Extended reserve Technical working group 11 September 2014 SLIDE 1 BACKGROUND Introductions The purpose of the working group: • Review the technical requirements schedule and the selection methodology • Consider how the proposals could be implemented • Test key implementation and operational elements and assumptions • Report on the findings of the investigation and outcomes of the trial. SLIDE 2 BACKGROUND Introductions Progress to date: • Reviewed the data requirements • Participants provided data • Creation of a trial procurement schedule. Which includes: • • SLIDE 3 Example demand unit allocation Example payment and cost allocation SESSION PURPOSE Introductions • Review procurement schedule • • Key issues and concerns Information provision • Assess operational impact • Terms and conditions • Assess implementation impact • SLIDE 4 Time and cost estimates INPUT: PROVIDING CAPABILITY Introductions Capable but not providing 16% (100) Not capable 4% (26) Currently providing AUFLS 80% (516) SLIDE 5 Overview • Total of 642 demand units provided • Majority currently providing AUFLS INPUT: RELAYIntroductions CAPABILITY 700 642 4.0% 600 212 500 33.0% 400 300 286 404 210 200 146 62.9% RG3 All regions 100 0 RG1 RG2 UF only SLIDE 6 26 df/dt None OUTPUT: PROVIDING CAPABILITY Introductions 700 642 600 500 26 4.0% 212 33.0% 400 6 300 200 0.9% 308 80 12.5% 404 62.9% 222 100 34.6% 0 Input UF only SLIDE 7 Allocated df/dt None Overview • Total of 308 demand units allocated • Block 4 includes 20 units which required new relays OUTPUT: Region 1 Allocation Summary Introductions Total demand units allocated: 123 3% (2) Block 1 32 % (19) 7.4% Block 2 14.8 % (2) (4) 65 (39) % 77.8 (21) % 3.8% Block 3 11.5 % (3) Block 4 (1) 84.6 (22) % 60.0% (6) 40.0% (4) 0.0% 60 27 26 Currently providing Not currently providing but has existing functionality No existing functionality SLIDE 8 10 OUTPUT: Region 2 Allocation Summary Introductions Total demand units allocated: 106 Block 1 14.3 % 2.9 % Block 2 (1) 4.8 % Block 3 (1) (4) (5) 26.7 % (30) 85.7 % (34) 97.1 % (20) 95.2 % 35 35 21 Currently providing Not currently providing but has existing functionality No existing functionality SLIDE 9 Block 4 73.3 % (11) 15 0.0% OUTPUT: Region 3 Allocation Summary Introductions Total demand units allocated: 79 Block 1 14.3 % 28 Block 2 Block 3 (3) (4) (24) 11.1 % 85.7 % (24) 88.9 % 27 33.3 % (4) 100. (12) 0% 12 Currently providing Not currently providing but has existing functionality No existing functionality SLIDE 10 Block 4 (3) 25.0 % 12 41.7 % (5) OUTPUT: MEDIAN DEMAND UNIT Introductions 1.400 Overview • The model tends to allocate larger sized demand units 1.200 MW 1.000 0.800 0.600 0.400 0.200 0.000 RG1 Offered SLIDE 11 RG2 Allocated RG3 Not allocated OUTPUT: ALLOCATION ANALYSIS 120000 RG1 (Block 1-3) High VoLL – low MW High VoLL – high MW VoLL ($/MWh) 100000 80000 60000 Example some good candidates that were NOT selected 40000 20000 0 Low VoLL – low MW 0 2 4 6 8 10 Low VoLL – high MW 12 14 16 18 MW SLIDE 12 Price (Not Allocated-Not capable) Price (Not Allocated-Capable) Price (Allocated-Not capable) Price (Allocated-Capable) OUTPUT: ALLOCATION ANALYSIS 120000 RG1 (Block 4) High VoLL – high MW High VoLL – low MW VoLL ($/MWh) 100000 80000 60000 Sensitive load selected Good candidates that were not selected 40000 20000 0 Low VoLL – low MW 0 2 4 6 8 10 Low VoLL – high MW 12 14 16 18 MW SLIDE 13 Price (Not Allocated-Not capable) Price (Not Allocated-Capable) Price (Allocated-Not capable) Price (Allocated-Capable) BREAKOUT: SCHEDULE REVIEW Introductions • In your company groups • Discuss your top 3 issues/concerns from the trial procurement schedule – Write each on post-it note (one per note) • Report back