TOTAL QUALITY MANAGEMENT (TQM) AT AN ORIGINAL DEVICE MANUFACTURER (ODM) A CASE STUDY: FAILURE ANALYSIS DEPERTMENT GEEVA RAJ A/L RAMANATHAN A project report submitted in partial fulfilment of the requirements for the award of the degree of Master of Engineering in Industrial Engineering Faculty of Mechanical Engineering Universiti Teknologi Malaysia. MAY 2009 iii To my beloved mother, father, sister and friends iv ACKNOWLEDGEMENT In the effort to materialize this thesis, I had the blessing to engage with many people, researchers, academicians and practitioners. They have contributed significantly towards my understanding and thoughts in materializing this write-up. In particular, I wish to express my sincere appreciation to my main thesis supervisor, Prof. Dr. Noordin bin Mohd Yusof, for his encouragement, guidance and friendship. I am also very thankful to my other lecturers namely Prof. Dr. Sha'ri bin Mohd Yusof, Assoc. Prof Dr. Abd. Rahman bin Abdul Rahim and Dr. Muhamad Zameri bin Mat Saman for their guidance, advices and motivation. Without their continued support and interest, this thesis would not have been the same as presented here. I am also indebted to Universiti Teknologi Malaysia (UTM) for the facilities rendered in the successful completion of this thesis namely the UTM Library for their assistance in supplying the relevant literatures. My fellow postgraduate students should also be recognised for their support. My sincere appreciation also extends to all my colleagues and others who have provided assistance at various occasions. Their views and tips are useful indeed. Unfortunately, it is not possible to list all of them in this limited space. I am grateful to all my family members. v ABSTRACT The purpose of this write up is to execute and evaluate a case study implementation of Total Quality Management (TQM) philosophy at the Failure Analysis Department of an Original Device Manufacture (ODM). This is an implementation effort at a very technically inclined entity whereby the preimplementation and post-implementation evaluation highlights the main TQM elements that mainly influences the entity. Quantitative and non-quantitative assessments are used to assess the pre-implementation and post-implementation changes. Eventually, the implementation efforts are conceptualized. Based on the implementation, it was identified that Continuous Improvement, Employee Involvement, and Training and Education are the main TQM elements that influence the Failure Analysis Department in particular and the ODM in general. vi ABSTRAK Penulisan ini adalah dengan objektive untuk melaksanakan and menilai sebuah kes penkajian mengenai pelaksanaan falsafah Pengurusan Kualiti Menyeluruh (Total Quality Management – “TQM”) di Jabatan Analisa Kegagalan, Sebuah Pembuat Peranti Asli. Ini adalah satu usaha perlaksanaan di sebuah entiti yang berasaskan kegiatan teknikal. Penilaian sebelum and selepas perlaksaan digunakan untuk mengenal pasti faktor TQM yang memainkan peranan penting dalam entiti tersebut. Penilaian kuantitatif and tidak kuantitatif digunakan untuk menilai perbezaan antara sebelum dan selepas perlaksanaan. Hasil pelaksanaan ini akan dirumuskan; dan dicatakan proses perlaksanan yang telah diambil. Berasaskan kes perlaksanaan ini “Pembaikan Berfarsa”, “Penglibitan para pekerja”, dan “Latihan dan pendidikan” dikenal pasti sebagai faktor TQM yang menpengaruhi Jabatan Analisa di Sebuah Pembuat Peranti Asli. vii TABLE OF CONTENTS CHAPTER 1 2 TITLE PAGE DECLARATION ii DEDICATION iii ACKNOWLEDGEMENTS iv ABSTRACT v ABSTRAK vi TABLE OF CONTENTS vii LIST OF TABLES x LIST OF FIGURES xi LIST OF SYMBOLS xii LIST OF APPENDIX xii INTRODUCTION 1 1.1 Background of the Problem 1 1.2 Statement of the Problem 4 1.3 Objectives 6 1.4 Scope and Key Assumptions 6 1.5 Importance of the Project 9 1.6 Organisation of the Report 10 LITERATURE REVIEW 12 2.1 Overview 12 2.2 Management Leadership and Commitment 16 2.3 Continuous Improvement 17 viii 3 4 5 2.4 Total Customer Satisfaction 17 2.5 Employee Involvement 18 2.6 Training and Education 19 2.7 Reward and Recognition 20 METHODOLOGY 21 3.1 Overview 21 3.2 Quantitative 23 3.3 Non- Quantitative (Subjective) 23 3.4 Data Interpretation Method & Purpose 24 THE CASE STUDY 25 4.1 Pre-implementation assessment: 25 4.1.1 Quantitative 25 4.1.2 Non-Quantitative 29 DISCISSION 35 5.1 Overview 35 5.2 Implementation 38 5.2.1 Training & Education 38 5.2.1.1 Technical Sharing 38 5.2.1.2 Hand-on 39 system/equipment training 5.2.1.3 Soft-Skill Building 40 5.2.1.4 On The Job Coaching 40 5.2.2 Employee Involvement 40 5.2.2.1 Open Door Policy 41 5.2.2.2 Trust Building 42 5.2.2.3 Involvement in 42 Direction Setting for the Department 5.3 Conceptualization of Implementation 43 ix 6 7 REFERENCES Appendix A POST-IMPLEMENTATION ASSESSMENT 47 6.1 Quantitative 50 6.2 Non-Quantitative 53 CONCLUSION 55 57 x LIST OF TABLES TABLE NO. TITLE PAGE 2.1 Main causes of TQM program failures 16 (Martins and de Toledo, 2000 TQM programs: A framework proposal) 4.1 The breakdown of yield fall out of each 27 process of model X (November 2008) 4.2 Summary of pre-implementation 30 questionnaire survey 4.3 Further breakdown of pre-implementation 32 questionnaire survey breakdown on the training factor 4.4 Further breakdown of pre-implementation 33 questionnaire survey breakdown on the employee relation factor 6.1 Breakdown of yield fall out of each 49 process of model X (March 2009) 6.2 Breakdown of yield improvement at specific stations pre and post implementation of TQM principles 50 xi LIST OF FIGURES FIGURE NO. TITLE PAGE 2.1 Components of TQM philosophy 15 and their interrelationship 4.1 Fallout trend over a week of production 27 at specific test-station for model “X” (November 2008) 4.2 High level summary of pre-implementation 34 questionnaire survey. 4.3 Next level details summary 34 of pre-implementation questionnaire survey. 5.1 Goetsch – Davis 20 steps TQM implementation 37 process 5.2 Conceptualization of TQM implementation 46 for this case study: Inside-out concept 6.1 Questionnaire survey data pre and 51 post implementation comparison 6.2 Next level details on questionnaire survey data pre and post implementation comparison 52 xii LIST OF SYMBOLS D, d - diameter F - Force g - Gravity = 9.81 m/s I - Moment of inersia xiii LIST OF APPENDIX APPENDIX A TITLE PAGE Questionnaire survey form 57 iv CHAPTER 1 INTRODUCTION This chapter provides the inside to the write up with regards to the problem statement, objectives of the write up and the organization of the write up. 1.1 Background of the Problem Quality management has evolved from a tool of system quality management to a competitive advantage to service in the era of globalization (Jamshed, 2003). Hence companies have ventured into various quality programs like Total Quality Management, Lean Manufacturing, ISO19000 certification, Six Sigma-Lean and etc. As part of the quality drive companies have ventured into the option of having a Failure Analysis Department within the Quality Assurance Organization. This option has evolved to become a necessity regardless of the high cost related to the capability setup. This is accordable to most manufacturing industry but dominantly seen in the electronic manufacturing industry. 2 The department is set to be the technical team of the Quality Assurance process. This Failure Analysis Department is seeded with the main purposes of being behaving as the technical mirror to the manufacturing process’s quality and reliability, the product design’s quality and reliability and to provide technical support to the too failures seen at the customer side. The department is to technical complement all the in-process quality checks that have been put in place eg. Statistical Process Control (SPC), Total Preventive Maintenance (TPM) and etc. With the level of expectation defined for a Failure Analysis Department, it is important that the department practices a certain level of quality management standard. This is to ensure that the technical analysis done by the department truly provides a mirror representation of the manufacturing process and product design. The analysis done by the Failure Analysis Department will be the basis of the corrective action to be taken by the organization to improve the quality and reliability of a process or product. This will paint the picture of importance for the department to practice a quality management standard apart form the multiple literature that state that quality is the trump-card of competitiveness in all industries (Quek and Sha’ri, 2003). This is truer then ever in a rapidly evolving technology market such as electronic manufacturing industry. Hence it is notable that practicing a particular type of Quality Management is of upmost important. This is more important in a rapidly changing industry, particularly if the corporation is a new player into the market segment where it multiplies the importance of implementing Quality Management principles at all levels of the corporation. The QDM being a company that evolved from an Electronic Manufacturing Services (EMS) business unit is an ISO9000 certified company using the parents company’s adaptation. But in reality the ISO9000 procedure is as far as paper work 3 only in practice. The principles of the ISO 9000 are not embraced and put to practice. This is highly noticeable across the departments at its local manufacturing plant. This same atmosphere is also noticeable at the Failure Analysis Department of the ODM Company. Where by ISO9000 is very much used as a documentation control guideline rather than an ideology of systematic control. This was evident as emphasis was more set at proper documentation of the equipment calibration track sheet, consumable track ability, and etc. Hence this leads to customer dissatisfaction and product yield impact to the corporation. As a result’s the plant’s top management decided to embark on a quality drive. A comprehensive quality ideology needs to be adopted by the company to achieve its quality targets. Total Quality Management (TQM) is seen as a holistic quality management concept meant to address the need of the overall organization with the mindset of providing the best solution of product and/or service to the corporation’s customer. (Mohammad Talha, 2004). The analysis/work done by the Failure Analysis Department of the ODM is seen as a service to the customer. Whereby the customer in this place could be the internal customers as in the manufacturing department, new product introductory engineering department, product design engineering department and others and/or the external customers as in the ODM’s customer. 