Capital Renewal Deferred Maintenance As of 03/19/13 Project P779212 P779453 P779476 P779477 P779506 P779508 P779512 P779514 P779618 P779652 P779673 P779738 P779744 P779749 P779774 P779776 P779782 P779785 P779787 P779794 P779839 P779920 Current Budget Descr FY07 CRDM Contingency Total FY07 Inactive FY07 CRDM S&R1 & S&R2 Generato FY07 CRDM MD Anderson Lib Coo FY07 CRDM Emg plumbing repairs FY07 CRDM S&R2 SDS Vent Stack FY07 CRDM Cullen Eng ADA Compl FY07 CRDM PGH Room Signs Repla FY07 CRDM E Cullen VP Research FY07 CRDM Moores Music Elevato FY07 CRDM SR1 Flash Tank repai FY07 CRDM CRS Broken Window FY07 CRDM E. Cullen core repla FY07 CRDM Drinking Water Quali FY07 CRDM E. Cullen Rekey ext. FY07 CRDM SR1 Lab 105 Water le FY07 CRDM Bate Law Broken Win FY07 CRDM E. Cullen Lighted Di FY07 CRDM Hofheinz Pav. Plumbi FY07 CRDM GSB Rm 111 Leak FY07 CRDM SEC Window Shades FY07 CRDM 547 Replace Broken G FY07 CRDM 564 Fleming Life Saf Total FY07 CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 210,794.72 6,391,870.49 32,717.00 108,213.44 14,022.53 2,500.00 8,100.00 6,000.00 350.00 7,986.00 6,930.00 831.60 750.00 325.00 308.00 5,225.00 825.00 2,345.00 1,116.00 880.00 2,200.00 733.30 7,222.00 6,812,245.08 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 198,453.67 6,386,870.49 29,356.53 91,726.21 12,089.65 836.23 3,853.08 2,411.03 3,368.27 6,917.67 856.12 307.87 317.50 60.04 2,345.97 746.82 2,000.00 418.00 6,742,935.15 Page 1 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 5,000.00 3,059.20 932.88 857.50 880.00 1,977.00 800.00 13,506.58 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 12,341.05 301.27 16,487.23 1,000.00 806.27 4,246.92 3,588.97 350.00 4,617.73 12.33 (24.52) 442.13 7.50 247.96 1,999.03 78.18 368.00 1,116.00 80.00 200.00 315.30 7,222.00 55,803.35 Cost Center Manager Anketell.Dilip M Gill Jenkins Gill Gill Harless Brungardt Rieck Rahurkar Gonzalez Wright Brungardt Sullivan Brungardt Gonzalez Wright Brungardt Villarreal Villarreal Villarreal Wright Buehler Capital Renewal Deferred Maintenance As of 03/19/13 Project P779260 P779268 P779273 P779289 P779293 P779352 P779354 P779356 P779361 P779374 P779375 P779376 P779385 P779412 P779418 P779427 P779495 P779496 P779498 P779659 P779689 P779755 P779756 P779763 P779770 P779779 P779785 P779808 P779824 P779829 P779837 P779838 P779844 P779845 Current Budget Descr FY08 CRDM CONTINGENCY Total FY08 Completed FY08 CRDM E.Cullen roof repair FY08 CRDM Classroom & Corridor FY08 CRDM Emerg fuel tank farm FY08 CRDM Moores Sch. of Music FY08 CRDM 509 MD Anderson Ext FY08 CRDM 543-509 Arch & MDA FY08 CRDM Framework Model Addi FY08 CRDM 516 E Cullen S Entra FY08 CRDM 581 Eng Fire Alarm U FY08 CRDM 585 GSB Fire Alarm U FY08 CRDM 590 Hilton Pump Moni FY08 CRDM 585 GSB Rm177 Carpet FY08 CRDM 544 Cemo Water Infil FY08 CRDM 586 Cameron Sewage L FY08 CRDM 551 S&R2 Water Drain FY08 CRDM MDA Library Basement FY08 CRDM Arch. Indoor Air Qua FY08 CRDM Welcome Ctr Odor Inv FY08 CRDM Fleming Dom. Hot Wat FY08 CRDM Tunnel air to SERC FY08 CRDM SR2 ACM Removal FY08 CRDM Agnes Arn. Window Re FY08 CRDM Classrom Cleaning FY08 CRDM Hofheinz Pav. Rm18 FY08 CRDM SR1 Loading Dock Sec FY07 CRDM Hofheinz Pav. Plumbi FY08 CRDM Mitchell Ctr. AHU#1 FY08 CRDM Refurbish Campus Dir FY08 CRDM 579 Labs S346 & S348 FY08 CRDM 519 Rook Repair Bull FY08 CRDM 528 Replace Broken W FY08 CRDM 590 CE Broken Window FY08 CRDM 578 Broken Window CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 388,243.67 7,046,504.59 120,786.13 97,187.64 870,008.88 11,523.00 164,190.24 124,749.48 24,440.00 73,098.34 241,598.30 321,148.00 5,737.00 5,032.34 53,820.00 1,917.00 5,000.00 7,210.00 21,958.50 3,240.00 32,951.60 12,430.00 1,172.76 3,754.76 209,500.00 2,521.00 377.00 2,475.27 12,851.30 6,600.00 51,154.40 1,013.12 2,628.60 1,551.64 867.64 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 291,262.14 