TEMPORARY OPERATING INSTRUCTION 16-05244 O.O. Name of Outage: Effective Dates: Standing Guide Reference: Description of Work: No. File No. 1-10542605 MISO No. 16-083 240803 Prairie Caps 7-12 230 kV Line D14S (Dorsey – St. Leon) 2016-04-16 from 2000 to 2016-04-17 at 1600 CDT MHEX – USA Special Study as per L. Ruchkall 2016-04-16 D14S – Replace defective line potential bank at Dorsey C.S. TRANSFER LIMITS: MH-USA South (MH Export) SOL: Location USA TTC 1800 Schedule Limit 1800 1575 RM Transfer (SOL) CRSG OM Firm NonFirm Schedule Limit 0 1800 150 75 1575 0 1575 MH-USA North (MH Import) IROL Location USA TLR Triggers 800 SOL: Schedule Limit 750 700 TTC 750 RM Transfer (SOL) CRSG OM Firm NonFirm Schedule Limit 0 750 500 50 200 500 700 South TLR 1 South TLR 3 North TLR 1 North TLR 3 1617 1650 698 713 Document1_ D14S_04_17_to_04_17.doc Page 1 of 3 TEMPORARY OPERATING INSTRUCTION MISO Webtool Postings Special Notes to MISO West RC Special Instructions to MHEB Operator Special Instructions to MHEB Operator (cont): MISO Webtool Postings TTC TRM No. 16-083 Coeff MHEX_S (Export) 1800 225 1.000 MHEX_N (Import) 750 550 0.091 A) If the MISO RTCA and MISO Flowgate Monitoring Tool is unavailable prior to or during this outage, MISO RC will notify MHEB that these tools are not available. A) TOI Extentions - This TOI may be extended until 23:59 by performing the following steps: 1. Verify system conditions to confirm there are no additional tie line facilities outages, or new internal MH outages. 2. Review RTCA to confirm there are no new contingencies. 3. Contact MISO to confirm there are no new outages, if there are no new outages provide notice to MISO that MH is extending the TOI. 4. Extend the outage in COLA. 5. Update TLAP outage table. 6. Provide notice to affected balancing authorities B) When called upon by MISO for the supply of CRSG: If Real Time Contingency Analysis (RTCA) indicates a post contingent overload condition on Y51L for the contingent loss of G37C - redispatch MH generation to maintain CRSG delivery as per: Start Brandon Gas Generation and run up to 60 MW. Brandon generation must be re-dispatched from HVDC generation at Dorsey After 60 MW re-dispatch is complete, should RTCA continues to indicate a post Document1_ D14S_04_17_to_04_17.doc Page 2 of 3 TEMPORARY OPERATING INSTRUCTION No. 16-083 contingent overload condition on Y51L due to the contingent loss of G37C, Continue to re-dispatch generation from Brandon gas in 10 MW increments until post contingent overload on Y51L has been mitigated. Prepared By: The mitigation must be completed within 30 minutes. M. Edmunds Copies to: SOSS, System Control Centre NSSS, System Control Centre GSSS, System Control Centre Document1_ D14S_04_17_to_04_17.doc Date: 2016 04 16 MISO GSO, System Control Centre Page 3 of 3