4 1.2 Statement of the Problem With the customer flak and yield impact felt by the higher management of the ODM plant, made them to kick-start a quality drive, resulting in all the department to look into ways to implement the quality drive from the top management. With the overall picture painted as in the impact of the Failure Analysis Department to the ODM organization; where the department’s level of service is seen as critical in making quality and reliability assessment and correction, and with the department also provides the confidence to the customers on the after sales commitments, itself justifies the need of the department to have a strong foundation on quality management. With the important issue defined, next it is important to access the current state of the quality management at the Failure Analysis Department. With the purpose to make an assessment on the level of satisfaction the customers has towards the service provided. A benchmark evaluation of the success or impact of any quality management principle adopted by the department before this point is to be evaluated. A first hand experience of managing the department showed the magnitude of disarray state of the company’s quality management, particularly in the Failure Analysis Department of the company. The magnitude of the disarray can be reflected by the confidence level of the customers on the department. This is further multiplied and reflected by the health state of the product yield. Another data point based on the personal experience is the confidence level of the employee of the company/department. This point of assessment reflects the employee’s involvement, empowerment and the setting of customer satisfaction as a milestone achievement across all levels of the organization. This point of data showed a very low confidence and involvement level. 5 A one-to-one dialog session with each employee showed the individual passion to drive for quality targets is hugely present. But a gap that was common across the employee is the lack of direction or culture set. The gap ranges from the amount of involvement, continuous skill building commitment, appreciation of achievement and the list goes on. The two points of data, (customer satisfaction and product yield) which reflect the main success indicators of the company and department points to the need of a quality management revamp. It also indicates the need for the company/department to adopt a change in quality management ideology. Further more the two points of data call for the dressing of a holistic quality management ideology with the customer being the centre of the focus. Hence with all the finger pointing to a quality cultural change adoption, Total Quality Management (TQM) ideology is seen to be the best fit concept for the Failure Analysis department. This is so, since the ideology is seen as a holistic solution (Dimitriades, 2000). To achieve continuous improvement targets. 6 1.3 Objectives With the top management of the ODM plant having geared into the quality drive. An effort is being made across all departments to improve the quality management principles of the departments. With the picture of impact that the Failure Analysis Department has on the ODM’s organization and the current state of the department defines earlier, drives this department as well to make it move in evolving it quality principles. The project objective is set at defining holistic quality management principles that best suit the department and organization with the foundation of the principles set at the basis of Total Quality Management ideology. This will be followed with the implementation of the principles at the department. A successful implementation is foresee with the hope that the climax of the Total Quality Management ideology implementation will improve the perception of the department within the customers, internal and external and the reflection of the success being translated to a higher yield of the products. This will enable the corporation to best serve the needs of the customers. After all customer satisfaction is the focus of Total Quality Management. 1.4 Scope and Key Assumptions The quality drive journey is a top management driven and a plant level drive. In order to revamp the quality practices of the plant as in overall, I will go to the extend of saying “waking up” the paper level quality to a quality principle that encompasses the day to day practice. As the case study focus will be set at the Failure Analysis Department to look at preconditions of the department’s quality practices and to gage the success level or changes seen in that department via the adoption of TQM as quality guiding principle. 7 There are six principles that could define the overall area of the Total Quality Management (Quek and Sha’ri, 2003 and Martins and de Toledo, 2000) and they are given in the following: • Management Leadership and Commitment • Continuous Improvement o Upstream control o Process management • Total Customer Satisfaction o Quality first o Market-in – customer orientation o Next process downstream is a customer (internal customer) • Employee Involvement o Management by facts o Employee respect • Training and Education o Poke yoke • Reward and Recognition o Motivation by recognition TQM principles do not work individually; it is a collective value that complements each other. Hence for the purpose of implementation all of the stated principles have to be adopted. Since they are all an interlinked element to the concept of TQM. After all TQM focuses on the process not the individual (Tavana et. al., 2003). 8 For the purpose of the project and project write-up implementation emphasis will be focused on just the three element: • Continuous Improvement o Upstream control o Process management • Employee Involvement o Management by facts o Employee respect • Training and Education o Poke yoke o Motivation by recognition This emphasis is based on the personal first hand experience at managing the department and verbal dialog session input obtained from the employee of the department and also from the internal and external customer. Coupled with the customer and employee feedback; the department’s function; the important element needed by the department to do a flawless execution of the function and the current state of the department of the elements calls for the focus to be set at the three elements. A questionnaire was carried out to support this point of focus for the project and write-up. A quality system survey questionnaire developed by Saraph et. al. (1989) will be used. The questionnaire is meant for evaluating quality management in either manufacturing or service organizations (Tavana et. al., 2003). Further more since it has been a time tested questionnaire to gage the standards of quality management (Kumar et al., 1999). Adaptation of this questionnaire eliminates the need to develop a new questionnaire which is time consuming and the need to vet the questionnaire. 9 1.5 Importance of the Project The need for a quality system is no more for a formality process. Having a system like ISO19000 but not fully embracing it is a failure of implementation and it will lead to the failure of quality system. Quality system has become a tool of competitiveness in this globalized business arena. Quality is the focal point of corporation’s survival. Hence with this emphasis in mind, the plant top management has embarked on Quality improvement drive. This is one of the trigger points that drove the departments of the corporation to set it focus on improving it quality management. On that note the Failure Analysis Department which has a significant quality performance indicator impact to the corporation has started it journey in quality management improvement. It is notable that the current low state of the internal and external customers’ perception of the department is the main driving factor of this quality drive and this project implementation. The success of quality management improvement at this department will be reflected in the overall yield improvement of the ODM’s products. Apart from that it will also reflect the confidence level of customer internal and external. This is the important part of TQM, focus on the customer, leading to customer satisfaction. Even though the department and the company in general are an ISO19000 registered via parent company, currently the department do not fully embrace the basis of quality operation fundamentals. The ISO9000 system is practiced purely as a documentation standard, rather then a system as overall. This it is one of the main justification that the department need to implement/put-to-practice a principle that could set the mindset of the department operation. With the department being a technical analytical team that defines Fault Model Effect Analysis (FMEA) on a regular basis it is critical for the department to adopt a system which could provide a structured solution. 