7,038,207.96 120,298.12 96,103.28 827,472.84 3,498.00 126,427.48 95,181.87 23,500.00 28,713.03 231,923.46 233,012.11 4,570.00 4,661.82 38,820.00 1,915.00 1,771.76 5,138.77 16,150.00 2,397.07 19,987.76 11,861.58 315.76 1,065.76 141,797.23 2,400.00 154.50 627.38 2,141.00 1,162.00 540.00 Page 2 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 8,296.63 238.01 13,000.00 34,716.41 7,251.89 680.00 1,212.26 - Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 96,981.53 250.00 1,084.36 42,536.04 8,025.00 24,762.76 29,567.61 940.00 9,668.90 9,674.84 80,884.00 1,167.00 370.52 15,000.00 2.00 3,228.24 2,071.23 5,808.50 162.93 12,963.84 568.42 857.00 2,689.00 66,490.51 121.00 222.50 2,475.27 12,851.30 6,600.00 51,154.40 385.74 487.60 389.64 327.64 Cost Center Manager Oliver Oliver LaMontagne Oliver Javaid Javaid Maal Villarreal Miller Oliver Schneller Gill Oliver Gill Wright Wright Wright Mosley Villarreal Brungardt Villarreal Gonzalez Wright Galvan Wright Wright Wright Wright Capital Renewal Deferred Maintenance As of 03/19/13 Project P779851 P779855 P779859 P779863 P779864 P779865 P779866 P779876 P779877 P779901 P779902 P779905 Current Budget Descr FY08 CRDM 516 Renewal multiple FY08 CRDM 547 Replace VFD on A FY08 CRDM 550 4th Flr. Brkn W FY08 CRDM 588 Flooring Renewal FY08 CRDM 588 Flooring Ste 306 FY08 CRDM 542 Front Door Glass FY08 CRDM 551 Broken Window 1 FY08 CRDM Agnes Arnold Electri FY08 CRDM Multiple Bldgs. Faci FY08 CRDM SR1 Exterior Repair FY08 CRDM 518 Rm205B Renewal FY08 CRDM 515 Emgy Generator R Total FY08 CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ 8,585.50 11,867.90 4,110.64 10,213.28 9,198.28 681.64 975.64 7,373.78 2,000.00 8,672.67 3,976.50 940.00 9,997,838.03 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ 3,488.00 3,810.00 2,885.00 371.00 638.00 417.38 113.21 9,384,800.27 Page 3 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ 4,979.00 4,980.00 5,264.00 80,618.20 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ 8,585.50 11,867.90 622.64 1,424.28 1,333.28 310.64 337.64 1,692.40 1,886.79 8,672.67 3,976.50 940.00 532,419.56 Cost Center Manager Wright Rahurkar Wright Wright Wright Wright Wright Wheeler Norcom Villarreal Wright Villarreal Capital Renewal Deferred Maintenance As of 03/19/13 Project P779300 P779388 P779390 P779396 P779398 P779442 P779449 P779474 P779710 P779714 P779716 P779724 P779736 P779736 P779743 P779743 P779860 P779861 P779867 P779868 P779908 Current Budget Descr FY09 CRDM Contingency Total FY09 Complete FY09 CRDM 551 S&R2 Trench Drai FY09 CRDM 524 SS Bldg. Fire Al FY09 CRDM 506 Comm Air Handler FY09 CRDM 516 ECullen Restroom FY09 CRDM Central Utility Plan FY09 CRDM OB Woods Irrigation FY07-FY10 MD Anderson Facade FY09 CRDM SEC Marker Board Rep FY09 CRDM Agnes Arn Window Rep FY09 CRDM E.Cullen Blvd Sign R FY09 CRDM SPA Garage Door Repl FY09 CRDM SR1 Heat & Humidity FY09 CRDM SR1 Heat & Humidity FY09 CRDM PGH Hall Elevator Dr FY09 CRDM PGH Hall Elevator Dr FY09 CRDM 550 ACM Removal Flo FY09 CRDM 581 Rm W401 Abatemen FY09 CRDM 581 Water Pipe Break FY09 CRDM Campus Backflow Prev FY09 CRDM 590 Broken Window E& Total FY09 CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 327,515.46 2,231,150.06 3,054.24 113,344.00 301,641.00 400.00 4,785.00 10,924.95 200,000.00 13,325.20 6,819.00 8,113.00 2,239.00 40,429.65 8,100.00 34,751.88 3,991.47 28,779.27 58,361.76 813.64 3,398,538.58 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 291,262.14 2,229,448.06 1,529.04 86,435.86 286,768.35 161.19 4,025.00 9,525.00 200,060.04 15,114.39 5,952.69 593.72 2,026.70 24,900.00 11,031.36 7,163.00 8,150.20 28,851.88 2,991.47 25,335.07 3,241,325.16 Page 4 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,702.00 43,588.42 45,290.42 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 36,253.32 1,525.20 26,908.14 14,872.65 238.81 760.00 1,399.95 (60.04) (1,789.19) 