Capital Renewal Deferred Maintenance As of 03/18/14 Project P779212 P779453 P779514 P779652 P779774 P779776 P779787 P779794 P779920 P779929 P779986 P779987 P779988 P779993 P790197 P779260 P779352 P779354 P779356 P779361 P779375 P779376 P779412 P779427 P779496 P779659 P779755 P779756 P779763 P779807 P779808 P779824 Descr FY07 CRDM Contingency Total FY07 Completed FY07 CRDM S&R1 & S&R2 Generato FY07 CRDM E Cullen VP Research FY07 CRDM SR1 Flash Tank repai FY07 CRDM SR1 Lab 105 Water le FY07 CRDM Bate Law Broken Win FY07 CRDM GSB Rm 111 Leak FY07 CRDM SEC Window Shades FY07 CRDM 564 Fleming Life Saf FY07 CRDM 585 SW105 Coolant Sy FY07 CRDM 585 Electrical Outle FY07 CRDM 588 Elevator 1 Pump FY07 CRDM Ground Flr Valve Rep FY07 CRDM 564 AHU#2-34 Valve L FY07 CRDM 508 Install Duct Hea Total FY07 FY08 CRDM CONTINGENCY Total FY08 Completed FY08 CRDM 509 MD Anderson Ext FY08 CRDM 543-509 Arch & MDA FY08 CRDM Framework Model Addi FY08 CRDM 516 E Cullen S Entra FY08 CRDM 585 GSB Fire Alarm U FY08 CRDM 590 Hilton Pump Moni FY08 CRDM 544 Cemo Water Infil FY08 CRDM 551 S&R2 Water Drain FY08 CRDM Arch. Indoor Air Qua FY08 CRDM Fleming Dom. Hot Wat FY08 CRDM SR2 ACM Removal FY08 CRDM Agnes Arn. Window Re FY08 CRDM Classrom Cleaning FY08 CRDM Law Library Electric FY08 CRDM Mitchell Ctr. AHU#1 FY08 CRDM Refurbish Campus Dir CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 208,129.71 6,514,340.21 32,717.00 350.00 6,930.00 5,225.00 825.00 880.00 2,200.00 7,222.00 8,705.72 5,250.00 4,254.88 6,635.00 6,068.52 9,147.04 6,818,880.08 300,694.60 8,439,888.02 164,190.24 124,749.48 24,440.00 73,098.34 321,148.00 5,737.00 53,820.00 5,000.00 21,958.50 32,951.60 1,172.76 3,754.76 209,500.00 3,714.04 12,851.30 6,600.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 198,453.67 6,514,340.21 29,356.53 6,917.67 4,147.45 746.82 2,000.00 8,781.75 5,017.17 2,121.04 2,489.72 1,402.00 6,775,774.03 291,262.14 8,439,888.02 126,427.48 95,181.87 23,500.00 28,713.03 253,149.98 4,570.00 38,958.24 1,771.76 16,150.00 25,100.21 315.76 1,065.76 141,797.23 15,066.69 287.50 - Page 1 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3,059.20 800.00 7,222.00 11,081.20 34,716.41 5,366.00 1,212.26 - Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 9,676.04 301.27 350.00 12.33 1,077.55 78.18 80.00 200.00 (76.03) 232.83 4,254.88 4,513.96 3,578.80 7,745.04 32,024.85 9,432.46 37,762.76 29,567.61 940.00 9,668.90 62,632.02 1,167.00 14,861.76 3,228.24 5,808.50 7,851.39 857.00 2,689.00 66,490.51 (11,352.65) 12,563.80 6,600.00 Cost Center Manager Anketell Gill Rieck Gonzales Gonzalez Wright Villarreal Villarreal Buehler Villarreal Rahurkar Rahurkar Hanley Villarreal Wright Oliver Oliver LaMontagne Oliver Javaid Maal Miller Schneller Oliver Wright Wright Wright Mosley Villarreal Gonzalez Wright Capital Renewal Deferred Maintenance As of 03/18/14 Project P779829 P779851 P779855 P779876 P779877 P779901 P779905 P779947 P779951 P779954 P779956 P779958 P779959 P779966 P779970 P779983 P790149 P779300 P779388 P779396 P779474 P779710 P779714 P779716 P779724 P779736 P779743 P779743 P779860 P779861 P779867 P779868 P779972 Descr FY08 CRDM 579 Labs S346 & S348 FY08 CRDM 516 Renewal multiple FY08 CRDM 547 Replace VFD on A FY08 CRDM Agnes Arnold Electri FY08 CRDM Multiple Bldgs. Faci FY08 CRDM SR1 Exterior Repair FY08 CRDM 515 Emgy Generator R FY08 CRDM 550 Abate & Replace FY08 CRDM 585 Perimeter Fence FY08 CRDM 550 Rms 309A B C Flo FY08 CRDM 581 Carpet Renewal E FY08 CRDM 590 CE Office Space FY08 CRDM 581 E20 Carpet Renew FY08 CRDM 596&587 Elevator Rep FY08 CRDM 564 Life Safety Reno FY08 CRDM 550 2nd Flr Abatemen FY08 CRDM SPA/Bayou Oaks Fence Total FY08 FY09 CRDM Contingency Total FY09 Completed FY09 CRDM 551 S&R2 Trench Drai FY09 CRDM 506 Comm Air Handler FY07-FY10 MD Anderson Facade FY09 CRDM SEC Marker Board Rep FY09 CRDM Agnes Arn Window Rep FY09 CRDM E.Cullen Blvd Sign R FY09 CRDM SPA Garage Door Repl FY09 CRDM SR1 Heat & Humidity FY09 CRDM PGH Hall Elevator Dr FY09 CRDM PGH Hall Elevator Dr FY09 CRDM 550 ACM Removal Flo FY09 CRDM 581 Rm W401 Abatemen FY09 CRDM 581 Water Pipe Break FY09 CRDM Campus Backflow Prev FY09 CRDM 550 Master Re-key/Co CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 51,154.40 8,585.50 11,867.90 7,373.78 2,000.00 8,672.67 940.00 4,568.28 16,431.46 12,063.00 3,435.64 9,303.60 3,435.64 17,485.32 21,766.00 3,612.20 2,589.00 9,990,553.03 299,599.43 2,334,195.36 3,054.24 301,641.00 200,000.00 13,325.20 6,819.00 8,113.00 2,239.00 40,429.65 8,100.00 34,751.88 3,991.47 28,779.27 58,361.76 46,812.