TEMPORARY OPERATING INSTRUCTION
O.O.
15-00008-OO
Name of Outage:
Effective Dates:
Standing Guide
Reference:
System
Posturing
MISO
No.
1-09142673
No.
15-258
File No.
240802
MHEB – SPC Payback Schedule and,
230 kV Line M39V (Minitonas – Vermillion)
2015-11-10 from 0000 to 1600 CST
(2015-11-10 from 0100 to 1700 EST)
MH-SPC Special Study (as per R. Arruda 2015-11-04)
B10T will be operated within the range of "Scheduled / SOL" 95 / 110 MW South and "Scheduled
/ SOL" 50 / 65 MW North.
“GRAPH” MAXIMUM of 900 MW was studied for this outage for west flow
conditions. Monitor Graph by using the “GRAPH LIMIT” calculation. “GRAPH”
MINIMUM of 0 MW. Maximum "PH" of 500 MW. Use "ARC Constant" value of 575
MW, for "GRAPH LIMIT" monitoring.
“GRAPH” MAXIMUM of 900 MW was studied for this outage for east flow
conditions. Monitor Graph by using the “GRAPH LIMIT” calculation. “GRAPH”
MINIMUM of 0 MW. Maximum "PH" of 500 MW. Use "ARC Constant" value of 575
MW, for "GRAPH LIMIT" monitoring.
Note: “GRAPH” = sum of Grand Rapids and Power to Ponton and Herblet Lake
(This acronym replaces previous “GRPTPH” which had the same parameter value )
Note: “ARC” = sum of A3R and A4D “OUT” at Ashern plus MR11 “OUT” at Raven Lake
plus C28R “IN” at Cornwallis.
Note: “PH” - sum of Power to Ponton and Herblet Lake from lines P19W, J30P, W73H and
W74H. (N.B: This acronym replaces previous “PTPH” which had the same parameter value).
Description
of Work:
MHEB – SPC Payback Schedule – 5 MW East transfer limit required on the MHEB-SPC Interface
to accommodate an Island Falls payback schedule.
M39V – Replacement of cross arms, removal of danger trees.
15-258_M39V_and_MHEB_SPC_Payback_Schedule_11_10.doc
Page 1 of 3
TEMPORARY OPERATING INSTRUCTION
No.
15-258
TRANSFER Limits:
MH-SPC West (MH Export)
SOL:
225
TTC
Location
West
225
Schedule Limit
Transfer
RM
(SOL)
0
225
150
OM
75
Firm
Non-Firm
Schedule Limit
150
0
150
MH-SPC East (MH Import)
SOL:
80
TTC
Location
East
80
Schedule Limit
Transfer
RM
(SOL)
0
80
OM
5
5
System Intact
TLR3
0
TLR1
Schedule Limit
SOL
Non-Firm
DYNAMIC
SCHED LIMIT
80
Firm
FIRM SCHED
LIMIT
MISO RC
INFO
5
MH-SPC_West (MH
Export)
150
150
225
209
214
0
5
80
74
76
MH-SPC_East (MH
Import)
MISO Webtool Manual Override is Required
NonMISO Webtool
Firm
Firm
Postings
TTC
TRM
TRM
Coeff
MH_SPC
_West (Export)
225
75
75
1.000
MH_SPC_East
(Import)
80
75
75
0.933
15-258_M39V_and_MHEB_SPC_Payback_Schedule_11_10.doc
Page 2 of 3
TEMPORARY OPERATING INSTRUCTION
Special
Instructions:
Prepared By:
No.
15-258
TOI Extensions - This TOI may be extended until 23:59 by performing the following steps:
1. Verify system conditions to confirm there are no additional tie line facilities
outages, or new internal MH outages.
2. Review RTCA to confirm there are no new contingencies.
3. Contact MISO to confirm there are no new outages, if there are no new outages
provide notice to MISO that MH is extending the TOI.
4. Extend the outage in COLA.
5. Update TLAP outage table.
6. Provide notice to affected balancing authorities
D.Williams
Copies to:
SOSS, System Control Centre
GSSS, System Control Centre
Operating Order
MHEB OASIS
SPC – Yong Zheng
Date:
2015.11.04
NSSS, System Control Centre
GSO, System Control Centre
File 240802
MISO – St. Paul
SPC - Colin Nicholson
15-258_M39V_and_MHEB_SPC_Payback_Schedule_11_10.doc
Page 3 of 3
Download