866.31 7,519.28 212.30 15,529.65 (11,031.36) 937.00 (8,150.20) 5,900.00 1,000.00 3,444.20 14,773.34 813.64 111,923.00 Cost Center Manager Rockwell-Hopkins Barnes Doyle Ruck Rieck Gill Smith Oliver Wright Wright Wright Wright Gonzalez Gonzalez Aguilar Aguilar Villarreal Villarreal Wright Villarreal Wright Capital Renewal Deferred Maintenance As of 03/19/13 Project P779325 P779716 P779422 P779869 P779874 P779883 P779886 P779893 P779894 P779895 P779896 P779898 P779900 P779912 P779913 P779914 P779915 P779916 P779918 P779925 Current Budget Descr FY10 CRDM Contingency Total FY10 Complete FY09 CRDM E.Cullen Blvd Sign R FY10 CRDM FPC Master Specifica FY10 CRDM 503 Hot Water Exchan FY10 CRDM 578 Emg. Generator T FY10 CRDM 578 Emg. Generator T FY10 CRDM 520 Emg Gen Troubles FY10 CRDM 538 Rms 337 Abate Ca FY10 CRDM 538 Rms 332 Abate Ca FY10 CRDM 590 Rm 116 Broken Wi FY10 CRDM 585 EHS Painting Ren FY10 CRDM 550 Rm 423 Broken Do FY10 CRDM Rm 407 Broken Door r FY10 CRDM 542 SPA Overhead Doo FY10 CRDM 701 TMC Generator Re FY10 CRDM 551 Greenhouse Roof FY10 CRDM 564 Water Intrusion FY10 CRDM 551 Backflow Replace FY10 CRDM Roof Program Planned FY10 CRDM TMC Pharmacy Generat Total FY10 CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 453,499.76 907,250.07 20,021.10 225,000.00 8,354.50 1,130.00 2,962.35 1,468.00 5,482.40 11,841.50 978.60 5,610.00 2,539.00 3,763.10 5,114.03 23,076.00 29,147.73 12,703.46 2,250.00 70,000.00 12,808.40 1,805,000.00 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 291,262.14 902,629.90 181,925.52 2,463.78 2,924.00 7,005.00 2,290,840.24 Page 5 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 4,620.17 17,996.00 14,178.00 41,414.34 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 162,237.62 20,021.10 25,078.48 8,354.50 1,130.00 498.57 1,468.00 2,558.40 4,836.50 978.60 5,610.00 2,539.00 3,763.10 5,114.03 8,898.00 29,147.73 12,703.46 2,250.00 70,000.00 12,808.40 379,995.49 Cost Center Manager Norcom Wright Yancey Gonzalez Villarreal Villarreal Villarreal Wright Wright Wright Wright Wright Wright Villarreal Rahurkar Villarreal Villarreal Oliver Villarreal Capital Renewal Deferred Maintenance As of 03/19/13 Project P779480 P779486 P779501 P779502 P779503 P779509 P779515 P779516 P779518 P779519 P779522 P779524 P779527 P779528 P779529 P779531 P779532 P779534 P779538 P779545 P779554 P779555 P779558 P779562 P779564 P779565 P779566 P779567 P779568 P779570 P779571 P779574 P779575 P779579 Current Budget Descr FY11 CRDM Contingency Total FY11 Complete FY11 CRDM Main Campus Utility FY11 CRDM Architectue Vestibul FY11 CRDM Student Svc Bldg Sky FY11 CRDM Melcher & Garrison G FY11 CRDM MD Anderson Lib Carp FY11 CRDM CW Water Sanitary St FY11 CRDM CW Transportation Ma FY11 CRDM CW Ruptured Coil Rep FY11 CRDM SR1 & SR2 Generator FY11 CRDM CCOE-S40 Flooring Re FY11 CRDM Cullen Eng Fire Supp FY11 CRDM Power Plant Chiller FY11 CRDM Wortham Theater Door FY11 CRDM Arch Mold Remediatio FY11 CRDM FCA Phase 1 and 2 FY11 CRDM Campus Grounds Fire FY11 CRDM UH Generator & ATS R FY11 CRDM GSB/Cameron Hot Wate FY11 CRDM Hilton (E&G) Control FY11 CRDM Campus Wide Fire Ext FY11 CRDM Optometry Elv. Jack FY11 CRDM E. Cullen Basement F FY11 CRDM S&E Annex AGL Domest FY11 CRDM GSB 1st Floor Restro FY11 CRDM Cameron Grease Trap FY11 CRDM Central Plant Chille FY11 CRDM Hilton/Moody Water L FY11 CRDM Trailer Village Util FY11 CRDM Eng. Northside Domes FY11 CRDM Wortham Theatre Awni FY11 CRDM SPA Awning N. Side FY11 CRDM Melcher Hall Exterio FY11 CRDM MDA Library Ductile CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 31,334.06 1,408,177.85 345,340.00 13,390.00 3,509.32 52,363.46 28,590.34 170,000.00 140,000.00 10,000.00 246,990.29 11,899.33 379,065.75 162,845.45 32,577.15 6,407.12 95,176.33 9,717.28 49,965.00 27,604.00 302,511.00 14,986.50 46,453.00 40,640.31 52,957.92 20,213.75 5,847.84 124,452.31 