NorthWestern Energy Transmission Planning and
Attachment K Business Practice
Links Document
This Business Practice provides URLs addresses to NorthWestern Energy’s (“NWE”)
local planning documents and business practices. URL addresses for Northern Tier
Transmission Group (“NTTG”) regional and Western Electric Coordinating Council
(“WECC”) interconnection wide planning documents are also included within this
business practice. These links are directed to specific documents, business practices and
folders that are stored on the following websites:



NWE OASIS (http://www.oasis.oati.com/NWMT/index.html)
NTTG Regional website (http://www.nttg.biz/site/)
WECC Interconnection wide website (http://www.wecc.biz/)
Accessing these documents will provide information on NWE’s Attachment K, local
transmission planning business practices, processes and results and other informational
documents.
Please refer to the Index table on page 2.
Broken Link
Please report any broken link to:
kelly.lovell@northwestern.com
Page 1 of 16
Revision: January 20, 2016
Section Index:
1. FERC Order 890 & 1000 Local Transmission Planning and Attachment K Link
Information ........................................................................................................................ 4
A. Attachment K ............................................................................................................. 4
B. Attachment K – Intervention ...................................................................................... 4
C. CEII ............................................................................................................................ 4
D. Calendar of Events and Study Cycle.......................................................................... 5
E. Comments on behalf of... ........................................................................................... 5
F. Confidentiality Agreement ......................................................................................... 5
G. Economic Congestion Studies (Economic Studies) ................................................... 5
H. Frequently Asked Questions ...................................................................................... 5
I. How to Contact Us ...................................................................................................... 5
J. L&R Data Request ...................................................................................................... 6
K. LTP Study Cycle – Data Collection ........................................................................... 7
L. Load Forecast – Forecast ............................................................................................ 7
M. Local Cost Allocation Methodology ......................................................................... 7
N. Local Transmission Plan ............................................................................................ 7
O. NWE Anti-Trust and SOC ......................................................................................... 8
P. Attachment K Business Practice ................................................................................. 8
Q. Business Practice ETP Method Criteria & Process ................................................... 8
R. Open Access Transmission Tariff (OATT) ................................................................ 9
S. Planning Docs Process for Amending Documentation .............................................. 9
T. Transmission Advisory Committee (TRANSAC) – How to Become Involved ........ 9
U. Transmission Advisory Committee (TRANSAC) Charter ...................................... 10
V. Other Transmission Planning Links ......................................................................... 10
W. Public Policy Project Request ................................................................................. 10
2. NTTG Regional Link Information ............................................................................ 11
A. NTTG Home Page (includes map)........................................................................... 11
B. Planning - Biennial Reports ..................................................................................... 11
C. Calendar ................................................................................................................... 11
D. Charters & Agreements ............................................................................................ 12
E. NTTG Cost Allocation Principles ............................................................................ 12
F. NTTG Attachment K Documents and NTTG Business Practices ............................ 12
G. NTTG Economic Congestion Studies ...................................................................... 12
H. NTTG Frequently Asked Questions ........................................................................ 12
I. NTTG Planning Committee Home Page ................................................................... 12
J. NTTG POR POD Map .............................................................................................. 12
K. NTTG Planning Cycle ............................................................................................. 13
L. NTTG Regional Planning and Cost Allocation Practices ........................................ 13
M. NTTG Study Plan .................................................................................................... 13
N. NTTG FERC Order 1000 Information..................................................................... 13
3. WECC Interconnection Wide Link Information ..................................................... 15
A. WECC Home Page................................................................................................... 15
B. WECC Planning Coordination Committee .............................................................. 15
Page 2 of 16
Revision: January 20, 2016
C. WECC Transmission Expansion Planning Policy Committee (TEPPC) Information
& Documents ................................................................................................................ 15
D. WECC Closed Session Confidentiality Agreement for non-group member
participants .................................................................................................................... 16
Page 3 of 16
Revision: January 20, 2016
1. FERC Order 890 & 1000 Local Transmission Planning and
Attachment K Link Information
Documents in this section address FERC Order 890 and FERC Order
1000 - Local Transmission Planning and are currently in effect.
