science Center The site of the Science Center looking toward the CDC on 10/28/02 The Science Center one year later Science Center The exterior showing the metal siding and the support structure. The Old OTI trailers were located here. This is the walkway between two of the buildings. Science Center Crane lifting the air handling units on to the roof. Units are for the heating and airconditioning. This is the roof showing the exhaust vents used for extracting air from the fume hoods & restrooms, etc. Also shows the support poles for the piping. Interior of Science Center The interior of the lecture hall showing the floor vents. One of the labs showing the acid waste pipes. Parking Structure The parking structure will be located in lot C. Lot C will be closed from 1 Dec 2003. Parking Structure Footprint Parking Structure Elevations Student Community Services The SCS building is located behind the ATC, on the present site of staff lot A. Staff lot A will be closed from 24 Nov 2003. Student Community Services Elevation Kirsch Environmental Center The Kirsch Center will be located in the South West Corner of campus, on the present site of the tennis courts. The courts will be closed at the end of Dec. Kirsch Center Elevation No Fuss Buss Parking Options Vallco ‘No Fuss Bus’ drop off and pick up Location of Vallco parking lot Open Lots: Flint J K I F E Staff carpool parking Open Lots: A B Compact C Perimeter Rd D Measure E Web Site Quick News Update for Fall 2003 & Today’s Town Hall Presentation www.deanza.edu/MeasureE/update