Expeditionary Energy Strategy and Implementation Plan Climate and Energy 30 Mar 11 Col Bob “Brutus” Charette, USMC Director, Expeditionary Energy Office (E2O) Unclassified Rising Energy Demand “Increasing Fiscal and Combat Risks” • • • • USMC Consumes ~ 5M Bbls per year Energy cost have risen over 300% since 2000’ $10 increase per Bbl, $1.3B cost to DoD Oil has increased $20 since Oct 2010 • Projected to increase to $125/Bbl by 2025 (EIA 2010) 299 Fuel/Water Convoys (98 Days) 6 Marines WIA hauling Fuel/Water 1 Marine WIA per 50 Fuel/Water Convoys 2 Unclassified USMC Energy Use USMC Annual Fuel ~5M Bbls ~1.0B / Year (Price/Gal ~$2.80) OEF 2010 Strategy Baseline ~1.7M Bbls / Year ~$0.5B / Year (Price/Gal ~$7.05) USMC Annual Battery Consumption $22M 3 Unclassified Pre-2001’ vs Today’s Company Radio Batteries Power / Weight / Cost / Quantity 3 Day Patrol - 12 Hr. BA-5590 Battery Rotation Pre-2001 Percent Increase Today 160 Watts 684% 1,255 Watts 122 lbs 382% 586 lbs $4K 2,441% $117K 54 Qty All Batt. 1,294% 754 Qty All Batt. 4 Vehicles not included Unclassified 35th CMC’s Planning Guidance “E2O – Develop a plan to decrease the Marine Corps’ dependence on fossil fuel in a deployed environment.” The Plan Signed 23 Feb 2011 5 Unclassified Strategy and Timeline Mission By 2025 we will deploy Marine Expeditionary Forces that can maneuver from the sea and sustain its C4I and life support systems in place; the only liquid fuel needed will be for mobility systems which will be more energy efficient than systems are today. Today Feb 11 Apr 11 2011 Fossil Fuel Fuel 1Gal Fuel 1Gal Fuel 1Gal Fuel 1Gal Fuel 1Gal Fuel 1Gal Fuel 1Gal Fuel 1Gal Marine / Day USMC Expeditionary Energy Strategy Signed Expeditionary Energy, Water, and Waste CBA / ICD 29 Tasks 112 Gaps 2025 Alternative Fuel Direct S&T / R&D P&E FNC Strategy and Supporting Requirements Documents Being Written in Parallel Fuel 1Gal Fuel 1Gal Fuel 1Gal Fuel 1Gal Marine / Day Future Capability Require Mobility Fuels Only 50% From Alternatives Current Status: E2W2 ICD / CBA in Staffing Developing POM-14 S&T GAPS 6 Unclassified Expeditionary Energy Goals Breakdown By 2025 “increase operational energy efficiency on the battlefield by 50%, and reduce fuel consumed per Marine per day by 50%...” 25% and Doctrine, Training, Organization, Leadership = Behavior Change “Spartan Ethos” 10-15% Increased Efficiency of Ground Vehicles and Equipment 5-10% Renewable/Alternative Energy 10% Increased Efficiency in Aviation (Air Force 10% - Navy Target is 15%) ~50% Reduction by 2025, 2010 OEF Baseline OEF 2010 Baseline, Approximate Break Out (200K Gal/Day) 7 Unclassified 8 Unclassified ExFOB Team DC CD&I • • • • • MCWL ONR Chair S&T MCSC TECOM Acquisitions Non-Material CDD E2O Material Operations ExFOB conducted each August Operational Planning Team - Weekly TELCON / Meeting Executive Board Meets Quarterly MROC Brief Annually E2O administrative oversight, scheduling, and budgeting 9 Unclassified ExFOB Process Informs Requirements / Mitigates Investment Risks / Builds Confidence Individual Marine and Company FOB Vehicles Phase I Phase II Mar 2010 Quantico, VA Baseline USMC Equipment Mar 2010 Battalion COC & FOB Phase III Jul 2010 ExFOB 2011 29 Palms, CA COTS Evaluation Mojave Viper User Evaluation Technologies Technologies Renewable Power: • GREENS (300W continuous) • Solar regenerator ( 300W cont.) Man Portable Power: SPACES—62W Solar battery charger Solar Hybrid Solar Water Purification Tent Solar LED Lights