TEMPORARY OPERATING INSTRUCTION 15-05086 O.O. File No. 1-09194943 MISO No. Name of Outage: Riel 230 - 500 kV Bank 71 Effective Dates: 2015-10-16 from 0600 to 2015-10-30 at 2000 CDT (2015-10-16 from 0600 to 2015-10-30 at 2000 EST) Standing Guide Reference: MHEX – USA Special study as per K. Long 2015-10-06 Description of Work: No. 15-201R2 240803 Riel Bank 71 (MHEB) – Fan Replacement, Relocate RTD’s, PT Replace, POW Control TRANSFER LIMITS: MH-USA South (MH Export) SOL: Location USA TTC 2360 Schedule Limit 2150 1925 RM Transfer (SOL) CRSG OM Firm NonFirm Schedule Limit 210 2150 150 75 1925 0 1925 MH-USA North (MH Import) IROL Location USA TLR Triggers 1100 SOL: Schedule Limit 900 850 TTC 935 RM Transfer (SOL) CRSG OM Firm NonFirm Schedule Limit 35 900 0 900 0 850 850 South TLR 1 South TLR 3 North TLR 1 North TLR 3 1980 2000 837 855 15-201R2_Riel_Bank71_10_16_to_10_30.doc Page 1 of 3 TEMPORARY OPERATING INSTRUCTION MISO Webtool Postings MISO Webtool Postings MHEX_S (Export) MHEX_N (Import) Special Notes to MISO West RC TTC TRM No. 15-201R2 Coeff 2360 435 1.000 935 935 0.091 A) During this prior outage condition generation curtailment of the St. Joseph and St. Leon wind farms concurrent with TLR on MHEX_N may be required when Manitoba to USA flows are north to prevent post contingent overloads on G37C following a trip of B10T. B) If the MISO RTCA and MISO Flowgate Monitoring Tool is unavailable prior to or during this outage, MISO RC will notify MHEB that these tools are not available. The SOL for MHEX_S shall remain the same at 2050. The SOL for MHEX_N shall remain the same at 900. Special Instructions to MHEB Operator A) TOI Extentions - This TOI may be extended until 23:59 by performing the following steps: 1. Verify system conditions to confirm there are no additional tie line facilities outages, or new internal MH outages. 2. Review RTCA to confirm there are no new contingencies. 3. Contact MISO to confirm there are no new outages, if there are no new outages provide notice to MISO that MH is extending the TOI. 4. Extend the outage in COLA. 5. Update TLAP outage table. 6. Provide notice to affected balancing authorities 15-201R2_Riel_Bank71_10_16_to_10_30.doc Page 2 of 3 TEMPORARY OPERATING INSTRUCTION Special Instructions to MHEB Operator (cont): No. 15-201R2 B) When called upon by MISO for the supply of CRSG: If Real Time Contingency Analysis (RTCA) indicates a post contingent overload condition on Y51L for the contingent loss of D14S - redispatch MH generation to maintain CRSG delivery as per: Start Brandon Gas Generation and run up to 60 MW. Brandon generation must be re-dispatched from HVDC generation at Dorsey After 60 MW re-dispatch is complete, should RTCA continues to indicate a post contingent overload condition on Y51L due to the contingent loss of D14S, Continue to re-dispatch generation from Brandon gas in 10 MW increments until post contingent overload on Y51L has been mitigated. The mitigation must be completed within 30 minutes. Prepared By: J. Cameron Date: 2015 09 22 Revised By: S.W. Saboraki Date: 2015 09 24 Revised By: G. Grenier Date: 2015 10 06 Copies to: SOSS, System Control Centre NSSS, System Control Centre GSSS, System Control Centre 15-201R2_Riel_Bank71_10_16_to_10_30.doc MISO GSO, System Control Centre Page 3 of 3