12/09/2013 Biofuel Production & Implementation Feasibility Study A Proposal for Calvin College Presented By: Engineering 333 & Business 380 1 What would it take to operate a biofuel vehicle using only on-campus resources? Transportation Processing Plant Feedstock 12/09/2013 Project Objective Biofuel Vehicle Application Waste 2 Technical Feasibility • • • • Fuel Selection Vehicle Selection Facilities Selection Future Planning Messaging & Communication • • • • • • Students Prospective Students Faculty/Staff Alumni/Community Donors Decision-Makers 12/09/2013 Project Segmentation 3 Resources • Prof. Thomas Betts – Business Department • Mr. Phil Beezhold – Physical Plant Director 12/09/2013 • Prof. Matthew Heun – Engineering Department • Mr. David LaGrand – Local Biofuel Producer • Mr. Geoffrey Van Berkel – Physical Plant Grounds • Mr. Rick Balfor – Dining Services • Mr. Rich Huisman – Chemistry Department • Mr. Henry Kingsma– Physical Plant Recycling 4 12/09/2013 Fuel Production and Feedstock Presented by: Claire Philippi 5 12/09/2013 Fuel? Processing? 6 Feedstock Vehicle Application 12/09/2013 Fuel Options Image source: nationalgeographic.com Methane Image Source: biodieselchemist.webs.com Biodiesel Image Source: baconsrebellion.com Ethanol Image Source: zombiehunters.org/wiki Vegetable Oil 7 Feedstock Vehicle Application 12/09/2013 Fuel Quality Fuel Clarity Image Source: journeytoforever.org/biodiesel_svo Acidity Image Source: titrations.info Vehicle Application 8 12/09/2013 Filtration Methods Image Source: filterbag.com Image Source: threedeadflies.com Image Source: wvodesigns.com Vehicle Application 9 Costs • The Upfront Component Costs: Total: $1494 $ 428 $ 50 12/09/2013 • Centrifuge and heating source: • Settling tanks: • Filter and screens: $1972 • Monthly Operating Costs: • Filters & Screens • Heat $ 4 $ 10 10 Vehicle Application 12/09/2013 Facilities & Infrastructure Presented By: Karl Bratt 11 12/09/2013 Where to Process? How to Process? Vehicle Application 12 WVO Processing Location 12/09/2013 Physical Plant Warehouse Vehicle Application 13 Shelving 12/09/2013 Industrial Racking System Vehicle Application 14 Heating 12/09/2013 Existing Heater & Heating Tape Vehicle Application 15 12/09/2013 WVO Storage Image Source: www.automotivetools.com/Liquidynamics Image Source: www.disasterstuff.com Image Source: www.amazon.com Vehicle Application 16 Process Design 12/09/2013 Rigid, Parallel System Wait 1 Month… *120 Sq. Ft Vehicle Application 17 Raw WVO Transportation 12/09/2013 Recycling Truck Vehicle Application 18 12/09/2013 Compost Vehicle Application 19 Costs • Upfront Component Costs: Pipes Pipe Connectors: Calvin Physical Plant labor: Valves & Actuators: Electronic Components: Total: $ 1,200 $ 600 $ 428 $ 185 12/09/2013 • • • • $2,413 • Monthly Operating Costs: • Student Labor (Year 1): • Student Labor (Year 2): $ 450 $ 150 Vehicle Application 20 12/09/2013 A Biofuel Vehicle Presented by: Mike Houtman 21 12/09/2013 What Vehicle? How to Convert? Vehicle Application 22 WVO Conversion Diesel Engine Image source: Dieseltronics WVO Purge 5 Microns Image source: WVO Designs Image source: Greasecar.com 160°F 12/09/2013 WVO criteria to be met: Image source: Glow Shift Direct Vehicle Application 23 Vehicle Yearly Usage (hours) 12/09/2013 2670 1072 200 Lawn Mower Leaf Blower Front Loader 100 200 Lift Tractor 50 20 Dump Truck John Deere 24 12/09/2013 2006 Toro GROUNDSMASTER 4000-D 25 12/09/2013 Previous Experience 