10 With the quality drive that has been put into gear at top management level sets the right environment for TQM implementation. This sets the platform for having the continuous commitment of the top management. This is a piece of TQM jigsaw puzzle that is of very important value for the successful implementation of TQM ideology, since it involves the change of culture at all level. It is noted that perfect timing is a variable in the successful implementation of TQM (Hashmi); The timeliness of TQM implementation is important so that all the jigsaw puzzle in TQM implementation could fall in place. A successful implementation of TQM involves internal and external factor, with one of the factor being the wheels of motion (Hashmi). As of system implementation, all the elements of TQM will be rolled out, but special emphasis will be given to three elements in this case study implementation and project writing at the Failure Analysis department as defined earlier. This is so because of the nature of the department where the function of the department is very much experience and technical knowledge based. Apart from that verbal survey from the employees of the department and the internal and external customer has pointed to the prioritization of the three elements over the other elements for the department. A questionnaire survey is being carried out to support this direction of focus. 1.6 Organisation of the Report With the introduction of the report that provide an insight to the background of the problem and defining the problem statement, this report will be furnished with a literature review that looks into the concept of Total Quality Management (TQM) and the implementation principles of TQM. 11 A description of the methodology will follow thereafter describing how the pre and post implementation evaluation will be done address two main factors of implementation: the product yield factor (quantitative) and the customer satisfaction factor (in-quantitative). This data points will be discussed based on the five element of TQM that is to be implemented. With that highlights and lowlights of the implemented will be identified and concluded upon. Possible future study/research will be noted at the end. CHAPTER 2 LITERATURE REVIEW 2.1 Overview With the evolution of business focus moving from mass production to quality assurance and to mass customization, a process operation is best definable based on the quality practices that the system is based on. This factor is multiplied more if the operation is a quality based function. A corporate quality system is becoming more than just a system performance monitoring tool. The importance of a qualities system has become a global competitive tool in this globalization era. It is becoming a tool for business to reflect the “total value” of their products and allowing a customer to maximize their value for money (Jamshed, 2003). End of the day coming to the point of having the trump card for business survival. This has driven various organizations regardless of business type, be it manufacturing or service provided to embark on a journey of quality management improvement. In doing that they have to look into adopting various qualities based ideology in achieving the desired quality standards and maintaining the quality standards. To name a few quality ideologies are as follows: 13 1) Total Quality Management 2) Lean Manufacturing 3) Lean-Six Sigma 4) ISO 9000 The list goes on with the derivative of these quality ideologies. Total Quality Management is noted as a holistic quality management solution ideology where is encompasses the whole quality management element with main purpose of achieving customer satisfaction (Moreno-Lonzo and Peris, 1998; Dean and Bowen, 1994). As for Lean Manufacturing it is focused at reducing waste, which drives for the optimization of process and process control. ISO 9000 is seen as an International level of quality standard standardization set of governing roles. It is sad that most of the companies put in all the effort to achieve the registration as ISO 9000 company but there after it becomes an annual documentation work only rather than embracing the full concept of the certification (Bradley, 1994). Six Sigma- Lean is the ideology marriage between the Six-Sigma concept and Lean manufacturing. Six-Sigma is a statistical control based system which was developed by Motorola and Lean Manufacturing is a system made popular by Toyota and calls for the reduction of waste. Hence it leads to a statistically controlled waste reduction ideology/process. All this ideologies have a best environment and purpose of use for example Lean and Six-Sigma is very useful in process optimization and improvement in specific whereas TQM is more of an all composed quality drive to achieve customer satisfaction. 14 TQM is structured upon various elements that build it. Based on a study surveyed by Saraph determined that TQM is build upon eight critical elements as follows: 1) Top management leadership; 2) Role of the quality department; 3) Training; 4) Product design; 5) Supplier quality management 6) Process management; 7) Quality data reporting; 8) Employee relations. After that a study carried out by Black and Porter (1996) highlighted the critical elements of TQM to be: 1) Factor 1: people and customer management. 2) Factor 2: supplier partnerships. 3) Factor 3: communication of improvement information. 4) Factor 4: customer satisfaction orientation. 5) Factor 5: external interface management. 6) Factor 6: strategic quality management. 7) Factor 7: teamwork structures for improvement. 8) Factor 8: operational quality planning. 9) Factor 9: quality improvement measurement systems. 10) Factor 10: corporate quality culture 15 As for a study carried out by Eng and Yusof, 2003 highlighted that the TQM elements to be 1) Management Leadership and commitment 2) Continuous improvement 3) Total customer satisfaction 4) Employee involvement 5) Training and Education 6) Reward and recognition Even though the number of elements is different between these studies but the elements are very much the same. Figure 2.1: Components of TQM philosophy and their interrelationship 16 It is notable that an improvement on one of the element will have a relative improvement to the other elements of total quality. Ultimate the coupled improvement brings to the satisfaction of the customer. The components of TQM philosophy and their interrelationship chart (Figure2.1) show’s the inter-relationship between the elements of TQM (Jamshed, 2003). 2.2 Management Leadership and Commitment In multiple TQM analysis study it has been noted that management leadership and commitment is the main element that causes the TQM implementation to fail. (Dayton, 2003; Martins and de Toledo 2000). Table 2.1: Main Causes of TQM program Failures (Martins and de Toledo, 2000 TQM Programs: A framework proposal) 17 Table 2.1 summarizes the main causes of TQM implementation failure as seen in multiple studies. Top management commitment is seen as essential piece of successful TQM implementation. Hence with the ODM plant top management have stepped their foot into the quality improvement effort as of current, it is the best time for this TQM implementation project at the ODM company as in overall and departments in specific. 2.3 Continuous Improvement The only thing that is constant is change. An organization needs to be agile enough to adapt to changes and demand of the customer. This also need for a technical team to be up to date on the relevant information and knowledge to provide effective and efficient technical respond. This junction links this element to the employee involvement element since employee empowerment need to be at the relevant level. This factor is so much so true since today’s customers’ satisfaction limit might not be the same tomorrow. Always go at a minimum a notch higher. 2.4 Total Customer Satisfaction This is the ultimate point and focus point of TQM ideology. All effort made in TQM implementation and improvement is focused at achieving this illusive point of satisfaction by the customer. Customer can be of internal (downstream processes) and external (end customer). 18 Employees are also seen as customer of the organization since they are the most priced asset of the organization. It is important for management to realize this and drives to improve the working environment and reasonable needs of the employee (Eng and Yusof, 2003). This eventually drives to committed employees delivering to up most standard which leads to the internal and external customer satisfaction. 2.5 Employee Involvement This element is important in driving quality improvement at all level of the organization. This is best achieving via employee empowerment in accordance to they level of involvement (Richardson, 1997). This is very much important to be adopted in this case study implementation where the failure analysis engineers and technicians are empowered to do relevant decisions so that it enables them to do their FMEA activities with a continuum and effectively. This hence builds the confidence and relevant decision making experience in the employee. This segment “confidence” and “relevant decision making experience” is important in the nature of the job and activity done by the Failure Analysis Department on daily basis. It is noted that the employees whom feel they are important to the organization will consistently deliver high value job. (Eng and Yusof, 2003). 