TEMPORARY OPERATING INSTRUCTION O.O. 16-04497-OO 16-03449-OO 16-05286-OO Effective Dates: Standing Guide Reference: Description of Work: 1-10301872 MISO 1-10402514 No. 1-10556813 115 kV Prairie Caps 7-12 230 kV Line Balta-McHenry 500 kV Forbes SVS 2016-04-19 1200 to 2016-04-20 1800 CDT (2016-04-19 1200 to 2016-04-20 1800 EST) Name of Outage: No. 16-085R1 File No. 240803 MHEX – USA Winter Standing Guide Upgrading 115KV BUS 2 , Moving BUS 2 CCVT's, Installing new 5G11 BKR Line Maintenance Bad optical isolator input card on SVC controller TRANSFER LIMITS: MH-USA South (MH Export) SOL: Location USA TTC 1700 Schedule Limit 1700 1475 RM Transfer (SOL) CRSG OM Firm NonFirm Schedule Limit 0 1700 150 75 1475 0 1475 MH-USA North (MH Import) IROL Location USA TLR Triggers 900 SOL: Schedule Limit 800 750 TTC 800 RM Transfer (SOL) CRSG OM Firm NonFirm Schedule Limit 0 800 0 550 250 500 750 South TLR 1 South TLR 3 North TLR 1 North TLR 3 1519 1550 744 760 16-085R1_ForbesSVS_Balta_McHenry_Prairie_Caps.doc Page 1 of 3 TEMPORARY OPERATING INSTRUCTION MISO Webtool Postings MISO Webtool Postings MHEX_S (Export) MHEX_N (Import) Special Notes to MISO North RC TTC TRM No. 16-085R1 Coeff 1700 225 1.000 800 550 0.091 A) During this prior outage condition generation curtailment of the St. Joseph and St. Leon wind farms concurrent with TLR on MHEX_N may be required when Manitoba to USA flows are north to prevent post contingent overloads on G37C following a trip of B10T or M602F. B) The SOL for MHEX_S and MHEX_ N is the same if the MISO RTCA and MISO Flowgate Monitoring Tool is unavailable prior to or during this outage. Special Instructions to MHEB Operator: A) TOI Extentions - This TOI may be extended until 23:59 by performing the following steps: 1. Verify system conditions to confirm there are no additional tie line facilities outages, or new internal MH outages. 2. Review RTCA to confirm there are no new contingencies. 3. Contact MISO to confirm there are no new outages, if there are no new outages provide notice to MISO that MH is extending the TOI. 4. Extend the outage in COLA. 5. Update TLAP outage table. 6. Provide notice to affected balancing authorities 16-085R1_ForbesSVS_Balta_McHenry_Prairie_Caps.doc Page 2 of 3 TEMPORARY OPERATING INSTRUCTION Special Instructions to MHEB Operator (cont): Prepared By: Revised By: No. 16-085R1 B) When called upon by MISO for the supply of CRSG: If Real Time Contingency Analysis (RTCA) indicates a post contingent overload condition on Y51L for the contingent loss of D14S - redispatch MH generation to maintain CRSG delivery as per: Start Brandon Gas Generation and run up to 60 MW. Brandon generation must be re-dispatched from HVDC generation at Dorsey After 60 MW re-dispatch is complete, should RTCA continues to indicate a post contingent overload condition on Y51L due to the contingent loss of D14S, Continue to re-dispatch generation from Brandon gas in 10 MW increments until post contingent overload on Y51L has been mitigated. The mitigation must be completed within 30 minutes. A. Hogeveen Rutter S.W. Saboraki Copies to: SOSS, System Control Centre NSSS, System Control Centre GSSS, System Control Centre 16-085R1_ForbesSVS_Balta_McHenry_Prairie_Caps.doc Date: 2016 04 18 Date: 2016 04 19 MISO GSO, System Control Centre Page 3 of 3