Efficient Shelters Phase IV Aug 2010 29 Palms, CA Quantico, VA • • • • • • Tactical 11-19 Aug 2011 Follow On Evaluation May 2011 29 Palms, CA COTS Evaluation 29 Palms, CA MCTOG COC Technologies • Hybrid PV Power • Energy Efficient C4I • Solar Power DC ECU • Solar Power Cooling Technology Focus Areas • Concentrated Solar • Stationary Vehicle Power Efficient Shelters: • LED Lighting (30-60% over POR) • Energy Efficient Tent Liners! Multi-Functional Team India 3BN 5th Marines Deployment • 2 Patrol Bases 100% Renewable Powered • 3 Week Foot Patrol w/o Battery Resupply • 3rd Patrol Base 90% reduction in fuel Battalion Deployment TBD Afghanistan for Evaluation 10 Unclassified Fleet Demand for Renewable Energy Increasing Units with SPACES Today !"#$%&'$ (&)*!+$ "#$%!&'(! ")$%!&'(! *+$%!&'(! )(>*!$ !"#$(A.$ Prior to ExFOB no Fleet interest in SPACES ,-$./0/1234$ !"#$%/5246"$ ,-$./0/1234$ :#;$%/5246"$ ,-$./0/1234$ =#;$%/5246"$ @-$./0/1234$ ,-$%/5246"$ @-$./0/1234$ :#;$%/5246"$ @-$./0/1234$ +#;$%/5246"$ %7)89($ (&.$<$ )(>*?$ %(>9'$ A465BC$&D9$/#$&DE$ ,-.-/!0121-34%!5-6! 7,18$!91:13-;<:=! !"#$./0/1234$ F#;$%/5246"$ @-$./0/1234$ %7('*:?$ #; F $%/5246"$ • 1,442 in FMF today !"#$./0/1234$ =#;$%/5246"$ @-$)6G34$ ./0/1234$ • 327 distributed for training !"#$)6G34$ Post ExFOB : %A($ Red: Denotes OEF Deployments • 1,115 in support of OEF force rotation • 446 SPACES in Afghanistan (Including 3/5) 11 Unclassified ExFOB Capabilities Deployed India Company 3/5 - Sep 2010 GREENS (300 Watts Continuous Power) SPACES (Battery Charger) Systems Approach Zero Base (300 Watts Continuous Power) • Couple Energy Efficiency with Renewable Energy • Train Marines in CONUS = = 3 Week Combat Patrol No Battery Resupply = 2 Patrol Bases Operating on Renewable Energy = 25%-90% Fuel Savings at Company FOB LED Lights Solar Shade (100 Watts Continuous Power) Unclassified Solar Light Poles 12 ExFOB Phase 4 Follow On Battalion Level COC Deploy Summer 2011 Systems Approach • Coupling LED lights with Liners • Adding • Hybrid Solar Systems • More Efficient A/C • Solar Power Refrigerators • Expected 70% Savings • ~$1M per year 13 Unclassified ExFOB Lessons and Accomplishments • Multifunctional Team Approach – From “0” to deployment in combat in less than a year • Training and Support Key to Success • Official Requirements Documents Approved – – – – – Statement of Need For LED Lights Statement of Need for Shelter Liners Statement of Need for 500kW Micro-Grid Statement of Need to Operate GENSET on Vegetable Oil Urgent Statement of Need for SPACES Improvements and Increase Numbers – GBOSS CDD Energy Efficiency Key Performance Parameter • Guided USMC Future Investments – 67% increase in PB-12 over PB-11 in Expeditionary Energy Initiatives 14 Unclassified Key Technology Focus Areas !"!%$ !"#!$ 15 Unclassified Changing Ethos 16 Unclassified Nawa Renewable Energy Project “Providing Opportunities” Objective: • Provide Hybrid Power Grid at Nawa • Employ and empower Afghans • Distribute energy with community support and ownership • Provide foundation for economic development Technical Details: Current Status: • Provide 144 kWh/day of revenue producing power • 12 Mar 11, construction began, complete Jul 11. • 30kW Diesel Generator • Grid-Tied PV Solar Collection • Coordinating similar projects in Nad-e Ali, Now Zad, and Delaram. • 900 kWh Battery Storage • ~ $500K E2O LNO Regional Command (SW) POC: • Maj Sean Sadlier CONOPS: • Afghan Constructed, Owned, and Operated 17 Unclassified 18 Unclassified