to group – Place each post-it on graph (size of impact/size of concern) – Discuss how the changes would impact on your organisation SLIDE 14 CUSTOMER CLASS STRAW MAN Introductions Customer Class VoLL ($/MWh) Residential $16k Commercial $66k Light Industrial $37k Heavy Industrial $12k Highly Sensitive $100k* User Submitted - Public health and safety Demand (including important public unit services) excluded *Value needs further consideration SLIDE 15 • Sensitive load broken into 2 categories • Public health and safety • PROPS Priority (1-3) • Hospitals, water and sewage pumping, fuel delivery systems etc. • Will not be allocated to an AUFLS block • Highly Sensitive Load • Captures those that don’t fall into other categories (food production) • Standard VoLL value applied • Possible to allocate to an AUFLS block • User submitted VoLL • Customers over 25GWh per year • Customer class percentages must sum to 100% BREAKOUT: INFORMATION PROVISION Introductions • In small groups • Identify any strengths/weaknesses of the straw man proposal – Write each on post-it note (one per note) • Report back to group – Discuss how each would impact on your organisation – POLL: Are you likely to submit user submitted VoLL for your demand units? SLIDE 16 DISCUSSION: INFORMATION PROVISION Introductions • As a large group • Were there any specific challenges to meeting the 60% compliance requirement? – White board session • Poll: Will the proposed straw man alleviate the challenges? – Follow up: If no, what issue remains? SLIDE 17 LUNCH Introductions • Lunch will be in the café – Billi room • 30 minutes SLIDE 18 BREAKOUT: ONGOING INFO REQUIREMENTS Introductions • In small groups • Discuss the impact of the ongoing information requirements (See 5.c-d of Sched. 2) – Are the notice and response requirements achievable? – Based on the TPS how often do you expect to be notifying the System Operator? • Report back to group – POLL: Are the requirements achievable? • Follow up: If not, what is the causing factor? – Indicate which yearly occurrence you expect to be notifying? SLIDE 19 DISCUSSION: PROFILE INFORMATION Introductions • As a large group • Discuss the profile information requirements – Is the provision of embedded station data practical? – How many embedded generators would meet this requirement in your network? – Do any of your demand units have embedded generation connected? How many (estimate)? – How much time is required to prepare information? • If the information was provided twice a year would it be onerous? • Identify size of the impact (# effected/time/resources) • POLL: Are the profile information requirements practical? – Follow up: If not, what is the concern? SLIDE 20 EXERCISE: COST ESTIMATES Introductions • In your company groups • Complete the cost estimate worksheet – What work, time, and cost are required to • test the different relay types (uf and df/dt)? • reconfigure relay settings • install new relay (df/dt capable)? • Report back to group – Hand in worksheets – Share any comments SLIDE 21 BREAKOUT: IMPLEMENTATION Introductions • In small groups • Discuss the relay testing straw man – What is your biggest concern with implementation? • Write on post-it – Would you be able to prepare an implementation plan from the TPS? (what/when for existing/new) – Would you be able to complete testing? – What additional information would you require? • Write each on post-it • Report back to group – POLL: Able to prepare an implementation plan? – POLL: Are the straw man testing requirements achievable? – Share your concerns and requirements SLIDE 22 Next steps Introductions • Outcomes from this meeting • ERTWG Findings Report • Final teleconference to discuss report SLIDE 23