19 2.6 Training and Education This is the element that enables the management level of the organization to do relevant empowerment to the employees. Management has to have the confidence that the employee has the necessary knowledge to execute the task empower to him/her flawlessly, and this is one of the way to achieve this empowerment milestone. This element is more important to a function that is of technical and debugging in nature. This is where the nature of the failure analysis department’s daily work is evolved around, debugging, reverse engineering, FMEA and etc. Hence it spells out the importance of the department to embrace this element of TQM. The mode of training and education can vary from classroom based to hands on real case. This eventually will also build the necessary skills in the employee and enables the management to embrace the TQM element of employee involvement at a higher level. 2.7 Reward and Recognition One of the reasons seen why TQM failed in the implementation phase is because the continuous fire to go the mile of complete implementation of TQM dies half way through. Having a reward and recognition practice will stimulate to keep the fire of TQM implementation to last mile. Having this element also reflects the commitment of the management to the effort of full TQM implementation (Eng and Yusof, 2003) 20 As part of corporation’s efforts in maximising their inline and after sales quality services, many manufacturing companies are seen to be in the bandwagon to establish their Failure Analysis Department, whereby the department is expected to provide technical feedback to the cooperation on their product and process and at the same time provide reverse engineering technical feedback on problems faced by customer. With the Failure Analysis Department being a quality service provider it emphasises the importance of the department to have a system base on quality principle. This is very much with the idea or philosophy that the customer is the centre of the focus and all effort made is to achieve optimum level of quality is to meet and exceed point of customer satisfaction (Sashkin and Kiser, 1993). The ideology is about the change of culture and work model from product focus to customer focus. CHAPTER 3 METHODOLOGY 3.1 Overview With the company has on the move to improve it quality management system, the failure analysis department is making it effort to achieve the customer satisfaction target. With that the objective of this project is a case study to do an ideology implementation with an effort to improve the service quality of the Failure Analysis Department of the Original Device Manufacturer (ODM) Company. With the impact of the department’s service not limited to the quality state of the company’s product, where it also provides a direct after sales service to the customer. This emphasis the need of the department to have a set of quality practice standards. For this case study purpose elements of TQM have been focused to three elements only based on the function of the department and the verbal customer and employee of the department feedback. But in reality of implementation the full spectrum of TQM elements will be rolled out. 22 Total Quality Management (TQM) is chosen as the quality ideology to be implemented at this Department because it is a holistic quality management ideology. The current status of the quality management at the department is at a low in service level, as reflected by the internal and external customer calls for a total overhaul of the department’s ideology if any. Hence TQM provides the right solution package to the need of the department. With the current emphasis from cooperate level to quality commitments provides the right environment for a successful implementation of TQM. As stated earlier the focus of the case study and the project write up will be focused on three elements of TQM Continuous Improvement • o Upstream control o Process management • Employee Involvement o Management by facts o Employee respect • Training and Education o Poke yoke o Motivation by recognition With that, first of all a current state assessment will be carried out. In order to do this the Failure Analysis Department will be evaluated in two manners: 1) Quantitative and 2) Non – Quantitative (subjective) 23 3.2 Quantitative For the quantitative scope of evaluation a specific product’s yield performance will be used as a point of assessment over a time frame. This point of data would be used to justify the success level of TQM ideology implementation because this it the ultimate reflection of internal customer satisfaction and cooperation’s product quality and reliability performance which translates to portion of external customer satisfaction indication. This point of data will reflect the success level of the TQM ideology implementation. 3.3 Non-Quantitative (Subjective) Whereas for the non-quantitative (subjective) scope of evaluation, a service level satisfaction verbal subjective survey has been carried out this pointed to the direction of setting the focus on the three element of TQM. To solidify this, a questionnaire survey is done to support this point of focus for the project and writeup. A quality system survey questionnaire developed by Saraph et. al. (1989), is used. The questionnaire is meant for evaluating quality management in either manufacturing or service organizations (Tavana et. al., 2003). Furthermore since it has been a time tested questionnaire to gage the standards of quality management (Kumar et al., 1999). Adaptation of this questionnaire eliminates the need to develop a time consuming new questionnaire and the need to vet the questionnaire. This point of data will reflect the effective level of the TQM ideology implementation 24 3.4 Data Interpretation Method and Purpose The pre-implementation data is used to plan for the necessary TQM ideology concept within the three elements to be implemented and way of implementation. It also will be the baseline line for evaluation the success level and effective level of the TQM ideology implementation at the Failure Analysis Department of the ODM Company. Personal experience will also be added to the point of data to provide a real experience of change in the pre and post implementation of the ideology. As for the post implementation of the three elements implementation, the same two data factor will be used, i.e. the quantitative and non-quantitative. This is to gage the impact that the three elements have on quality management improvement at the Failure Analysis Department. The quantitative data will be ploted over the defined time frame and indication of TQM ideology concept implementation milestone will be indicated. This is to provide a reflection on the yield improvement associated to each particular TQM ideology concept adopted over the time frame. With the indication of what engineering effort that has been taken to achieve the milestones of improvement. For the non-quantitative data obtained over the process of implementation the TQM ideology implementation it to be plotted on a comparable Histogram diagram. This is with the purpose of obtaining an indication of which TQM ideology implementation concept has the most positive impact to a successful implementation of the quality ideology. CHAPTER 4 THE CASE STUDY 4.1 Pre-implementation assessment: Assessment was done in two mode quantitative and qualitative mode. 4.1.1 Quantitative: The company is in the business of producing two variant of camera module 1) Fix-Focus 2) High-end Low-Cost Auto-Focus With this variant, the complexity of both camera modules manufacturing process varies with Fix-Focus modules having a less complex operation since it has less mechanical, optical and electronic functions manufacturing to consider compared to a High-End Low-Cost Auto-Focus modules. For the purpose of this 26 write-up will focus on model “X” of a High-End Low-Cost Auto-Focus camera module. The assembly of this model involves 11 main processes, and they are as follows: 1) SMT(Surface Mount Technology) - attachment of components on PCB 2) Die Attach – Photon-sensor Die glue to the PCB 3) WireBond – Connect the Die and PCB connectivity 4) IRCF Attach – Die Sensor cover attach 5) Particle Testing – Testing for the cleanliness of the sensor area 6) VCM attach – Attaching the Auto-Focus module of the camera module 7) Focusing – Calibration of pre-define focus and focusing testing 8) Shutter Attach – Camera module Shutter attachment 9) EMI Shield attach – EMI shield attachment and soldering 10) Functional Testing - Complete module functionality testing 11) Cover-glass attach – Cover glass attachment to the camera module 12) Packing and shipment This product is chosen since it is a product cycle phase of NPI (new product introductory) to Mass Production (MP). An assessment of the process yield and the CUM yield of the model X manufacturing towards the end of last year (2008) showed a very low yield percentage which was way of f the target of 90%. The CUM yield of the model was at 14.06%. This significant yield drop was accountable to a few particular key processes. 