ITC Transmission Company Generator Status Verification ITC has scheduled the following transmission outage which impacts generation. ITC plans to contact the generator and/or their designee to verify the generator status in preparation for the planned outage. MISO Transmission Planned Outage: Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 06/03/2016 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 12/11/2015 Posting Date: 4/15/2015 1-10340608 120kV Minden Rapson Minden – Rapson 120 kV Line 06/07/2016 0630 EDT 06/09/2016 1830 EDT Planned The output of the Sigel Wind Park and Big Turtle must be restricted to 40 MW gross output for the duration of this outage, to prevent Tie 5611 from exceeding its emergency rating, for the contingency loss of Rapson – Seaside, Harbor Beach – Seaside, or Rapson – Wyatt #2 120kV lines. 1-09610058 345kV Kilgore Lee Kilgore – Lee 120 kV Line 12/07/2015 1330 EDT 12/11/2015 1400 EDT Planned With the Greenwood – Kilgore line out of service and the contingency loss of the Greenwood Transformer 301, the System Service 61 transformer at Greenwood will no longer have a power source that is capable of supporting and properly shutting down the Greenwood MTG 1. Therefore Greenwood MTG 1 must be made “unavailable”. The Greenwood peakers can run un-restricted for the duration of this outage. MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 1-07594018 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 3/2/2015 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 1/5/2015 Posting Date: MISO Ticket Number: KV: From Station: To Station: 12/30/2014 345kV Greenwood Greenwood Greenwood Transformer 301 04/18/2015 0700 EDT 04/19/2015 1600 EDT Planned The combined output of Michigan Wind I and II will be restricted to 50 MW to prevent any post-contingent overloads on the Sandusky 120/40kV Transformer and 40kV tie lines out of Sandusky. 1-07244968 120 KV Arrowhead Bad Axe Arrowhead - Bad Axe 120kV 3/03/2015 0700 EST 3/03/2015 1830 EST Planned The combined output of Harvest Wind I and II will be restricted to 70 MW to prevent any post-contingent overloads on the Arrowhead 120/40kV Transformer and 40kV tie lines out of Arrowhead. 1-06921575 120 KV Bad Axe Bus 102 Bad Axe Bus 102 120kV 1/08/2015 0630 EST 1/08/2015 1630 EST Planned The combined output of Harvest Wind I and II will be restricted to 70 MW to prevent any post-contingent overloads on the Arrowhead 120/40kV Transformer and 40kV tie lines out of Arrowhead. N/A 120 KV Lee Sandusky Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: Lee - Sandusky 120kV 12/31/2014 0151 EST 4/15/2015 1530 EST Planned Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 12/5/2014 1-06729570 120 KV Remer St. Clair Remer – St. Clair #2 120kV line 12/08/2014 0630 EST 12/09/2014 1830 EST Planned Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 11/26/2014 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: 10/03/2014 There are no restrictions to Michigan Wind One and Two PRE-contingent. The combined output of Michigan Wind One and Two will be restricted to 50MW when the Sandusky 120/40kV Transformer must be placed back in service. The restriction will lift once the Sandusky Transformer can be reopened. Dean Units GT-1 and GT-2 must be unavailable for the duration of this outage. 1-06721583 120 KV Arrowhead Cosmo Tap Arrowhead – Bad Axe 120kV 12/02/2014 0700 EST 12/06/2014 1730 EST Planned The combined output of Harvest Wind I and II will be restricted to 85MW to prevent the overload of several 40kV tie lines into the Arrowhead substation. 1-06424528 120 KV Minden Rapson Minden – Rapson 120kV 10/06/2014 0830 EST Planned End Date/Time: Outage Type: Comments: 10/10/2014 1400 EST Planned Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 8/15/2014 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 6/20/2014 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 6/10/2014 The output of the Sigel Wind Park must be restricted to 40 MW gross output for the duration of this outage, to prevent Tie 5611 from exceeding its emergency rating, for the contingency loss of Rapson – Seaside, Harbor Beach – Seaside, or Rapson – Wyatt #2 120kV lines. 1-05910492, 1-06194058 120 KV Minden Rapson Minden – Rapson 120kV 8/18/2014 0800 EST 8/24/2014 1700 EST Planned The output of the Sigel Wind Park must be restricted to 40 MW gross output for the duration of this outage, to prevent Tie 5611 from exceeding its emergency rating, for the contingency loss of Rapson – Seaside, Harbor Beach – Seaside, or Rapson – Wyatt #2 120kV lines. 1-05620671 120 KV Seaside Rapson Rapson - Seaside 120kV 6/11/2014 0630 EST 6/24/2014 1700 EST Planned The output of the Sigel Wind Park must be restricted to 45 MW gross output for the duration of this outage, to prevent Tie 5611 from exceeding its emergency rating, for the contingency loss of the Minden – Rapson line. 1-05620671 120 KV Seaside Rapson Rapson - Seaside 120kV 6/11/2014 0630 EST 6/24/2014 1700 EST Planned The output of the Sigel Wind Park must be restricted to 40 MW gross output for the duration of this outage, to prevent Tie 5611 from exceeding its emergency rating, for the contingency loss of the Minden – Rapson line. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 5/23/2014 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 4/23/2014 1-05597918, 1-05597919 120 KV Minden Rapson Minden - Rapson 120kV 5/29/2014 0800 EST 6/10/2014 1700 EST Planned The output of the Sigel Wind Park must be restricted to 40 MW gross output for the duration of this outage, to prevent Tie 5611 from exceeding its emergency rating, for the contingency loss of Rapson – Seaside, Harbor Beach – Seaside, or Rapson – Wyatt #1 120kV lines. 1-05227240 120 KV Kilgore Lee Kilgore – Lee 120kV 5/17/2014 0700 EST 5/19/2014 1900 EST Planned Greenwood MTG 1 must be offline for the duration of this outage. A condition of operation of any condensing steam unit, including Greenwood, is the unit must have two feeds from outside the plant capable of supporting the plant internal electrical load. This is necessary so that, in the event of loss of one of the feeds, there is an immediate availability of the second feed in order to safely shutdown the unit. Greenwood MTG 1 must not be available for operation, unless outside plant power is available to System Service 61 transformer via both Transformer 301 and the Greenwood-Kilgore line. These are the only two sources individually capable of supporting operation and a proper shutdown of Greenwood. Therefore Greenwood MTG 1 must be made “unavailable”. The Greenwood peakers can run un-restricted for the duration of this outage. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 4/23/2014 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 3/27/2014 1-05014250 345 KV Belle River Greenwood – Pontiac Belle River – Greenwood - Pontiac 2/26/2014 0600 EST 5/16/2014 2000 EST Planned For the duration of this outage, because the entire 345kV Greenwood yard is out of service, there is no outlet for any generation at Greenwood. This includes both Greenwood MTG 1 and Greenwood Peakers CTG 11-1, 11-2, and 12-1. 1-05014250 345 KV Belle River Greenwood – Pontiac Belle River – Greenwood - Pontiac 2/26/2014 0600 EST 5/05/2014 2000 EST Planned Greenwood Peakers When Belle River-Greenwood-Pontiac line is open, Greenwood peakers CTG 11-1, 11-2 and 12-1 can run. The total output (all three peakers) must be below 75 MW. Above 75 MW, for the loss of GreenwoodKilgore line, Bennett Transformer 102 exceeds its tripping limit. Other Considerations It is recommended to reschedule the outage if Greenwood generation is expected to be online at any time during the outage due to the following reasons: A condition of operation of any condensing steam unit, including Greenwood, is the unit must have two feeds from outside the plant capable of supporting the plant internal electrical load. This is necessary so that, in the event of loss of one of the feeds, there is an immediate availability of the second feed in order to safely shutdown the unit. Greenwood MTG 1 must not be available for operation, unless outside plant power is available to System Service 61 transformer via both Transformer 301 and the Greenwood- Kilgore line. These are the only two sources individually capable of supporting operation and a proper shutdown of Greenwood. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: If Greenwood-Bennett is the only power source available, it is not capable of starting any of the required large motors at Greenwood to start the plant. It is not capable of supporting the plant auxiliary loads while MTG 1 is already operating nor is it capable of supporting the safe shutdown of the plant. It can be used to maintain lights, ventilation, etc. in the plant, when the plant is already in a safe shutdown condition. 1/15/2014 1-04793979 345 KV Belle River Greenwood – Pontiac Belle River – Greenwood - Pontiac 1/21/2014 0600 EST 3/29/2014 1900 EST Planned Greenwood Peakers When Belle River-Greenwood-Pontiac line is open, Greenwood peakers CTG 11-1, 11-2 and 12-1 can run. The total output (all three peakers) must be below 75 MW. Above 75 MW, for the loss of GreenwoodKilgore line, Bennett Transformer 102 exceeds its tripping limit. Other Considerations It is recommended to reschedule the outage if Greenwood generation is expected to be online at any time during the outage due to the following reasons: A condition of operation of any condensing steam unit, including Greenwood, is the unit must have two feeds from outside the plant capable of supporting the plant internal electrical load. This is necessary so that, in the event of loss of one of the feeds, there is an immediate availability of the second feed in order to safely shutdown the unit. Greenwood MTG 1 must not be available for operation, unless outside plant power is available to System Service 61 transformer via both Transformer 301 and the GreenwoodKilgore line. These are the only two sources individually capable of supporting operation and a proper shutdown of Greenwood. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: If Greenwood-Bennett is the only power source available, it is not capable of starting any of the required large motors at Greenwood to start the plant. It is not capable of supporting the plant auxiliary loads while MTG 1 is already operating nor is it capable of supporting the safe shutdown of the plant. It can be used to maintain lights, ventilation, etc. in the plant, when the plant is already in a safe shutdown condition. 