TEMPORARY OPERATING INSTRUCTION
15-05086
O.O.
File
No.
1-09194943
MISO No.
Name of
Outage:
Riel 230 - 500 kV Bank 71
Effective Dates:
2015-10-16 from 0600 to 2015-10-30 at 2000 CDT
(2015-10-16 from 0600 to 2015-10-30 at 2000 EST)
Standing Guide
Reference:
MHEX – USA Special study as per K. Long 2015-10-06
Description
of Work:
No. 15-201R2
240803
Riel Bank 71 (MHEB) – Fan Replacement, Relocate RTD’s, PT Replace, POW Control
TRANSFER LIMITS:
MH-USA South (MH Export)
SOL:
Location
USA
TTC
2360
Schedule
Limit
2150
1925
RM
Transfer
(SOL)
CRSG
OM
Firm
NonFirm
Schedule
Limit
210
2150
150
75
1925
0
1925
MH-USA North (MH Import)
IROL
Location
USA
TLR
Triggers
1100
SOL:
Schedule
Limit
900
850
TTC
935
RM
Transfer
(SOL)
CRSG
OM
Firm
NonFirm
Schedule
Limit
35
900
0
900
0
850
850
South
TLR 1
South
TLR 3
North
TLR 1
North
TLR 3
1980
2000
837
855
15-201R2_Riel_Bank71_10_16_to_10_30.doc
Page 1 of 3
TEMPORARY OPERATING INSTRUCTION
MISO
Webtool
Postings
MISO
Webtool
Postings
MHEX_S
(Export)
MHEX_N
(Import)
Special Notes
to MISO West
RC
TTC
TRM
No. 15-201R2
Coeff
2360
435
1.000
935
935
0.091
A) During this prior outage condition generation curtailment of the St. Joseph and St.
Leon wind farms concurrent with TLR on MHEX_N may be required when
Manitoba to USA flows are north to prevent post contingent overloads on G37C
following a trip of B10T.
B) If the MISO RTCA and MISO Flowgate Monitoring Tool is unavailable prior to or
during this outage, MISO RC will notify MHEB that these tools are not available. The
SOL for MHEX_S shall remain the same at 2050. The SOL for MHEX_N shall remain
the same at 900.
Special
Instructions to
MHEB Operator
A) TOI Extentions - This TOI may be extended until 23:59 by performing the following
steps:
1. Verify system conditions to confirm there are no additional tie line facilities
outages, or new internal MH outages.
2. Review RTCA to confirm there are no new contingencies.
3. Contact MISO to confirm there are no new outages, if there are no new outages
provide notice to MISO that MH is extending the TOI.
4. Extend the outage in COLA.
5. Update TLAP outage table.
6. Provide notice to affected balancing authorities
15-201R2_Riel_Bank71_10_16_to_10_30.doc
Page 2 of 3
TEMPORARY OPERATING INSTRUCTION
Special
Instructions to
MHEB Operator
(cont):
No. 15-201R2
B) When called upon by MISO for the supply of CRSG:
If Real Time Contingency Analysis (RTCA) indicates a post contingent overload
condition on Y51L for the contingent loss of D14S - redispatch MH generation to
maintain CRSG delivery as per:

Start Brandon Gas Generation and run up to 60 MW.
Brandon generation must be re-dispatched from HVDC generation at Dorsey

After 60 MW re-dispatch is complete, should RTCA continues to indicate a post
contingent overload condition on Y51L due to the contingent loss of D14S,
Continue to re-dispatch generation from Brandon gas in 10 MW increments
until post contingent overload on Y51L has been mitigated.

The mitigation must be completed within 30 minutes.
Prepared By:
J. Cameron
Date:
2015 09 22
Revised By:
S.W. Saboraki
Date:
2015 09 24
Revised By:
G. Grenier
Date:
2015 10 06
Copies to:
SOSS, System Control Centre
NSSS, System Control Centre
GSSS, System Control Centre
15-201R2_Riel_Bank71_10_16_to_10_30.doc
MISO
GSO, System Control Centre
Page 3 of 3
Download