Print Date: 6/30/2014 Page: 1 2016-20 FIVE YEAR CAPITAL OUTLAY PLAN (2016-17 FIRST FUNDING YEAR) Rio Hondo CCD Prepared in reference to the Community College Construction Act of 1980 and approved on behalf of the local governing board for submission to the office of the Chancellor, California Community Colleges Signed Teresa Dreyfuss (Chief Executive Officer or their designee) Title Superintendent/Pres. Date Contact Person James Poper Telephone (562) 908-3441 Date Received at Chancellor's Office Chancellor's Office reviewed by Notice of Approval Calif. Comm. Colleges Five Year Construction Plan Inventory of Land Rio Hondo CCD 6/30/2014 Page 3 List the address and acreage of every land unit owned by the district (Education Code 81821(e)). Please identify all locations, both on-campus and off-campus, grouped according to their "parent" institution. In the event the list is long or complicated, please substitute copies of college bulletins or other notices to the public which display similar information. The list should be current as of October the prior year Address Acreage Regional Public Safety Training Facility 11400 Greenstone Ave. Santa Fe Springs, CA 90670 6.0 Rio Hondo College 3600 Workman Mill Road Whittier, CA 90601-1699 188.0 El Monte Educational Center 3017 Tyler Ave. El Monte, CA 91731 0.0 Legislative Districts Campus Rio Hondo College Assembly Senate House 58 30 0 Calif. Comm. Colleges Five Year Construction Plan Instructional Delivery Locations Rio Hondo CCD Address Santa Fe Springs Regional Trng. Ctr. 11300 Greenstone Ave. Santa Fe Springs, CA Rio Hondo College 3600 Workman Mill Road Whittier, CA 90601-1699 South Whittier Educational Center 14307 E. Telegraph Road Whittier, Ca. 90604 El Monte Educational Center 3017 Tyler Ave. El Monte, CA 91731 6/30/2014 Page 4 Calif. Comm. Colleges No. Project ASF Occupancy Total Cost 1 Fine Arts Center 11,098 2019/2020 $13,137,000 $12,164,000 Five Year Construction Plan District Projects Priority Order Rio Hondo CCD Source 2014/2015 2015/2016 6/30/2014 Page 5 Schedule of Funds 2016/2017 2017/2018 2018/2019 Rio Hondo College State NonState 2 L Tower Seismic and Code Upgrades 2017/2018 $21,939,000 State $252,000 NonState Rio Hondo College (P)(W) (C)(E) $1,849,000 $20,090,000 $252,000 3 Music/Wray Theater Renovation 3,128 2019/2020 $9,767,000 State $10,057,000 NonState Rio Hondo College 4 Renovation of Business ED 2020/2021 $10,739,000 $10,739,000 Rio Hondo College (P)(W) $1,006,000 $928,000 (C)(E) $12,131,000 $11,236,000 (P)(W) $1,058,000 $1,058,000 (C)(E) $8,709,000 $8,999,000 (P)(W) $788,000 $788,000 State NonState 5 Administration Bldg. Remodel 2017/2018 $11,079,000 NonState Rio Hondo College (C)(E) $10,172,000 6 Physical Education Facilities 11,579 2012/2013 $16,382,000 State $5,070,000 NonState Rio Hondo College 7 Learning Resource Center 2009/2010 $30,085,000 $7,566,000 Rio Hondo College State NonState 8 Applied Technology Building Reconstru Rio Hondo College 2009/2010 $15,136,000 State $780,000 NonState 9 Soccer Field Renovation 2014/2015 Rio Hondo College 10 Welcome Center 2014/2015 Rio Hondo College (C)(E) $9,951,000 $9,951,000 2019/2020 2020/2021 Calif. Comm. Colleges No. Project Lect ASF WSCH Five Year Construction Plan District Lecture Capacity/Load Ratios Rio Hondo CCD Occupancy 2015/2016 2016/2017 2 L Tower Seismic and Code Upgrades 0 0 2017/2018 Rio Hondo College 1 Fine Arts Center 2,712 6,322 Rio Hondo College 2017/2018 2018/2019 6/30/2014 Page 6 2019/2020 2021/2022 172,564 113% 2019/2020 178,886 110% 3 Music/Wray Theater Renovation 896 2,089 2019/2020 Rio Hondo College 180,974 111% 4 Renovation of Business ED 2,276 5,305 2020/2021 Rio Hondo College Lecture Actual*/Projected WSCH 74,030 Cumulative Capacity Capacity/Load Ratio 2020/2021 186,280 111% 2015/2016 143,211 172,564 120% 2016/2017 148,015 172,564 117% 2017/2018 152,820 172,564 113% 2018/2019 157,624 172,564 109% 2019/2020 162,428 172,564 106% 2020/2021 167,233 180,974 108% 2021/2022 167,233 186,280 111% Calif. Comm. Colleges No. Project Lab ASF WSCH Five Year Construction Plan District Laboratory Capacity/Load Ratios Rio Hondo CCD Occupancy 2015/2016 2016/2017 2017/2018 2018/2019 6/30/2014 Page 7 2019/2020 2020/2021 2021/2022 6 Physical Education Facilities 1,750 545 2012/2013 Rio Hondo College 2 L Tower Seismic and Code Upgrades 0 0 2017/2018 Rio Hondo College 1 Fine Arts Center 1,934 941 Rio Hondo College 36,905 81% 2019/2020 37,846 78% 3 Music/Wray Theater Renovation 2,656 1,033 2019/2020 Rio Hondo College 38,880 81% 4 Renovation of Business ED 8,783 6,572 2020/2021 Rio Hondo College Laboratory Actual*/Projected WSCH 108,676 Cumulative Capacity Capacity/Load Ratio 45,451 92% 2015/2016 42,512 36,360 86% 2016/2017 43,938 36,905 84% 2017/2018 45,365 36,905 81% 2018/2019 46,791 36,905 79% 2019/2020 48,217 36,905 77% 2020/2021 49,643 38,880 78% 2021/2022 49,643 45,451 92% Calif. Comm. Colleges No. Project Off ASF Five Year Construction Plan District Office Capacity/Load Ratios Rio Hondo CCD FTE Occupancy 2015/2016 2016/2017 2017/2018 2018/2019 6/30/2014 Page 8 2019/2020 2020/2021 2021/2022 6 Physical Education Facilities 3,085 22 2012/2013 Rio Hondo College 2 L Tower Seismic and Code Upgrades 0 0 2017/2018 Rio Hondo College 1 Fine Arts Center 4,401 31 Rio Hondo College 578 104% 2019/2020 610 104% 3 Music/Wray Theater Renovation -451 -3 2019/2020 Rio Hondo College 606 103% 4 Renovation of Business ED 0 0 2020/2021 Rio Hondo College Office Actual*/Projected FTE 77,864 Cumulative Capacity Capacity/Load Ratio 606 100% 2015/2016 504 556 110% 2016/2017 529 578 109% 2017/2018 