11/27/2013 1-04620813 120 KV Custer Whiting Custer - Whiting 120kV Line 12/2/2013 0700 EST 12/3/2013 1530 EST Planned This outage may require the use of the Fermi Peakers. In order to provide the necessary voltage support at the Fermi PP 120 kV station, all Fermi PP Peaking Units (11-3, and 11-4) should be available and used as necessary both pre and post-contingency. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 11/26/2013 1- 04650477 120 KV St. Clair Posting Date: 11/8/2013 Bus 111 12/2/2013 06:30 EDT 12/13/2013 17:30 EDT Planned During this outage the output of St. Clair Units #2 and #3, CTG 11, and DG 12-1 and 12-2 will need to be restricted to a total of 175 MW to prevent overloads on the St. Clair Reactor 102 for loss of the St. Clair – Jacob – Victor 120kV path. MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 1- 04585539 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 11/7/2013 120 KV Leppek Wyatt Leppek – Wyatt 120kV Line 12/2/2013 0630 EST 12/31/2013 2030 EST Planned Michigan Wind One & Two will be restricted to 50 MW to prevent the overloads on Sandusky Transformer 101 and 40kV lines in the area for the loss of the Lee - Sandusky 120kV line. 2-00460498 120 KV Enrico Fermi PP Seville 1 Fermi Breaker GK 11/18/2013 0700 EST 11/22/2013 1530 EST Opportunity This outage may require the use of the Fermi Peakers. In order to provide the necessary voltage support at the Fermi PP 120 kV station, all Fermi PP Peaking Units (11-1, 11-2, 11-3, and 11-4) should be available and used as necessary both pre and post-contingency. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 10/24/2013 Posting Date: Outage #: KV: 10/16/2013 1-04373594 120kV 1-04440782 120 KV Leppek Wyatt Leppek – Wyatt 120kV Line 10/29/2013 0630 EST 11/2/2013 2030 EST Planned Michigan Wind One & Two will be restricted to 50 MW to prevent the overloads on Sandusky Transformer 101 and 40kV lines in the area for the loss of the Lee - Sandusky 120kV line. From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: Monroe Monroe Bues 102 and 103 including Transformer 304 10/21/13 11/1/13 Planned In order to provide the necessary voltage support and delta V requirements at the Fermi PP 120 kV station, all Fermi PP Peaking Units (11-2, 11-3, and 11-4) should be available and used as necessary both pre and post-contingency.. Real-time security/contingency analysis should be used in determining if/how many peakers should be utilized. Fermi PP Peaking Unit 11-1 is reserved for emergency black-start purpose and can be dispatched only at the discretion of the plant. At least 2 units at Whiting must be available and used as necessary. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 10/9/2013 1-04366697 120 KV Radka Radka 120kV Bus 101 10/17/2013 0700 EST 10/19/2013 1530 EST Planned This outage may require the use of the Fermi Peakers. In order to provide the necessary voltage support at the Fermi PP 120 kV station, all Fermi PP Peaking Units (11-1, 11-2, 11-3, and 11-4) should be available and used as necessary both pre and post-contingency. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 10/1/2013 2-00377098 345 KV Belle River Greenwood – Pontiac Belle River – Greenwood - Pontiac 10/7/2013 0700 EST 10/25/2013 2100 EST Planned Greenwood Peakers on and Michigan Wind Off When Belle River-Greenwood-Pontiac line is open, Greenwood peakers CTG 11-1, 11-2 and 12-1 can run. The total output (all three peakers) must be below 75 MW. Above 75 MW, for the loss of GreenwoodKilgore line, Benet Transformer 102 exceeds its tripping limit. Greenwood Peakers on and Michigan Wind On The loss of Leppek-Wyatt line will overload the 40kV lines in the area. Therefore, the combined output of Greenwood peakers and Michigan Wind is restricted to 75 MW gross output for the duration of this outage. Other Considerations It is recommended to reschedule the outage if Greenwood generation is expected to be online at any time during the outage due to the following reasons: Posting Date: MISO Ticket Number: KV: From Station: To Station: A condition of operation of any condensing steam unit, including Greenwood, is the unit must have two feeds from outside the plant capable of supporting the plant internal electrical load. This is necessary so that, in the event of loss of one of the feeds, there is an immediate availability of the second feed in order to safely shutdown the unit. Greenwood MTG 1 must not be available for operation, unless outside plant power is available to System Service 61 transformer via both Transformer 301 and the GreenwoodKilgore line. These are the only two sources individually capable of supporting operation and a proper shutdown of Greenwood. If Greenwood-Bennett is the only power source available, it is not capable of starting any of the required large motors at Greenwood to start the plant. It is not capable of supporting the plant auxiliary loads while MTG 1 is already operating nor is it capable of supporting the safe shutdown of the plant. It can be used to maintain lights, ventilation, etc. in the plant, when the plant is already in a safe shutdown condition. 