1) IRCF attach process 2) Wirebond process; and 3) Cover-Glass Attach 27 Table 4.1 indicates the breakdown of yield fall out of each process of model X (November 2008) Table 4.1: the breakdown of yield fall out of each process of model X (November 2008) Qty In Qty Out Qty Fail Prime Yield % Target % Delta % SMT Visual Station 69 69 0 100.00% 99.50% 0.50% Underfill 727 725 2 99.72% 99.50% 0.22% SMT_IPQA 872 871 1 99.89% 99.50% 0.39% singulation 1512 1505 7 99.54% 99.00% 0.54% WB Inspection 1858 1706 152 91.82% 98.50% -6.68% IRCF_Attach 1555 1540 15 99.04% 100.00% -0.96% SensorCap_Test 833 386 447 46.34% 80.00% -33.66% VCM_Attach 209 200 9 95.69% 100.00% -4.31% Soldering 253 253 0 100.00% 99.50% 0.50% Focus Test 197 156 41 79.19% 87.50% -8.31% AF_Calibration 68 62 6 91.18% 90.00% 1.18% Shutter_Attach 144 143 1 99.31% 100.00% -0.69% Shutter_Solder 106 105 1 99.06% 99.50% -0.44% EMI_Soldering 105 104 1 99.05% 99.50% -0.45% Final_Calibration 104 104 0 100.00% 90.00% 10.00% Final Test 104 79 25 75.96% 90.00% -14.04% CG_Attach 79 57 22 72.15% 90.00% -17.85% Visual Inspection 57 52 5 91.23% 95.00% -3.77% OQA Final Test 0 0 0 0.00% 90.00% -90.00% OQA MI 0 0 0 0.00% 90.00% -90.00% CUM Yield 0 0 0 14.06% 90.00% -75.94% Figure 4.1 shows the fallout trend over a week of production at specific test-station for Model “X” (November 2008) Yield Trend 120.00% Y ield 100.00% 80.00% 60.00% 40.00% 20.00% 0.00% W eekend Yield 10-Nov 11-Nov 12-Nov 13-Nov Date WB Inspection SensorCap_Test Focus Test Final_Calibration Final Test CUM Yield AF_Calibration Figure 4.1: fallout trend over a week of production at specific test-station for Model “X” (November 2008) 28 This quantitative data as seen in Table 4.1 and Figure 4.1 indicates that there is a dire need to immediately improve the quality of model –X manufacturing; it is to be note that this numbers do not include the possible field return DPM. What are to be improved and enhanced are the underlining questions. In order to answer these questions the Failure Analysis Department comes into the picture to debug and drive the root cause of the fallout together with the Engineering Department. Hence this calls for a systematic and data driven approach, which calls for a well defined quality management principles. Based on the quantitative data and failure root cause analysis done it was concluded that two main problems need to be resolved. 1) Process optimization – Wirebond process; which contributed to wire bond inspection fallout (6.68%) and a big portion of functional testing fallout (14.04%). – Cover glass attached manual attachment process contributed to high glass cracking. 2) Material optimization – IRCF material; reliability testing showed that the material chosen is of self decaying quality after the material has gone through the assembly process. (mainly contributed by post heat treatment). 29 With these quantitative data it leads to the next question what kind of prequalification and quality standards that was adhered to? Hence calls for an assessment on the quality management practices in the design and assembly of the camera module model X. In specify the Failure Analysis Department which was accountable for the technical aspect of product fallout analysis and reliability. Nevertheless it is notable that quality is the responsibility of all involved. 4.1.2 Non-Quantitative: There are two ways of performing the non-quantitative assessment: 1) A questionnaire survey 2) A service level satisfaction verbal subjective survey These surveys were done with the emphasis on the Failure Analysis Department, the perception that the internal and external customer of the department and also feedback by the employees of the department. These surveys had a 42% reply rate based on 50 person respondents set. For the questionnaire survey; a questionnaire developed by Saraph et. al. (1989) was adopted. These are 8 main grouping of survey data was done to access the main contribution factor to a quality management system; namely: 1) Role of divisional top management and quality policy 2) Role of the quality department 3) Training 30 4) Product/service design 5) Supplier quality management (supplier of goods and/or services) 6) Process management/operating procedures 7) Quality data and reporting 8) Employee relations In accordance to the survey results as shown in Table 4.2; Training (2.57) and Employee Relation (2.65) which registered an average value of less than 3 points would be the main cause of poor yield performance seen on Model X. Table 4.2: Summary of Pre-implementation Questionnaire Survey Training 2.57 Employee relations 2.65 Role of the quality department 3.16 Role of divisional top management and quality policy 3.36 Product/service design 3.42 Supplier quality management (supplier of goods and/or services) 3.55 Process management/operating procedures 3.69 Quality data and reporting 3.94 Survey data showing the pre-implementation quality management practice standards at the ODM Company with the emphasis on the Failure Analysis department. What was ironic in the survey data was that the company has a very good and compressive quality data monitoring system and reporting. Hence it is the writers’ perception that the system used for the quality data monitoring is not used optimally, which triggers the question of the culture of quality management practiced by the organization which seems to be purely for data collection. 31 Hence it is important for the organization to embark on a Total Quality journey so that the effective quality data and reporting system is maximised the usage, which could eventual be reflected on the yield of the Model X manufacturing process. The subjective survey which was carried out on selective respondents which ranged from the internal and external customer, employees of the Failure Analysis Department and the Director of the Quality Assurance Department, echoed similar sentiments as highlighted in the questionnaire survey; 1) Where the involvement on the Failure Analysis engineers were limited to the capturing of data rather then driving for solutions, 2) The engineers lacked self confidence to communicate the root cause 3) There was no proper defined Failure Analysis related training emphasis for the Failure Analysis engineers and technician. 4) The direction set for the Failure Analysis department was not well defined. 5) No clear effort to clearly link the process quality data to the defect manifestation and the root cause The next level of analysis on the survey results provides some insights what was the flaws that could have manifested as the poor quality management practices. Focusing at the two main total quality factors that scored the lowest in the survey shows that a few main factors in TQM was not of practice; to name a few 1) Employee empowerment and involvement 2) Continuous improvement 3) Proper and well defined training programs 32 Table 4.3: Further Breakdown of Pre-implementation Questionnaire Survey breakdown on the Training Factor Training • Specific work-skills training (technical and vocational) given to hourly employees throughout the division 2.45 • Quality-related training given to hourly employees throughout the division 2.64 • Quality-related training given to managers and supervisors throughout the division 3.18 • Training in the “total quality concept” (i.e. philosophy of company-wide responsibility for quality) throughout the division 2.27 • Training in the basic statistical techniques (such as histograms and control charts) in the division as a whole 2.45 • Training in advanced statistical techniques (such as design of experiments and regression analysis) in the division as a whole 2.09 • Commitment of the divisional top management to employee training 3.00 • Availability of resources for employee training in the division 2.45 This survey data from Table 4.3 shows that there was no clear Failure Analysis Department centric training defined hence limiting the engineers and technicians growth even though the team was to work on relative complex camera modules. The data also showed that there was not emphasis on quality related training which is a necessity in building a quality culture. There was also no emphasis in providing basic statistical knowledge, hence limited the employees knowledge on how to systematically drive for root cause closure. But the over riding matter to this problem is the lack of competent resources to train the employees especially in the specific work-skill training Hence this factor of TQM need to be worked on, to define training programs that a relevant and important to the Failure Analysis Department. Apart for the content of the training a continuous assessment of skill level for the employees need to be defined so that the employees could keep in touch of the capabilities and to work on continuous improvement 33 Table 4.4: Further Breakdown of Pre-implementation Questionnaire Survey breakdown on the Employee Relation Factor Employee relations • Extent to which quality circle or employee involvement type programs are implemented in the division • Effectiveness of quality circle or employee 2.363636 involvement type programs in the division • Extent to which employees are held responsible for error-free output • Amount of feedback provided to employees on their quality performance • Degree of participation in quality decisions by 2.363636 hourly/non-supervisory employees • Extent to which quality awareness building among employees is ongoing • Extent to which employees are recognized for superior quality performance • Effectiveness of supervisors in solving problems/issues 2.272727 3.727273 2.636364 2.727273 2.363636 2.727273 Having a look at the breakdown details of employee relation factor as shown in Table 4.4 tells that on average these segments of survey scored less than 3 points. This is a matter of concern in total quality management environment. This data indicates a very hierarchal management system which does not fit with a culture that would like to drive for total quality system. There is an outlier point in this data; the question related to the recognition of employee for their contribution (The extend to which employees are held responsible for error-free output) this is due to most respondents read the question in a negative manner where employee are enforced negatively to drive for equitability; via fear of management. Hence effort need to made to break away for the current mode of operation and to build a system of trust among the employees so that that take pride on the work done, hence the employee it self assuring high quality standards in the operation of department and processes. Figure 4.2 and Figure 4.3 provides a graphical summary of the preimplementation survey, which