North Central Texas North Central Texas Water Quality Project Water Quality Project Objectives Study of Eagle Mountain Watershed Wastewater Treatment Plants Robert Adams, PE Alan Plummer Associates, Inc. • Identify point source loads (wastewater treatment plants) within the watershed. • Assess current load, permit limits, and annual variability. • Evaluate 2050 projections of flow. • Evaluate plant improvements needed to achieve: ◦ Level I—current permit limits. ◦ Level II—TN = 10 mg/L, TP = 1 mg/L. ◦ Level III—TN = 5 mg/L, TP = 0.5 mg/L. • Develop cost estimates for each level of improvement. North Central Texas North Central Texas Water Quality Project Water Quality Project Eagle Mountain Wastewater Plants Load and Permit Data—Azle (Nitrogen) 14 12 kg/day 10 8 6 4 2 e Ju ly A ug us Se t pt em be r O ct ob er N ov em be D r ec em be r ay M Ju n A pr il ar y M Fe br u ar y nu Ja ar ch 0 14 plants evaluated North Central Texas Water Quality Project Water Quality Project Load and Permit Data—Azle (Phosphorus) 2050 Population and Flow Projections 60,000 1.5 50,000 1 40,000 0.5 30,000 0 20,000 M A pr i Ju ly A u Se gus t pt em be r O ct ob er N ov em be D r ec em be r 70,000 2 Ju ne 80,000 2.5 l 90,000 3 ay 3.5 Ja nu ar y Fe br ua ry M ar ch kg/day North Central Texas NH3 ON NOx SPRINGTOWN RHOME NEWARK DECATUR CHICO BRIDGEPORT BOYD BOWIE AZLE ALVORD 10,000 OPO4 OP 0 2000 2010 2020 2030 2040 2050 1 North Central Texas Water Quality Project Plant Visits: Data Collection and Process Evaluation City of Alvord Wastewater Treatment Plant Oxidation Ditch March 5, 2004 City of Alvord Wastewater Treatment Plant Sludge Drying Beds March 5, 2004 City of Alvord Wastewater Treatment Plant Outfall City of Alvord Wastewater Treatment Plant Clarifier March 5, 2004 City of Alvord Wastewater Treatment Plant Clarifiers March 5, 2004 March 5, 2004 2 North Central Texas North Central Texas Water Quality Project Water Quality Project Plant Process Evaluation (Alvord) Eagle Mountain: 2050 N Loads City or Facility Current Load (lb/day) 13 23 97 5 53 13 58 1 3 1 4 3 3 16 293 Loads at 2050 Flows (lbs/day) Level I 23 96 101 11 116 36 92 38 29 82 52 676 Level II 14 264 47 15 107 23 88 33 18 79 58 745 Level III 7 132 23 8 53 11 44 16 9 40 29 373 Increase or (Decrease) from Current Load 383 452 80 Increase or (Decrease) in tons/yr 70 82 15 Alvord Azle Bowie Boyd Bridgeport Chico Decatur Ft Worth Boat Club Garrett Creek Ranch Larry Buck RV Park Newark Paradise ISD Rhome Springtown Total Loads *Current and Level I loads based on average effluent concentration determined by nutrient testing North Central Texas North Central Texas Water Quality Project Water Quality Project Eagle Mountain: 2050 TP Loads City or Facility Current Load (lb/day) 5 3 15 1 10 5 13 0.2 0.4 0.1 1 1 1 4 60 Eagle Mountain: Cost Summary Loads at 2050 Flows (lbs/day) Level I 9 14 16 3 22 14 20 12 11 18 13 149 Level II 1 26 5 2 11 2 9 3 2 8 6 75 Level III 1 13 2 1 5 1 4 2 1 4 3 37 Increase or (Decrease) from Current Load 89 15 (23) Increase or (Decrease) in tons/yr 16 3 (4) Alvord Azle Bowie Boyd Bridgeport Chico Decatur Ft Worth Boat Club Garrett Creek Ranch Larry Buck RV Park Newark Paradise ISD Rhome Springtown Total Loads *Current and Level I loads based on average effluent concentration determined by nutrient testing City or Facility Alvord Azle Bowie Boyd Bridgeport Chico Decatur Ft. Worth Boat Club Garrett Creek Ranch Larry Buck RV Park Newark Paradise ISD Rhome Springtown Total Costs Costs Associated with Upgrades Level I $1,808,352 $13,544,093 $0 $0 $5,765,861 $2,056,421 $8,390,290 $0 $0 $0 $3,106,656 $2,137,565 $8,063,395 $4,750,402 $49,623,034 Level II $51,005 $255,024 $51,005 $102,010 $127,512 $51,005 $127,512 $0 $0 $0 $51,005 $51,005 $51,005 $51,005 $969,091 Level III $579,600 $1,761,984 $835,783 $586,555 $840,420 $630,605 $840,420 $0 $0 $0 $672,336 $605,102 $835,783 $835,783 $9,024,372 3