TEMPORARY OPERATING INSTRUCTION 15-11621-OO 15-00012-OO O.O. Name of Outage: Effective Dates: Standing Guide Reference: System Posturing MISO No. 1-09490474 1-09348035 No. 15-251R1 File No. 240802 230 kV Line R7B (Reston – Auburnton) and, 115 kV Line MR11 (Raven Lake Terminal) 2015-11-04 from 0700 to 1600 CST (2015-11-04 from 0800 to 1700 EST) MH-SPC Special Study (as per R. Arruda 2015-10-27) B10T will be operated within the range of "Scheduled / SOL" 95 / 110 MW South and "Scheduled / SOL" 50 / 65 MW North. West Flow “GRAPH” MAXIMUM of 975 MW was studied for this outage for west flow conditions. Monitor Graph by using the “GRAPH LIMIT” calculation. “GRAPH” MINIMUM of 0 MW. Maximum "PH" of 500 MW. Use "ARC Constant" value of 575 MW, for "GRAPH LIMIT" monitoring. East Flow “GRAPH” MAXIMUM of 975 MW was studied for this outage for east flow conditions. Monitor Graph by using the “GRAPH LIMIT” calculation. “GRAPH” MINIMUM of 0 MW. Maximum "PH" of 500 MW. Use "ARC Constant" value of 575 MW, for "GRAPH LIMIT" monitoring. Note: “GRAPH” = sum of Grand Rapids and Power to Ponton and Herblet Lake (This acronym replaces previous “GRPTPH” which had the same parameter value ) Note: “ARC” = sum of A3R and A4D “OUT” at Ashern plus MR11 “OUT” at Raven Lake plus C28R “IN” at Cornwallis. Note: “PH” - sum of Power to Ponton and Herblet Lake from lines P19W, J30P, W73H and W74H. (N.B: This acronym replaces previous “PTPH” which had the same parameter value). Description of Work: R7B – SaskPower to modify and test CT and tripping circuits related to Auburnton 905 CS, Initial energization of new 904 Breaker, 904 A, 903 LM and 903G Disconnects. MR11 – Repair various Line deficiencies including sky wire, cross arms, and tree trimming. 15-251R1_R7B_and_MR11_11_04.doc Page 1 of 3 TEMPORARY OPERATING INSTRUCTION No. 15-251R1 TRANSFER Limits: MH-SPC West (MH Export) SOL: 150 TTC Location West 150 Schedule Limit Transfer RM (SOL) 0 150 75 OM 75 Firm Non-Firm Schedule Limit 75 0 75 MH-SPC East (MH Import) SOL: 75 TTC Location East 75 Schedule Limit Transfer RM (SOL) 0 75 OM Firm System Intact TLR3 0 TLR1 0 SOL Schedule Limit DYNAMIC SCHED LIMIT 75 Non-Firm FIRM SCHED LIMIT MISO RC INFO 0 MH-SPC_West (MH Export) 75 75 150 140 143 MH-SPC_East (MH Import) 0 0 75 70 71 MISO Webtool Manual Override is Required NonMISO Webtool Firm Firm Postings TTC TRM TRM Coeff MH_SPC _West (Export) 150 75 75 1.000 MH_SPC_East (Import) 75 75 75 1.000 15-251R1_R7B_and_MR11_11_04.doc Page 2 of 3 TEMPORARY OPERATING INSTRUCTION Special Instructions: No. 15-251R1 TOI Extensions - This TOI may be extended until 23:59 by performing the following steps: 1. Verify system conditions to confirm there are no additional tie line facilities outages, or new internal MH outages. 2. Review RTCA to confirm there are no new contingencies. 3. Contact MISO to confirm there are no new outages, if there are no new outages provide notice to MISO that MH is extending the TOI. 4. Extend the outage in COLA. 5. Update TLAP outage table. 6. Provide notice to affected balancing authorities Prepared By: D. Williams Date: 2015-10-22 Revised By: D. Williams Date: 2015-10-27 Copies to: SOSS, System Control Centre GSSS, System Control Centre Operating Order MHEB OASIS SPC – Yong Zheng 15-251R1_R7B_and_MR11_11_04.doc NSSS, System Control Centre GSO, System Control Centre File 240802 MISO – St. Paul SPC - Colin Nicholson Page 3 of 3