555 578 104% 2018/2019 583 578 99% 2019/2020 588 578 98% 2020/2021 604 606 100% 2021/2022 604 606 100% Calif. Comm. Colleges Five Year Construction Plan District Library Capacity/Load Ratios Rio Hondo CCD 6/30/2014 Page 9 No. Project Lib ASF Occupancy 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 4 Renovation of Business ED -2,276 2020/2021 Rio Hondo College Library Actual*/Projected ASF 57,050 Cumulative Capacity Capacity/Load Ratio 2020/2021 2021/2022 54,774 84% 2015/2016 49,919 57,050 114% 2016/2017 52,509 57,050 109% 2017/2018 55,176 57,050 103% 2018/2019 57,922 57,050 98% 2019/2020 61,418 57,050 93% 2020/2021 65,034 57,050 88% 2021/2022 3,795 54,774 1,443% Calif. Comm. Colleges Five Year Construction Plan District AV/TV Capacity/Load Ratios Rio Hondo CCD 6/30/2014 Page 10 No. Project AVTV ASF Occupancy 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 2018/2019 14,396 8,525 59% 2019/2020 14,693 8,525 58% 2020/2021 15,001 8,525 57% 2021/2022 3,500 8,525 244% 6 Physical Education Facilities 350 2012/2013 Rio Hondo College 2 L Tower Seismic and Code Upgrades 0 2017/2018 Rio Hondo College AV/TV Actual*/Projected ASF 8,175 Cumulative Capacity Capacity/Load Ratio 8,525 60% 2015/2016 13,716 8,175 60% 2016/2017 13,936 8,525 61% 2017/2018 14,163 8,525 60% Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo CCD 6/30/2014 Page 11 District Load Distribution Reference: Chancellor's Office Forecast Instructional Staff FTE Total Campus WSCH Off-Campus WSCH On-Campus WSCH P.E. Laboratory WSCH On-Campus Lecture WSCH On-Campus Laboratory WSCH 2012 436 176,512 1,589 174,923 7,872 110,202 56,850 2013 458 183,074 1,648 181,426 8,164 114,299 58,964 2014 480 189,658 1,707 187,951 8,458 138,407 41,086 2015 504 196,241 1,766 194,475 8,751 143,211 42,512 2016 529 202,824 1,825 200,999 9,045 148,015 43,938 2017 555 209,408 1,885 207,523 9,339 152,820 45,365 2018 583 215,991 1,944 214,047 9,632 157,624 46,791 2019 588 222,574 2,003 220,571 9,926 162,428 48,217 2020 604 229,158 2,062 227,096 10,219 167,233 49,643 Actual Fall Forecast Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo CCD 6/30/2014 Page 12 Instructional Load by Campus or Location Reference: Chancellor's Office Forecast WSCH Distributed to Campuses or Other Locations Campus 2011 Rio Hondo College 188,358 _______ Total 188,358 Actual 2012 2013 2014 2015 2016 Projected 2017 2018 2019 2020 176,512 _______ 176,512 183,074 _______ 183,074 189,658 _______ 189,658 196,241 _______ 196,241 202,824 _______ 202,824 209,408 _______ 209,408 215,991 _______ 215,991 222,574 _______ 222,574 229,158 _______ 229,158 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo CCD 6/30/2014 Page 13 Total District Library Load Reference: Chancellor's Office Forecast of Day-Graded Enrollment Number of Campuses (c) Initial ASF (3,795/Camp) (d) First 3,000 Day Graded (3.83/DG) (e) Between 3k 9k (3.39/DG) (f) Above 9,000 (2.94/DG) (g) Total ASF (d+e+f+g) (a) Total DayGraded (b) 2014/2015 13,009 1 3,795 11,490 20,340 11,786 47,411 2015/2016 13,862 1 3,795 11,490 20,340 14,294 49,919 2016/2017 14,743 1 3,795 11,490 20,340 16,884 52,509 2017/2018 15,650 1 3,795 11,490 20,340 19,551 55,176 2018/2019 16,584 1 3,795 11,490 20,340 22,297 57,922 2019/2020 17,773 1 3,795 11,490 20,340 25,793 61,418 2020/2021 19,003 1 3,795 11,490 20,340 29,409 65,034 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo CCD 6/30/2014 Page 14 Library Load by Campus or Location Reference: Chancellor's Office Forecast of Day-Graded Enrollment Campus Rio Hondo College Total 2014 2015 2016 2017 2018 2019 2020 47,411 (100%) _______ 47,411 49,919 (100%) _______ 49,919 52,509 (100%) _______ 52,509 55,176 (100%) _______ 55,176 57,922 (100%) _______ 57,922 61,418 (100%) _______ 61,418 65,034 (100%) _______ 65,034 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo CCD 6/30/2014 Page 15 Total District AV, Radio, TV Load Reference: Chancellor's Office Forecast of Day-Graded Enrollment Number of Campuses (c) Initial ASF (3,500/Camp) (d) First 3,000 Day Graded (1.50/DG) (e) Between 3k 9k (0.75/DG) (f) Above 9,000 (0.25/DG) (g) Total ASF (d+e+f+g) (a) Total DayGraded (b) 2014/2015 13,009 1 3,500 4,500 4,500 1,002 13,502 2015/2016 13,862 1 3,500 4,500 4,500 1,216 13,716 2016/2017 14,743 1 3,500 4,500 4,500 1,436 13,936 2017/2018 15,650 1 3,500 4,500 4,500 1,663 14,163 2018/2019 16,584 1 3,500 4,500 4,500 1,896 14,396 2019/2020 17,773 1 3,500 4,500 4,500 2,193 14,693 2020/2021 19,003 1 3,500 4,500 4,500 2,501 15,001 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo CCD 6/30/2014 Page 16 AV, Radio, TV Load by Campus or Location Reference: Chancellor's Office Forecast of Day-Graded Enrollment Campus Rio Hondo College Total 2014 2015 2016 2017 2018 2019 2020 13,502 (100%) _______ 13,502 13,716 (100%) _______ 13,716 13,936 (100%) _______ 13,936 14,163 (100%) _______ 14,163 14,396 (100%) _______ 14,396 14,693 (100%) _______ 14,693 15,001 (100%) _______ 15,001 Calif. Comm. Colleges No. Project Lect ASF WSCH Five Year Construction Plan Campus Lecture Capacity/Load Ratios Rio Hondo College Occupancy 2015/2016 2016/2017 2 L Tower Seismic and Code Upgrades 0 0 2017/2018 Rio Hondo College 1 Fine Arts Center 2,712 6,322 Rio Hondo College 2017/2018 2018/2019 6/30/2014 Page 18 2019/2020 2021/2022 172,564 113% 2019/2020 178,886 110% 3 Music/Wray Theater Renovation 896 2,089 2019/2020 Rio Hondo College 180,974 111% 4 Renovation of Business ED 2,276 5,305 2020/2021 Rio Hondo College Lecture Actual*/Projected WSCH 74,030 Cumulative Capacity Capacity/Load Ratio 2020/2021 186,280 111% 2015/2016 143,211 172,564 120% 