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 6,778.99 10,137.73 7,325.87 1,957.75 4,574.28 10,242.59 2,875.00 54.03 2,875.00 17,054.14 21,368.00 2,328.00 2,026.23 9,592,803.28 291,262.14 2,334,195.36 1,529.04 286,768.35 200,060.04 15,114.39 5,952.69 2,201.86 2,026.70 35,931.36 8,150.20 7,163.00 29,016.43 3,794.05 25,335.07 53,347.74 34,102.08 Page 2 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 14,705.11 55,999.78 540.65 12,409.44 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 51,154.40 1,806.51 1,730.17 47.91 42.25 8,672.67 940.00 (6.00) 1,726.35 1,820.41 560.64 9,249.57 560.64 431.18 398.00 1,284.20 562.77 341,749.97 8,337.29 1,525.20 14,872.65 (60.04) (1,789.19) 866.31 5,911.14 212.30 4,498.29 (8,150.20) 937.00 5,735.45 197.42 3,444.20 4,473.37 300.48 Cost Center Manager Galvan Wright Rahurkar Wheeler Norcom Villarreal Villarreal Wright Mathis Wright Wright Wright Wright Rahurkar Buehler Villarreal Wright Rockwell-Hopkins Barnes Ruck Oliver Wright Wright Wright Wright Gonzalez Aguilar Aguilar Villarreal Villarreal Wright Villarreal Brungardt Capital Renewal Deferred Maintenance As of 03/18/14 Project P779994 P779325 P779422 P779716 P779869 P779874 P779883 P779886 P779891 P779900 P779913 P779915 P779916 P779918 P779925 P779969 P779989 P779990 P779991 P790109 P779480 P779486 P779501 P779503 P779518 P779519 P779524 P779527 P779529 P779532 P779534 Descr FY09 CRDM 547 Rm310 Floor and Total FY09 FY10 CRDM Contingency Total FY10 Completed FY10 CRDM FPC Master Specifica FY09 CRDM E.Cullen Blvd Sign R FY10 CRDM 503 Hot Water Exchan FY10 CRDM 578 Emg. Generator T FY10 CRDM 578 Emg. Generator T FY10 CRDM 520 Emg Gen Troubles FY10 CRDM 509 ACM Flooring Pro FY10 CRDM Rm 407 Broken Door r FY10 CRDM 701 TMC Generator Re FY10 CRDM 564 Water Intrusion FY10 CRDM 551 Backflow Replace FY10 CRDM Roof Program Planned FY10 CRDM TMC Pharmacy Generat FY10 CRDM Water Bottle Filling FY10 CRDM 509 2nd Flr Window R FY10 CRDM 534 Broken Window Re FY10 CRDM 503 Tech Annex Move FY10 CRDM 550 SR1 Handicap Doo Total FY10 FY11 CRDM Contingency Total FY11 Completed FY11 CRDM Main Campus Utility FY11 CRDM Architectue Vestibul FY11 CRDM Melcher & Garrison G FY11 CRDM CW Ruptured Coil Rep FY11 CRDM SR1 & SR2 Generator FY11 CRDM Cullen Eng Fire Supp FY11 CRDM Power Plant Chiller FY11 CRDM Arch Mold Remediatio FY11 CRDM Campus Grounds Fire FY11 CRDM UH Generator & ATS R CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 8,326.32 3,398,538.58 299,389.69 1,029,611.18 225,000.00 20,021.10 8,354.50 1,130.00 2,962.35 1,468.00 4,400.41 3,763.10 23,076.00 12,703.46 2,250.00 70,000.00 12,808.40 78,700.00 642.64 671.64 5,149.86 2,897.67 2,834,611.18 36,366.66 2,258,393.36 345,340.00 13,390.00 52,363.46 10,000.00 246,990.29 379,065.75 162,845.45 6,407.12 9,717.28 49,965.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3,335,950.50 293,232.06 1,029,611.18 181,925.52 17,969.64 8,156.58 2,463.78 2,696.24 3,897.32 13,343.00 14,779.66 2,292.08 10,327.78 10,713.80 68,020.32 584.64 610.64 3,277.73 2,275.49 2,695,788.64 27,533.66 2,275,474.21 343,571.62 390.00 49,249.58 247,732.56 114,790.75 152,633.07 3,986.62 8,628.23 40,087.95 Page 3 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 4,756.00 17,706.09 17,996.00 1,704.17 80.00 1,572.13 21,352.30 440.22 59,250.00 865.00 - Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 39,500.00 - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3,570.32 44,881.99 6,157.63 25,078.48 2,051.46 197.92 1,130.00 498.57 1,468.00 (134.22) 9,733.00 (2,076.20) (42.08) 59,592.22 2,094.60 10,679.68 58.00 61.00 300.00 622.18 117,470.24 8,833.00 1,768.38 13,000.00 2,673.66 10,000.00 (742.27) 165,525.00 10,212.38 1,555.50 1,089.05 9,877.05 Cost Center Manager Wright Norcom Yancey Wright Gonzalez Villarreal Villarreal Villarreal Villarreal Wright Rahurkar Villarreal Oliver Villarreal Brokhin Wright Wright Villarreal Villarreal Rockwell-Hopkins Ivy Oliver Wiesman Oliver Gill Oliver Gill Oliver Oliver Gill Capital Renewal Deferred Maintenance As of 03/18/14 Project P779538 P779545 P779555 P779562 P779564 P779565 P779566 P779567 P779570 P779579 P779581 P779584 P779588 P779592 P779593 P779598 P779599 