TEMPORARY OPERATING INSTRUCTION O.O. 15-00008-OO Name of Outage: Effective Dates: Standing Guide Reference: System Posturing MISO No. 1-09142673 No. 15-258 File No. 240802 MHEB – SPC Payback Schedule and, 230 kV Line M39V (Minitonas – Vermillion) 2015-11-10 from 0000 to 1600 CST (2015-11-10 from 0100 to 1700 EST) MH-SPC Special Study (as per R. Arruda 2015-11-04) B10T will be operated within the range of "Scheduled / SOL" 95 / 110 MW South and "Scheduled / SOL" 50 / 65 MW North. “GRAPH” MAXIMUM of 900 MW was studied for this outage for west flow conditions. Monitor Graph by using the “GRAPH LIMIT” calculation. “GRAPH” MINIMUM of 0 MW. Maximum "PH" of 500 MW. Use "ARC Constant" value of 575 MW, for "GRAPH LIMIT" monitoring. “GRAPH” MAXIMUM of 900 MW was studied for this outage for east flow conditions. Monitor Graph by using the “GRAPH LIMIT” calculation. “GRAPH” MINIMUM of 0 MW. Maximum "PH" of 500 MW. Use "ARC Constant" value of 575 MW, for "GRAPH LIMIT" monitoring. Note: “GRAPH” = sum of Grand Rapids and Power to Ponton and Herblet Lake (This acronym replaces previous “GRPTPH” which had the same parameter value ) Note: “ARC” = sum of A3R and A4D “OUT” at Ashern plus MR11 “OUT” at Raven Lake plus C28R “IN” at Cornwallis. Note: “PH” - sum of Power to Ponton and Herblet Lake from lines P19W, J30P, W73H and W74H. (N.B: This acronym replaces previous “PTPH” which had the same parameter value). Description of Work: MHEB – SPC Payback Schedule – 5 MW East transfer limit required on the MHEB-SPC Interface to accommodate an Island Falls payback schedule. M39V – Replacement of cross arms, removal of danger trees. 15-258_M39V_and_MHEB_SPC_Payback_Schedule_11_10.doc Page 1 of 3 TEMPORARY OPERATING INSTRUCTION No. 15-258 TRANSFER Limits: MH-SPC West (MH Export) SOL: 225 TTC Location West 225 Schedule Limit Transfer RM (SOL) 0 225 150 OM 75 Firm Non-Firm Schedule Limit 150 0 150 MH-SPC East (MH Import) SOL: 80 TTC Location East 80 Schedule Limit Transfer RM (SOL) 0 80 OM 5 5 System Intact TLR3 0 TLR1 Schedule Limit SOL Non-Firm DYNAMIC SCHED LIMIT 80 Firm FIRM SCHED LIMIT MISO RC INFO 5 MH-SPC_West (MH Export) 150 150 225 209 214 0 5 80 74 76 MH-SPC_East (MH Import) MISO Webtool Manual Override is Required NonMISO Webtool Firm Firm Postings TTC TRM TRM Coeff MH_SPC _West (Export) 225 75 75 1.000 MH_SPC_East (Import) 80 75 75 0.933 15-258_M39V_and_MHEB_SPC_Payback_Schedule_11_10.doc Page 2 of 3 TEMPORARY OPERATING INSTRUCTION Special Instructions: Prepared By: No. 15-258 TOI Extensions - This TOI may be extended until 23:59 by performing the following steps: 1. Verify system conditions to confirm there are no additional tie line facilities outages, or new internal MH outages. 2. Review RTCA to confirm there are no new contingencies. 3. Contact MISO to confirm there are no new outages, if there are no new outages provide notice to MISO that MH is extending the TOI. 4. Extend the outage in COLA. 5. Update TLAP outage table. 6. Provide notice to affected balancing authorities D.Williams Copies to: SOSS, System Control Centre GSSS, System Control Centre Operating Order MHEB OASIS SPC – Yong Zheng Date: 2015.11.04 NSSS, System Control Centre GSO, System Control Centre File 240802 MISO – St. Paul SPC - Colin Nicholson 15-258_M39V_and_MHEB_SPC_Payback_Schedule_11_10.doc Page 3 of 3