161,695.00 10,965.00 2,603.94 1,030.00 17,878.74 53,154.36 2,664.00 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 27,056.31 1,414,933.53 340,415.51 390.00 3,202.21 49,249.58 26,435.85 164,387.65 130,466.32 2,029.47 8,659.93 85,165.75 152,633.07 29,899.32 3,986.62 91,188.78 8,628.23 40,087.95 25,365.08 8,811.00 11,673.33 29,525.00 37,655.77 44,633.58 2,653.43 5,125.17 167,443.59 115,758.45 9,411.99 2,374.78 414.14 15,934.90 143.57 2,637.79 Page 6 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 10,325.17 356.85 440.22 6,650.00 6,792.50 128,375.00 865.00 483.18 1,042.00 10,240.32 17,072.72 49,148.75 - Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 4,277.75 4,567.64 13,000.00 307.11 2,673.66 2,154.49 5,612.35 2,883.68 3,207.50 244,960.82 3,239.40 165,525.00 10,212.38 2,677.83 1,555.50 3,504.37 1,089.05 9,877.05 2,238.92 293,700.00 2,271.17 16,928.00 2,984.54 8,324.34 7,320.00 722.67 (42,991.28) 28,863.83 1,553.01 229.16 615.86 1,943.84 3,862.04 26.21 Cost Center Manager Rockwell-Hopkins Ivy Oliver Jenkins Wiesman Jenkins Ivy Ivy Oliver Gill Davis Oliver Gill Brungardt Oliver Norcom Oliver Gill Gill Rahurkar Oliver Rahurkar Jenkins Gill Jenkins Gill Gill Gill Ivy Gill Ivy Ivy Jenkins Gill Capital Renewal Deferred Maintenance As of 03/19/13 Project P779581 P779584 P779588 P779590 P779592 P779593 P779598 P779599 P779604 P779605 P779619 P779620 P779622 P779623 P779624 P779627 P779629 P779629 P779745 P779750 P779757 P779758 P779760 P779771 P779772 P779773 P779775 P779781 P779786 P779788 P779789 P779790 P779791 P779792 P779793 Current Budget Descr FY11 CRDM Krost Hall Six-Inch FY11 CRDM Eight-Inch Water Mai FY11 CRDM Cullen Eng. Mech. Rm FY11 CRDM Tech ADA Automatic D FY11 CRDM SR2 Animal Care Sani FY11 CRDM CW Four-inch Irrigat FY11 CRDM McElhinney Hall New FY11 CRDM SR2 AHU#4-D Water Co FY11 CRDM McElhinney Damaged C FY11 CRDM Social Work Carpet F FY11 CRDM Lot 15C & ROTC Sanit FY11 CRDM SR1 1st flr. drains FY11 CRDM Merlin Gerin Circuit FY11 CRDM Cougar Substation Gr FY11 CRDM SERC Emerg 15KV ATS FY11 CRDM Fine Arts Blaffer Ga FY11 CRDM GSB Auto Shop Vehicl FY11 CRDM GSB Auto Shop Vehicl FY11 CRDM Sink Hole Spur 5 FY11 CRDM DPS Emerg. Repairs FY11 CRDM Old Science Asbestos FY11 CRDM Cmpting Ctr. Chiller FY11 CRDM Cull. Eng S344A Seal FY11 CRDM Computing Ctr Genera FY11 CRDM Old Science Decommis FY11 CRDM Dr. Bissada Lab Plum FY11 CRDM Heyne Bldg. Sprinkle FY11 CRDM Cullen Eng. Roof Rep FY11 CRDM Cull. Eng. Leak S343 FY11 CRDM Facility Renewal Pla FY11 CRDM Cheyenne Fountain Pa FY11 CRDM Cullen Plaza Fountai FY11 CRDM Campus Kiosks Phase2 FY11 CRDM Fountain Epoxy Remov FY11 CRDM Cull. Eng Duct Leak CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3,138.63 8,461.00 25,970.00 9,062.07 7,220.00 5,120.59 11,968.00 6,790.30 2,980.00 1,511.13 32,782.00 9,434.00 22,091.28 20,747.50 66,236.00 51,676.83 6,100.00 2,204.42 1,976.23 2,368.05 933.00 40,343.60 27,800.13 12,383.39 30,000.00 13,533.02 3,668.24 31,212.06 2,188.54 11,130.00 14,460.36 60,534.35 49,578.64 28,768.30 2,063.78 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3,125.29 8,286.92 20,478.24 7,996.93 5,283.68 4,949.77 10,856.34 5,918.32 3,052.65 1,382.60 31,734.20 7,881.46 17,634.69 12,329.08 56,172.23 6,079.06 424.33 111.86 329.17 932.81 23,500.80 26,100.13 700.95 1,698.11 11,372.38 2,643.59 28,535.21 2,072.26 6,553.60 9,383.38 57,669.73 38,452.24 1,628.39 1,511.82 Page 7 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,377.50 7,569.27 13,000.00 9,620.44 4,079.50 - Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 13.34 174.08 5,491.76 1,065.14 1,936.32 170.82 1,111.66 871.98 (72.65) 128.53 1,047.80 1,552.54 3,079.09 849.15 10,063.77 51,676.83 20.94 1,780.09 1,864.37 2,038.88 0.19 3,842.80 1,700.00 2,062.00 28,301.89 2,160.64 1,024.65 2,676.85 116.28 496.90 5,076.98 2,864.62 11,126.40 27,139.91 551.96 Cost Center