P779604 P779619 P779620 P779623 P779624 P779629 P779629 P779745 P779757 P779758 P779760 P779771 P779772 P779781 P779788 P779793 P779798 P779799 Descr FY11 CRDM GSB/Cameron Hot Wate FY11 CRDM Hilton (E&G) Control FY11 CRDM Optometry Elv. Jack FY11 CRDM S&E Annex AGL Domest FY11 CRDM GSB 1st Floor Restro FY11 CRDM Cameron Grease Trap FY11 CRDM Central Plant Chille FY11 CRDM Hilton/Moody Water L FY11 CRDM Eng. Northside Domes FY11 CRDM MDA Library Ductile FY11 CRDM Krost Hall Six-Inch FY11 CRDM Eight-Inch Water Mai FY11 CRDM Cullen Eng. Mech. Rm FY11 CRDM SR2 Animal Care Sani FY11 CRDM CW Four-inch Irrigat FY11 CRDM McElhinney Hall New FY11 CRDM SR2 AHU#4-D Water Co FY11 CRDM McElhinney Damaged C FY11 CRDM Lot 15C & ROTC Sanit FY11 CRDM SR1 1st flr. drains FY11 CRDM Cougar Substation Gr FY11 CRDM SERC Emerg 15KV ATS FY11 CRDM GSB Auto Shop Vehicl FY11 CRDM GSB Auto Shop Vehicl FY11 CRDM Sink Hole Spur 5 FY11 CRDM Old Science Asbestos FY11 CRDM Cmpting Ctr. Chiller FY11 CRDM Cull. Eng S344A Seal FY11 CRDM Computing Ctr Genera FY11 CRDM Old Science Decommis FY11 CRDM Cullen Eng. Roof Rep FY11 CRDM Facility Renewal Pla FY11 CRDM Cull. Eng Duct Leak FY11 CRDM Cameron AHU Design FY11 CRDM Water Leak Campus In CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 27,604.00 302,511.00 46,453.00 52,957.92 20,213.75 5,847.84 124,452.31 161,695.00 2,603.94 2,664.00 3,138.63 8,461.00 25,970.00 7,220.00 5,120.59 11,968.00 6,790.30 2,980.00 32,782.00 9,434.00 20,747.50 66,236.00 6,100.00 2,204.42 1,976.23 933.00 40,343.60 27,800.13 12,383.39 31,212.06 11,130.00 2,063.78 30,957.30 2,894.58 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 25,365.08 8,811.00 29,525.00 44,633.58 2,653.43 5,125.17 167,443.59 115,758.45 2,374.78 2,637.79 3,125.29 8,286.92 20,478.24 5,283.68 4,949.77 10,856.34 5,918.32 3,052.65 31,734.20 7,881.46 14,370.72 56,172.23 6,079.06 424.33 111.86 932.81 36,500.80 26,145.16 700.95 783.52 28,535.21 10,633.10 1,511.82 22,002.30 163.84 Page 4 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 10,240.32 17,072.72 5,527.63 6,750.00 2,730.73 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2,238.92 293,700.00 16,928.00 8,324.34 7,320.00 722.67 (42,991.28) 28,863.83 229.16 26.21 13.34 174.08 5,491.76 1,936.32 170.82 1,111.66 871.98 (72.65) 1,047.80 1,552.54 849.15 10,063.77 20.94 1,780.09 1,864.37 0.19 3,842.80 1,654.97 11,682.44 (783.52) 2,676.85 496.90 551.96 2,205.00 0.01 Cost Center Manager Gill Rahurkar Rahurkar Gill Jenkins Gill Gill Gill Gill Gill Gill Gill Oliver Gill Gill Gill Rahurkar Wright Gill Gill Gill Gill Smith Smith Gill Gill Simmons Oliver Gill Galvan Oliver Oliver Law Gill Capital Renewal Deferred Maintenance As of 03/18/14 Project P779800 P779811 P779812 P779822 P779823 P779879 P779919 P779949 P779960 P779961 P779965 P779976 P779977 P779984 P779992 P790114 P790186 P779576 P779375 P779588 P779630 P779635 P779636 P779637 P779639 P779640 P779642 P779645 P779647 P779649 P779650 P779651 P779654 Descr FY11 CRDM Tech. Restroom Refre FY11 CRDM Water Leak Investiga FY11 CRDM Water Line Leak repa FY11 CRDM 547&578 Water Leak FY11 CRDM 551 Sanitary Drain C FY11 CRDM TMC Pharmacy Generat FY11 CRDM 586 New Walkway Inst FY11 CRDM 587 Locate undergrou FY11 CRDM 590 Aerco Water Heat FY11 CRDM 543 Shilled Water Fl FY11 CRDM 597&503 Electrical R FY11 CRDM 534 Repair Ext. Door FY11 CRDM 516 Rm317 HVAC Repai FY11 CRDM 564 Fleming Water In FY11 CRDM 579 Painting Renewal FY11 CRDM 503 Foundation Seali FY11 CRDM 596 Chiller Leak Rep Total FY11 FY12 CRDM Contingency Total FY12 Completed FY08 CRDM 585 GSB Fire Alarm U FY11 CRDM Cullen Eng. Mech. Rm FY12 CRDM Replace Chill Water FY12 CRDM Water main leak @OS FY12 CRDM AA Hall Water Leak FY12 CRDM E. Cullen Water Valv FY12 CRDM FIne Arts Irrigation FY12 CRDM Computing Ctr Gen FY12 CRDM EHS Shower & Eyewash FY12 CRDM E&G Storm Issues FY12 CRDM Access Pannel for St FY12 CRDM Lot 9C Fence Clean u FY12 CRDM MDA Lib. Water Main FY12 CRDM Fine Arts 8" Water m FY12 CRDM SR1 Stuctural Assess CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 139,920.00 11,154.66 7,738.11 9,252.73 6,757.50 38,153.91 2,246.88 4,823.73 34,980.00 6,869.01 12,315.77 8,668.93 15,593.00 3,844.62 15,005.76 501.22 4,293.00 5,010,812.47 6,270.28 1,914,199.31 275,686.47 134,148.19 235,628.40 6,035.27 16,752.66 9,541.37 8,094.49 18,513.05 364,890.75 27,647.94 