indicates a lot area for improvement of the quality management system practiced by the organization if any. 34 Figure 4.2: High level summary of pre-implementation questionnaire survey. Figure 4.3: Next level details summary of pre-implementation questionnaire survey. CHAPTER 5 DISCUSSION 5.1 Overview With the project’s objective set at defining a holistic quality management principle that best suits the department and organization with the foundation of the principles set at the basis of Total Quality Management ideology. Based on the preimplementation assessment, the focus of the write-up implementation emphasis focused at three element bellow: • Continuous Improvement o Upstream control o Process management • Employee Involvement o Management by facts o Employee respect • Training and Education o Poke yoke o Motivation by recognition TQM principles cannot be implemented without a total framework. The main perquisite to it implementation is Top Management approval and commitment, in this case effort of total quality implementation was able to be consider in the Failure Analysis Department since the whole organization at corporate level itself have embarked into restructuring and reorganizing the company. The involvement of the organization in a restructuring effort is a trigger by survival fear of the current global economy crisis. It is noted that is change is always easier to implement during dire need, since it is easier to convince the relevant top management on the importance and benefit of the change. An example for a total quality implementation process is the Goetsch – Davis 20 steps TQM implementation Process (Goetsch and Davis, 2006). This model adopts 3 main phases; (Figure5.1) 1) preparation, 2) planning and 3) execution 37 Action By Top exec 2. Form Total Quality Steering Committee Consultant 3. Team building Preparation 4. Total Quality Training for the Steering Committee Total Quality Steering Committee 5. Create Vision, Guiding Principles 6. Set Broad Strategic Objectives 7. Communicate and Publicize 8. Identify Organizational Strengths and Weaknesses 9. Identify Advocated and Resisters Planning Steering Committee Augmented Steering Committee 11. Baseline Customer Satisfaction 12. Plan the implementation Approach >> Plan–Do-Check-Adjust 13. Identify projects 14. Establish Team Composition Project teams Execution 10. Baseline Employee Satisfaction/ Attitude Steering Committee 15. Provide Team Training 16. Team activation and Direction >> (PDCA cycle) 20. Modify Infrastructure as Necessary • Procedures/ Processes, etc. • Organizational Structure • Reward/ Recognition System Note: Step 7 and 12 thru 20 repeat forever Figure 5.1: Goetsch – Davis 20 steps TQM implementation Process For this case study; a formal process was not adopted where some exceptions were made, where a formal steering committee was not formed and external consultant were not hired. Due to budget constrains, and it is a department specific implementation within the ongoing effort by the organization to make cooperate level changes. 38 5.2 Implementation Referring to the quantitative and non-quantitative data of pre-implementation, it is relatable that the Failure Analysis department need focus implementation of programs for training system improvement and employee involvement emphasis. Together with that build a system that will help to continuously improve the total quality system. 5.2.1 Training and Education Hence several training effort was build around the routine tasks. Emphasis of training was build around four aspects: 1) Technical sharing 2) Hand-on system/equipment operation 3) Soft-skill building 4) On the job coaching 5.2.1.1 Technical Sharing This mode of training has been set on a weekly basis. Where various in-house content experts are engaged to provide technical sharing on product, process or analysis skills this is with the purpose to provide a platform for knowledge retention. Apart from that employees itself are expected to do self research study and sharing of 39 that topic in this weekly forum. As knowledge cross-learning efforts, any analysis cases done by a particular employee that is done uniquely in nature are expected to provide a case “walk-through” sharing to the team. These efforts of getting the employees to provide a platform for other employees to learn from the team member on Best Know Method(BKM) of analysis. This case “walk-through” sharing also serves as a recognition platform for the employees on successful or vigilant effort on a unique analysis case. This also served as a platform for superiors to learn from the employees on various expects; creating a platform for a two way continual cross learning. Hence make sure there is a continuous learning at all levels of the department and provide a temporary relieve from a hierarchical system. Employees are also encouraged to take up job relevant external technical short courses programs, this is with effort to build employees competency. This is encouraged on a continuous basis to keep in touch with the rapidly evolving/changing industry. 5.2.1.2 Hand-on system/equipment training This is done by engaging the equipment vendors. These training are for the purpose to provide a refresher to the employees on the proper operation of the equipment and to provide a platform for the employees to enhance their operation skills of the system/machine with the guidance and pointers from the equipment experts. This is also with the purpose to drive employees to maximize the usage and capability of the system/equipment. 40 5.2.1.3 Soft-Skill Building Soft skill trainings are done through practical means, where the technical sharing forums are set as a platform for the employees to sharpen their presentation skills and to build their communication. Apart from that it is a platform to build self confidence for the employees. 5.2.1.4 On The Job Coaching This is done with two purpose in mind, first is to provide technical guidance for analysis roadblocks faced by employees and also to provide moral support to the employees to achieve a higher standard of job quality every time. This is done by providing open communication practices with employees are always welcomed to seek consultation help from the relevant technical lead and content experts in and outside of the department, organization or company. Off cause “spoon-feeding” is not the order of the day. 5.2.2 Employee Involvement A paradigm shift from a top-down system to a system that enshrines involvement and relevant empowerment at all level of organization is adopted. This change is possible with the help from top management. The endorsement given by the top management can be seen in the form of including an employee centric thinking into to the new Vision and Mission of the organization. 41 “To be the employer of Choice” This mindset shift is also embroiled to the Failure Analysis Department. Whereby a few polices and practices are put in place, so that it builds a culture of total quality: 1) Open Door Policy 2) Trust Building 3) Involvement in direction setting for the department. 5.2.2.1 Open Door Policy Open Door Policy is seen as one of the main ingredient to break away from hierarchal system. This policy system provides access to all level of employee to directly communicate to all levels of managements. Example: An operation is allowed and welcomed to have a 1-to-1 dialog/meeting with the General Manager of the plant. This policy also drives a way the fear of management within the employees of the organization. This policy installs the mindset of constructive confrontation at all levels. Apart from this platform of “all level” free communication, this policy encourages and regular and continuous communication between the employees and their direct superiors. This is with the purpose to maintain a continual linkage between employee’s contribution and the vision and mission of the organization. Hence, keeping the employees at the heart of the organization operation. 42 5.2.2.2 Trust Building Trust is an important virtue that needs to build within and across the organization. Total quality is depended on high standards of ethics which is build over the moral value of integrity and trust. Hence relevant efforts have been made within the Failure Analysis Department. One notable change is Project based operation, where the exempt staff are defined as owners of analysis cases and entrusted for the successful completion of the analysis cases. This does not mean a complete wash hand by superiors. Where the superiors are expected to provide technical guidance and assistance to remove any roadblocks faced by employees in executing flawlessly assignment and tasks entrusted to them. Employees are hold to the analysis case “turn-around-time” committed to and systematic execution of analysis. Hence removing micro-management. Specific employees are also entrusted to be equipment owners, where the status and up-keeping of the highly valued equipment are entrusted to the employees. This is with emphasis provide employees with more responsibilities that are traditionally held by the management. 5.2.2.3 Involvement in direction setting for the department In an effort to have employee’s involvement at all level of department operations, the senior members of the team are involved in the (Strength, Opportunity, Weakness and Treats) SOWT analysis brainstorming sessions together with the management. This is as a platform for employees to have their say on the future of the department and how to step forward as a team. This is an opportunity 43 for the employees to make a difference how the department is operated and to enhance it to be more competitive. The training system and employees involvement system are done in a sustainable manner so that continuous improvement could be build into the culture of the organization. One example of an effective and sustainable system that was deployed within the Failure Analysis Department is the use of Online Database for analysis case submission, progress tracking, closure of analysis case, trigger of root cause closure and department’s periodical Key Performance Indicator (KPI) review. Since it is an integrated system it is a “poke yoke” system. An analysis of the KPI indicators on a periodical cycle provides direction for the continual improvement of the department. The system which is an integrated system would keep track for root cause fix and closure. 