On Wednesday October 31, 2007, at 1531 MST, EPE experienced loss of generation which precipitated a series of events that threatened the remaining generating resources at the Newman generating plant. At this time, in an effort to prevent further system decay and to restore EPE’s system to pre-disturbance status, EPE Reliability specifically directed EPE Marketing, EPE’s load serving entity, to purchase energy from the Southwest Power Pool at the Eddy County HVDC tie.