12,137.00 8,752.42 11,009.00 12,501.00 143,306.70 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 14,408.15 6,908.59 12,909.43 7,211.44 5,257.50 37,189.91 127.18 4,918.29 43,043.97 7,081.53 10,556.22 6,945.68 917.18 3,546.29 1,998.97 28.37 3,431.24 4,141,520.64 1,914,199.31 259,331.24 95,919.00 237,379.87 4,569.79 14,312.69 8,054.10 6,823.63 17,512.96 46,523.46 21,640.76 10,908.46 5,611.11 8,535.21 12,300.60 108,461.10 Page 5 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,256.00 104,132.62 19,200.00 2,464.79 5,701.14 1,278.46 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 39,500.00 - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 124,255.85 4,246.07 (5,171.32) 2,041.29 1,500.00 964.00 2,119.70 (94.56) (8,063.97) (212.52) 1,759.55 1,723.25 14,675.82 298.33 13,006.79 472.85 861.76 742,740.06 6,270.28 16,355.23 19,029.19 (1,751.47) 1,465.48 2,439.97 1,487.27 1,270.86 1,000.09 315,902.50 306.04 1,228.54 3,141.31 2,473.79 200.40 33,567.14 Cost Center Manager Connell Wheeler Wheeler Gill Gill Villarreal Warner Gill Gill Gill Wheeler Simmons Law Law Wright Law Villarreal Rockwell-Hopkins Simmons Oliver Gill Gill Gill Gill Gill Gill Tolbert Rockwell-Hopkins Gill Warner Gill Gill Ivy Capital Renewal Deferred Maintenance As of 03/18/14 Project P779661 P779668 P779669 P779672 P779674 P779679 P779682 P779690 P779692 P779693 P779696 P779701 P779704 P779705 P779712 P779713 P779718 P779720 P779721 P779729 P779730 P779731 P779733 P779740 P779741 P779742 P779762 P779764 P779766 P779767 P779804 P779814 P779815 P779816 P779820 Descr FY12 CRDM MDA Lib. Backwater V FY12 CRDM Cameron Bldg. Restro FY12 CRDM SR1 General Refresh FY12 CRDM Wortham Thtr Sprinkl FY12 CRDM Hilton Roof Assessme FY12 CRDM SERC Classrooms Phas FY12 CRDM Central Plant Chille FY12 CRDM UHPD Roof Repair FY12 CRDM FloodBreak annual Ma FY12 CRDM Capmus Posting Kiosk FY12 CRDM Cougar Sub Lighting FY12 CRDM Chilled Pipe Assessm FY12 CRDM Cemo HVAC unit Repla FY12 CRDM Lot 19D water leak FY12 CRDM S&R1 Post Renovation FY12 CRDM OB Hall Six Inch OS& FY12 CRDM MDA Duct Work Reconf FY12 CRDM Grease Trap for Kitc FY12 CRDM Fire Prot. Cm.Item 1 FY12 CRDM Electrical Infrastru FY12 CRDM Optometry Rep. Desig FY12 CRDM MDA Lib. Sewer Desig FY12 CRDM MDA Lib. Brown Wing FY12 CRDM Opt. Structural Demo FY12 CRDM Repair Steam Leak FY12 CRDM Exterior Water Infra FY12 CRDM Exterior Refresh FY12 CRDM Fire Hydrants PM FY12 CRDM TU2 Water Infiltrati FY12 CRDM Hilton Life Safety & FY12 CRDM Fleming Transformer FY12 CRDM Tech Annex Life Safe FY12 CRDM SR2 Fire Pump Tie In FY12 CRDM FDC Hydrostatic Test FY12 CRDM 596 New Chiller and CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 31,850.00 22,154.00 465,150.00 333,117.03 60,885.76 27,322.81 317,305.00 12,423.43 8,395.00 45,596.29 42,375.70 144,248.00 34,603.70 2,395.00 23,428.30 4,742.41 21,105.55 179,020.00 34,980.00 5,060.00 88,404.00 98,427.89 221,000.00 54,909.23 18,472.00 21,224.68 130,515.00 104,940.00 12,534.50 1,757,668.00 82,549.00 21,345.05 30,432.60 17,781.50 433,125.00 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 28,742.24 18,957.87 468,222.13 322,335.30 56,087.91 26,095.02 11,593.28 7,675.19 45,524.50 36,794.32 119,536.95 2,140.60 2,410.33 23,198.00 3,922.97 19,089.57 161,116.17 31,779.54 3,826.42 87,880.00 86,765.70 207,446.29 52,134.51 15,978.58 18,612.38 63,657.37 23,694.14 3,215.32 1,519,853.58 74,438.68 17,014.43 21,093.62 11,023.97 326,541.02 Page 6 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,585.25 2,675.77 4,165.37 0.73 65.96 800.00 6,325.00 1,987.70 7,500.00 49,641.00 6,728.98 33,893.97 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3,107.76 1,610.88 (5,747.90) 10,781.73 632.48 1,227.79 305,711.72 12,423.43 719.81 71.06 5,581.38 24,711.05 32,463.10 (15.33) 230.30 819.44 1,950.02 17,903.83 2,400.46 1,233.58 524.00 5,337.19 11,566.01 2,774.72 2,493.42 2,612.30 66,857.63 81,245.86 1,819.18 188,173.42 8,110.32 4,330.62 2,610.00 6,757.53 72,690.01 Cost Center Manager Gill Connell Galvan Norcom Tolbert Gonzalez Gill Rahurkar Gill Warner Gill Gill Oliver Gill Mosley Gill Oliver Gill Simmons Gill Law Simmons Galvan Law Gill Gill Espey Simmons Law Maal Tolbert Simmons Simmons Oliver Capital Renewal Deferred Maintenance As of 03/18/14 Project P779833 P779842 P779909 P779911 P779921 P779922 P779930 P779953 P779967 P779978 P790110 P790115 