5.3 Conceptualization of Implementation The implementation of this ideological towards total quality change was an inside out approach where the implementation was done in a case study mode from a department level and proliferated to the cooperate level. With that said, some elements need to be done at top management level example; the commitment to change and involvement from top management, where this factor has been indentified as the main cause of failure of many TQM implementation efforts previously. The scenario was unique during the implementation of the TQM case study at this department where the 21st century global economy slump triggered the top management to embark in an effort to change. Hence, this scenario helped to ease the implementation of TQM effort at this organization. 44 The next step that needs to be done on the implementation is to do an assessment on the current state of total quality practices at the organization and in specific at the department level. This is needed to identify the elements of TQM practice implementation which would have the great is difference to the organization and department in specific. In this case for the Failure Analysis Department: • Continuous Improvement o Upstream control o Process management • Employee Involvement o Management by facts o Employee respect • Training and Education o Poke yoke o Motivation by recognition was identified to be the main elements that would be the great’s improvement to the department and organization at large. Upon identification, this was followed on by the tailoring of implementation efforts focused around the elements defined earlier. The tailoring done needs to take in consideration the current culture of the organization, so that the change efforts do not create a “culture-shock” which will hinder the successful implementation of TQM. Hence it is important to remember that TQM implementation is a journey and changes should be done slowly at start. 45 One of the most main ingredients for this inside-out implementation effort is to define and track evaluation points to see the change that results from the implementation of the tailor made efforts. This is case a quantitative and a nonquantitative was defined to access the changes that results from the evolution of TQM within the department in specific and the organization on general. The person who is acting as the agent of change preferably a management personal of the top management is of a person who has the passion and obsession on quality. So that the ideology change could be rubbed upon to the other agent of change players in the implementation effort. Finally, the impact review is shared and perforated across the organization, with the top management playing the role of “wheel of motion”. Figure 5.2 shows a pictorial representation of the conceptual implementation of the TQM in this case study. 46 Having personal acting the role of “agent for change” Identifying the suitable subgroup that could be practical to implement change Proliferation Management Commitment and Involvement to change Identify the elements of TQM that will have the great is difference impact to the subgroup and organization Assessment of change Implementation of the tailored efforts Tailoring implementation effort based on the TQM elements identified Figure 5.2: Conceptualization of TQM implementation for this case study: Insideout concept CHAPTER 6 POST-IMPLEMENTATION ASSESSMENT 6.1 Quantitative This Failure Analysis Department is seeded in an organization with the main purposes to behave as the technical mirror to the manufacturing process’s quality and reliability, the product design’s quality and reliability and, to provide technical support to the failures seen at the customer side. This department is to technically complement all the in-process quality checks that have been put in place eg. Statistical Process Control (SPC), Total Preventive Maintenance (TPM) and etc. With the notation any improvement efforts at the Failure Analysis Department’s is directly in relation to the performance of the product yields. With a total quality approach of debugging the fallout for Model-X and driving for root cause fix and closure, a significant improvement has been made on the product yield. Cum Yield for product Model X improved by 61.41% over a four month period. 48 Among the efforts made in the improvement of yield are IRCF material improvement and heat treatment profile optimization to cater with the use of piece part materials, Wirebond process profile optimization and evaluation, and automation of Cover Glass attach process. Table 6.1 indicates the breakdown of yield fall out of each process of model X (March 2009) Table 6.1: Breakdown of yield fall out of each process of model X (March 2009) Station SMT Visual Qty In 1518 Underfill 1518 SMT_IPQA 1513 singulation 1520 WB Inspection 689 IRCF_Attach 660 SensorCap_Test 182 VCM_Attach 76 FVI 0 Soldering 0 Focus Test 0 AF_Calibration 0 Shutter_Attach 0 Shutter_Solder 0 EMI_Soldering 0 CG_Attach 0 Final_Calibration 0 Final Test 0 Visual Inspection 0 OQA Final Test 0 OQA MI 0 CUM Yield 0 Qty Out Qty Fail 1516 1513 1513 1520 660 660 163 76 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 5 0 0 29 0 19 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Prime Yield % 99.87% Target % 100.00% Delta % -0.13% 99.67% 99.51% 0.16% 100.00% 100.00% 0.00% 100.00% 100.00% 0.00% 95.79% 99.06% -3.27% 100.00% 100.00% 0.00% 89.56% 90.88% -1.32% 100.00% 99.74% 0.26% 99.92% 90.00% -90.00% 99.04% 99.69% -99.69% 99.71% 95.76% -95.76% 97.84% 98.63% -98.63% 100.00% 100.00% -100.00% 100.00% 99.76% -99.76% 100.00% 99.92% -99.92% 100.00% 98.38% -98.38% 98.70% 99.25% -99.25% 94.16% 96.30% -96.30% 98.51% 97.58% -97.58% 0.00% 100.00% -100.00% 0.00% 99.33% -99.33% 75.48% 90.00% -4.21% Table 6.2 indicates the breakdown of yield improvement at specific stations pre and post implementation of TQM principles. 50 Table 6.2: Breakdown of yield improvement at specific stations pre and post implementation of TQM principles Pre-implementation Prime Yield % 100.00% Post- implementation Prime Yield % 99.87% Percentage Improvement Underfill 99.72% 99.67% -0.05% SMT_IPQA 99.89% 100.00% 0.11% singulation 99.54% 100.00% 0.46% WB Inspection 91.82% 95.79% 3.97% IRCF_Attach 99.04% 100.00% 0.96% SensorCap_Test 46.34% 89.56% 43.22% VCM_Attach 95.69% 100.00% 4.31% FVI 99.98% 99.92% -0.06% Soldering 100.00% 99.04% -0.96% Focus Test 79.19% 99.71% 20.52% Station SMT Visual -0.13% AF_Calibration 91.18% 97.84% 6.66% Shutter_Attach 99.31% 100.00% 0.69% Shutter_Solder 99.06% 100.00% 0.94% EMI_Soldering 99.05% 100.00% 0.95% CG_Attach 100.00% 100.00% 0.00% Final_Calibration 75.96% 98.70% 22.74% Final Test 72.15% 94.16% 22.01% Visual Inspection 91.23% 98.51% 7.28% OQA Final Test NA NA NA OQA MI NA NA NA 14.06% 75.48% 61.41% CUM Yield 6.2 Non-Quantitative: Similar mode of assessment was carried out post the implementation of TQM principles. Similar to quantitative assessment non-quantitative assessment showed significant improvement at all area of total quality especially at the two lowly scored parameter previously at pre-implementation stage (Training and Employee Relation). The overall comparative improvement data is reflected in Figure 6.1 and Figure 6.2. Figure 6.1: Questionnaire Survey data per and post implementation comparison E m ploy ee relations Q uality data and reporting P roc es s m anagem ent/operating proc edures S upplier quality m anagem ent (s upplier of goods and/or s erv ic es ) P roduc t/s erv ic e des ign T raining R ole of the quality departm ent R ole of div is ional top m anagem ent and quality polic y 51 4.5 3.5 4 2.5 3 1.5 2 0.5 1 0 Pre-Implementation Post-Implementation 52 Pre-Implementation Post-Implementation Figure 6.2: Next level details on Questionnaire Survey data per and post implementation comparison CHAPTER 7 CONCLUSION This case study was an implementation effort of TQM principles at a department where its core function is to behave as the technical mirror to the manufacturing process’s quality and reliability, the product design’s quality and reliability. Hence a successful paradigm shift in this department is seen to have a cascading effect across the organization and company’s product quality performance. But it is noted here and from various previous studies that implementation of TQM will not bare the expected results without the commitment and involvement of organization’s top management. As for this case study implementation the support and engagement of top management was obtain due to the drastic business restructuring that was warrant by the lump of global economy. Triggering the organization and many consumers electronic based industry players’ organization to make changes to current practice. The implementation emphasis of three principle of TQM namely • Continuous Improvement • Employee Involvement • Training and Education made a significant difference to the Failure Analysis Department’s performance due to nature of the department which is a heavily technical oriented. This factor contributes to choosing the type of TQM principles to be implemented and mode of implementation. It is also notable from this case study that product yield is no necessarily a technological issue but could be due to ideology stumbling block too. Hence it takes a paradigm shift as in individuals and organization to see the bigger picture of ideologies. TQM provide a holistic ideological frame for this purpose. The principle of TQM to be implemented would be very much a unique solution to each organization. This uniqueness can be true to department level too but the principle should be bounded by the vision and missions of the organization. So those all in the organization are in sync. Future research should consider comparative analysis between technically inclines organization on their quality management systems and the cascading effects that come about the due to the implementation and how differently they are implemented. This would provide more inside on TQM principles that influence technically inclined organizations especially for the consumer electronic industry. 