Stakeholder Presentation held on 04/21/09 Updated:2009-11-05 15:03 CS

advertisement
Duke Energy Carolinas
Quarterly Stakeholder
Meeting
Independent Entity Services
Tuesday, April 21, 2009
2:00 to 3:00 p.m. EDT
Agenda
•
•
•
•
•
•
•
Action Items for follow-up from January 28, 2009
–
Consistency of OATI webOASIS and OATI webSweep ATC Offerings
–
–
Review Transition to Daylight Savings Time
Attestation Requirement for Designated Network Resources
New Look of Duke Energy Carolinas OASIS Site
Business Practice 3.J - Rollover Rights
NAESB Wholesale Electric Quadrant Update
FERC NOPR / NERC Standards & NAESB Practices
Accessing NAESB Standards
Wrap-up
2
Consistency Of
OATI webOASIS and OATI
webSweep ATC Offerings
• Vendor Response
– Would require full system base change
• webOASIS & webSweep
– Consensus among all users of webOASIS
• Vendor has indicated that this topic will be
discussed at OATI’s Customer Meeting (Fall
2009)
3
Review Transition
to
Daylight Savings Time
• Sunday, March 8, 2009
• Non-event for Duke Tariff Administration
and Tagging
4
When is the
Attestation Required?
• Sections 29.2 and 30.2 of the Duke OATT that an
attestation must accompany an Application for a new
DNR.
• FERC Order 890-B
– P182
• “In Order No. 890, the Commission adopted the attestation
requirement as the means by which the network customer
can make this demonstration”
• “We affirm this requirement, consistent with the network
customer’s obligations under section 30.7”
– P183
• “… may attest that execution of a contract is contingent upon
availability of transmission service under Part III of the pro
forma OATT.”
5
New Look of
Duke Energy Carolinas
OATI webOASIS Site
• Incorporated most of the layout from the FERC
NOPR on NAESB Business Practices (Docket
RM05-5-013)
• Functional organization
– Better flow
• Please provide your comments on layout
– E-mail: DukNCIE-TA@midwestiso.org
6
7
Business Practice 3.J
Rollover Rights
• Duke Energy Carolinas modified the conditions for
granting Rollover Rights
– Effective date for change is 4-1-2009
– PTP Reservations with a duration of 5 yrs or more
• RENEWAL must be queued 1 yr prior to end of the existing
reservation
– Network Reservations (NITSA must be for 5 years)
• RENEWAL must be queued 1 yr prior to end of the existing
reservation
• Transmission Service Requests queued prior to 4-1-2009
– Subject to the current 1yr/60day requirement until the first rollover
date on or after 4-1-2009, then subject to new requirements
8
NAESB Update:
Wholesale Electric Quadrant
• NAESB Request & Standards Development Activity
Applicable to WEQ (link to web page)
– Rollover Rights on Redirect on a Firm Basis (Comments Due May 13)
– WEQ-011 Consistency Changes to include: Introduction and
Applicability sections (Comments Due May 13)
– Order 717, Standards of Conduct (Comments Duke April 27)
• WEQ Executive Committee (EC) (link WEQ EC page)
– Approves Business Practices and sends them for membership
ratification
– Next meeting May 12 (check 1 wk before meeting for agenda
and meeting materials)
9
NAESB Update:
Wholesale Electric Quadrant
• NAESB Subcommittees
–
–
–
–
Draft business practices for approval by the EC
Open to any industry participant (including non-members)
Each subcommittee has a web page and an exploder
Multiple subcommittees (see this page for listing and access to the
subcommittee web pages)
• Electronic Scheduling Subcommittee (ESS) and
Information Technology Subcommittee (ITS)
– These two subcommittees meet jointly and will soon be combined and
named the OASIS Subcommittee.