P790116 P790117 P790120 P790121 P790123 P790124 P790126 P790127 P790128 P790129 P790133 P790134 P790135 P790136 P790141 P790165 P790222 P779784 P779564 P779642 P779668 Descr FY12 CRDM 515 Water Softener R FY12 CRDM 596 Emerg. Gen. Stud FY12 CRDM Lynn Eusan Storm Dra FY12 CRDM 520 Electrical Repai FY12 CRDM Floodbreak - Annual FY12 CRDM Water Leak at Parkin FY12 CRDM 596 Chiller Monitori FY12 CRDM 545 Troubleshoot 15k FY12 CRDM GSB Accessible Toile FY11 CRDM 543 Visible Mold Gro FY12 CRDM 585 Bay Area Roof Re FY12 CRDM 516 Exterior Slab Re FY12 CRDM 533 Playground Lands FY12 CRDM 516 PRV Steam Statio FY12 CRDM 550 Exterior Façade FY12 CRDM 551 Concrete Floor R FY12 CRDM 587 Rm218 Carpet Rep FY12 CRDM 587 Rm219 Carpet Rep FY12 CRDM 587 Rm 232 Carpet Re FY12 CRDM 587 Rm 213 Carpet Re FY12 CRDM 587 Rm 217 Carpet Re FY12 CRDM 587 Rm 211 Carpet Re FY12 CRDM 579 Rm103 Carpt & Pa FY12 CRDM Water Leak under str FY12 CRDM 551Hydrojet drain li FY12 CRDM 522 Fire Hydrant #37 FY12 CRDM 579 Fire Water Line FY12 CRDM 518 Strorm Repair Ne FY12 CRDM Heyne Loading dock c Total FY12 FY13 CRDM Contingency Total FY13 Completed FY11 CRDM GSB 1st Floor Restro FY12 CRDM EHS Shower & Eyewash FY12 CRDM Cameron Bldg. Restro CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 13,744.00 12,359.60 21,112.04 24,060.41 4,524.00 4,691.56 4,897.20 5,911.22 903.65 9,374.64 26,203.20 10,291.05 7,500.56 13,201.68 5,830.00 5,602.00 8,839.40 8,839.40 11,432.80 8,839.40 8,839.40 8,839.40 5,111.00 16,517.67 6,757.50 5,183.07 18,422.80 2,262.86 20,573.96 8,415,266.20 9,169.46 1,260,450.47 148,795.78 302,644.00 62,840.31 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 12,565.96 4,999.60 6,197.93 21,593.03 4,136.08 4,491.56 4,477.20 254.63 51.15 8,040.00 1,483.20 582.51 8,738.81 330.00 5,102.09 7,335.69 6,223.56 4,525.00 5,857.40 6,754.12 4,525.00 4,032.97 16,463.63 382.50 293.38 1,042.80 6,830,960.99 164.38 1,260,450.47 58,240.63 Page 7 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 4,300.00 775.00 6,215.00 1,750.00 157,054.12 0.75 Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 54.00 54.00 154.00 - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,178.04 3,060.00 14,914.11 2,467.38 387.92 200.00 420.00 5,656.59 77.50 1,334.64 24,720.00 3,493.54 7,446.56 4,462.87 3,750.00 499.91 1,503.71 2,615.84 6,907.80 2,982.00 2,085.28 4,314.40 1,078.03 54.04 6,375.00 4,889.69 17,380.00 2,262.86 20,573.96 1,427,197.09 9,005.08 148,795.78 302,490.00 4,598.93 Cost Center Manager Gill Simmons Vail Wheeler Gill Gill Simmons Wheeler Burks Burks Oliver Law Mathis Gill Galvan Banavali Wright Wright Wright Wright Wright Wright Wright Gill Gill Gill Simmons Gill Gill Rockwell-Hopkins Burks Tolbert Law Capital Renewal Deferred Maintenance As of 03/18/14 Project P779672 P779730 P779798 P779806 P779816 P779825 P779827 P779831 P779832 P779846 P779852 P779853 P779862 P779870 P779871 P779880 P779884 P779885 P779887 P779888 P779889 P779890 P779892 P779897 P779899 P779923 P779926 P779927 P779928 P779931 P779932 P779933 P779937 P779938 P779939 Descr FY12 CRDM Wortham Thtr Sprinkl FY12 CRDM Optometry Rep. Desig FY11 CRDM Cameron AHU Design FY13 CRDM SR1 Fume Hood Leak FY12 CRDM FDC Hydrostatic Test FY13 CRDM Water main leak PGH FY13 CRDM WorthamTheatre Renew FY13 CRDM 580Bldg. Envelope Wo FY13 CRDM 586Bldg. Envelope Wo FY13 CRDM Water leak MDA & CP FY13 CRDM 534 Storm Drain Leak FY13 CRDM SFMO Vltn #16 FY13 CRDM 534 Rm27 Floor Drain FY13 CRDM 585 GSB Fire Dept. R FY13 CRDM 499 Vandalism Repair FY13 CRDM Exterior Patio Repla FY13 CRDM 515 Chiller #3 Inspe FY13 CRDM 515Chiller #4 Replac FY13 CRDM 585 Restroom Phase 2 FY13 CRDM 550 Lab 103/105 Code FY13 CRDM 506 Courtyard Landsc FY13 CRDM 581 Room W122 Refres FY13 CRDM 592 Cooling Tower PM FY13 CRDM 585 FPC 2nd Flr Abat FY13 CRDM Waterline repair und FY13 CRDM OM Refurbishment E&G FY13 CRDM 550 Lab 105 Exhaust FY13 CRDM 550 105 Wet Lab FY13 CRDM 550 Lab 105 Wet Lab FY13 CRDM 543 HVAC Repairs & U FY13 CRDM High Rise Stair Enc. FY13 CRDM 534 Waterline Leak a FY13 CRDM 590 Sewer Line Rehab FY13 CRDM 542 Road Repairs Des FY13 CRDM 542 Privacy Fence Sl CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 730,924.37 894,259.00 76,656.58 233,768.45 67,946.52 62,361.04 343,041.36 152,460.00 344,767.00 50,051.97 5,549.42 252,229.94 8,039.01 9,211.40 2,200.94 51,887.00 7,520.70 21,594.32 11,893.20 