Power Point Presentation Updated:2006-06-15 10:58 CS

advertisement
JPA Meeting
Joint Planning Agreement
Western Area Power Administration
Desert Southwest Region
July 13, 2005
1
JPA Agenda
•
•
•
•
•
•
•
Welcome / Introductions / Logistics
Power Marketing Updates (Oretta/Gray)
– O&M Agreements (Oretta)
– Remarketing Efforts (Gray)
WALC OASIS (Steward)
10 Year Plan (Byron)
– HDR161KV – BLY161KV Reconductoring
– South of Phoenix
Study Updates (York)
– River System Study
– Southern Arizona Study
JPA 2005-2006 Goals (Moulton)
2
Action Items
JPA Meeting
Power Marketing Updates
Mary Oretta
Jean Gray
(602) 605-2639 (602) 605-2555
oretta@wapa.gov gray@wapa.gov
3
Power Marketing Updates
• O & M Agreements
• Remarketing Efforts
4
JPA Meeting
WALC OASIS
http://www.oatioasis.com/walc/index.html
John Steward
(602) 605-2774
steward@wapa.gov
5
WALC OASIS
•Definitions
•Webpage Links
•Registration Process to obtain Login
•View Business Practices
•View Transmission Offerings
•View Transmission Reservations
•Summary
•Questions
6
Definitions
Open Access Same-time Information System (OASIS)
Open Access Technology International (OATI)
WestTTrans
Transmission Services Information Network (TSIN)
7
Webpage Links
http://reg.tsin.com/
http://www.westtrans.net/
http://www.oatioasis.com/cwo_default.htm
8
Registration Process
REGISTRATION PROCESS
1. Obtain a NERC acronym – Once an acronym is obtained proceed to step (Takes
approximately 1 to 2 Days).
2. Register Company with OATI, Email Company Registration form to OATI. Once OATI
verifies your company is registered proceed to step 3.
3. Obtain OATI’s security certificate Registration – Contact OATI to start the registration
process. When a security certificate is obtained proceed to step 4.
4. Register with OATI as an OASIS user – Email user registration form to OATI. When user
account is activated proceed to step 5.
5. Contact Western to activate you as a valid customer – Western will verify if customer is
eligible to purchase transmission. Customer will be notified if they met eligibility requirements.
Proceed to step 6.
6. Log on to WestTTrans and submit transmission request.
7. How to Purchase WALC Transmission Services Flowchart
9
Western’s Business Practices
Web Site: http://www.oatioasis.com/walc/index.html
10
Example of Offerings
11
Transmission Offerings
• Knowledge of transmission provider’s path
• View the price associated with a path
• Most important view ATC (both firm and
non-firm) on a given path during a specific
time period
12
Transmission Reservations
• View transmission market tendencies
• View the status of your transmission
request
• View queued position of your request
13
Example of Reservations
14
Summary
• Registration Process
• View Western’s Business Practice &
News
• Tutorials – Transmission Offerings &
Transmission Reservations
15
JPA Meeting
10 Year Plan Updates
Don Byron
(602) 605-2685
byron@wapa.gov
16
10 Year Plan Updates
• Headgate Rock 161-kV Substation to Blythe
161-kV Substation Reconductoring
– (HDR161KV – BLY161KV Reconductoring)
• South of Phoenix
– Completed Upgrades
– Future Projects
• Ten Year Plan Link
17
JPA Meeting
Transmission Study Updates
Leonard York
(602) 605-2797
york@wapa.gov
18
Update - River System Study
•
Purpose
–
–
–
–
•
Projects
–
–
–
•
Reconductor Mead-Davis-Topock Line
Reconductor Gavilan Peak/Peacock Line
Build Griffith-North Havasu Line
Participants
–
–
–
–
–
•
Evaluate Three 230kV Transmission Projects
Expect Each to Substantially Increase River System ATC
Each To Require About a Three-Year Lead Time
Focus on Year 2008 Load-Serving in Mohave County
APS
CAWCD
MEC
SWTC
TEP/UNS
Case
–
Reviewed By Participants
19
Update – Southern Arizona
Study
• Purpose
– Re-rate Path C (South of Phoenix)
– Inservice: South of Phoenix Uprate to Casa Grande
– Not Inservice: Pinal West/Santa Rosa/Browning 500kV
• Results
– Increased Rating from 290 to 660 MW
– Critical Outage: Kyrene-Knox 230kV
– Critical Overload: Lone Butte-Test Track 230kV
• Report
– Non-Simultaneous Import Power Flow Study
– Expect Brief Report by September 2005
20
JPA Meeting
Joint Planning Agreement
2005-2006 Goals
Ron Moulton
(602) 605-2668
moulton@wapa.gov
21
JPA Principles
• Purpose & Objectives
– Establish a Planning Committee.
