Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Wednesday, January 28, 2009 2:00 to 3:00 p.m. ET Agenda • • • • • • • • Creating a Request from OATi ATC Offerings Processing Time of Short Term Firm Requests ATC Narratives Posted as Outage Postings Designated Network Resources Business Practice 3.J – Rollover Rights Transmission Service Annulments OATi webOASIS 3.4.08 Upgrade Wrap-up 2 Creating a Request from OATi webOASIS ATC Offerings 3 Creating a Request from the OATi webOASIS ATC Offerings Using OATi webOASIS to create a TSR from ATC Offerings MW Amount will default to the full Capacity Available for that Increment (in this case the daily amount of firm available is 232MW) 4 Creating a Request from OATi webSweep ATC Offerings Clicking on the PostingRef brings the user to the Offering for the specified Service, Path & Term. The offering is for the full Capacity Available for that Increment. User access to webSweep is through OATi ETS 5 Creating a Request from WebSweep ATC Offerings Creating a TSR from the Offering Detail returns to a TSR Entry form with a Blank or Null MW field. 6 Creating a Request from OATi ATC Offerings • Given the demonstration of the tools, is there sufficient value to warrant asking for a change? 7 Processing Time of Short Term Firm Requests • Transmission Service Requests that start beyond 9 days from current date or of a duration covering more than one week beyond the 9th day, requires additional analysis – All requests have been processed within the Tariff timing requirements • IE will evaluate ways to further expedite the processing of Short Term Firm 8 ATC Narratives Posted as OATi webOASIS Outage Postings • Utilizes Outage Posting to post narratives for changes in ATC/TTC as required by FERC – Links the TTC change to a narrative • Working with OATI to develop an alternative solution 9 Designated Network Resources Revised On System and Off System DNR Forms – FERC Order 890B Requirements – CFR 37.6 (Total Installed Capacity, Electrical Location, and Geographical Location) – Information Required Consistent with OATT 29.2 and 30.3 • More information (next 2 slides provide details) – Ease of Use • Forms Consolidated - On & Off System / One Form – Improved “How to” Guide / Instructions 10 Designated Network Resources • New or Changed fields – Network Customer (NITSA Holder) – Agent Name (Scheduling on behalf of Network Customer) – Separate sections for Owned Generation and PPA • Section 1 – Owned Generation • Section 2 – Power Purchase Agreement (PPA) – Name of agreement “PPA with Southern Wholesale” – “SOCO” as an identifier is not acceptable 11 Designated Network Resources • New or Changed fields – Section 5 – Valid Customer – Section 6 – Attestation • Checkbox – Customer agrees to Attestation – Person agreeing to the Attestation is an authorized Company Officer or Agent • Timing for receipt of the DNR Request Form – A DNR request on OASIS will be deemed invalid if a completed DNR request form is not received by 5pm ET the day the request is queued – Business Practice change • Business Practice 6B.i. 12 Designated Network Resource Business Practice Changes • Business Practice 4.C – Tagging 7-FN • Generation is Firm (G-F) • Transmission must be Firm from the point the Customer takes title of the power • Business Practice 6B.i. – Receipt of the DNR Request Form • EOB same day as request for service is queued 13 Business Practice 3.J Rollover Rights • Duke Energy Carolinas modified the conditions for granting Rollover Rights – Effective date for change is 4-1-2009 – PTP Reservations with a duration of 5 yrs or more • RENEWAL must be queued 1 yr prior to end of the existing reservation – Network Reservations (NITSA must be for 5 years) • RENEWAL must be queued 1 yr prior to end of the existing reservation • Service Agreements queued prior to 4-1-2009 – Subject to the current 1yr/60day requirement until the first rollover date on or after 4-1-2009, then subject to new requirements 14 Transmission Service Annulments • Business Practice 3.A.xi – Business Practice became effective 11/12/2008 – Doesn’t change current situation where Annulments are granted – Provides Audit Trail for both the Customer and Provider • Minor Process Requirement Changes – Complete Annulment Form – Phone Call to the Duke TA 651-632-8708 • REMINDER- The Annulment Form – This reservation is NOT scheduled or upon annulment, I will remove references to this reservation from e-Tag allocations – Failure to adhere will result in Unreserved Use penalties. • Business Practice 7B.iv 15 • How to Request Nullification of Transmission Service Point-to-Point and Non-Designated Network – Business Practice 3.A.xi. • Customer submits Annulment Request Form • IE processes Annulment • Non-Firm Redirects – Business Practice 3.H.ii.b. • Customer would submit a RELEASE request on OASIS (Annulment not needed) • “RELEASE” will become “RELINQUISH” 1-29-2009 • Firm Designated Network Requests – Business Practice 6.E. • Undesignation of Network Resource Request Form • IE processes annulment or recall 16 OATi webOASIS 3.4.08 Upgrade • Compliance with FERC Order 676-C • 1-29-09, 11:10am ET • webOASIS Release Notes v3.4.08 – http://www.oatioasis.com/releasenotes/v3.4.08_OASIS %20Release%20Notes%20.pdf • OATi Help Desk: 763-201-2020 17 OATi webOASIS 3.4.08 Upgrade • OATi webOASIS Changes – Assignment of Ownership (NAESB Business Practice WEQ 001-12) • FULL_TRANSFER – Assigns Ownership of the Parent Reservation and encumbrances (Redirects, Resales, etc) to a New Owner – Approval required by Reseller, Assignee and Duke • PART_TRANSFER – Assigns a portion of the Parent Reservation to a new Owner – Encumbrances (Redirects, Resales) may not be Reassigned – Approval required by Reseller, Assignee and Duke – RESALE (NAESB Business Practice WEQ 001-11) • Duke Business Practices do not Change (see DUKE BP 3.A.vii) • OATi webOASIS now permits posting of any price (in $/MWH reserved) • Permits Reseller to Post for Resale in increments e.g.; Daily, Weekly or Monthly – Check for capacity is done when Assignee makes the RESALE Request • Resale reservation has the same scheduling attributes as the Parent – Redirects on a Non-Firm Basis (NAESB Business Practice WEQ 001-10) • Replaces RELEASE request type with RELINQUISH for Non-firm (Secondary) Redirects 18 Wrap-up • Proposed Next Quarterly Stakeholder Meeting – Tuesday, April 21, 2009 – 2 p.m. to 3 p.m. ET • Customer Suggested Topics? – This is the forum for discussing emergent topics (Upcoming changes, stakeholder input) • Questions and Comments 19 Attachments Table of Contents • Slide 22 – Designated Network Resource Form • Slide 23 – Business Practice 3.A.xi – Customer Request for Annulment • Slide 24 – Annulment Request Form • Slide 25 – Undesignation of Network Resource Form 20 Designated Network Resource Form 21 Business Practice 3.A.xi – Customer Request for Annulment 22 Annulment Request Form 23 Undesignation of Network Resource Form 24