16-016_Prairie_Ramsey_and_Oslo_Oslotap_02_03_02_05R2

advertisement
TEMPORARY OPERATING INSTRUCTION
No. 16-016R2
MISO
1-05550745
No.
File No.
1-09874957
230 kV Line Prairie - Ramsey and,
115 kV Line Oslo – Oslo tap (equivalent to Oslo – Thief River)
2016-02-03 from 1000 to 2016-02-05 at 1600 CDT
(2016-02-03 from 1100 to 2016-02-05 at 1700 EST)
15-03483-OO (Pra-Rmsy)
16-02332-OO (Oslo-TR)
Name of
Outage:
Effective Dates:
Standing Guide
Reference:
Description
of Work:
MHEX – As per special study by K. Long
Prairie – Ramsey (GRE) – Rebuild Line
Oslo – Oslo tap (OTP) – Planned Maintenance
TRANSFER LIMITS:
MH-USA South (MH Export)
SOL:
Location
USA
TTC
1670
Schedule
Limit
1670
1445
RM
Transfer
(SOL)
CRSG
OM
Firm
NonFirm
Schedule
Limit
0
1670
150
75
1445
0
1445
MH-USA North (MH Import)
IROL
Location
USA
TLR
Triggers
950
SOL:
Schedule
Limit
850
800
TTC
850
RM
Transfer
(SOL)
CRSG
OM
Firm
NonFirm
Schedule
Limit
0
850
0
550
300
500
800
South
TLR 1
South
TLR 3
North
TLR 1
North
TLR 3
1490
1520
791
808
16-016_Prairie_Ramsey_and_Oslo_Oslotap_02_04_02_05R2.doc
Page 1 of 3
TEMPORARY OPERATING INSTRUCTION
MISO Webtool
Postings
MISO
Webtool
Postings
MHEX_S
(Export)
MHEX_N
(Import)
Special Notes
to MISO West
RC
TTC
TRM
No. 16-016R2
Coeff
1670
225
225
850
550
550
A) During this prior outage condition generation curtailment of the St. Joseph and St.
Leon wind farms concurrent with TLR on MHEX_N may be required when
Manitoba to USA flows are north to prevent post contingent overloads on G37C
following a trip of B10T or D602F.
B) The SOL for MHEX_S and MHEX_ N is the same if the MISO RTCA and MISO
Flowgate Monitoring Tool is unavailable prior to or during this outage.
Special
Instructions to
MHEB
Operator:
A) TOI Extentions - This TOI may be extended until 23:59 by performing the following
steps:
1. Verify system conditions to confirm there are no additional tie line facilities
outages, or new internal MH outages.
2. Review RTCA to confirm there are no new contingencies.
3. Contact MISO to confirm there are no new outages, if there are no new outages
provide notice to MISO that MH is extending the TOI.
4. Extend the outage in COLA.
5. Update TLAP outage table.
6. Provide notice to affected balancing authorities
16-016_Prairie_Ramsey_and_Oslo_Oslotap_02_04_02_05R2.doc
Page 2 of 3
TEMPORARY OPERATING INSTRUCTION
Special
Instructions to
MHEB
Operator
(cont):
Prepared By:
No. 16-016R2
B) When called upon by MISO for the supply of CRSG:
If Real Time Contingency Analysis (RTCA) indicates a post contingent overload
condition on Y51L for the contingent loss of D14S - redispatch MH generation to
maintain CRSG delivery as per:

Start Brandon Gas Generation and run up to 60 MW.
Brandon generation must be re-dispatched from HVDC generation at Dorsey

After 60 MW re-dispatch is complete, should RTCA continues to indicate a post
contingent overload condition on Y51L due to the contingent loss of D14S,
Continue to re-dispatch generation from Brandon gas in 10 MW increments until
post contingent overload on Y51L has been mitigated.

The mitigation must be completed within 30 minutes.
A. Hogeveen Rutter
Date:
Copies to:
SOSS, System Control Centre
NSSS, System Control Centre
GSSS, System Control Centre
16-016_Prairie_Ramsey_and_Oslo_Oslotap_02_04_02_05R2.doc
2016/01/29
MISO
GSO, System Control Centre
Page 3 of 3
Download