A. Attachment K
LOCAL and REGIONAL
*EFFECTIVE*
Fourth Regional Compliance filing, submitted December 30, 2014 (which applies to
the 2014-2015 Local Area Planning Cycle) was accepted by FERC March 24, 2015
with an Effective date of October 1, 2013 and matches the OATT. Attachment K
revisions were submitted on December 30, 2014 in Docket No. ER13-67-003 to
comply with FERC’s December 8, 2014 Order.
FERC Acceptance Letter
http://www.oasis.oati.com/NWMT/NWMTdocs/FERC_AcceptanceNWE_MT_O1K_4th_Regional_Compliance_Filing.pdf
Attachment K-Effective 10/1/2013
http://www.oasis.oati.com/NWMT/NWMTdocs/Atth_K-Order_1000Effective_10-1-13_Order_Date_3-24-15.pdf
INTER-REGIONAL
*EFFECTIVE*
Second Interregional, submitted February, 18, 2015 – NTTG FERC Order Joint
Compliance filing was in response to the December 18, 2014 Order on Interregional
requirements. On June 1, 2015 FERC issued a final order accepting the Western
Filing Parties Interregional compliance filings in Docket No. ER13-1448-001.
Attachment K-Effective 6/1/2015
http://nttg.biz/site/index.php?option=com_docman&view=download&alias=2427
-ferc-interregional-compliance-order-06-01-2015&category_slug=ferc-order1000-interregional&Itemid=31
B. Attachment K – Intervention
Currently there are no intervention documents.
C. CEII
Posted Critical Energy Infrastructure Information (CEII)
http://www.oasis.oati.com/NWMT/NWMTdocs/Posted_CEII.doc
Page 4 of 16
Revision: January 20, 2016
D. Calendar of Events and Study Cycle
2016 Calendar of Events and Study Cycle
http://www.oasis.oati.com/NWMT/NWMTdocs/2016_Calendar_of_Events_and_
Study_Cycle.doc
2015 Calendar of Events and Study Cycle
http://www.oasis.oati.com/NWMT/NWMTdocs/2015_Calendar_of_Events_and_
Study_Cycle.doc
E. Comments on behalf of...
Currently there are no ‘Comments on behalf of...’ documents.
F. Confidentiality Agreement
Confidentiality Agreement Form 3359 12.04
Shortcut to:
http://www.oasis.oati.com/NWMT/NWMTdocs/Confidentiality_Agreement
.doc
G. Economic Congestion Studies (Economic Studies)
Economic Congestion Study 2016/2017 Cycle
Economic Study Request Listing & Meeting Information
http://www.oasis.oati.com/NWMT/NWMTdocs/Economic_Study_Request_Listin
g_&_Meeting_Info.xls
2016 Economic Congestion Study Submittal Reminder
http://www.oasis.oati.com/NWMT/NWMTdocs/2016Annual_Stakeholder_Reminder.pdf
Economic Study Request Form
http://www.oasis.oati.com/NWMT/NWMTdocs/Economic_Study_Request_Form
.xls
Other Info on Economic Studies
http://www.oasis.oati.com/NWMT/NWMTdocs/Other_Info_on_Economic_Studi
es.doc
Note: A description of the process, procedure, and methodology for processing
Additional Economic Congestion Studies is available in the “Attachment K Business
Practice”. See Section 1.P of this document.