71,962.34 7,537.02 11,834.50 10,446.19 141,970.00 19,307.24 12,791.25 154,542.15 3,065.39 44,478.38 28,567.00 25,523.74 7,258.11 34,874.00 6,360.00 16,762.42 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 432,489.86 774,302.42 69,890.98 152,830.92 46,559.59 49,361.04 266,296.64 31,018.18 34,497.48 45,304.97 5,556.74 237,229.94 455.04 8,421.40 2,000.86 33,193.09 425.70 18,026.29 9,373.96 55,742.10 426.62 8,282.97 591.29 139,675.24 15,659.96 8,119.94 139,831.35 3,075.16 2,517.64 6,125.00 17,508.16 442.36 7,474.00 4,137.68 15,324.82 Page 8 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 66,581.94 750.00 17,902.50 4,520.00 16,770.00 3,574.32 2,519.24 2,537.50 18,375.00 5,847.50 1,222.32 - Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 298,434.51 119,956.58 6,765.60 14,355.59 20,636.93 13,000.00 76,744.72 103,539.32 305,749.52 4,747.00 (7.32) 15,000.00 7,583.97 790.00 200.08 1,923.91 7,095.00 (6.29) 16,220.24 7,110.40 1,014.03 9,854.90 2,294.76 3,647.28 4,671.31 14,710.80 (9.77) 41,960.74 4,067.00 2,168.08 6,815.75 27,400.00 1,000.00 1,437.60 Cost Center Manager Prochaska Law Law Galvan Simmons Gill Prochaska Vail Vail Gill Gill Simmons Wheeler Burks Simmons Law Wheeler Wheeler Burks Oliver Warner Vail Wheeler Wiesman Gill Wheeler Oliver Law Tolbert Oliver Anorga Wheeler Gill Oliver Oliver Capital Renewal Deferred Maintenance As of 03/18/14 Project P779943 P779944 P779945 P779948 P779971 P779973 P779974 P779978 P779984 P779995 P779996 P779997 P779998 P779999 P790104 P790105 P790108 P790111 P790113 P790119 P790130 P790140 P790143 P790144 P790145 P790146 P790147 P790150 P790151 P790164 P790167 P790170 P790132 Descr FY13 CRDM Elev. Interior Refre FY13 CRDM Fire Hydrant 14 Repl FY13 CRDM 533 Steam Fired Wate FY13 CRDM 542 Phase 3 Concrete FY13 CRDM 550 Han Lab Deficien FY13 CRDM 533 Pool Decommissio FY13 CRDM 503 Corridor Ceiling FY11 CRDM 543 Visible Mold Gro FY11 CRDM 564 Fleming Water In FY13 CRDM 551 Elec. Short Circ FY13 CRDM 549 Fire Water Avail FY13 CRDM 596 Coordination Stu FY13 CRDM 521 AC Installation FY13 CRDM 587 Restroom Renovat FY13 CRDM FMO Violations Caulk FY13 CRDM 596 Replace Fire Wat FY13 CRDM 590 Galvanized Water FY13 CRDM 550 Roof Repairs FY13 CRDM 589 AERCO Heater Rep FY13 CRDM Standpipe Flow and H FY13 CRDM 501 Restroom Remodel FY13 CRDM 590 Replace Concrete FY13 CRDM 550 SR1 Lab Chilled FY13 CRDM 507 Water Leak FY13 CRDM 589 Seating Replacem FY13 CRDM 520 Electrical Feede FY13 CRDM 547 6" Water Main Le FY13 CRDM Hilton College Elev. FY13 CRDM 568 & 509 Fire Prote FY13 CRDM 585 GSB Adjustable D FY13 CRDM 545 SERC Broken Exte FY13 CRDM 507 Wortham Shower Total FY13 FY14 CRDM Contingency Total FY14 Completed CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 5,300.00 9,543.71 28,816.00 19,816.17 23,510.80 71,812.77 53,939.16 4,127.64 9,995.00 71,942.20 25,535.40 51,420.60 90,948.00 251,790.01 9,118.12 86,338.80 111,974.30 13,250.00 31,895.93 82,786.00 8,480.00 11,038.24 8,215.00 14,497.85 102,041.65 19,659.20 3,906.25 38,869.96 14,991.46 1,037.00 2,491.00 3,415.00 6,990,045.19 6,390,264.94 65,731.78 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 300.00 27,860.69 18,394.47 18,761.11 47,917.56 50,715.24 3,696.64 9,151.51 4,072.20 1,445.40 2,984.67 12,682.16 120,486.86 7,336.12 61,584.08 87,770.69 750.00 26,730.40 69,555.47 498.00 624.81 465.00 9,783.47 4,859.13 16,872.00 221.11 27,596.63 1,366.46 837.00 2,306.76 2,714.76 4,601,365.27 65,731.78 Page 9 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 5,000.00 7,330.00 13,453.00 715.84 109,211.69 18,067.50 618.66 7,500.00 13,625.00 316,122.76 - Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 431.00 10,413.43 10,998.43 - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 9,543.71 955.31 1,421.70 (2,580.31) 10,442.21 3,223.92 843.49 67,870.00 24,090.00 48,435.93 77,550.00 22,091.46 1,782.00 6,687.22 23,584.95 12,500.00 5,165.53 13,230.53 482.00 7,750.00 4,714.38 97,182.52 2,787.20 3,685.14 11,273.33 200.00 184.24 700.24 2,061,558.73 6,390,264.94 - Cost Center Manager Prochaska Wheeler Gill Oliver Oliver Vail Galvan Burks Law Simmons Simmons Simmons Law Burks Simmons Simmons Law Oliver Gill Simmons Banavali Gill Gill Villarreal Galvan Villarreal Gill Rahurkar Simmons Kapileshwari Mosley Villarreal Kapileshwari Capital Renewal Deferred Maintenance As of 03/18/14 Project P779767 P779812 