SPS DC tie Scheduling Practice

advertisement
SPS DC tie Scheduling Practice
Due to the different default ramp durations in the WECC region and the Eastern
Interconnection, the SPS balancing authority is seeing a conflict that is causing
fluctuations in the net scheduled interchange.
Starting on 9/18/2006 we will make notifications if the duration profiles are not
specified on the tags involving transactions scheduled across the DC ties.
Effective on 10/1/2006, SPS will only accept tags involving transactions
scheduled across the DC ties that have a ramp duration profile designated on the
tag. This is to prevent a conflict in the default ramp rates that will impact the
scheduled interchange.
The POR and POD that this practice will impact are as follows:
Eddy
BLKW
Lam345