H. Frequently Asked Questions
http://www.oasis.oati.com/NWMT/NWMTdocs/Frequently_Asked_Questions.do
c
I. How to Contact Us
http://www.oasis.oati.com/NWMT/NWMTdocs/How_To_Contact_Us.doc
Page 5 of 16
Revision: January 20, 2016
J. L&R Data Request
L&R Data Request 2015 includes the following Documents:
Attachment B 2015
http://www.oasis.oati.com/NWMT/NWMTdocs/Section_2.docx
Generation Request Letter NWE 2015
http://www.oasis.oati.com/NWMT/NWMTdocs/Generation_Request_LetterNWE_2015.pdf
LAR2015
http://www.oasis.oati.com/NWMT/NWMTdocs/LAR2015.pdf
Load Data Request 2015
http://www.oasis.oati.com/NWMT/NWMTdocs/Load_Data_Request_2015.xls
Load Request Letter-NWE 2015
http://www.oasis.oati.com/NWMT/NWMTdocs/Load_Request_LetterNWE_2015.pdf
Narrative Request Letter 2015
http://www.oasis.oati.com/NWMT/NWMTdocs/Narrative_Discussion_LetterNWE_2015.pdf
Note: Additional information regarding the Load and Resource (L&R) Data Requests can
be found on NWE’s OASIS site in the “Transmission Planning – Attachment K” folder.
Under the “L&R Data Request” folder there is a folder for individual annual L&R Data
Request cycles (such as “Customer L&R Data Request Information-2015”).
L&R Data Request 2014 includes the following Documents:
Attachment B 2014
http://www.oasis.oati.com/NWMT/NWMTdocs/Attachment_B_2014.docx
Generation Request Letter NWE 2014
http://www.oasis.oati.com/NWMT/NWMTdocs/Generation_Request_LetterNWE_2014.pdf
LAR2014
http://www.oasis.oati.com/NWMT/NWMTdocs/LAR2014.pdf
Load Data Request 2014
http://www.oasis.oati.com/NWMT/NWMTdocs/Load_Data_Request_2014.xls
Page 6 of 16
Revision: January 20, 2016
Load Request Letter-NWE 2014
http://www.oasis.oati.com/NWMT/NWMTdocs/Load_Request_LetterNWE_2014.pdf
Narrative Request Letter 2014
http://www.oasis.oati.com/NWMT/NWMTdocs/Narrative_Request_Letter_2014.
pdf
Note: Additional information regarding the Load and Resource (L&R) Data Requests can
be found on NWE’s OASIS site in the “Transmission Planning – Attachment K” folder.
Under the “L&R Data Request” folder there is a folder for individual annual L&R Data
Request cycles (such as “Customer L&R Data Request Information-2014”).
Shortcut to: http://www.oasis.oati.com/NWMT/index.html
K. LTP Study Cycle – Data Collection
2016-2017 LTP Study Cycle – Data Collection – Timeline (effective 10-17-13 per
FERC)
http://www.oasis.oati.com/NWMT/NWMTdocs/LTP_Study_Cycle-2016-2017Effective_10-17-13.doc
Annual Stakeholder Reminder Submittal-2016
http://www.oasis.oati.com/NWMT/NWMTdocs/2016Annual_Stakeholder_Reminder.pdf
Submitting Alternative Solutions
http://www.oasis.oati.com/NWMT/NWMTdocs/Submit_Alternative_Solutions.xl
s
L. Load Forecast – Forecast
Winter 2013-2014 Load Forecast – 04-16-14
http://www.oasis.oati.com/NWMT/NWMTdocs/Winter_20132014_Load_Forecast_-_04-16-14.docx
M. Local Cost Allocation Methodology
2008 Local Cost Allocation Methodology Projects outside OATT effective 05-14-08
Shortcut to:
http://www.oasis.oati.com/NWMT/NWMTdocs/2008_Local_Cost_Allocatio
n_Methodology_Projects_Outside_OATT_effective_5-14-08.doc
N. Local Transmission Plan
2014-2015 Planning Cycle
2014-2015 Electric Transmission Local Area Plan – 11-10-15 Final
http://www.oasis.oati.com/NWMT/NWMTdocs/NWMT_20142015_Local_Area_Plan_FINAL_11-10-15.pdf