26 12/09/2013 Vendors 27 12/09/2013 Kits Available Image source: Greasecar.com 28 12/09/2013 Image source: Greasecar.com 29 12/09/2013 WVO Tank Location WVO Tank 30 Controller 12/09/2013 Image source: Greasecar.com 31 WVO Tank 12/09/2013 Controller Location 32 • The purchased equipment costs of this system derive from: • • • • Greasecar WVO kit: Greasecar “Co-Pilot” controller: Calvin Physical Plant labor: Insulating tank cover: Total: $1595 $ 300 $ 360 $ 40 12/09/2013 Costs $2295 33 12/09/2013 Long-Term Planning Presented by Brandon Koster 34 Possible Expansion? CERF Involvement? 12/09/2013 Mower Maintenance? Educational Outcomes? 35 12/09/2013 Fuel Injector Maintenance Image Source: www.standardbrand.com Image Source ecx.images-amazon.com 36 12/09/2013 Fuel Filter Maintenance Image Source: www.vw-resource.com 37 12/09/2013 Engine Oil Analysis Image Source: www.rockingsconsulting.com 38 12/09/2013 Testing Period Image Source : bestclipartblog.com 39 Campus Safety Vehicle Transportation Van 12/09/2013 Additional Vehicle Options Image Source: vimeo.com 40 New Vehicle Selection 12/09/2013 2002-2006 Dodge Sprinter Van http://mbgtown.files.wordpress.com/2010/10/2008-sprinter-passenger-van-0061.jpg http://www.moibibiki.com/images/dodge-sprinter-4.jpg 41 12/09/2013 New Feedstock Sources http://1.bp.blogspot.com/ http://farm4.static.flickr.com/3201/2409592844_f382ca64a7_o.jpg 42 12/09/2013 CERF Integration: Capital Funding 43 12/09/2013 CERF Integration: Internship Program http://www.chamaschools.org/wp-content/uploads/CLIPART_OF_32162_SMJPG_2.jpg 44 Engineering 101 Fridays at Calvin Annual Seminars Prelude 12/09/2013 Educational Integration 45 12/09/2013 Possible Senior Design Project: Automating the Production System Two Electrical Concentrations One Mechanical Concentration One Chemical Concentration 46 • The monthly ongoing maintenance costs: • • • • 1 hour Physical Plant Mechanic Time: Fuel Injector Additive: Fuel Filter: CERF Intern Total: $ $ $ $ 45 16 15 180 12/09/2013 Costs $221/month 47 • Fuel Processing Costs: • Vehicle Conversion Costs: • Infrastructure Costs: Total: $ 1,972 $ 2,295 $ 2,413 12/09/2013 Upfront Capital Costs $6,680 48 • Fuel Processing Costs: • Vehicle Conversion Costs: • Infrastructure Costs: Total: $ $ $ 14 221 150 12/09/2013 Monthly Operating Costs $ 385 49 Total Cost Analysis Breakeven (w/ Student Labor) Diesel vs. WVO $40,000 12/09/2013 $35,000 $30,000 Cost $25,000 $20,000 $15,000 Diesel $10,000 $5,000 WVO (Centrifuge) $- 1 2 3 Year 4 5 6 50 12/09/2013 Proposed Timeline Fall 2014 Summer 2014 Construction Senior Design Automation & WVO Collection Winter 2014/15 Spring 2015 Mower Conversion Begin Operation 51 • Practically Feasible? • Economically Feasibility? • Environmentally Feasibility? YES YES YES 12/09/2013 Feasibility 52 12/09/2013 We recommend that Calvin operate one mower on WVO beginning April 2015. 53 Thank you for your time… 12/09/2013 Questions? 54 12/09/2013 Appendix 55 Operating Procedure • The system must be started on diesel and the “Co-Pilot” will assist the operator in the fuel switch over • Process takes approximately 5 minutes • System flush 12/09/2013 • WVO temperature • System must be flushed with diesel before final shut-down • Process takes less than 1 minute • Fuel Usage • • • • The tank must be routinely at capacity to prevent air in the lines The tank must not be stored with WVO throughout winter The tank must be cleaned and inspected to prevent