– Interactively develop a long-term
“Transmission Plan.”
– Review & Revise Transmission Plan
Annually.
22
JPA Principles
• Planning Committee
– Comprised of Parties to the JPA.
– Identify, receive and process planning
information provided by Parties annually.
– Prepare Transmission Plan.
– Hold Annual Planning Meeting(s)
23
JPA Principles
• Annual Planning Meeting
– Held in July each year.
– Review Transmission Plan
– Review, discuss, deliberate other.
24
JPA Principles
• Goals 2005-2006
– Interactively develop DSW 10 Year Transmission
Plan.
• River System
• South of Phoenix System
– File DSW 10 Year Transmission Plan with
Arizona Corporation Commission (ACC) in
January 2006 (as a courtesy).
– Support/Coordinate with Southwest Area
Transmission Planning Forum (SWAT).
– Support ACC Biennial Transmission Assessment
(next round 2006).
25
JPA Meeting
• Any
–Questions?
–Comments?
–Answers?
26
JPA Action Items
27
JPA Meeting
Thanks for
Attending!!
28
JPA Participants
•
•
•
•
•
•
•
•
•
•
•
•
AGUILA
AK-CHIN INDIAN COMMUNITY
ARIZONA POWER AUTHORITY
ARIZONA POWER POOLING ASSN
ARIZONA PUBLIC SERVICE
COMPANY
AVRA VALLEY IRRAGATION
DISTRICT
BOULDER CITY, CITY OF
BUCKEYE WATER CONSERVATION
DRAINAGE DIST
BUREAU OF RECLAMATION
CENTRAL ARIZONA WATER
CONSERVATION DIST
CHANDLER HEIGHTS CITRUS
IRRAGATION DIST
•
•
•
•
•
•
•
•
•
•
•
29
COLORADO RIVER COMM OF
NEVADA
CORTARO-MARANA IRRIGATION
DISTRICT
ELECTRICAL DIST NO 3
ELECTRICAL DIST NO 4
ELECTRICAL DIST NO 5 MARICOPA
ELECTRICAL DIST NO 5 PINAL
ELECTRICAL DIST NO 6
ELECTRICAL DIST NO 7
ELECTRICAL DIST NO 8
HARQUAHALA VALLEY POWER
DISTRICT
LINCOLN COUNTY POWER
DISTRICT #1
MARICOPA WATER DISTRICT
JPA Participants
•
•
•
•
•
•
•
•
•
•
•
•
•
MCMULLEN VALLEY WATER
CONSERVATION & DD
NEEDLES, CITY OF
OCOTILLO WATER CONSV DIST
OVERTON POWER DISTRICT NO 5
QUEEN CREEK IRRIGATION DIST
ROOSEVELT IRRIGATION DIST
SAFFORD, CITY OF
SALT RIVER PROJECT
SAN CARLOS IRRIGATION
PROJECT
SAN TAN IRRIGATION DISTRICT
SILVERBELL IRRIGATION DISTRICT
•
•
•
•
•
•
•
•
•
•
30
THATCHER, TOWN OF
TOHONO O’ODHAM UTILITY
AUTHORITY
TOHOPAH IRRIGATION DISTRICT
UNIT “B” IRRIGATION & DRAINAGE
DISTRICT
UNS ELECTRIC INC
VALLEY ELECTRIC ASSOCIATION
WELLTON-MOHAWK IRRIGATION &
DD
WICKENBURG, TOWN OF
YUMA COUNTY WATER USERS
ASSOC
YUMA IRRIGATION DISTRICT
YUMA PROVING GROUND
YUMA-MESA IRRIGATION & DRAIN
Download