Page 7 of 16
Revision: January 20, 2016
NWMT 2014-2015 Local Area Plan Development & Distribution
http://www.oasis.oati.com/NWMT/NWMTdocs/NWMT_20142015_Local_AreaPlan_Development_&_Distribution.docx
2012-2013 Planning Cycle
2012-2013 Electric Transmission Local Area Plan – 12-16-13 Final
http://www.oasis.oati.com/NWMT/NWMTdocs/NWMT_20122013_Local_Area_Plan_Final_12-16-13.pdf
NWMT 2012-2013 Local Area Plan Development & Distribution
http://www.oasis.oati.com/NWMT/NWMTdocs/NWMT_20122013_Local_AreaPlan_Development_&_Distribution.docx
O. NWE Anti-Trust and SOC
2009 NWE Anti-Trust and SOC 03-17-09
Shortcut to:
http://www.oasis.oati.com/NWMT/NWMTdocs/2009_NWE_AntiTrust_and_SOC_03-17-09.doc
P. Attachment K Business Practice
2013 Attachment K Business Practice 10-18-13 (Effective 10-25-13)
http://www.oasis.oati.com/NWMT/NWMTdocs/2013_Attachment_K_Business_
Practice-10-18-13_effective_10-25-13.pdf
Q. Business Practice ETP Method Criteria & Process
FINAL Approved Current B-PRACTICE effective 12-22-15
FINAL-2015-Business Practice ETP Method Criteria and Process (Approved 12/22/15,
Effective 12-31-15)
http://www.oasis.oati.com/NWMT/NWMTdocs/2015ETP_Method_Criteria_and_Process_BP_FINAL_12-22-15_Effective_12-3115.pdf
REDLINE-2015 Business Practice ETP) Method Criteria and Process – 12-22-15
http://www.oasis.oati.com/NWMT/NWMTdocs/2015ETP_Method_Criteria_and_Process_BP_REDLINE_12-22-15.doc
FINAL - 2015 Business Practice ETP Method Criteria and Process (Approved 12/01/15,
Effective 12-07-15)
http://www.oasis.oati.com/NWMT/NWMTdocs/2015_Business_Practice_ETP_M
ethod_Criteria_and_Process_12-1-15_effective_12-7-15.pdf
Page 8 of 16
Revision: January 20, 2016
FINAL Redline – 2015 Business Practice ETP Method Criteria and Process – 10-30-15
http://www.oasis.oati.com/NWMT/NWMTdocs/ETP_Method_Criteria_and_Proc
ess_BP_Redline-10-30-15.doc
FINAL - 2014 Business Practice ETP Method Criteria and Process (Approved 08/21/14,
Effective 08-26-14)
http://www.oasis.oati.com/NWMT/NWMTdocs/ETP_Method_Criteria_and_Proc
ess_BP_Order1000-FinalApproved_08-21-14-Color.pdf
FINAL Redline – 2014 Business Practice ETP Method Criteria and Process – 08-21-14
http://www.oasis.oati.com/NWMT/NWMTdocs/ETP_Method_Criteria_and_Proc
ess_BP_Order1000-FinalRedline_08-21-14.doc
R. Open Access Transmission Tariff (OATT)
Transmission Services Procedures: Business Practice
Open Access Transmission Tariff Vol. 5, 0.1.0 A
Order date effective – 02-17-11 NorthWestern Corporation as of 9/10/2014
FERC Docket: ER10-03171-001 11
Table of Contents
http://www.oasis.oati.com/NWMT/NWMTdocs/0_-_Table_of_Contents.pdf
NOTE: Each Part, Attachment, and Schedule is posted separately and to lengthy
to list. Please go to:
1) NorthWestern Energy’s OASIS website,
(http://www.oasis.oati.com/NWMT/index.html)
2) open the ‘Tariffs/FERC Filings’ folder,
3) open the ‘Current NWE MT OATT’ folder – all files are listed in this sub-folder
S. Planning Docs Process for Amending Documentation
FINAL Approved Current 03-27-15
2015 Planning Documents Amend Process (Approved 03-27-15, Effective 04-1-15)
http://www.oasis.oati.com/NWMT/NWMTdocs/PlanningDocumentsAmendProce
ss_Aprvd03-27-15.doc
Document Posting Log (tracks the documents being amended) (03-27-15)