Manager Gill Gill Oliver Jenkins Gill Gill Gill Rahurkar Wright Jenkins Gill Gill Gill Gill Gill Maal Smith Smith Gill Vail Gill Simmons Oliver Gill Galvan Tolbert Vail Oliver Oliver Warner Warner Warner Norcom Oliver Capital Renewal Deferred Maintenance As of 03/19/13 Project P779797 P779798 P779799 P779800 P779803 P779809 P779811 P779812 P779822 P779823 P779879 P779919 Current Budget Descr FY11 CRDM Cow Path Sidewalks FY11 CRDM Cameron AHU Design FY11 CRDM Water Leak Campus In FY11 CRDM Tech. Restroom Refre FY11 CRDM McElhinney Paint & C FY11 CRDM Hines Arch. Steam Pi FY11 CRDM Water Leak Investiga FY11 CRDM Water Line Leak repa FY11 CRDM 547&578 Water Leak FY11 CRDM 551 Sanitary Drain C FY11 CRDM TMC Pharmacy Generat FY11 CRDM 586 New Walkway Inst Total FY11 CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ 32,722.88 30,957.30 2,894.58 139,920.00 14,796.80 7,840.67 11,154.66 7,738.11 9,252.73 6,757.50 38,153.91 2,246.88 5,013,877.86 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ 29,991.33 1,752.30 163.84 13,643.51 14,383.37 6,668.23 6,908.59 6,574.46 6,752.47 2,007.50 37,189.91 3,601,195.38 Page 8 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ 27,000.00 2,730.73 2,019.35 5,724.38 3,250.00 308,162.88 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ 2,731.55 2,205.00 0.01 124,257.14 413.43 1,172.44 4,246.07 (4,560.73) 2,500.26 1,500.00 964.00 2,246.88 1,121,600.45 Cost Center Manager Rockwell-Hopkins Laws Gill Connell Laws Wheeler Wheeler Wheeler Gill Gill Villarreal Warner Capital Renewal Deferred Maintenance As of 03/19/13 Project P779576 P779375 P779531 P779568 P779588 P779630 P779635 P779636 P779637 P779639 P779640 P779641 P779642 P779643 P779645 P779647 P779649 P779650 P779651 P779654 P779660 P779661 P779668 P779669 P779672 P779674 P779679 P779690 P779692 P779693 P779696 P779701 P779704 P779705 Current Budget Descr FY12 CRDM Contingency Total FY12 Completed FY08 CRDM 585 GSB Fire Alarm U FY11 CRDM FCA Phase 1 and 2 FY11 CRDM Trailer Village Util FY11 CRDM Cullen Eng. Mech. Rm FY12 CRDM Replace Chill Water FY12 CRDM Water main leak @OS FY12 CRDM AA Hall Water Leak FY12 CRDM E. Cullen Water Valv FY12 CRDM FIne Arts Irrigation FY12 CRDM Computing Ctr Gen FY12 CRDM Pilot Mother's Room FY12 CRDM EHS Shower & Eyewash FY12 CRDM Renew Dom. Water Loo FY12 CRDM E&G Storm Issues FY12 CRDM Access Pannel for St FY12 CRDM Lot 9C Fence Clean u FY12 CRDM MDA Lib. Water Main FY12 CRDM Fine Arts 8" Water m FY12 CRDM SR1 Stuctural Assess FY12 CRDM Quad. Ext. Sidewalk FY12 CRDM MDA Lib. Backwater V FY12 CRDM Cameron Bldg. Restro FY12 CRDM SR1 General Refresh FY12 CRDM Wortham Thtr Sprinkl FY12 CRDM Hilton Roof Assessme FY12 CRDM SERC Classrooms Phas FY12 CRDM UHPD Roof Repair FY12 CRDM FloodBreak annual Ma FY12 CRDM Capmus Posting Kiosk FY12 CRDM Cougar Sub Lighting FY12 CRDM Chilled Pipe Assessm FY12 CRDM Cemo HVAC unit Repla FY12 CRDM Lot 19D water leak CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 16,973.68 1,171,172.13 275,686.47 294,892.61 216,080.55 134,148.19 235,628.40 6,035.27 16,752.66 9,541.37 8,094.49 18,513.05 22,207.34 364,890.75 30,529.44 27,647.94 12,137.00 8,752.42 11,009.00 12,501.00 143,306.70 1,976.37 31,850.00 22,154.00 465,150.00 333,117.03 60,885.76 27,322.81 12,423.43 8,395.00 44,237.27 42,375.70 144,248.00 34,603.70 2,395.00 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,161,150.46 196,912.04 270,241.52 199,717.87 88,239.00 237,379.87 4,569.79 14,312.69 8,054.10 6,823.63 17,512.96 16,474.21 46,103.46 1,728.08 21,640.76 10,908.46 495.42 8,535.21 12,300.60 108,461.10 1,806.87 28,742.24 1,254.00 344,206.17 287,631.22 29,757.80 24,959.60 7,675.19 40,937.63 36,794.32 116,351.95 2,140.60 2,394.57 Page 9 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,349.00 60,580.00 26,880.00 0.01 784.79 5,701.14 5,109.00 1,278.46 18,000.00 89,158.24 28,465.00 0.73 - Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 8,672.67 - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 16,973.68 18,194.43 24,651.09 16,362.68 19,029.19 (1,751.47) 1,465.48 2,439.97 1,487.27 1,270.86 1,000.09 5,733.12 318,002.50 28,801.36 306.04 1,228.54 3,148.00 2,473.79 200.40 33,567.14 169.50 3,107.76 2,900.00 31,785.59 17,020.81 31,127.96 2,363.21 12,423.43 719.81 3,298.91 5,581.38 27,896.05 32,463.10 0.43 Cost Center Manager Rockwell-Hopkins Simmons Norcom Ivy Oliver Gill Gill Gill Gill Gill Gill Gill Tolbert Rockwell-Hopkins Gill Warner Gill Gill Ivy Prochaska Gill Connell Galvan Norcom Tolbert Gonzalez Rahurkar Gill Warner Gill Gill Oliver Gill Capital Renewal Deferred Maintenance As of 03/19/13 Project P779708 P779712 P779713 P779718 P779720 P779721 P779722 P779729 P779730 P779731 P779732 P779733 P779737 P779740 P779741 P779742 P779748 P779761 P779762 P779764 P779765 P779766 P779767 P779804 P779810 P779813 P779814 P779815 P779816 P779820 P779833 P779840 P779841 P779842 P779907 Current Budget Descr FY12 CRDM Fire Extingusher CW FY12 CRDM S&R1 Post Renovation FY12 CRDM OB Hall Six Inch OS& FY12 CRDM MDA Duct Work Reconf FY12 CRDM Grease Trap for Kitc FY12 CRDM Fire Prot. Cm.Item 1 FY12 CRDM Fire Prot CM. Item 3 FY12 CRDM Electrical Infrastru FY12 CRDM Optometry Rep. Desig FY12 CRDM MDA Lib. Sewer Desig FY12 CRDM CDPB Carpet Replacem FY12 CRDM MDA Lib. Brown Wing FY12 CRDM Fire Prot. Comp. #4 FY12 CRDM Opt. Structural Demo FY12 CRDM Repair Steam Leak FY12 CRDM Exterior Water Infra FY12 CRDM Clinical Res. Roof R FY12 CRDM Classroom Lighting & FY12 CRDM Exterior Refresh FY12 CRDM Fire Hydrants PM FY12 CRDM Fine Arts Cleaning & FY12 CRDM TU2 Water Infiltrati FY12 CRDM Hilton Life Safety & FY12 CRDM Fleming Transformer FY12 CRDM DPS Interior Paintin FY12 CRDM Y-Parking Landscape FY12 CRDM Tech Annex Life Safe FY12 CRDM SR2 Fire Pump Tie In FY12 CRDM FDC Hydrostatic Test FY12 CRDM 596 New Chiller and FY12 CRDM 515 Water Softener R FY12 CRDM 586 Sound Abatement FY12 CRDM 516 SFMO Vltn #09 FY12 CRDM 596 Emerg. Gen. Stud FY12 CRDM VCT Florring Rms 703 CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 11,489.34 23,428.30 4,742.41 21,105.55 179,020.00 34,980.00 29,150.00 5,060.00 88,404.00 98,427.89 96,267.00 221,000.00 22,957.47 54,909.23 18,472.00 21,224.68 10,722.20 173,250.00 130,515.00 104,940.00 177,349.10 12,534.50 1,757,668.00 82,549.00 48,777.35 34,557.91 21,345.05 30,432.60 17,781.50 433,125.00 13,744.00 29,998.00 34,692.57 12,359.60 7,375.06 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 7,297.18 23,198.00 3,922.97 19,089.57 161,116.17 31,779.54 26,650.00 3,826.42 45,580.14 66,134.70 91,419.23 172,435.69 19,788.56 50,442.51 15,978.58 18,612.38 9,490.52 144,778.07 63,657.37 23,694.14 160,706.91 709.50 1,358,163.22 72,468.08 44,594.04 30,877.75 1,208.21 8,172.60 1,006.50 20,625.00 777.96 1,698.00 29,717.22 1,989.60 4,877.46 Page 10 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 717.22 65.96 800.00 26,956.00 36,998.30 1,692.00 (1,490.60) 9,924.00 10,000.00 162,345.56 19,650.00 10,000.00 11,788.00 7,310.00 1,488.00 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 8,923.86 - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3,474.94 230.30 819.44 1,950.02 17,903.83 2,400.46 2,500.00 1,233.58 33,900.00 5,337.19 4,847.77 11,566.01 3,168.91 2,774.72 2,493.42 2,612.30 1,231.68 29,962.53 66,857.63 81,245.86 6,718.19 1,825.00 237,159.22 10,080.92 4,183.31 3,680.16 20,136.84 2,610.00 6,775.00 412,500.00 1,178.04 28,300.00 4,975.35 3,060.00 1,009.60 Cost Center Manager Tolbert Mosley Gill Oliver Gill Simmons Simmons Gill Laws Simmons Wright Galvan Simmons Laws Gill Gill Galvan Espey Espey Simmons Vail Laws Maal Laws Galvan Tolbert Simmons Simmons Simmons Gill Vail Simmons Simmons Mathis Capital Renewal Deferred Maintenance As of 03/19/13 Project P779909 P779910 P779911 