2016/2017 148,015 172,564 117% 2017/2018 152,820 172,564 113% 2018/2019 157,624 172,564 109% 2019/2020 162,428 172,564 106% 2020/2021 167,233 180,974 108% 2021/2022 167,233 186,280 111% Calif. Comm. Colleges No. Project Lab ASF WSCH Five Year Construction Plan Campus Laboratory Capacity/Load Ratios Rio Hondo College Occupancy 2015/2016 2016/2017 2017/2018 2018/2019 6/30/2014 Page 19 2019/2020 2020/2021 2021/2022 6 Physical Education Facilities 1,750 545 2012/2013 Rio Hondo College 2 L Tower Seismic and Code Upgrades 0 0 2017/2018 Rio Hondo College 1 Fine Arts Center 1,934 941 Rio Hondo College 36,905 81% 2019/2020 37,846 78% 3 Music/Wray Theater Renovation 2,656 1,033 2019/2020 Rio Hondo College 38,880 81% 4 Renovation of Business ED 8,783 6,572 2020/2021 Rio Hondo College Laboratory Actual*/Projected WSCH 108,676 Cumulative Capacity Capacity/Load Ratio 45,451 92% 2015/2016 42,512 36,360 86% 2016/2017 43,938 36,905 84% 2017/2018 45,365 36,905 81% 2018/2019 46,791 36,905 79% 2019/2020 48,217 36,905 77% 2020/2021 49,643 38,880 78% 2021/2022 49,643 45,451 92% Calif. Comm. Colleges No. Project Off ASF Five Year Construction Plan Campus Office Capacity/Load Ratios Rio Hondo College FTE Occupancy 2015/2016 2016/2017 2017/2018 2018/2019 6/30/2014 Page 20 2019/2020 2020/2021 2021/2022 6 Physical Education Facilities 3,085 22 2012/2013 Rio Hondo College 2 L Tower Seismic and Code Upgrades 0 0 2017/2018 Rio Hondo College 1 Fine Arts Center 4,401 31 Rio Hondo College 578 104% 2019/2020 610 104% 3 Music/Wray Theater Renovation -451 -3 2019/2020 Rio Hondo College 606 103% 4 Renovation of Business ED 0 0 2020/2021 Rio Hondo College Office Actual*/Projected FTE 77,864 Cumulative Capacity Capacity/Load Ratio 606 100% 2015/2016 504 556 110% 2016/2017 529 578 109% 2017/2018 555 578 104% 2018/2019 583 578 99% 2019/2020 588 578 98% 2020/2021 604 606 100% 2021/2022 604 606 100% Calif. Comm. Colleges Five Year Construction Plan Campus Library Capacity/Load Ratios Rio Hondo College 6/30/2014 Page 21 No. Project Lib ASF Occupancy 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 4 Renovation of Business ED -2,276 2020/2021 Rio Hondo College Library Actual*/Projected ASF 57,050 Cumulative Capacity Capacity/Load Ratio 2020/2021 2021/2022 54,774 84% 2015/2016 49,919 57,050 114% 2016/2017 52,509 57,050 109% 2017/2018 55,176 57,050 103% 2018/2019 57,922 57,050 98% 2019/2020 61,418 57,050 93% 2020/2021 65,034 57,050 88% 2021/2022 3,795 54,774 1,443% Calif. Comm. Colleges Five Year Construction Plan Campus AV/TV Capacity/Load Ratios Rio Hondo College 6/30/2014 Page 22 No. Project AVTV ASF Occupancy 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 2018/2019 14,396 8,525 59% 2019/2020 14,693 8,525 58% 2020/2021 15,001 8,525 57% 2021/2022 3,500 8,525 244% 6 Physical Education Facilities 350 2012/2013 Rio Hondo College 2 L Tower Seismic and Code Upgrades 0 2017/2018 Rio Hondo College AV/TV Actual*/Projected ASF 8,175 Cumulative Capacity Capacity/Load Ratio 8,525 60% 2015/2016 13,716 8,175 60% 2016/2017 13,936 8,525 61% 2017/2018 14,163 8,525 60% Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo College 6/30/2014 Page 23 Campus Load Distribution Reference: Chancellor's Office Forecast Instructional Staff FTE Total Campus WSCH Off-Campus WSCH On-Campus WSCH P.E. Laboratory WSCH On-Campus Lecture WSCH On-Campus Laboratory WSCH 2012 436 176,512 1,589 174,923 7,872 110,202 56,850 2013 458 183,074 1,648 181,426 8,164 114,299 58,964 2014 480 189,658 1,707 187,951 8,458 138,407 41,086 2015 504 196,241 1,766 194,475 8,751 143,211 42,512 2016 529 202,824 1,825 200,999 9,045 148,015 43,938 2017 555 209,408 1,885 207,523 9,339 152,820 45,365 2018 583 215,991 1,944 214,047 9,632 157,624 46,791 2019 588 222,574 2,003 220,571 9,926 162,428 48,217 2020 604 229,158 2,062 227,096 10,219 167,233 49,643 Actual Fall Forecast Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo College 6/30/2014 Page 24 Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus. Total Certificated Instructional and Statutory Staff FTE (b) (a) Instructors Non-Instructional Portion of FTE (c) Net Total Instructional and Statutory Staff FTE (b-c) (d) 434.0 434.0 Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al. 27.0 27.0 Department Administrators 19.0 19.0 Librarians Include certificated director of audio/visual, et. al. Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al. Fall 2014 Totals 6.0 6.0 10.0 __________ 496.0 10.0 __________ 16.0 Column (b) is the total number of Column (a) distributed to categories Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work. Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties. __________ 480.0 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo College 6/30/2014 Page 25 Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus. Total Certificated Instructional and Statutory Staff FTE (b) (a) Instructors Non-Instructional Portion of FTE (c) Net Total Instructional and Statutory Staff FTE (b-c) (d) 456.0 456.0 Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al. 29.0 29.0 Department Administrators 19.0 19.0 Librarians Include certificated director of audio/visual, et. al. Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al. Fall 2015 Totals 6.0 6.0 10.0 __________ 520.0 10.0 __________ 16.0 Column (b) is the total number of Column (a) distributed to categories Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work. Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties. __________ 504.0 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo College 6/30/2014 Page 26 Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus. Total Certificated Instructional and Statutory Staff FTE (b) (a) Instructors Non-Instructional Portion of FTE (c) Net Total Instructional and Statutory Staff FTE (b-c) (d) 480.0 480.0 Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al. 30.0 30.0 Department Administrators 19.0 19.0 Librarians Include certificated director of audio/visual, et. al. Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al. Fall 2016 Totals 6.0 6.0 10.0 __________ 545.0 10.0 __________ 16.0 Column (b) is the total number of Column (a) distributed to categories Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work. Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties. __________ 529.0 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo College 6/30/2014 Page 27 Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus. Total Certificated Instructional and Statutory Staff FTE (b) (a) Instructors Non-Instructional Portion of FTE (c) Net Total Instructional and Statutory Staff FTE (b-c) (d) 504.0 504.0 Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al. 32.0 32.0 Department Administrators 19.0 19.0 Librarians Include certificated director of audio/visual, et. al. Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al. Fall 2017 Totals 6.0 6.0 10.0 __________ 571.0 10.0 __________ 16.0 Column (b) is the total number of Column (a) distributed to categories Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work. Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties. __________ 555.0 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo College 6/30/2014 Page 28 Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus. Total Certificated Instructional and Statutory Staff FTE (b) (a) Instructors Non-Instructional Portion of FTE (c) Net Total Instructional and Statutory Staff FTE (b-c) (d) 531.0 531.0 Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al. 33.0 33.0 Department Administrators 19.0 19.0 Librarians Include certificated director of audio/visual, et. al. Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al. Fall 2018 Totals 6.0 6.0 10.0 __________ 599.0 10.0 __________ 16.0 Column (b) is the total number of Column (a) distributed to categories Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work. Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties. __________ 583.0 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo College 6/30/2014 Page 29 Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus. Total Certificated Instructional and Statutory Staff FTE (b) (a) Instructors Non-Instructional Portion of FTE (c) Net Total Instructional and Statutory Staff FTE (b-c) (d) 536.0 536.0 Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al. 33.0 33.0 Department Administrators 19.0 19.0 Librarians Include certificated director of audio/visual, et. al. Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al. Fall 2019 Totals 6.0 6.0 10.0 __________ 604.0 10.0 __________ 16.0 Column (b) is the total number of Column (a) distributed to categories Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work. Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties. __________ 588.0 Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast Rio Hondo College 6/30/2014 Page 30 Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus. Total Certificated Instructional and Statutory Staff FTE (b) (a) Instructors Non-Instructional Portion of FTE (c) Net Total Instructional and Statutory Staff FTE (b-c) (d) 552.0 552.0 Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al. 33.0 33.0 Department Administrators 19.0 19.0 Librarians Include certificated director of audio/visual, et. al. Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al. Fall 2020 Totals 6.0 6.0 10.0 __________ 620.0 10.0 __________ 16.0 Column (b) is the total number of Column (a) distributed to categories Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work. Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties. __________ 604.0 Calif. Comm. Colleges Five Year Construction Plan Cum Sum of Existing and Proposed Space, 2015 - 2021 Rio Hondo College 6/30/2014 Page 31 Cumulative Summary of Existing and Proposed Areas, 2015-2021 Priority and Year of Occupancy (a) Total ASF 1 2019/2020 Classroom 100's (b) Laboratory 200's (c) 74,030 108,676 77,864 1,934 110,610 Fine Arts Center 2,712 76,742 2 2017/2018 L Tower Seismic and Code Upgrades 3 2019/2020 Music/Wray Theater Renovation 896 2,656 77,638 113,266 4 2020/2021 Office 300's (d) Library 400's (e) 8,175 P.E. 520 - 525 (g) 55,388 Assembly 610 - 625 (h) 21,809 Inactive 050 - 070 (i) 21,949 All Other Areas (j) Total ASF (k) 91,592 516,533 4,401 82,265 2,051 93,643 11,098 527,631 -451 81,814 27 93,670 3,128 530,759 Renovation of Business ED 2,276 8,783 79,914 122,049 57,050 AV Radio TV 530 - 535 (f) -2,276 54,774 -8,783 84,887 Total Existing and Proposed Space 79,914 122,049 81,814 54,774 8,175 55,388 21,809 21,949 84,887 530,759 Calif. Comm. Colleges Five Year Construction Plan Capacity of Net Existing On-Campus ASF Rio Hondo College Classrooms, Classroom Service (Room Type 100's) Totals . . . . . . . . . . . . . . . 