polymerization The fuel must be treated with additives to prevent bacterial growth 56 Total Cost Analysis Breakeven (w/ CERF Grant) CERF Grant vs. No CERF Grant $40,000 12/09/2013 $35,000 $30,000 Cost $25,000 $20,000 $15,000 $10,000 Diesel No CERF Grant CERF Granr Grant Breakeven Point: August 2015 $5,000 $- 1 2 3 4 5 Year 57 12/09/2013 Tank Insulation 58 • Fuel savings • 1300 gallons of diesel 12/09/2013 Yearly Savings • Cost savings • $4,000 of purchased diesel 59 12/09/2013 Hardware Locations Image source: Greasecar.com 60 12/09/2013 Temperature Concern WVO Tank Vehicle Application 61 Yearly Lawnmower Usage (hours/model) 630 360 Mower 1 (4700D) Mowers 2&3 (4000D) 12/09/2013 1680 Mower 4 (3280D) 62 12/09/2013 Temperature Solution Image source: Zoro Tools 63 12/09/2013 Controller Location 64 Presentation Outline Transportation Fuel Source After: Processing Plant Biofuel Vehicle Vehicle Application 12/09/2013 Before: Waste 65 Process Design 12/09/2013 Rigid, Parallel System 66 Tank Dispense 12/09/2013 Two Outlet, Float Dispense Image Source: www.vegoilcar.co.uk 67 Total Upfront Costs = $6,850 Cost Quantity Total Cost Greasecar Calvin Physical Plant $ $ 1,895.00 60.00 1 8 $ $ $ 1,895.00 480.00 2,375.00 Facilities & Infrastructure Team Raw Power Centrifuge Centrifuge Bolt-on Heater 275 gallon IBC Tote Duda 110 Gallon Cone Tank 25gpm Industrial Oil Transfer Pump 2" PVC Piping (per foot) PVC Schedule 40; 2" Ball Valves Ball Valve Actuator Male/ Female Connectors PVC 90 Degree Joints 600 Micron EZ Strainer - 55 Gal Heating Tape ($/ft) Uniseal for 2" Pipe Installation Time Floats Tubing (33ft) Manual Trigger Nozzle Light switches 250 ft Wire Plug AC to DC converter 1/4" Ready Fuel Hose ($/ft) Facilities & Infrastructure TOTAL WVO Designs WVO Designs Craigslist DudaDiesel WVO Designs Lowes Lowes MegaHobby Lowes Lowes Amazon ACE Hardware Tank Depot Calvin Physical Plant Walmart WVO Designs AdBlueOnline Lowes Lowes Lowes Lowes Delcity $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,197.00 297.00 30.00 188.00 350.00 2.04 14.85 15.50 2.60 15.00 50.00 1.67 5.00 30.00 12.60 60.00 44.00 0.69 63.24 4.34 31.90 1.08 1 1 8 1 2 150 13 11 7 12 1 24 4 20 4 1 1 8 1 1 1 15 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,197.00 297.00 240.00 188.00 700.00 306.00 193.05 170.50 18.20 180.00 50.00 40.00 20.00 600.00 50.40 60.00 44.00 5.52 63.24 4.34 31.90 16.20 4,359.67 $ 6,850.35 Total Upfront Cost: 12/09/2013 Vendor Vehicle Team Lawn Mower Kit Installation Time Vehicle TOTAL 68 Student Worker Wages Additional Preventive Maintenance Labor Fuel Filters Fuel Injector Cleaner Cost of Industrial Space Energy Calvin College Calvin Physical Plant Greasecar Ryder Fleet Products Calvin College Consumers Electricity $ $ $ $ $ $ 10.00 60.00 15.00 8.00 4.00 5.00 14 1 1 2 120 1 $ $ $ $ $ $ 140.00 60.00 15.00 16.00 480.00 5.00 Total Operating Cost: Total Operating Cost Less Sunk Costs $ 716.00 $ 236.00 Total First Year Costs Total First Year Costs Less Sunk Costs $ 15,442.35 $ 9,682.35 12/09/2013 Operating Costs = $236/month 69 Valve Design 12/09/2013 Actuator Controlled Valves Image Source: www.praher-valves.com 70 Valve Design 12/09/2013 Actuator Controlled Valves 71 Transportation Van Cost Analysis 12/09/2013 Result: 1.5 year payback time Thousands Transportation Van Payback $10.00 $9.00 $8.00 Dollars Spent $7.00 $6.00 Diesel Cost $5.00 WVO Cost $4.00 $3.00 $2.00 $1.00 $May-13 Nov-13 Jun-14 Dec-14 Jul-15 Jan-16 Aug-16 Mar-17 72