P779921 P779922 Current Budget Descr FY12 CRDM Lynn Eusan Storm Dra FY12 CRDM 593 Electrical Repai FY12 CRDM 520 Electrical Repai FY12 CRDM Floodbreak - Annual FY12 CRDM Water Leak at Parkin Total FY12 CRDM As of 03/19/13 $ $ $ $ $ $ 21,112.04 10,516.15 24,060.41 4,524.00 4,691.56 8,396,893.00 YTD/PTD Rev/Exp $ $ $ $ $ $ 1,195.02 595.25 1,361.91 6,095,849.36 Page 11 of 15 Open Cmt $ $ $ $ $ $ 5,000.00 540,550.81 Soft Cmt $ $ $ $ $ $ 17,596.53 BBA $ $ $ $ $ $ 14,917.02 9,920.90 22,698.50 4,524.00 4,691.56 1,742,896.30 Cost Center Manager Vail Wheeler Wheeler Gill Gill Capital Renewal Deferred Maintenance As of 03/19/13 Project P779784 P779783 P779668 P779672 P779730 P779798 P779806 P779816 P779819 P779825 P779826 P779827 P779828 P779830 P779831 P779832 P779846 P779848 P779852 P779853 P779854 P779856 P779857 P779858 P779862 P779870 P779871 P779872 P779873 P779875 P779880 P779881 P779884 P779885 P779887 Current Budget Descr FY13 CRDM Contingency FY13 CRDM SR2 3rd Floor Mold FY12 CRDM Cameron Bldg. Restro FY12 CRDM Wortham Thtr Sprinkl FY12 CRDM Optometry Rep. Desig FY11 CRDM Cameron AHU Design FY13 CRDM SR1 Fume Hood Leak FY12 CRDM FDC Hydrostatic Test FY13 CRDM 543 Loading Dock Doo FY13 CRDM Water main leak PGH FY13 CRDM HSC Pressure Washing FY13 CRDM WorthamTheatre Renew FY13 CRDM 533 Dance Floor Inst FY13 CRDM SFMO Vltn #10 FY13 CRDM 580Bldg. Envelope Wo FY13 CRDM 586Bldg. Envelope Wo FY13 CRDM Water leak MDA & CP FY13 CRDM 564 Leaking Ceiling FY13 CRDM 534 Storm Drain Leak FY13 CRDM SFMO Vltn #16 FY13 CRDM SFMO Vltn #17 FY13 CRDM 543 Water Main Leak FY13 CRDM 532 SFMO Vltn #14 FY13 CRDM 517 SFMO Vltn #10 Pe FY13 CRDM 534 Rm27 Floor Drain FY13 CRDM 585 GSB Fire Dept. R FY13 CRDM 499 Vandalism Repair FY13 CRDM 550 Plumbing Repairs FY13 CRDM 590 Storm Sewer CCTV FY13 CRDM Inf. Water Leak at C FY13 CRDM Exterior Patio Repla FY13 CRDM 585 PIV Emg. Repair FY13 CRDM 515 Chiller #3 Inspe FY13 CRDM 515Chiller #4 Replac FY13 CRDM 585 Restroom Phase 2 CRDM As of 03/19/13 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2,314,657.04 12,768.37 62,840.31 730,924.37 894,259.00 76,656.58 163,782.33 19,122.40 13,264.42 62,361.04 25,246.58 343,041.36 90,651.56 350,957.38 152,460.00 344,767.00 50,051.97 47,407.72 5,549.42 266,727.94 232,569.38 3,769.60 126,996.38 309,811.41 8,039.01 9,211.40 2,200.94 7,964.99 5,651.84 4,961.66 51,887.00 24,440.18 7,520.70 21,594.32 11,893.20 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 12,073.68 3,557.00 420,904.52 23,617.25 8,712.00 47,497.38 14,500.00 10,176.00 49,361.04 21,881.35 40,537.64 74,376.98 299,555.40 7,260.00 24,031.48 45,304.97 43,341.88 5,556.74 238,634.61 207,433.50 3,769.60 111,001.02 277,987.91 455.04 521.40 2,012.18 7,964.99 319.92 280.85 2,937.00 7,276.11 425.70 673.20 Page 12 of 15 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 7,520.70 45,890.14 10,229.24 690,000.00 104,556.17 750.00 225,759.00 23,300.00 22,600.00 7,900.00 44,500.00 13,068.00 21,594.32 3,195.00 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2,307,136.34 694.69 13,393.17 299,790.61 180,641.75 67,944.58 11,728.78 3,872.40 3,088.42 13,000.00 3,365.23 76,744.72 16,274.58 51,401.98 121,900.00 298,135.52 4,747.00 4,065.84 (7.32) 28,093.33 25,135.88 15,995.36 31,823.50 7,583.97 790.00 188.76 5,331.92 4,680.81 4,450.00 4,096.07 7,095.00 8,025.00 Cost Center Manager Rockwell-Hopkins Oliver Laws Prochaska Laws Laws Galvan Simmons Oliver Gill Laws Prochaska Galvan Simmons Vail Vail Gill Oliver Gill Simmons Simmons Gill Simmons Simmons Wheeler Burks Simmons Laws Wheeler Wheeler Laws Simmons Wheeler Wheeler Burks Capital Renewal Deferred Maintenance As of 03/19/13 Project Current Budget Descr P779888 P779889 P779890 P779892 P779897 P779899 P779923 FY13 CRDM 550 Lab 103/105 Code FY13 CRDM 506 Courtyard Landsc FY13 CRDM 581 Room W122 Refres FY13 CRDM 592 Cooling Tower PM FY13 CRDM 