6/30/2014 Page 32 Net ASF ASF/100 WSCH Capacity WSCH 74,030 42.9 172,564 Net ASF ASF/100 WSCH Capacity WSCH 6,906 385 1,794 16,141 257 6,281 Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) TOP Code/Description Net ASF ASF/100 WSCH Capacity WSCH TOP Code/Description 0100 Agriculture and Natural Resources 492 0956 Manufacturing and Industrial Technology 0116 Agricultural Power Equipment Technology 856 1000 Fine and Applied Arts 0200 Architecture and Related Technologies 257 1100 Foreign Language 0300 Environmental Sciences and Technologies 0400 Biological Sciences 235 150 1200 Health 214 11,761 235 5,005 1300 Family and Consumer Sciences 0500 Business and Management 2,276 128 1,778 1400 Law 0600 Media and Communications 5,688 214 2,658 1500 Humanities (Letters) 0700 Information Technology 7,292 171 4,264 1600 Library Science 150 1700 Mathematics 150 0800 Education 0900 Engineering & Industrial Technologies 321 9,665 321 3,011 1900 Physical Sciences 0946 Environmental Control Technology (HVAC) 556 2000 Psychology 0949 Automotive Collison Repair 3,738 856 437 17,882 856 2,089 6,758 856 789 0950 Aeronautical and Aviation Technology 749 0952 Construction Crafts Technology 749 46 1800 Military Studies 556 0948 Automotive Technology 257 309 150 0945 Industrial Systems Technology and Mainte 0947 Diesel Technology 795 150 31 214 12,049 257 4,688 150 2100 Public and Protective Services 3,048 2200 Social Sciences 214 1,424 150 3000 Commercial Services 4900 Interdisciplinary Studies Totals . . . . . . . . . . . . . . . 214 4,631 108,676 Campus Avg Lab ASF/100 WSCH Office and Office Service Areas (Room Type 300's) Totals . . . . . . . . . . . . . . . 257 1,802 36,360 299 Net ASF ASF per FTE Capacity FTE 77,864 140 556 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 33 District Priority : 1 Fine Arts Center Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : $25,301,000 Anticipated Source(s) of Funds : State and Non-State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Working Drawing Construction Equipment Occupancy Year 2016/2017 2016/2017 2017/2018 2017/2018 2019/2020 Estimated Cost $1,020,000 $914,000 $22,877,000 $490,000 Explain why this project is needed: The Fine Arts Center is proposed as a new construction project to replace 50 year old classroom and laboratory space that currently is the location of the fine arts program. In assessing the alternatives for this project, the college initially considered renovating the existing Campus Inn and Business/arts building as well as other buildings on the campus. Engineering and cost studies indicated it would be more cost effective to not renovate an existing facility but rather demolish the Campus Inn and construct a new Fine Arts facility on that site. The total GSF for the project is 35,122 sq. ft. and the ASF is 24,233 sq. ft. As part of the project, 31,448 sq. ft. will be removed from the campus space inventory as a result of the proposed demolition. The new Fine Arts Center will be constructed adjacent to the existing Wray Theater with the two building together creating a new, fine and performing arts complex for the campus.. 50% local and 50% state funding is proposed for the project. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 34 1 Fine Arts Center Outline of Project Space - Buildings and Remodelings Classroom Type 100's Project Primary Laboratory 210 - 255 2,712 15,919 Project Secondary Office Type 300's Library Type 400's AV - TV 530 - 535 All Other 4,401 Total ASF 2,051 -13,985 Project Net ASF 2,712 1,934 25,083 -13,985 4,401 2,051 11,098 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 2,712 42.9 6,322 TOP Code/Description Net ASF ASF/100 WSCH Capacity WSCH 1000 Fine and Applied Arts -13,985 257 -5,442 Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH 0600 Digital Media 1000 Art (Painting, Drawing and Sculpture) 1000 Dramatic Arts 2,410 9,487 1,397 214 257 257 1,126 3,691 544 1000 Photography 2,625 257 1,021 TOP Code/Description Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 1,934 941 Net ASF ASF per FTE Capacity FTE 4,401 140 31.44 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 35 District Priority : 2 L Tower Seismic and Code Upgrades Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : $22,191,000 Anticipated Source(s) of Funds : State and Non-State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Working Drawing Construction Equipment Occupancy 2014/2015 2014/2015 2015/2016 2015/2016 2017/2018 $959,000 $1,142,000 $20,090,000 $0 Year Estimated Cost Explain why this project is needed: Project proposes to seismically retrofit this outdated and underutilized facility which was originally built in 1966 to house the Library functions, offices, and classrooms with a 57,800 GSF (31,120 ASF) 5-story building with a basement. This building has been identified in the 2005-2014 Campus Master Plan and again in the 2008 Resource and Facilities Master Plan as a high priority and the first of several renovation projects needed to update this facility and its structure to meet current code and to be repurposed as a future project to support the students and academic programs on the campus. The building structure was found to be severely deficient structure in various areas. The scope of this project is to seismically enhance the existing structure and to renovate the building to meet current accessibility and fire life safety codes. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 36 2 L Tower Seismic and Code Upgrades Outline of Project Space - Buildings and Remodelings Classroom Type 100's Project Primary Project Secondary Laboratory 210 - 255 Office Type 300's Library Type 400's AV - TV 530 - 535 All Other Total ASF 7,549 12,035 6,360 3,815 1,361 31,120 -7,549 -12,035 -6,360 -3,815 -1,361 -31,120 Project Net ASF 0 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 0 42.9 0 TOP Code/Description Net ASF ASF/100 WSCH Capacity WSCH 1200 Nursing -12,035 214 -5,624 Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect TOP Code/Description 1200 Nursing Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH 12,035 214 5,624 Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 0 0 Net ASF ASF per FTE Capacity FTE 0 140 0.00 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 37 District Priority : 3 Music/Wray Theater Renovation Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : $19,824,000 Anticipated Source(s) of Funds : State and Non-State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Working Drawing Construction Equipment Occupancy 2016/2017 2016/2017 2017/2018 2017/2018 2019/2020 $906,000 $1,210,000 $17,498,000 $210,000 Year Estimated Cost Explain why this project is needed: The renovation/replacement of the Music Building (#8) was identified in the Rio Hondo Facilities Master Plan document as part of what will be known as the "Fine and Performing Arts Complex" for the campus. This project is a companion project to the previously submitted Fine Arts Center project that is projected for occupancy in 2017-2018. Specifically, this project proposes to renovate and modernize Building # 8, an 20,441 ASF (28,712 GSF) building that currently houses the Wray Theater and the music/performing arts instructional programs. When completed, this building, will provide the college with a 23,569 ASF (35,441 GSF) building to house a major portion of the performing arts instructional program of the College. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 38 3 Music/Wray Theater Renovation Outline of Project Space - Buildings and Remodelings Classroom Type 100's Project Primary Laboratory 210 - 255 896 Project Secondary Project Net ASF 896 Office Type 300's Library Type 400's AV - TV 530 - 535 All Other Total ASF 11,584 193 10,896 23,569 -8,928 -644 -10,869 -20,441 2,656 -451 27 3,128 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 896 42.9 2,089 Net ASF ASF/100 WSCH Capacity WSCH -2,690 -6,238 257 257 -1,047 -2,427 Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect TOP Code/Description Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH 5,742 5,842 257 257 2,234 2,273 1000 Dramatic Arts 1000 Music TOP Code/Description 1000 Dramatic Arts 1000 Music Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 2,656 1,033 Net ASF ASF per FTE Capacity FTE -451 140 -3.22 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 39 District Priority : 4 Renovation of Business ED Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : $21,478,000 Anticipated Source(s) of Funds : State and Non-State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Working Drawing Construction Equipment Occupancy 2017/2018 2017/2018 2018/2019 2018/2019 2020/2021 $674,000 $902,000 $19,192,000 $710,000 Year Estimated Cost Explain why this project is needed: The Business Ed Building was built in 1966 and the current facilities lack the appropriate technology to support relevant business programs using preferred delivery methods. In addition to the business programs the existing facility houses the fine arts programs will vacate the facility once the new Fine Arts Center is completed. The proposed project will renovate the obsolete business facilities and vacated space into modern business teaching facility that will support the necessary computer and networking technology of the 21st century. For the 2010/2011 school year the district projects 207,936 WSCH and the State Chancellor’s Office is projecting an average annual growth rate of 4.9% a year. At this growth rate the current facilities will not be able to serve the current needs of the campus and this obsolete facility is responsible for servicing a major discipline at the campus. Currently, the capacity load ratio for assignable square footage in laboratory is at 52%. This amount of space is half of what is needed to serve a student population of size according to state standards. The College recognizes this deficiency and seeks to improve current conditions by reconstructing the existing building to take advantage of new innovations in energy and building efficiency along with providing access to new methods in educational delivery systems. The current facilities also will be improved through seismic retrofitting, the removal of hazardous substances, and conform to ADA requirements. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 40 4 Renovation of Business ED Outline of Project Space - Buildings and Remodelings Classroom Type 100's Project Primary Project Secondary Project Net ASF Laboratory 210 - 255 Office Type 300's Library Type 400's AV - TV 530 - 535 All Other Total ASF 5,690 14,473 4,920 2,276 8,485 35,844 -3,414 -5,690 -4,920 -4,552 -17,268 -35,844 2,276 8,783 -2,276 -8,783 0 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 2,276 42.9 5,305 Net ASF ASF/100 WSCH Capacity WSCH 0500 Accounting -1,138 128 -889 0500 Office Technology/Office Computer Ap 0700 Information Technology, General -1,138 -3,414 128 171 -889 -1,996 Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH 0500 Business and Commerce, General 9,582 128 7,486 0700 Information Technology, General 4,891 171 2,860 TOP Code/Description TOP Code/Description Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 8,783 6,572 Net ASF ASF per FTE Capacity FTE 0 140 0.00 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 41 District Priority : 5 Administration Bldg. Remodel Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : $11,079,000 Anticipated Source(s) of Funds : Non-State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Working Drawing Construction Equipment Occupancy 2012/2013 2012/2013 2014/2015 2014/2015 2017/2018 $390,000 $517,000 $9,922,000 $250,000 Year Estimated Cost Explain why this project is needed: The first floor of the existing Administration Building will be remodeled to accommodate new classroom space for the liberal arts and general education programs. This project is a secondary effect project following the construction of the new Student Services Building which will be occupied in 2011-12. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 42 5 Administration Bldg. Remodel Outline of Project Space - Buildings and Remodelings Classroom Type 100's Laboratory 210 - 255 Office Type 300's Library Type 400's AV - TV 530 - 535 All Other Total ASF Project Primary Project Secondary Project Net ASF 0 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 0 42.9 0 Net ASF ASF/100 WSCH Capacity WSCH Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect TOP Code/Description Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH TOP Code/Description Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 0 0 Net ASF ASF per FTE Capacity FTE 0 140 0.00 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 43 District Priority : 6 Physical Education Facilities Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : $21,452,000 Anticipated Source(s) of Funds : State and Non-State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Working Drawing Construction Equipment Occupancy Year 2006/2007 2006/2007 2006/2007 2006/2007 2012/2013 Estimated Cost $1,164,000 $1,013,000 $19,002,000 $273,000 Explain why this project is needed: The purpose of the project is to upgrade/replace the existing Physical Education facilities and the related play fields to achieve a safe learning environment for students that meets all current Code provisions and, in the process, also address ADA requirements and Title IX requirements for gender equity. To meet this multi-faceted objective, the buildings within the existing 47,381 ASF P. E. Complex will need to be either reconstructed or replaced. Simply remodeling the existing space will not achieve the objective. Rather, a combination of approaches including renovation/remodel, demolition and new construction is proposed. Under the proposed plan, the existing gymnasium and fitness facilities, accounting for 22,130 ASF, will be retained and reconstructed to meet current code requirements. To accommodate the site proposed for new facilities, 25,251 ASF of existing facilities that do not meet current life/safety, structural and seismic guidelines will be demolished. Once demolition has been completed, 36,935 ASF of new space will be constructed. There will be a net gain of 11,684 ASF as a result of the proposed project. This additional space is within state guidelines for physical education facilities as well as within capacity load ratios for lecture, laboratory and office space. This project also proposes to renovate the Physical Education outdoor classrooms. The outdoor PE facilities have eroded over time and require extensive repairs. PE core classes are constrained to smaller areas due to the deteriorated conditions of the larger outdoor classrooms. Specific areas to be addressed include site grading, drainage system, irrigation systems and restoration of turf areas. Approximately 175,000 square feet of outdoor area will be renovated. This project is proposed as a shared funded project with 23% from non-state sources and 77% from state funding. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 44 6 Physical Education Facilities Outline of Project Space - Buildings and Remodelings Classroom Type 100's Laboratory 210 - 255 Project Primary 1,750 Office Type 300's Library Type 400's 3,085 AV - TV 530 - 535 All Other 350 Project Secondary Project Net ASF 1,750 3,085 350 Total ASF 53,775 58,960 -47,381 -47,381 6,394 11,579 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 0 42.9 0 Net ASF ASF/100 WSCH Capacity WSCH Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect TOP Code/Description Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH 1,750 321 545 0800 Physical Education TOP Code/Description Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 1,750 545 Net ASF ASF per FTE Capacity FTE 3,085 140 22.04 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 45 District Priority : 7 Learning Resource Center Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : $37,651,000 Anticipated Source(s) of Funds : State and Non-State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Working Drawing Construction Equipment Occupancy Year 2004/2005 2004/2005 2005/2006 2005/2006 2009/2010 Estimated Cost $1,091,000 $1,052,000 $31,243,000 $4,265,000 Explain why this project is needed: This project proposes the construction of a new Learning Resource Center (LRC). A new LRC addresses the need to improve services and expand the physical facilities of the Library, Learning Assisitance Center (LAC) and student computer laboratories. This improvement and expansion will meet the needs of Rio Hondo College`s diverse, dynamic and technology driven student population. A new LRC will enable the College to achieve the California state recommendations for Library/Learning Resource Centers. This project has the highest priority as a result of the recently completed Educational Master Plan. The exisiting library building will be remodeled to accomodate future needs of the college. This proposed secondary effect will be defined in a subsequent project proposal. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 46 7 Learning Resource Center Outline of Project Space - Buildings and Remodelings Classroom Type 100's Laboratory 210 - 255 Office Type 300's Library Type 400's AV - TV 530 - 535 All Other Total ASF Project Primary Project Secondary Project Net ASF 0 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 0 42.9 0 Net ASF ASF/100 WSCH Capacity WSCH Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect TOP Code/Description Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH TOP Code/Description Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 0 0 Net ASF ASF per FTE Capacity FTE 0 140 0.00 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 47 District Priority : 8 Applied Technology Building Reconstruction Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : $15,916,000 Anticipated Source(s) of Funds : State and Non-State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Working Drawing Construction Equipment Occupancy 2005/2006 2005/2006 2006/2007 2006/2007 2009/2010 $399,000 $486,000 $13,906,000 $1,125,000 Year Estimated Cost Explain why this project is needed: This project is a remodel for efficiency project. The current facility provides space for instructional disciplines that are no longer viable curricular offerings for the college. Specific examples include: welding and machine shop. The proposed plan for the remodel reconfigures the existing ASF in this building for other Applied Technology programs including automotive technology and related automotive repair programs. Currently, enrollment in these programs is exceeding the capacity of the existing facilities. By renovating this building, the college will be able to meet the needs of students requesting enrollment in these programs. WSCH hours will increase and space utilization will be maximized. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 48 8 Applied Technology Building Reconstruction Outline of Project Space - Buildings and Remodelings Classroom Type 100's Laboratory 210 - 255 Office Type 300's Library Type 400's AV - TV 530 - 535 All Other Total ASF Project Primary Project Secondary Project Net ASF 0 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 0 42.9 0 Net ASF ASF/100 WSCH Capacity WSCH Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect TOP Code/Description Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH TOP Code/Description Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 0 0 Net ASF ASF per FTE Capacity FTE 0 140 0.00 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 49 District Priority : 9 Soccer Field Renovation Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : Anticipated Source(s) of Funds : State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Year Working Drawing Construction Equipment Occupancy 2014/2015 Estimated Cost Explain why this project is needed: The existing soccer field grass area has been found to be too narrow to meet NCAA field size rules. To expand the field, the existing running track is to be removed to allow extension of the grass playing surface for the proper width. Also, increased accessibility for physically challenged people is to be incorporated into the proposed project. The project will require a full set of construction documents, DSA approval, competitive bidding and contracting. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 50 9 Soccer Field Renovation Outline of Project Space - Buildings and Remodelings Classroom Type 100's Laboratory 210 - 255 Office Type 300's Library Type 400's AV - TV 530 - 535 All Other Total ASF Project Primary Project Secondary Project Net ASF 0 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 0 42.9 0 Net ASF ASF/100 WSCH Capacity WSCH Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect TOP Code/Description Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH TOP Code/Description Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 0 0 Net ASF ASF per FTE Capacity FTE 0 140 0.00 Calif. Comm. Colleges Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 51 District Priority : 10 Welcome Center Project Type : Site Acquisition New Construction Reconstruction Replacement Infrastructure Equipment Total Estimated Costs : Anticipated Source(s) of Funds : State Type of construction : Seismic Retrofit : If Existing - Age : If Existing - Condition : Anticipated Time Schedule Land Acquisition Preliminary Plans Year Working Drawing Construction Equipment Occupancy 2014/2015 Estimated Cost Explain why this project is needed: The Welcome Center will provide information for students, faculty, and staff as well as general public in an accurate and efficient manner. We provide information such as parking information, driving directions, class location, and much more. Calif. Comm. Colleges District Priority No.: Five Year Construction Plan Project Intent And Scope Rio Hondo College 6/30/2014 Page 52 10 Welcome Center Outline of Project Space - Buildings and Remodelings Classroom Type 100's Laboratory 210 - 255 Office Type 300's Library Type 400's AV - TV 530 - 535 All Other Total ASF Project Primary Project Secondary Project Net ASF 0 Project Net Capacity Net ASF/100 Capacity ASF WSCH WSCH 0 42.9 0 Net ASF ASF/100 WSCH Capacity WSCH Classrooms, Classroom Service (Room Type 100's) Classroom Totals . . . . . . . . . . . . . . . Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) Primary Effect TOP Code/Description Secondary Effect Net ASF ASF/100 WSCH Capacity WSCH TOP Code/Description Laboratory Totals . . . . . . . . . . . . . . . Office and Office Service Areas (Room Type 300's) Office Totals . . . . . . . . . . . . . . . 0 0 Net ASF ASF per FTE Capacity FTE 0 140 0.00