TEMPORARY OPERATING INSTRUCTION O.O. MISO 1-09470505 No. 1-05550745 115 kV Prairie Caps (7-12) and, 230 kV Line Prairie-Ramsey 2015-11-30 at 0700 to 2015-12-04 1800 CST (2015-11-30 at 0800 to 2015-12-04 1900 EST) 15-11853-OO 15-03483-OO Name of Outage: Effective Dates: Standing Guide Reference: Description of Work: No. 15-270 File No. 240803 MHEX – USA Special Study as per K. Long 2015-11-02 Prairie Caps – Clearance for wiring in existing 115 kV Bays for TR7 & TR8 Prairie – Ramsey (GRE) – House Move TRANSFER LIMITS: MH-USA South (MH Export) SOL: Location USA TTC 1750 Schedule Limit 1750 1525 RM Transfer (SOL) CRSG OM Firm NonFirm Schedule Limit 0 1750 150 75 1525 0 1525 MH-USA North (MH Import) IROL Location USA TLR Triggers 850 SOL: Schedule Limit 700 650 TTC 700 RM Transfer (SOL) CRSG OM Firm NonFirm Schedule Limit 0 700 0 550 150 500 650 South TLR 1 South TLR 3 North TLR 1 North TLR 3 1584 1600 651 665 15-270_PrairieCaps(7-12)_and_Prairie_Ramsey_11_30_to_12_04.doc Page 1 of 3 TEMPORARY OPERATING INSTRUCTION MISO Webtool Postings MISO Webtool Postings MHEX_S (Export) MHEX_N (Import) Special Notes to MISO North RC TTC TRM No. 15-270 Coeff 1750 225 1.000 700 550 0.091 A) During this prior outage condition generation curtailment of the St. Joseph and St. Leon wind farms concurrent with TLR on MHEX_N may be required when Manitoba to USA flows are north to prevent post contingent overloads on G37C following a trip of B10T or M602F. B) The SOL for MHEX_S and MHEX_ N is the same if the MISO RTCA and MISO Flowgate Monitoring Tool is unavailable prior to or during this outage. Special Instructions to MHEB Operator: A) TOI Extentions - This TOI may be extended until 23:59 by performing the following steps: 1. Verify system conditions to confirm there are no additional tie line facilities outages, or new internal MH outages. 2. Review RTCA to confirm there are no new contingencies. 3. Contact MISO to confirm there are no new outages, if there are no new outages provide notice to MISO that MH is extending the TOI. 4. Extend the outage in COLA. 5. Update TLAP outage table. 6. Provide notice to affected balancing authorities 15-270_PrairieCaps(7-12)_and_Prairie_Ramsey_11_30_to_12_04.doc Page 2 of 3 TEMPORARY OPERATING INSTRUCTION Special Instructions to MHEB Operator (cont): Prepared By: No. 15-270 B) When called upon by MISO for the supply of CRSG: If Real Time Contingency Analysis (RTCA) indicates a post contingent overload condition on Y51L for the contingent loss of D14S - redispatch MH generation to maintain CRSG delivery as per: Start Brandon Gas Generation and run up to 60 MW. Brandon generation must be re-dispatched from HVDC generation at Dorsey After 60 MW re-dispatch is complete, should RTCA continues to indicate a post contingent overload condition on Y51L due to the contingent loss of D14S, Continue to re-dispatch generation from Brandon gas in 10 MW increments until post contingent overload on Y51L has been mitigated. The mitigation must be completed within 30 minutes. D. Williams Date: Copies to: SOSS, System Control Centre NSSS, System Control Centre GSSS, System Control Centre 15-270_PrairieCaps(7-12)_and_Prairie_Ramsey_11_30_to_12_04.doc 2015 11 12 MISO GSO, System Control Centre Page 3 of 3