585 FPC 2nd Flr Abat FY13 CRDM Waterline repair und FY13 CRDM OM Refurbishment E&G Total FY13 $ $ $ $ $ $ $ $ P779321 P779342 P779343 P779481 P779482 P779483 P779484 FY09 CRDM Cooling Tower 5 FY10 CRDM Cooling Tower 4 Repl FY10 CRDM Central Plant Expans FY11 CRDM Central Plant Expans FY12 CRDM Central Plant Expans FY13 CRDM Central Plant Expans FY14 CRDM Central Plant Expans Total CUP $ 6,605,000.00 $ 2,970,000.00 $ 5,225,000.00 $ 4,996,670.00 $ 5,903,107.00 $ 7,325,297.00 $ 5,378,122.00 $ 38,403,196.00 CRDM As of 03/19/13 7,208.00 7,537.02 11,834.50 10,446.19 49,570.00 19,307.24 12,791.25 6,974,703.00 YTD/PTD Rev/Exp $ $ $ $ $ $ $ $ Open Cmt Soft Cmt BBA Cost Center Manager 408.00 426.62 669.88 591.29 1,092.86 2,017,126.99 $ $ $ $ $ $ $ $ 5,800.00 10,150.00 8,459.00 1,245,271.57 $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ 1,000.00 7,110.40 1,014.62 1,395.90 49,570.00 18,214.38 12,791.25 3,712,304.44 Oliver Warner Vail Wheeler Wiesman Gill Wheeler $ 5,874,888.86 $ 2,932,478.92 $ 2,437,267.50 $ 4,996,237.64 $ 5,905,741.36 $ 6,467,350.64 $ 4,399,063.33 $ 33,013,028.25 $ $ $ $ $ $ $ $ 406,847.22 85,481.22 842,386.66 949,568.68 2,284,283.78 $ $ $ $ $ $ $ $ 93.00 93.00 $ $ $ $ $ $ $ $ 323,263.92 37,521.08 2,702,251.28 432.36 (2,634.36) 15,466.70 29,489.99 3,105,790.97 Norcom Kapileshwari Kapileshwari Buehler Buehler Buehler Buehler Page 13 of 15 Capital Renewal Deferred Maintenance As of 03/19/13 Project Descr Current Budget YTD/PTD Rev/Exp Open Cmt Soft Cmt Total Available Funds (FY13+ PRIOR YEAR AVL FUNDS) Reserved Emergency Funding (25% of available funds) Total Dollars Available for Allocation Previous CRDM Balances FY07 FY08 FY09 FY10 FY11 FY12 Total Prior Year AVL $ $ $ $ $ $ $ $ $ $ 12,341.05 96,981.53 36,253.32 162,237.62 4,277.75 16,973.68 329,064.95 Projected CRDM Allocations FY13 FY13 CRDM FY13 CRDM Central Plant Expans Cost centers Set up using FY13 Reserve for known needs Projected Balance FY14 FY14 CRDM FY14 CRDM Central Plant Expans Emergency Contingency Reserve FY 14 Fire Life Safety Reserve FY 14 Science Life Safety Critical Reserve Projected Balance $ 14,300,000.00 $ 7,325,297.00 $ 4,660,045.96 $ 1,350,000.00 $ 964,657.04 $ 14,300,000.00 $ 5,378,122.00 $ 2,230,469.50 $ 5,000,000.00 $ 720,000.00 $ 971,408.50 FY 15 FY15 CRDM FY15 CRDM Fire/Life Safety Emergency Contingency Reserve Projected Balance CRDM As of 03/19/13 $ 14,300,000.00 $ 5,000,000.00 $ 2,325,000.00 $ 6,975,000.00 Page 14 of 15 1,293,721.99 323,430.50 970,291.49 Reserve for Known Needs Computing Center Elevators Science Life Safety Critical Library Sewer Remediation Metering Design Campus Exterior Signage Fire Total Cost Center Manager BBA $ $ $ $ $ $ 50,000.00 200,000.00 300,000.00 150,000.00 150,000.00 500,000 $ 1,350,000 Capital Renewal Deferred Maintenance As of 03/19/13 Project Current Budget Descr YTD/PTD Rev/Exp Open Cmt Soft Cmt BBA Cost Center Manager FY 16 FY16 CRDM FY16 CRDM Fire/Life Safety Emergency Contingency Reserve Projected Balance $ 14,300,000.00 $ 5,000,000.00 $ 2,325,000.00 $ 6,975,000.00 Needed Currently Not Funded & Not in Outlook Above Hilton Patio Structural - exterior drainage and infrastructure Engineering HVAC Project (Oliver) Cameron HVAC Replacement $ $ Additional Fire Life Safety SR1 Failing Ductwork - building wide MSM Roof Replacement Science Research Other - Category 2 Security Access General Classroom Planning Hilton Roof Campus Exterior Signage FY14 Portion Total $ 5,000,000.00 $ 5,000,000.00 $ 1,400,000.00 $ 4,700,000.00 TBD $ 500,000.00 $ 1,200,000.00 $ 200,000.00 $ 11,900,000.00 CRDM As of 03/19/13 $ 350,000.00 Moved to FY13 1,440,000.00 FY14 moved down form this year. 500,000.00 in planning includes D1/D2 *Could be in excess of $8M in planning Will require full replace 2-3 years Page 15 of 15 in study - 2 emergency projects currently for EHS issues related to fume hood leaks