9/19/2013 1-04195056 120 KV Rapson Wyatt Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: Rapson – Wyatt #2 120kV line 9/22/2013 0630 EST 9/27/2013 0830 EST Planned With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 45 MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 9/4/2013 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 8/29/2013 1-04184052 120 KV Atlanta Tuscola Atlanta - Tuscola 120kV line 9/17/2013 0630 EST 9/17/2013 2030 EST Planned Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for Thumb Load levels above 450MW (ITC load 9000MW). 1-04195821 120 KV Arrowhead Tuscola Arrowhead - Tuscola 120kV line 9/22/2013 0700 EST 9/22/2013 1200 EST Planned Harbor Beach Unit 1 must run with an output of 45 MW (gross). The combined output of Harbor Beach, Michigan Wind 1 and 2, Harvest Wind, and Sigel must also be restricted to 200MW for the duration of this outage. Posting Date: MISO Ticket Number: KV: 8/29/2013 1-04195823 120 KV From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: Leppek Wyatt Leppek – Wyatt 120kV line 9/22/2013 1200 EST 9/22/2013 1630 EST Planned Harbor Beach Unit 1 must run with an output of 45 MW (gross). Michigan Wind 1 and 2 will be restricted to 75MWfor the duration of this outage. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 8/22/2013 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 8/9/2013 N/A N/A N/A N/A N/A 8/9/2013 N/A N/A Due to the pending retirement of Harbor Beach generation ITC is providing the following information to ensure availability of generation is maintained to provide for reliable operation of the transmission system in the Thumb area throughout the summer and fall timeframes. The anticipated Harbor Beach dispatch for voltage support, capacity needs and scheduled transmission outages through the fall of 2013 are provided below. Note that this information does not include local dispatch needs due to 40 kV distribution outages in the area. 2-00380396 AND 2-00380899 120 KV Minden – Rapson AND Rapson – Wyatt #1 120kV lines 9/3/2013 0630 EST 9/21/2013 2030 EST Planned With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 45 MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. Harbor Beach Run Requirement due to scheduled transmission facility outages: August 2013 There are no scheduled outages that will require Harbor Beach to run. September 2013 There are 2 outages planned for the month of September that will require Harbor Beach to run. Lepek – Wyatt 120kV line: 1 day duration (9/10/2013) Arrowhead – Tuscola 120kV line: 1 day duration (9/12/2013) It is currently anticipated that beyond October 1, 2013 Harbor Beach will not be required as a must run unit for scheduled transmission outages. The two Bauer – Rapson 345kV lines and three 345/120kV Rapson Transformers are scheduled to be placed into service on this date. This date may change and is dependent on construction progress; weather forecast; unplanned generation, transmission, and distribution outages; and obtaining the necessary outages cited above. ITC will review and update this posting periodically as well as when information resulting in material changes become available. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 7/17/2013 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 7/11/2013 1-04015240 120 KV Hunters Creek Hunters Creek Bus 102 7/26/2013 0630 EST 7/26/2013 1630 EST Planned Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for Thumb Load levels above 450MW (ITC load 9000MW). 1-03949486 120 KV Hunters Creek Hunters Creek Bus 101 7/24/2013 0700 EST 7/25/2013 1530 EST Planned Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for Thumb Load levels above 450MW (ITC load 9000MW). Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 6/17/2013 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 7/17/2013 1-0905103 120 KV Tuscola Tuscola Section Breaker HG 7/22/2013 0630 EST 7/23/2013 1630 EST Planned Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for all Thumb load levels. 1-03994845 120 KV Arrowhead Bad Axe Arrowhead – Bad Axe 120kV line 7/20/2013 0630 EST 7/21/2013 1930 EST Planned Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for all Thumb load levels. Harvest Wind I and II will NOT be able to run for the duration of this outage. The combined output of Harbor Beach, Sigel, and Michigan Wind I and II will be restricted to 110MW for the duration of this outage. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: 6/20/2013 1-03875969 120 KV Hunters Creek Stratford Hunters Creek – Stratford 120kV line Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 6/26/2013 0700 EST 6/26/2013 1530 EST Planned Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 6/7/2013 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 6/7/2013 Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for Thumb Load levels above 450MW (ITC load 9000MW). 