P779880 P779938 P790105 P790137 P790138 P790148 P790152 P790154 P790155 P790158 P790159 P790160 P790161 P790162 P790163 P790166 P790169 P790171 P790173 P790174 P790175 P790176 P790177 P790178 P790180 P790181 P790182 P790183 P790184 P790185 P790187 P790188 P790189 Descr FY12 CRDM Hilton Life Safety & FY11 CRDM Water Line Leak repa FY13 CRDM Exterior Patio Repla FY13 CRDM 542 Road Repairs Des FY13 CRDM 596 Replace Fire Wat FY14 CRDM 550 FLS Repair Needs FY14 CRDM 509 Fire Life Safety FY14 CRDM Electrical Testing f FY14 CRDM 564 AHU Coil replace FY14 CRDM 550 Duct Removal Lab FY14 CRDM 547 Water Line Repla FY14 CRDM 590 Hilton South Win FY14 CRDM 531 Hofheinz Generat FY14 CRDM 516 E Cullen Steam r FY14 CRDM Technology ACM Abate FY14 CRDM GSB Fire Line Leak a FY14 CRDM 564 Research Stores FY14 CRDM 550 Lab 705 New Exha FY14 CRDM 507 Wortham Theatre FY14 CRDM 550 S&R1 Lab 417 Rem FY14 CRDM 581 Counter Top and FY14 CRDM 509 Fire Life Safety FY14 CRDM 543 Fire Life Safett FY14 CRDM 585 GSB Flood 2013 FY14 CRDM 800 Water Leak Ent. FY14 CRDM 537 AERCO Water Heat FY14 CRDM 516 AERCO Water Heat FY14 CRDM 590 1st Flr. Pipe le FY14 CRDM 15kV Circuit Break r FY14 CRDM 590 Alumni Hall & Ki FY14 CRDM Chenical Pot Feeders FY14 CRDM 550 Lab33 Chilled Wa FY14 CRDM 590 Wine Sensory Lab FY14 CRDM 590 Elevator Repairs FY14 CRDM 590 Rm 123 Leak Repa CRDM as of 03/18/14 YTD/PTD Rev/Exp Current Budget $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 79,744.00 7,258.11 487,410.00 141,060.00 29,616.27 63,375.28 56,576.42 350,930.00 44,376.79 11,092.73 14,942.61 26,642.26 42,644.68 7,891.70 4,603.20 18,685.83 213,549.90 38,967.58 22,579.66 29,578.24 5,048.78 35,000.00 64,098.68 48,746.96 18,746.06 31,895.93 34,618.54 22,712.40 34,640.80 29,124.58 18,597.70 5,210.98 29,770.31 15,252.96 7,105.73 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 3,587.28 3,980.60 16,710.95 14,891.89 9,646.63 14,945.89 19,445.57 38,236.39 6,837.82 5,779.43 13,829.98 60,572.53 1,904.73 19,026.96 1,674.24 285.78 1,981.13 3,175.40 5,612.37 17,684.97 1,805.43 1,959.54 21,919.76 4,496.40 1,648.56 6,560.70 3,564.08 1,685.11 8,658.06 402.21 Page 10 of 13 Open Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 100,187.00 23,513.00 42,334.59 620.66 - Soft Cmt $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 486.00 4,855.85 8,166.18 975.00 - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 79,744.00 7,258.11 487,410.00 141,060.00 29,616.27 59,788.00 52,595.82 334,219.05 28,998.90 1,446.10 (3.28) 7,196.69 4,408.29 1,053.88 (1,176.23) 44,624.19 13,549.85 3,552.70 27,904.00 4,763.00 33,018.87 60,923.28 800.00 1,061.09 30,090.50 32,659.00 792.64 30,144.40 27,476.02 12,037.00 1,646.90 28,085.20 4,999.24 6,703.52 Cost Center Manager Maal Wheeler Galvan Mathis Simmons Tolbert Tolbert Wheeler Gill Galvan Gill Villarreal Villarreal Gill Gill Gill Banavali Banavali Villarreal Galvan Mathis Tolbert Tolbert Villarreal Gill Gill Gill Villarreal Gill Burks Gill Gill Burks Brasher Villarreal Capital Renewal Deferred Maintenance As of 03/18/14 Project Descr YTD/PTD Rev/Exp Current Budget Open Cmt Soft Cmt P790190 P790192 P790193 P790195 P790196 P790198 P790199 P790201 P790202 P790203 P790204 P790205 P790206 P790207 P790208 P790210 P790211 P790212 P790213 P790214 P790215 P790216 P790217 P790218 P790220 P790221 P790223 FY14 CRDM Cullen Fountain Leak FY14 CRDM 564 Dr. Iyer Lab 7 FY14 CRDM 507 Life Safety Wort FY14 CRDM 596 Knee Wall Repair FY14 CRDM 576 Valve Replacemen FY14 CRDM 590 Isolation Valve FY14 CRDM 530 Gym Flood Phase FY14 CRDM 545 Circuit Breaker FY14 CRDM 545 Install Surge Pr FY14 CRDM 545 Transfer Scheme FY14 CRDM FDC Signs Campuswide FY14 CRDM Costal Center Ant Tr FY14 CRDM 596 Chiller Display FY14 CRDM Non-Destructive Plum FY14 CRDM Topographic & Utilit FY14 CRDM Bates Law College Wa FY14 CRDM MacGregor Woods Clea FY14 CRDM S&R1 Sewer line repa FY14 CRDM Fire Water Line Isol FY14 CRDM Architecture Rm143B FY14 CRDM Storm drain repair a FY14 CRDM Entrance 14 Backflow FY14 CRDM Repair Fire Dept. Co FY14 CRDM GSB Card Readers Ins FY14 CRDM GSB Business Office FY14 CRDM Static Ground Sys Co FY14 CRDM Campus Signage Repla Total FY14 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 1,386.00 49,411.90 26,250.00 4,208.82 13,840.42 2,428.31 81,728.75 2,923.16 3,951.57 2,396.13 5,217.00 10,512.20 3,033.40 19,472.00 7,229.20 