http://www.oasis.oati.com/NWMT/NWMTdocs/Document_Posting_Log.xls
T. Transmission Advisory Committee (TRANSAC) – How to Become Involved
http://www.oasis.oati.com/NWMT/NWMTdocs/TRANSAC__How_to_become_involved.doc
Page 9 of 16
Revision: January 20, 2016
U. Transmission Advisory Committee (TRANSAC) Charter
2014 TRANSAC Charter 12-16-14
http://www.oasis.oati.com/NWMT/NWMTdocs/TRANSAC_Charter_12-1614.doc
V. Other Transmission Planning Links
On NWE’s OASIS website, there are a number of folders containing various documents
and materials regarding transmission planning activities. The following shortcut will
bring you to NWE’s OASIS website.
Shortcut to:
http://www.oasis.oati.com/NWMT/index.html
The folders outlining Transmission Planning include:
 Transmission Planning
 Transmission Planning – Attachment K
 Transmission Planning – Economic Studies
 Transmission Planning – TRANSAC
W. Public Policy Project Request
Instructions for Public Policy Project Request
http://www.oasis.oati.com/NWMT/NWMTdocs/InstructionsPublic_Policy_Project_Request.docx
Workbook to submit Public Policy Project Request
http://www.oasis.oati.com/NWMT/NWMTdocs/Public_Policy_Project_Request_Wrkbk.
xlsx
Page 10 of 16
Revision: January 20, 2016
2. NTTG Regional Link Information
Documents in this section address FERC Orders 890 & 1000 Regional
(NTTG) Transmission Planning. These documents are currently in
effect.
A. NTTG Home Page (includes map)
http://nttg.biz/site/index.php?option=com_content&view=featured&I
temid=107
B. Planning - Biennial Reports
2014-2015
2014-2015 NTTG Final Regional Transmission Plan Approved-December 17, 2015
http://www.oasis.oati.com/NWMT/NWMTdocs/NTTG_2014_2015_Regional_Tr
ansmission_Plan_for_Posting_010816_FINAL_ver2.pdf
2012-2013
2012-2013 Biennial Reports
http://nttg.biz/site/index.php?option=com_docman&slug=final-approved-20122013-nttg-biennial-reports&Itemid=31&view=list
2012-2013 NTTG Biennial Transmission Plan Executive Summary Final
http://nttg.biz/site/index.php?option=com_docman&view=document&layout=def
ault&alias=2144-2012-2013-nttg-biennial-transmission-plan-executive-summaryfinal&category_slug=final-approved-2012-2013-nttg-biennial-reports&Itemid=31
2012-2013 NTTG Biennial Transmission Plan Final
http://nttg.biz/site/index.php?option=com_docman&view=document&layout=def
ault&alias=2139-2012-2013-nttg-biennial-transmission-planfinal&category_slug=final-approved-2012-2013-nttg-biennial-reports&Itemid=31
2012-2013 NTTG Cost Allocation Report Final
http://nttg.biz/site/index.php?option=com_docman&view=document&layout=def
ault&alias=2138-2012-2013-nttg-cost-allocation-reportfinal&category_slug=final-approved-2012-2013-nttg-biennial-reports&Itemid=31
C. Calendar
http://nttg.biz/site/index.php?option=com_jevents&view=month&layo
ut=calendar&Itemid=30
Page 11 of 16
Revision: January 20, 2016
D. Charters & Agreements
Includes NTTG Agreements, NTTG Committee Charters, Executed NTTG Planning
Agreements and Anti-Trust Policy
http://nttg.biz/site/index.php?option=com_docman&view=list&slug=f
erc-order-1000-committee-charters&Itemid=31
E. NTTG Cost Allocation Principles
Contains an explanation of the NTTG cost allocation principles and process (Published
September 6, 2007).