1-03850198 120 KV Tuscola Tuscola Section Breaker HG 6/19/2013 0700 EST 6/19/2013 1530 EST Planned Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for all Thumb load levels. 1-03821419 120 KV Rapson Rapson Bus 104 + Rapson – Wyatt #2 120kV line 6/17/2013 0630 EST 6/19/2013 1700 EST Planned With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 45 MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. This outage may require the use of Harbor Beach peakers if the Rapson – Wyatt #1 120kV line is lost. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: 6/7/2013 1-03818661 120 KV Rapson Rapson Bus 102 + Rapson – Wyatt #1 120kV line 6/10/2013 0630 EST 6/12/2013 1700 EST Planned Comments: With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 45 MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. This outage may require the use of Harbor Beach peakers if the Rapson – Wyatt #2 120kV line is lost. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 5/27/2013 1-03696215 120 KV Arrowhead Tuscola Arrowhead – Tuscola 120kV line 6/5/2013 0700 EST 6/7/2013 1530 EST Planned Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for all Thumb load levels for the entire duration of the outage. The maximum combined output of Harbor Beach Unit 1, and all thumb wind farms (Michigan Wind 1, Michigan Wind 2, Harvest Wind and Sigel) must be restricted to 200 MW for the duration of this outage. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: Thumb Load Min HBHPP Output (Gross) Up to 400 MW 400 - 430 MW 430 - 450 MW 450 - 475 MW 45 MW 55 MW 70 MW 85 MW Max Combined Wind Farm Output 155 MW 145 MW 130 MW 115 MW 5/27/2013 1-03798033 120 KV Rapson Wyatt Rapson – Wyatt #2 120kV line 6/4/2013 0700 EST 6/4/2013 1630 EST Planned With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 45 MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. This outage may require the use of Harbor Beach peakers if the Rapson – Wyatt #1 120kV line is lost. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 5/22/2013 N/A N/A N/A N/A N/A 5/22/2013 N/A N/A Due to the pending retirement of Harbor Beach generation ITC is providing the following information to ensure availability of generation is maintained to provide for reliable operation of the transmission system in the Thumb area throughout the summer and fall timeframes. The anticipated Harbor Beach dispatch for voltage support, capacity needs and scheduled transmission outages through the fall of 2013 are provided below. Note that this information does not include local dispatch needs due to 40 kV distribution outages in the area. High Load Harbor Beach Requirement If the Thumb area load exceeds 500MW on any given day, HB#1 will be required to run at a output between of 40 – 90MW. As a reference Harbor Beach was required to run a total of 29 days throughout the summer of 2012 due to the Thumb area load exceeding the 500 MW load level during summer months. June: 7 days July: 11 days August: 11 days Harbor Beach Run Requirement due to scheduled transmission facility outages May There are no scheduled outages that will require Harbor Beach to run. June 2013 There is one outage scheduled in the month of June that will require Harbor Beach to run for 4 days Arrowhead – Tuscola 120kV: 4 Day Duration July 2013 There is one outage planned for the month of July that will require Harbor Beach to run for 10 days: Arrowhead – Cosmo Tap – Bad Axe 120kV: 10 Day Duration August 2013 There are no scheduled outages that will require Harbor Beach to run. September 2013 There are 2 outages planned for the month of September that will require Harbor Beach to run. Atlanta – Karn - Thetford line: 7 Day Duration Tuscola Breaker GW (Tuscola – Atlanta line): 21 Day Duration October 2013 There are no scheduled outages that will require Harbor Beach to run. November 2013 There is 1 outage planned for the month of November that will NOT require Harbor Beach to run if Bauer-Rapson lines and Rapson Transformers placed in service as currently scheduled: Bauer – Rapson #1 line: 7 Day Duration It is currently anticipated that beyond November 1, 2013 Harbor Beach will not be required as a must run unit for scheduled transmission outages. This date may change and is dependent on construction progress; weather forecast; unplanned generation, transmission, and distribution outages; and obtaining the necessary outages cited above. ITC will review and update this posting periodically as well as when information resulting in material changes become available. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 5/17/2013 1-03798032 120 KV Custer Custer HD 120kV Breaker 5/23/2013 0700 EST 5/24/013 1530 EST Planned This outage may require the use of the Fermi Peakers. In order to provide the necessary voltage support at the Fermi PP 120 kV station, all Fermi PP Peaking Units (11-2, 11-3, and 11-4) should be available and used as necessary both pre and post-contingency. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: 5/15/2013 1-03743127 120 KV Brownstown Berlin Brownstown – Berlin 120kV line 5/21/2013 0700 EST 5/22/013 1530 EST Planned Comments: This outage may require the use of the Fermi Peakers. In order to provide the necessary voltage support at the Fermi PP 120 kV station, all Fermi PP Peaking Units (11-2, 11-3, and 11-4) should be available and used as necessary both pre and post-contingency. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 5/15/2013 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 5/9/2013 1-03755232 120 KV Fermi Fermi Bus 102 120kV 5/18/2013 0530 EST 5/19/013 1830 EST Planned Loss of the Custer – Monroe 120kV line will force the Whiting – Custer 120kV line to feed the entire load at Custer, Shoal, and Fermi. For this reason, Whiting should run at with a minimum output of 120MW for the duration of this outage. 1-03793830 120 KV Fermi Swan Creek Fermi – Swan Creek120kV line 5/15/2013 0530 EST 5/16/2013 1830 EST Planned This outage may require the use of the Fermi Peakers. In order to provide the necessary voltage support at the Fermi PP 120 kV station, all Fermi PP Peaking Units (11-1, 11-2, 11-3, and 11-4) should be available and used as necessary both pre and post-contingency. Posting Date: MISO Ticket Number: KV: From Station: To Station: 5/9/2013 1-03793829 120 KV Fermi Radka Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: Fermi - Radka 120kV line 5/13/2013 0530 EST 5/14/2013 1830 EST Planned This outage may require the use of the Fermi Peakers. In order to provide the necessary voltage support at the Fermi PP 120 kV station, all Fermi PP Peaking Units (11-1, 11-2, 11-3, and 11-4) should be available and used as necessary both pre and post-contingency. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 4/29/2013 1-03705907 120 KV Minden Rapson Minden - Rapson 120kV line 5/6/2013 0700 EST 5/7/2013 1530 EST Planned This outage may require the use of Harbor Beach if the Rapson – Seaside 120kV line is lost. With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 45 MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 4/29/2013 1-03729592 120 KV Harbor Beach Minden Harbor Beach - Minden 120kV line 5/8/2013 0700 EST 5/9/2013 1930 EST Planned This outage may require the use of Harbor Beach if the Rapson – Seaside 120kV line is lost. With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 45 MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 4/23/2013 1-03595627 345 KV Belle River Greenwood – Pontiac Belle River – Greenwood - Pontiac 5/7/2013 0630 EST 5/17/2013 1930 EST Planned At this point in time the combined output of Harbor Beach and Sigel Wind must not exceed 100MW at any time. This posting states the guidelines for Harbor Beach if Sigel Wind is not producing any MW. However this number may be adjusted as long as the combined output of both units meets the minimum generation requirement. Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for all Thumb load levels over 400 MW when the Belle River-GreenwoodPontiac line is outaged. It is recommended to reschedule the outage if Harbor Beach Unit 1 is unavailable and the thumb load is expected to exceed 400 MW. The contingency loss of Arrowhead-Tuscola 120kV line may result in extremely low voltages around the Bad Axe and Harbor Beach substations during the outage of the Belle River-Greenwood-Pontiac 345kV line. Therefore Harbor Beach Unit 1 must run pre-contingency, as indicated in the table below, in order to prevent low post-contingent voltages. Thumb Load 400MW - 425 MW 425 MW – 450 MW Min HBHPP Output (Gross) 45 MW 70 MW There is no restriction on the maximum output. A condition of operation of any condensing steam unit, including Greenwood, is the unit must have two feeds from outside the plant capable of supporting the plant internal electrical load. This is necessary so that, in the event of loss of one of the feeds, there is an immediate availability of the second feed in order to safely shutdown the unit. Greenwood MTG 1 must not be available for operation, unless outside plant power is available to System Service 61 transformer via both Transformer 301 and the Greenwood-Kilgore line. These are the only two sources individually capable of supporting operation and a proper shutdown of Greenwood. If Greenwood-Bennett is the only power source available, it is not capable of starting any of the required large motors at Greenwood to start the plant. It is not capable of supporting the plant auxiliary loads while MTG 1 is already operating nor is it capable of supporting the safe shutdown of the plant. It can be used to maintain lights, ventilation, etc. in the plant, when the plant is already in a safe shutdown condition. When Belle River-Greenwood-Pontiac line is open, Greenwood peakers CTG 11-1, 11-2 and 12-1 can run. The total output (all three peakers) must be below 75 MW. Above 75 MW, for the loss of Greenwood-Kilgore line, Benet Transformer 102 exceeds its tripping limit. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 3/13/2013 Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 3/12/2013 1-03574043 120 KV River Rogue Power Plant River Rogue Power Plant Bus 101 and 111 3/25/2013 0630 EST 4/26/2013 1730 EST Planned River Rogue Generator 1 will not be able to run for the duration of this outage. 