9,645.71 15,582.00 7,958.84 10,637.42 2,973.00 14,290.40 13,577.02 2,545.38 26,999.90 19,998.00 24,033.67 11,395.00 8,941,717.59 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 428.45 2,582.40 1,485.85 238.24 14,099.09 137.45 68,995.66 165.46 223.67 135.63 295.30 595.03 2,786.70 1,102.19 409.20 471,922.49 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 166,655.25 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ P779321 P779342 P779343 P779481 P779482 P779483 FY09 CRDM Cooling Tower 5 FY10 CRDM Cooling Tower 4 Repl FY10 CRDM Central Plant Expans FY11 CRDM Central Plant Expans FY12 CRDM Central Plant Expans FY13 CRDM Central Plant Expans $ $ $ $ $ $ 6,605,000.00 2,970,000.00 5,225,000.00 4,996,670.00 5,903,107.00 7,325,297.00 $ $ $ $ $ $ 6,264,527.86 2,944,328.92 5,014,728.28 4,996,237.64 5,905,741.36 7,245,708.01 $ $ $ $ $ $ 20,098.22 41,673.68 93,358.66 $ $ $ $ $ $ CRDM as of 03/18/14 Page 11 of 13 12,583.09 27,066.12 - BBA $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 957.55 46,829.50 24,764.15 3,970.58 (258.67) 2,290.86 150.00 2,757.70 3,727.90 2,260.50 4,921.70 9,917.17 246.70 18,369.81 6,820.00 9,645.71 15,582.00 7,958.84 10,637.42 2,973.00 14,290.40 13,577.02 2,545.38 26,999.90 19,998.00 24,033.67 11,395.00 8,276,073.73 $ $ $ $ $ $ 320,373.92 25,671.08 168,598.04 432.36 (2,634.36) (13,769.67) Cost Center Manager Mathis Banavali Oliver Mathis Villarreal Villarreal Villarreal Wheeler Wheeler Wheeler Brasher Villarreal Villarreal Mathis Mathis Villarreal Warner Gill Simmons MacLeod Gill Villarreal MacLeod Simmons Wright Wheeler Vail Norcom Kapileshwari Kapileshwari Buehler Buehler Buehler Capital Renewal Deferred Maintenance As of 03/18/14 Project P779484 Descr FY14 CRDM Central Plant Expans Total CUP Current Budget YTD/PTD Rev/Exp $ 5,378,122.00 $ 38,403,196.00 $ 3,584,569.65 $ 35,955,841.72 Open Cmt $ $ 32,162.50 187,293.06 Total Available Funds (FY14+ PRIOR YEAR AVL FUNDS) Reserved Emergency Funding (25% of available funds) Total Dollars Available for Allocation Previous CRDM Balances FY07 FY08 FY09 FY10 FY11 FY12 FY13 Total Prior Year AVL $ $ $ $ $ $ $ $ Projected CRDM Allocations FY14 FY14 CRDM FY14 CRDM Central Plant Expans Cost Centers Set up using FY14 Projected Balance CRDM as of 03/18/14 9,676.04 9,432.46 8,337.29 6,157.63 8,833.00 6,270.28 9,005.08 57,711.78 $ 14,330,000.00 $ 5,378,122.00 $ 2,551,452.65 $ 6,400,425.35 Page 12 of 13 Soft Cmt $ $ - BBA Cost Center Manager $ $ 1,761,389.85 Buehler 2,260,061.22 $ $ $ 6,458,137.13 1,614,534.28 4,843,602.85 7047 H0183 G0008 P779375 FY08 CRDM 585 GSB Fire Alarm U $ 275,686.47 Should be in FY12 x 7047 H0192 G0008 P779716 FY09 CRDM E.Cullen Blvd Sign R $ x 7047 H0183 G0008 P779980 FY10 CRDM 590 Water Pipe Leak $ 20,021.10 FY10 5,111.81 Should be in FY12 x x x x x x x x x 7047 H0183 G0004 P779978 FY11 CRDM 543 Visible Mold Gro $ 7,497.38 Split between FY11 and FY13 7047 H0183 G0008 P779978 FY11 CRDM 543 Visible Mold Gro $ 9,374.64 FY12 7047 H0183 7047 H0184 G0008 G0028 P779798 P779588 FY11 CRDM Cameron AHU Design FY11 CRDM Cullen Eng. Mech. Rm $ 76,656.58 FY13 $ 134,148.19 Should be in FY12 7047 H0183 G0008 P779984 FY11 CRDM 564 Fleming Water In $ 7047 H0184 G0028 P779531 FY11 CRDM FCA Phase 1 and 2 7047 H0183 G0008 P779564 FY11 CRDM GSB 1st Floor Restro 7047 H0183 G0008 P779568 FY11 CRDM Trailer Village Util $ 294,892.61 Should be in FY12 $ 148,795.78 FY13 $ 205,709.41 Should be in FY12 7047 H0183 G0008 P779812 FY11 CRDM Water Line Leak repa $ 9,995.00 FY13 7,258.11 FY14 7047 H0183 G0008 P779668 FY12 CRDM Cameron Bldg. Restro $ 7047 H0183 G0008 P779642 FY12 CRDM EHS Shower & Eyewash $ 302,644.00 FY13 7047 H0183 7047 H0183 G0008 G0008 P779816 P779730 FY12 CRDM FDC Hydrostatic Test FY12 CRDM Optometry Rep. Desig $ 67,946.52 FY13 $ 894,259.00 FY13 7047 H0183 G0008 P779672 FY12 CRDM Wortham Thtr Sprinkl $ 730,924.37 FY13 x x x x x 7047 H0184 G0008 P779767 FY12 CRDM Hilton Life Safety & $ 79,744.00 FY14 x 7047 H0183 7047 H0183 7047 H0183 G0008 G0008 G0008 P779938 P779880 P790105 FY13 CRDM 542 Road Repairs Des FY13 CRDM Exterior Patio Repla FY13 CRDM 596 Replace Fire Wat $ 141,060.00 $ 487,410.00 $ 29,616.27 FY14 FY14 FY14 x x x P779474 P779474 P779474 Actual CRDM Budget 7047 H0184 G0004 P779553 62,840.31 FY13 x $ 254,468.62 FY07 $ 200,000.00 FY09 $ 592,243.23 FY10 FY11 CRDM Cullen Eng. Chill Wa $ 20,682.83