http://nttg.biz/site/index.php?option=com_docman&view=document&sl
ug=cost-allocation-principles-andprocess&layout=default&alias=193-cost-allocation-principles-andprocess&category_slug=cost-allocation-principles-andprocess&Itemid=31
2010-2011 NTTG Cost Allocation Committee Final Report (11/14/11 and published
April 22 2013)
http://nttg.biz/site/index.php?option=com_docman&view=document&alias=1981
-nttg-2010-2011-cost-allocation-committee-final-report-11-142011&category_slug=2010-2011-cost-allocation-report-development&Itemid=31
F. NTTG Attachment K Documents and NTTG Business Practices
http://nttg.biz/site/index.php?option=com_content&view=article&id
=129:nttg-members-order-890-attachment-k&catid=119:ferc-order890&Itemid=107
G. NTTG Economic Congestion Studies
http://nttg.biz/site/index.php?option=com_content&view=category&l
ayout=blog&id=108&Itemid=98
H. NTTG Frequently Asked Questions
http://nttg.biz/site/index.php?option=com_content&view=category&l
ayout=blog&id=102&Itemid=88
I. NTTG Planning Committee Home Page
Contains members, process documents and meeting information, data submittals,
reports, and other general information, in addition to the links to specific
documents described below.
http://nttg.biz/site/index.php?option=com_content&view=category&l
ayout=blog&id=567&Itemid=26
J. NTTG POR POD Map
A map of the Point-of-Receipt and Point-of-Delivery can be found on the NTTG
website at the following URL address.
http://nttg.biz/site/index.php?option=com_docman&view=download&la
yout=default&alias=2264-december-2014-por-pod-mapfinal&category_slug=atc-information-2014&Itemid=31
Page 12 of 16
Revision: January 20, 2016
K. NTTG Planning Cycle
http://nttg.biz/site/index.php?option=com_docman&view=document&alias=1458
-nttg-planning-cycle-calendar&category_slug=home-topmenu&Itemid=31
L. NTTG Regional Planning and Cost Allocation Practices
This is part of the FERC Order 1000 filing. See Section 0. NTTG FERC Order
1000 Information.
M. NTTG Study Plan
Study plan containing the assumptions, data, and tools used in conducting the
current biennial planning cycle.
Revised NTTG Biennial Study Plan APPROVED 3-9-2015
http://nttg.biz/site/index.php?option=com_docman&view=document&alias=2365
-revised-nttg-biennial-study-plan-approved-03-09-2015&category_slug=meetingmaterials-3&Itemid=31
NTTG 2012-2013 Study Plan and appendices
NTTG 2012-2013 Approved Study Plan
http://nttg.biz/site/index.php?option=com_docman&view=document&alias=2189
-2012-13-nttg-revised-approved-study-plan-06-12-2013&category_slug=20122013-nttg-study-plan&Itemid=31
Appendix A - CCTA document
http://nttg.biz/site/index.php?option=com_docman&view=document&slug=20122013-study-plan-appendix-a&layout=default&alias=1755-2012-2013-study-planappendix-a&category_slug=2012-2013-nttg-study-plan&Itemid=31
Appendix B - TEPPC Data Analysis
http://nttg.biz/site/index.php?option=com_docman&view=document&alias=1754
-2012-2013-study-plan-appendix-b&category_slug=2012-2013-nttg-studyplan&Itemid=31
Appendix C - Flow Diagram
http://nttg.biz/site/index.php?option=com_docman&view=document&alias=1753
-2012-2013-study-plan-appendix-c&category_slug=2012-2013-nttg-studyplan&Itemid=31
The completed Biennial reports are shown in category B. of this document
N. NTTG FERC Order 1000 Information
At this site are documents and/or updates for Regional and Interregional documents for
activity related to FERC Order 1000.