2-00314156 120 KV Lee Sandusky Lee – Sandusky 120kV line 3/18/2013 0700 EST 3/22/2013 1830 EST Planned Harbor Beach Unit 1 is required to run with a minimum output of 45 MW (gross) for the entire duration of this outage. It is recommended to reschedule the outage if Harbor Beach is unavailable or expected to offline at any time during the outage. It is also recommended to reschedule the outage if the Thumb Load is expected to exceed 450 MW at any time during the outage. Harbor Beach Generator 1 must run as mentioned in the table below for all Thumb load levels: Thumb Load Up to 350 MW 350-375 MW 375-400 MW 400-430 MW 430-450 MW Minimum HBHPP Output 45 MW 55 MW 65 MW 75 MW 85 MW To prevent 40kV distribution circuit overloads the combined output from Harbor Beach, Sigel, Michigan Wind One/Two and Harvest One/Two must be restricted to 215 MW. Michigan Wind One & Two will be restricted to 80 MW to prevent overload on Sandusky Transformer 101 for the loss of Wyatt – Lepek 120kV line. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 3/5/2013 2-00289856 120 KV Rapson Wyatt Rapson – Wyatt #1 120kV line 3/12/2013 0700 EST 3/12/2013 1530 EST Planned This outage may require the use of Harbor Beach if the Rapson – Wyatt #2 120kV line is lost. With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 60 MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 1/19/2013 1-03544416 120 KV Seaside Wyatt Seaside – Wyatt 120kV line 2/25/2013 0530 EST 3/8/2013 1830 EST Planned This outage may require the use of Harbor Beach if the Harbor Beach – Minden 120kV line is lost. With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 45 MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. Posting Date: MISO Ticket Number: KV: 1/14/2013 1-03477399 345 KV From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: Belle River Greenwood – Pontiac Belle River – Greenwood - Pontiac 2/24/2013 0600 EST 2/24/2013 1900 EST Planned At this point in time the combined output of Harbor Beach and Sigel Wind must not exceed 100MW at any time. This posting states the guidelines for Harbor Beach if Sigel Wind is not producing any MW. However this number may be adjusted as long as the combined output of both units meets the minimum generation requirement. Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for all Thumb load levels under 300 MW when the Belle RiverGreenwood-Pontiac line is outaged. It is recommended to reschedule the outage if Harbor Beach Unit 1 is unavailable and the thumb load is expected to exceed 300 MW. The contingency loss of Arrowhead-Tuscola 120kV line may result in extremely low voltages around the Bad Axe and Harbor Beach substations during the outage of the Belle River-Greenwood-Pontiac 345kV line. Therefore Harbor Beach Unit 1 must run pre-contingency, as indicated in the table below, in order to prevent low post-contingent voltages. Thumb Load Output Below 300 MW 300 MW – 350 MW 350 MW – 375 MW 375 MW – 400 MW 400 MW - 450 MW Minimum Gross HBHPP 45 MW 55 MW 70 MW 80 MW 90 MW There is no restriction on the maximum output. A condition of operation of any condensing steam unit, including Greenwood, is the unit must have two feeds from outside the plant capable of supporting the plant internal electrical load. This is necessary so that, in the event of loss of one of the feeds, there is an immediate availability of the second feed in order to safely shutdown the unit. Greenwood MTG 1 must not be available for operation, unless outside plant power is available to System Service 61 transformer via both Transformer 301 and the Greenwood-Kilgore line. These are the only two sources individually capable of supporting operation and a proper shutdown of Greenwood. If Greenwood-Bennett is the only power source available, it is not capable of starting any of the required large motors at Greenwood to start the plant. It is not capable of supporting the plant auxiliary loads while MTG 1 is already operating nor is it capable of supporting the safe shutdown of the plant. It can be used to maintain lights, ventilation, etc. in the plant, when the plant is already in a safe shutdown condition. When Belle River-Greenwood-Pontiac line is open, Greenwood peakers CTG 11-1, 11-2 and 12-1 can run. The total output (all three peakers) must be below 75 MW. Above 75 MW, for the loss of Greenwood-Kilgore line, Benet Transformer 102 exceeds its tripping limit. There is no restriction on the maximum output. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 2/12/2013 1-03530534 120 KV Minden Wyatt Minden – Wyatt 120kV line 2/14/2013 0530 EST 2/22/2013 1530 EST Planned This outage will require the use of Harbor Beach if the Seaside – Wyatt 120kV line is lost. The combined output of Harbor Beach and Sigel Wind Park will be restricted to 50MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 2/4/2013 Posting Date: MISO Ticket Number: 1/18/2013 1-03458795 138 KV Atlanta Karn - Thetford Atlanta – Karn – Thetford 138kV line 2/6/2013 2000 EST 2/23/2013 1830 EST Planned With Harbor Beach unit 1 off and no wind generation, when the thumb load exceeds 450MW, the loss of Lee - Sandusky 120kV line can cause very low voltages in the thumb region. For this reason, Harbor Beach should run at with a minimum output of 40MW when the thumb load is expected to exceed 450MW. During the timeframe of the outage, the load of the thumb is about 6% of the total ITC load. 1-03418965 KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 120 KV Seaside Wyatt Seaside – Wyatt 120kV line 1/29/2013 0630 EST 2/6/2013 1830 EST Planned This outage will require the use of Harbor Beach if the Harbor Beach – Minden 120kV line is lost. With Harbor Beach on, the combined output of Harbor Beach and Sigel Wind Park will be restricted to 50MW gross output for the duration of the outage. This will prevent Tie 5611 from exceeding its emergency rating. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 1/14/2013 1-03390582 345 KV Belle River Greenwood – Pontiac Belle River – Greenwood - Pontiac 1/26/2013 0700 EST 1/29/2013 1900 EST Planned At this point in time the combined output of Harbor Beach and Sigel Wind must not exceed 100MW at any time. This posting states the guidelines for Harbor Beach if Sigel Wind is not producing any MW. However this number may be adjusted as long as the combined output of both units meets the minimum generation requirement. Harbor Beach Unit 1 must run with a minimum output of 45 MW (gross) for all Thumb load levels under 300 MW when the Belle RiverGreenwood-Pontiac line is outaged. It is recommended to reschedule the outage if Harbor Beach Unit 1 is unavailable and the thumb load is expected to exceed 300 MW. The contingency loss of Arrowhead-Tuscola 120kV line may result in extremely low voltages around the Bad Axe and Harbor Beach substations during the outage of the Belle River-Greenwood-Pontiac 345kV line. Therefore Harbor Beach Unit 1 must run pre-contingency, as indicated in the table below, in order to prevent low post-contingent voltages. Thumb Load Output Below 300 MW 300 MW – 350 MW 350 MW – 375 MW 375 MW – 400 MW 400 MW - 450 MW Minimum Gross HBHPP 45 MW 55 MW 70 MW 80 MW 90 MW There is no restriction on the maximum output. A condition of operation of any condensing steam unit, including Greenwood, is the unit must have two feeds from outside the plant capable of supporting the plant internal electrical load. This is necessary so that, in the event of loss of one of the feeds, there is an immediate availability of the second feed in order to safely shutdown the unit. Greenwood MTG 1 must not be available for operation, unless outside plant power is available to System Service 61 transformer via both Transformer 301 and the Greenwood-Kilgore line. These are the only two sources individually capable of supporting operation and a proper shutdown of Greenwood. If Greenwood-Bennett is the only power source available, it is not capable of starting any of the required large motors at Greenwood to start the plant. It is not capable of supporting the plant auxiliary loads while MTG 1 is already operating nor is it capable of supporting the safe shutdown of the plant. It can be used to maintain lights, ventilation, etc. in the plant, when the plant is already in a safe shutdown condition. When Belle River-Greenwood-Pontiac line is open, Greenwood peakers CTG 11-1, 11-2 and 12-1 can run. The total output (all three peakers) must be below 75 MW. Above 75 MW, for the loss of Greenwood-Kilgore line, Benet Transformer 102 exceeds its tripping limit. There is no restriction on the maximum output. Posting Date: MISO Ticket Number: KV: From Station: To Station: Equipment Name: Planned Start Date/Time: Planned End Date/Time: Outage Type: Comments: 1/14/2013 1-03375656 120 KV Leppek Wyatt Leppek – Wyatt 120kV 1/23/2013 0700 EST 12/25/2012 1830 EST Planned At this point in time the combined output of Harbor Beach and Sigel Wind must not exceed 100MW at any time. This posting states the guidelines for Harbor Beach if Sigel Wind is not producing any MW. However this number may be adjusted as long as the combined output of both units meets the minimum generation requirement. Harbor Beach Unit 1 is required to run with a minimum output of 45 MW (gross) for the entire duration of this outage. It is recommended to reschedule the outage if Harbor Beach is unavailable or expected to offline at anytime during the outage. It is also recommended to reschedule the outage if the Thumb Load is expected to exceed 450 MW at anytime during the outage. Harbor Beach Generator 1 must run as mentioned in the table below for all Thumb load levels: Thumb Load (Gross) Up to 350 MW 350-375 MW 375-400 MW 400-430 MW 430-450 MW Minimum HBHPP Output 45 MW 55 MW 65 MW 75 MW 85 MW At Thumb loads above 450 MW, loss of Arrowhead-Tuscola can result in extremely low voltages and severe overloads on Tuscola XF 101 and several 40kV Tie lines. If the Thumb Load unexpectedly exceeds 450 MW during the outage, it is recommended to return Lee-Sandusky line back to service as soon as possible. The Thumb peakers can be turned ON for voltage support if necessary. Michigan Wind One & Two will be restricted to 85 MW to prevent overload on Sandusky TRF 101 for the loss of Lee - Sandusky 120kV line. Also, to prevent high voltages at Sandusky, DTE may fix the LTC on Sandusky XF 101 to the neutral position prior to the start of the outage.