– Drafting business practices for Network Service on OASIS – next
meeting is April 22 (link to ESS web page)
10
NAESB Update:
Wholesale Electric Quadrant
• Joint Interchange Scheduling Working Group
(JISWG)
– Addresses interdependency of commercial and reliability
activities between NAESB and NERC (e.g., etagging,
coordination of interchange, TSIN registry enhancements)
– Next meeting is May 13-15 (link to JISWG web page)
• Business Practices Subcommittee (BPS)
– This subcommittee handles work not assigned to others
– Drafted Standards of Conduct business practice changes
– Next meeting is a joint meeting with the NERC TLR drafting
team on April 28 & 29 (link to the BPS web page)
11
FERC NOPR
NERC Reliability Standards
NERC Reliability Standards (Docket Nos. RM08-19-000, RM08-19-001, RM09-5-000,
RM06-16-005)
• http://www.ferc.gov/whats-new/comm-meet/2009/031909/E-5.pdf
(FERC filed Document)
• Official Version NERC NOPR in the Federal Register
–
Proposal to approve 6 Modeling, Data and Analysis Reliability Standards submitted by
NERC
•
•
•
•
•
•
–
–
–
Available Transmission System Capability
http://www.nerc.com/files/MOD-001-1.pdf
Capacity Benefit Margin
http://www.nerc.com/files/MOD-004-1.pdf
Transmission Reliability Margin Calculation Methodology
http://www.nerc.com/files/MOD-008-1.pdf
Area Interchange Methodology
http://www.nerc.com/files/MOD-028-1.pdf
Rated System Path Methodology
http://www.nerc.com/files/MOD-029-1.pdf
Flowgate Methodology
http://www.nerc.com/files/MOD-030-2.pdf
Consistency and Transparency of ATC and AFC Calculations
Issued March 19, 2009
Comment period will end 60 days after publication in the Federal Register (May 26, 2009)
12
FERC NOPR
NAESB Business Practice Standards
NAESB Business Practice Standards (Docket RM05-5-013)
•
•
http://elibrary.ferc.gov/idmws/common/OpenNat.asp?fileID=11969248
(FERC filed Document)
Official Version NAESB NOPR in the Federal Register
– Proposal to incorporate the latest version (Version 002.1) of certain
business practice standards adopted by NAESB Wholesale Electric
Quadrant
• This version includes Standards in response to Order 890, 890-A & 890-B
• NAESB booklet version 2.1 NAESB link (requires login to view booklet)
– ATC related reforms
– New business practices include rules for treatment of requests with no value for
bid price, treatment of pre-confirmed STF & NF requests, customer rebid of
capacity, treatment of competing bids when insufficient ATC is available,
treatment of rollover rights, conditional firm reservations, and other items
– Issued March 19, 2009
– Comment period has been extended from April 24th to May 26th
13
Accessing
NAESB Standards
• NAESB Business Practices Standards (BP)
are incorporated in the Code of Federal
Regulations
– NAESB BP Standards are under copyright
– Full text is not viewable in the CFR’s
• NAESB Contact for User Login
– http://www.naesb.org/pdf/homepage.pdf
14
Wrap-up
• Proposed Next Quarterly Stakeholder
Meeting
– Tuesday, July 21, 2009 – 2 p.m. to 3 p.m. ET
• Customer Suggested Topics?
– This is the forum for discussing emergent
topics (Upcoming changes, stakeholder input)
• Questions and Comments
15
Attachments
Table of Contents
• Slide 17 & 18 – Creating a Request from OATI
WebOASIS ATC Offerings
• Slide 19 & 20 – Creating a Request from
WebSweep ATC Offerings
16
Creating a Request from OATI
WebOASIS ATC Offerings
On WebOASIS Query Offerings in the Transmission Offerings Summary
TP Pull down = DUK
Query = Incr / Class / Type / POR / POD
Double click the Posting Ref of interest
17
Creating a Request from the OATI
webOASIS ATC Offerings
Using OATI webOASIS to create a
TSR from ATC Offerings
MW Amount will default to the full
Capacity Available for that
Increment (in this case the daily
amount of firm available is
232MW). This field can be
changed to a different value.
18
Creating a Request from OATI
webSweep ATC Offerings
Clicking on the PostingRef
brings the user to the
Offering for the specified
Service, Path & Term. The
offering is for the full
Capacity Available for that
Increment.
User access to webSweep is through OATI ETS
19
Creating a Request from
WebSweep ATC Offerings
Creating a TSR from
WebSweep the Offering
Detail returns to a TSR
Entry Form with a Blank
or Null MW field.
20