http://nttg.biz/site/index.php?option=com_content&view=category&l
ayout=blog&id=569&Itemid=136
Page 13 of 16
Revision: January 20, 2016
FERC Order 1000: Regional
http://nttg.biz/site/index.php?option=com_content&view=article&id=350:fercorder-1000-regional&catid=341&Itemid=139
FERC Order 1000: Interregional
http://nttg.biz/site/index.php?option=com_content&view=article&id=351&Itemid
=138
Page 14 of 16
Revision: January 20, 2016
3. WECC Interconnection Wide Link Information
Documents in this section address FERC Orders 890 & 1000
Interconnection Wide (WECC) information. These documents are
currently in effect.
A. WECC Home Page
Shortcut to:
http://www.wecc.biz/
B. WECC Planning Coordination Committee
The WECC Planning Coordination Committee is made up of four subcommittees:
Reliability Subcommittee (RS) Charter
http://www.wecc.biz/Corporate/RS%20Charter.pdf#search=Reliability%20Subco
mmittee%20Charter
Remedial Action Scheme (RAS) Reliability Subcommittee Charter – approved March 25,
2014
http://www.wecc.biz/Corporate/RASRS%20Charter.pdf#search=RAS%20Reliabi
lity%20Charter
Loads & Resources Subcommittee (LRS) Charter
http://www.wecc.biz/_layouts/15/WopiFrame.aspx?sourcedoc=/Reliability/LRS_
Charter_approved2010506.pdf&action=default&DefaultItemOpen=1
Technical Studies Subcommittee (TSS) Charter
http://www.wecc.biz/Corporate/TSS%20Charter.pdf#search=Technical%20Studie
s%20Subcommittee%20Charter
Joint Synchronized Information Subcommittee (JSIS) Charter
http://www.wecc.biz/Reliability/Joint%20Synchronized%20Information%20Subc
ommittee%20Charter.pdf#search=Joint%20synchronized%20information%20sub
committee%20charter
C. WECC Transmission Expansion Planning Policy Committee (TEPPC)
Information & Documents
WECC Transmission Expansion Planning Policy Committee – Contains
members, process documents, meeting information, reports, and other general
information regarding the regional planning processes, in addition to the links to
specific documents described below.
Page 15 of 16
Revision: January 20, 2016
TEPPC Home Page
Shortcut to:
http://www.wecc.biz/TEPPC
TEPPC Charter
http://www.wecc.biz/Corporate/TEPPC_Charter.pdf#search=TEPPC%20Charter
TEPPC Planning Protocol – May 22, 2012
http://www.wecc.biz/Corporate/TEPPC_PlanningProtocol.pdf#search=TEPPC%2
0Planning%20Protocol
TEPPC 2015 Study Program
http://www.wecc.biz/Pages/results.aspx?k=TEPPC 2015 Study Program
TEPPC 2014 Study Program
http://www.wecc.biz/_layouts/15/WopiFrame.aspx?sourcedoc=/Reliability/TEPP
C_2014_StudyProgram.docx&action=default&DefaultItemOpen=1
TEPPC 2013 Study Program
http://www.wecc.biz/Reliability/TEPPC_2013_StudyProgram.pdf#search=TEPP
C
D. WECC Closed Session Confidentiality Agreement for non-group member
participants
http://www.wecc.biz/_layouts/15/WopiFrame.aspx?sourcedoc=/Corporate/WECC
%20Closed%20Session%20Confidentiality%20Agreement%20for%20NonGroup%20Members.pdf&action=default&DefaultItemOpen=1
Page 16 of 16
Download