55 REFERENCE Quek Eng Eng and Sha’ri Mohd Yusof (2003) A survey of TQM practices in Malaysian Electrical and Electronic industry; UTM, Johor Malaysia; Jamshed H. Khan (2003) Impact of total quality management on productivity; Lahore University of Management Sciences, Lahore, Pakistan Denis Leonard and Rodney McAdam (2002) The strategic impact and implementation of TQM; University of Wisconsin, Wisconsin, USA and University of Ulster, Newtownabbey, UK; Mohammad Talha (2004) Total Quality Management (TQM) an overview; Multimedia University, Melaka, Malaysia; Rosalind Taylor and Alan Pearson (1994) Total Quality Management in Research and Development; Naceur Jabnoun (2002) Control Processes for TQM and QA; University of Sharjah, Sharjah, UAE; Roberto Antonio Martins and Jose Carlos de Toledo (2000) TQM programs: A framework proposal; Federal University, Sao Carlos, Brazil; 56 Madjid Tavana et. al. (2003) Total quality index: a benchmarking tool for TQM; LaSalle University, Philadelphia, Pennsylvania, USA; Nick A.Dayton (2003) The Demise of TQM; Praxis Quality Systems, Lake Forest, Illinois, USA; Michael Bradley (1994) Starting TQM from ISO 9000 David L. Goetsch and Stanley B. Davis (2006) Quality Management: Introduction to Total Quality Management for Production, Processing and Services Fifth Edition, 57 Appendix A QUESTIONARE SURVEY FORM The purpose of this questionnaire is to assess your perceptions of the extent of effective quality management in the department. The questionnaire captures the most important aspects of effective quality management as espoused by the leading practitioners and researchers. This is a confidential survey. Your name is not required to complete it. Please read each statement carefully and circle the number that best describes the current practice of quality management within the department. (For the department managers, this statement reworded to focus on the ideal state: . . .that best describes the ideal level of quality management in the department.) Answer each statement as accurately as possible and remember that you are assessing your own perceptions of how quality management is practiced in the company. (For the department managers: should be practiced in the department.) Rating of current practice in the Department (rating of the ideal level of QM in the department) Very low high • • • • • • • • • • • • • Role of divisional top management and quality policy Extent to which the top division executive (responsible for division profit and loss) assumes responsibility for quality performance Acceptance of responsibility for quality by major department heads within the division Degree to which divisional top management (top divisional executive and major department heads) is evaluated for quality performance Extent to which the division top management supports long-term quality improvement process Degree of participation by major department heads in the quality improvement process Extent to which the divisional top management has objectives for quality performance Specificity of quality goals within the division Comprehensiveness of the goal-setting process for quality within the division Extent to which quality goals and policy are understood within the division Importance attached to quality by the divisional top management in relation to cost and schedule objectives Amount of review of quality issues in divisional top management meetings Degree to which the divisional top management considers quality improvement as a way to increase profits Degree of comprehensiveness of the quality plan within the division Low Medium High Very 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 1 2 2 3 3 4 4 5 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 58 Rating of current practice in the department (rating of the ideal level of QM in the department) Very low high Low Medium High Very Role of the quality department • • • • • Visibility of the quality department Quality department’s access to divisional top management Autonomy of the quality department Amount of coordination between the quality and other departments Effectiveness of the quality department in improving quality 1 2 3 4 5 1 1 2 2 3 3 4 4 5 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 Training • • • • • • • • Specific work-skills training (technical and vocational) given to hourly employees throughout the division Quality-related training given to hourly employees throughout the division Quality-related training given to managers and supervisors throughout the division Training in the “total quality concept” (i.e. philosophy of company-wide responsibility for quality) throughout the division Training in the basic statistical techniques (such as histograms and control charts) in the division as a whole Training in advanced statistical techniques (such as design of experiments and regression analysis) in the division as a whole Commitment of the divisional top management to employee training Availability of resources for employee training in the division Product/service design • • • • • • Thoroughness of new product/service design reviews before the product/service is produced and marketed Coordination among affected departments in the product/service development process Quality of new products/services emphasized in relation to cost or schedule objectives Clarity of product/service specifications and procedures Extent to which implementation/producibility is considered in the product/service design process Quality emphasis by sales, customer service, marketing, and PR personnel 59 Rating of current practice in the department (rating of the ideal level of QM in the department) Very low high Low Medium High Very Supplier quality management (supplier of goods and/or services) • • • • • • • • Extent to which suppliers are selected based on quality rather than price or schedule Thoroughness of the supplier rating system Reliance on reasonably few dependable suppliers Amount of education of supplier by division Technical assistance provided to the suppliers Involvement of the supplier in the product development process Extent to which longer term relationships are offered to suppliers Clarity of specifications provided to suppliers 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4 5 5 5 5 5 1 2 3 4 5 1 1 2 2 3 3 4 4 5 5 1 1 2 2 3 3 4 4 5 5 1 2 3 4 5 1 2 3 4 5 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 1 2 2 3 3 4 4 5 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 Process management/operating procedures • • • • • • • • • • Use of acceptance sampling to accept/reject lots or batches of work Amount of preventative equipment maintenance Extent to which inspection, review, or checking of work is automated Amount of incoming inspection, review, or checking Amount of in-process inspection, review, or checking Amount of final inspection, review, or checking Stability of production schedule/work distribution Degree of automation of the process Extent to which process design is “fool-proof” and minimizes the chances of employee errors Clarity of work or process instructions given to employees Quality data and reporting • • • • • • • • Availability of cost of quality data in the division Availability of quality data (error rates, defect rates, scrap, defects, etc.) Timeliness of the quality data Extent to which quality data (cost of quality, defects, errors, scrap, etc.) Extent to which quality data are available to hourly employees Extent to which quality data are available to managers and supervisors Extent to which quality data are used to evaluate supervisor and managerial performance Extent to which quality data, control charts, etc., are displayed at employee work stations 60 Rating of current practice in the department (rating of the ideal level of QM in the department) Very low high Low Medium High Very Employee relations • • • • • • • • Extent to which quality circle or employee involvement type programs are implemented in the division Effectiveness of quality circle or employee involvement type programs in the division Extent to which employees are held responsible for error-free output Amount of feedback provided to employees on their quality performance Degree of participation in quality decisions by hourly/non-supervisory employees Extent to which quality awareness building among employees is ongoing Extent to which employees are recognized for superior quality performance Effectiveness of supervisors in solving problems/issues 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 ______________________________________________END_________________________________________ ________ Adaptation of Questionnaire from: Saraph, J.V., Benson, P.G. and Schroeder, R.G. (1989), “An instrument for measuring the critical factors of quality management”, Decision Sciences, Vol. 20 No. 4, pp. 810-29.